Volume II Page
Technical Specification
Pumping B1 B34–
Electrical Installation C1 C1 60
–
. Lift Installation D1 D3 –
Communication Installation E1 E8 –
Security System F1 F6 –
Gas Installation H1 H8 –
1.0 GENER AL
1.1 The following preambles shall be read in conjunction with their respective work
sections in the the Fixed Schedule of Rates. All rates contained in the Fixed Schedule
of Rates shall be held to include allowances for complying with the Preliminaries,
the Conditions of Contract, Specification and Preambles where applicable. Where
temporary works are required, e.g. planking and strutting, hoardings, etc the
Contractor shall be fully responsible for the design and adequacy of the system
installed and for ensuring that the system conforms to all existing regulations. All
rates in the Fixed Schedule of Rates are deemed to include allowances for
complying with the above requirements.
1.2 Before any works commence, the Contractor must inform the SO or his
representative and tenants of the premises. Failure to do so will render the
Contractor liable for all costs and consequences arising.
1.3 Unless otherwise specified in this Schedule of Rates, all measurement shall base
on the Standard Method of Measurement (SMM) of Building Works (Second Edition)
published by the Singapore Institute of Surveyors and Valuers. If there are any
discrepancies between the SMM and this Fixed Schedule of Rates, the latter shall
take precedence.
2.2 All rates in the Fixed Schedule of Rates are deemed to include provisions for general
facilities, transportation attending upon and making good after in all trades as may be
required to complete the works.
2.3 The items in connection with such facilities and attendances are for example, the
supply of water and electricity, locked up storage, security, lighting, temporary tracks
and access, tools and equipment, screens, ladders, trestles, safe custody of
materials, protection of the work, supervision, transportation, parking fees and
everything as stated in the Preliminaries.
S-1
2.0 GENERAL FACILITIES (CONT’D)
2.3 Allowance has also been made in the Fixed Schedule of Rates for extending the
Contractor’s facilities to contractors or persons directly employed by the Government
within the same premises. There is also allowance in the Fixed Schedule of Rates for
pre-inspection of the works by the Contractor or his representatives including
scheduling and organisation of the work and bringing to the attention of the SO any
defects or white ants detected or found within the same premises of work.
3.2 All necessary access in the form of temporary scaffolding, staging, etc for works up to
3.50m high shall be deemed to be provided by the Contractor at his own costs. For
works exceeding 3.50m high which require the usage of scaffolding, staging,
hydraulic platform, gondola, etc, these facilities shall be measured and paid
separately in accordance to the Fixed Schedule of Rates, Volume I, 2010 hereof
including the percentage adjustment tendered by the Contractor.
3.3 Where works require heavy machineries such as cranes, bulldozers etc, except
those specified and included in the respective works or rates and those that have
already been paid for, these machineries shall be measured and paid separately in
accordance to the Fixed Schedule of Rates hereof including the percentage
adjustment tendered by the Contractor.
3.4 Use of scaffolding, etc already provided for the works shall be permitted to all other
authorised sub-contractors, suppliers, specialists, artists and other tradesmen
whether directly employed by the Government or by the Contractor and to such
persons as the SO may direct.
3.5 No scaffolding, staging, etc shall be dismantled and removed away from the site
without the written permission by the SO. Should the Contractor strike any of his
scaffolding or removal of heavy machineries before ascertaining whether it is
required by any of his sub-contractor or persons or by any Public Authority, he must
re-erect it if so required at his own cost and expense.
3.6 Scaffolding, staging, gondolas and heavy machineries, etc used for the work shall
be of good quality and approved by the SO. Scaffolders and operators employed for
the works must be competent.
3.7 The Contractor shall be fully responsible for the design and safety of scaffolding,
staging, gondolas, heavy machines, etc which must conform to all existing
regulations and to obtain approval from the relevant authorities. Rates for
scaffoldings, gondolas, heavy machineries etc shall deem to include the above
requirements including preparation and submission of design details and structural
calculations and the Professional Engineer's fees where necessary.
S-2
3.0 SCAFFOLDING, STAGING, HYDRAULIC PLATFORM, GONDOLAS, HEAVY
MACHINERIES. ETC (CONT'D)
3.7 Rates for scaffolding, staging, gondolas, etc shall be deemed also to include for the
supply and installation of the system including work platform, temporary access,
base plates, anchorages, ladders, warning lights and signs, barricades, supervision,
maintenance, testing, shifting or manoeuvring plant over sites where applicable,
operators, fuel, insurances, etc and where applicable, dismantling and removal of the
system and making good work disturbed to match existing.
3.8 In the execution of works to external surfaces or part of the buildings or structure of
five storeys or above, the Contractor shall use travelling cradles, hanging platform,
gondola or other approved less labour-intensive or mechanised methods.
3.9 When requested, the Contractor must be able to furnish to the SO relevant
brochures, details and reports or certificates of any tests that have been carried out
to the access system or plant installed. It is the duty of the Contractor to ensure that
the whole of the access system installed or plant employed has been duly inspected,
tested and certified as safe by the Engineer before the system is actually put into use.
He shall also ensure that the access system installed or plant used are properly
maintained and regularly checked by the Engineer during the duration of the work
and that the mounting positions are shifted with care where applicable.
3.10 For gondola system and the like, he is required to complete the schedule (see
sample copy in the appendix) for each job.
3.11 All rates in the Fixed Schedule of Rates shall be held to include allowances for
complying the above requirements.
4.2 The Contractor shall pay all the customs and excise duties on the materials and
equipment supplied under the Contract and will be deemed to have allowed for all
payable duties at the time of tender.
5.2 The Contractor shall carry out the works in accordance with the Specification in the
best workmanlike manner and commercial practice and shall comply with the
following: -
a. All local regulations, safety codes and other relevant acts in force in
Singapore.
S-3
6.1 OPERATION AND MAINTENANCE MANUALS
6.2 The Contractor shall furnish four (4) bound copies of Operation and Maintenance
Manuals in English for all equipment supplied under this Contract. The Manual shall
be compiled on paper of A4 size and bound in hard covers appropriately labelled.
Information shall be organised in a neat and concise manner. It shall be properly
indexed and contain dividers with tabs between each section.
6.4.1 All pages shall be standard A4 size or multiples thereof. Any reduced size
pages shall be clearly legible at their reduced size.
6.4.2 All drawings, plans, electrical single line and circuit drawings shall be folded
and inserted in individual A4 size transparent plastic pockets which shall have
standard 3 hole (reinforced) side punching for insertion into binders. The
drawing number and drawing title shall be written on adhesive labels on the
face of each container pocket.
6.4.3 Binders shall be light blue (imitation leather-covered) hard covers with
standard (5mm high) gold block lettering of the O&M manual title embossed
on the bound edge and the front cover. Binders should have 75mm maximum
capacity with 50mm free extendibility, a centre locking post and 3 binding
copper screws and shall be approximately (not exceeding) 228mm by 300mm
in size.
6.5 G e ne r a l
6.5.1 The Operation and Maintenance Manual shall comprise the following: -
a Introduction
b Operating Instructions
6.5.2 The instructions shall provide sufficient information for personnel unfamiliar
with the installation to understand and operate the system in accordance with
proper-procedures, operating techniques, precautions and limitations. The
information shall as a minimum contain the following items: -
S-4
6.0 OPERATION AND MAINTENANCE MANUALS (CONT’D)
c Maintenance Instructions
vii A complete list of materials and equipment, type, rating and associated
information.
S-5
6.0 OPERATION AND MAINTENANCE MANUALS (Cont’d)
Project changes and variation works made after the distribution of the
Operation and Maintenance Manuals shall make it necessary to submit
the data as and when they are finished. In this case, 4 sets of the data
shall be submitted to the S.O. and they are to be segregated and each
document is to be clearly marked (Operation and Maintenance Manual
title, volume, section and page) for ease of proper insertion into the
Operation and Maintenance Manuals. New Table of Content, index
tables, plastic drawing pockets and/or additional binders are to be
prepared and distributed if deemed necessary.
For modification and improvement works carried out during the Defects
Liability Period (DLP), similar arrangements as detailed in above
paragraph shall be followed.
S-6
7.1 REOUIREMENTS FOR HAND-OVER
The Contractor shall be required to attend the handing over of the whole installation
to the User Department. He shall be responsible for starting-up the system at least
one hour before the appointed time of handover and shall ensure that the system
operation is satisfactory. He shall note and rectify as soon as possible all faults and
defects pointed out to him during this handover inspection.
7.3 Handover To The Government
7.3.1 After the handover to the User Department, the installation shall be subjected
to a trial run period of 20 days during which the system will be operated in the
manner for which it is designed. The trial run shall proceed without essential
trouble. Minor adjustments carried out during the trial run will not be
considered as disturbance. If more than two (2) shutdown per iods are
required during the otherwise normal operation of the system, or if any one
shutdown occurs for more than 24 hours, the trial run shall be considered as
interrupted and be repeated from the beginning.
7.3.2 The trial run shall begin on the date of handover or any other date thereafter
which is mutually agreed upon between the Contractor and the SO.
7.3.3 It shall be the responsibility of the Contractor to record, and inform the SO of
all adjustments and repairs carried out during the trial run, failing which the
trial would be considered as unsuccessful.
7.3.4 After a successful trial run, the Contractor shall arrange a date with the SO for
an official handover inspection of the installation. The installation will only be
accepted if all defects are rectified, all test results and as-fitted drawings and
documents are submitted to the SO. The twelve (12) months guarantee and
maintenance period will commence on the day of acceptance by the SO.
S-7
8.1 LICENSED SUB-CONTRACTORS
8.2.1 If in the sole opinion of the SO, the Sub-Contractor's performance fails to
satisfy him or commits an act of bankruptcy or cheating or any other serious
offences, the Contractor when so directed by the SO in writing shall at once
remove such sub-contractor from the works and he shall not again be
employed on the works without the written permission of the SO. Immediately
upon the removal of such sub-contractor, the Contractor shall replace him with
another subject to the SO's approval. The Contractor is not entitled for any
consequences caused by the removal of such Sub-Contractor. The work shall
be carried out strictly in accordance with the relevant by-laws and regulations
including new by-laws and regulations being introduced during the contract
period and, if the work fails to satisfy the local authority concerned, the
Contractor must rectify all faults at his own expense.
8.3.1 If the Contractor is not either licensed to carry out the gas services or
registered by the Building Control Authority (BCA) under the respective Head
for gas services, then the gas services must be sub-let to a Contractor who is
so registered under the same Head and the name of such Sub-Contractor
must be sent to the SO for approval within two (2) weeks from the date of site
possession. After the approval of the SO, such Sub-Contractor will be
regarded as an authorised Sub-Contractor under the Conditions of Contract.
The Sub-Contractor must employ licensed gas service worker to carry out any
gas works. The Contractor shall not change the name of such sub-contractor
without the approval of the SO.
8.3.2 If in the sole opinion of the SO, the Sub-Contractor's performance fails to
satisfy him or commits an act of bankruptcy or cheating or any other serious
offences, the Contractor when so directed by the SO in writing shall at once
remove such Sub-Contractor from the works and he shall not again be
employed on the works without the written permission of the SO. Immediately
upon the removal of such sub-contractor, the Contractor shall replace him with
another subject to the SO's approval. The work shall be carried out strictly in
accordance with the relevant by-laws and regulations including new by-laws
and regulations being introduced during the contract period and, if the work
fails to satisfy the local authority concerned, the Contractor must rectify all
faults at his own expenses.
S-8
9.1 TESTS AT MANUFACTURER'S WORKSHOP
9.2 All equipment shall be tested at the manufacturer's workshop before shipme nt or
transportation to site. All inspection, examination and testing shall be carried out
strictly in accordance with the latest Singapore Standards or such other Standards as
approved by the SO.
9.3 Before shipment or transportation to site of any equipment, the Contractor shall
submit four (4) copies of the Test Certificate for approval. The Test Certificate shall
give full details of the test, readings obtained, performance calculations, details
calibration, together with characteristics curves, etc. If the SO witnesses a test, he
shall be given a copy of the test certificate immediately. No materials or item of
equipment shall be sent to site until its test certificate has been approved by the SO.
9.4 The Contractor shall provide facilities for SO or his representative to witness tests at
manufacturer's workshop and shall bear the cost of all incidental, labour, materials,
facilities, etc. necessary to conduct the tests. In the event that the tests are to take
place outside Singapore, the Government will bear the cost of the return air
passages and subsistence allowances of the Officers.
10.2 Upon completion of the works and prior to handing over of the installation to the User
Department and the Government, the Contractor shall test the whole installation as
well as sub-systems and make good any defects to the approval and satisfaction of
the SO.
10.3 The types and methods of testing shall include but not necessarily be restricted to
those prescribed by the SO.
10.4 All test results shall be recorded and the cost of all test instruments and labour shall
be borne by the Contractor.
11.2 GENERAL
11.2.1 The following preambles shall be read in conjunction with their respective
trades in the Fixed Schedule of Rates. All rates contained in the Fixed
Schedule of Rates shall be held to include allowances for complying with the
following preambles where applicable.
11.3 FIXED SCHEDULE OF RATES
11.3.1 All rates shown against every item are fixed basic rates and no amendments
whatsover shall be made to such rates.
S-9
11.0 PREAMBLES FOR ALL TRADES (CONT’D)
11.2.2 The rates so set against each and every item shall be held to include the
supply, delivery and installation as specified, all labour and materials
establishment charges, profit preliminaries and generally and all other
consequential requirements unless otherwise stated.
11.2.3 The rates shall be used as the basis for progress payments and as the basis
for calculating the cost of any variation which may be ordered in accordance
with the terms of this Contract.
11.2.4 The Contractor shall be deemed to have made a close study of the rates, and
duly understood the concept of BASE RATES and their implication in this
Contract.
11 .2.5 The term "as specified" shall mean all that is written in this Specification.
11.2.6 Where the range of sizes is provided under the same item, the flexibility to
provide the required size shall be on the SO's instruction.
11.2.7 The Contractor is required to fill in the "Offered Make" whenever requested in
the rates. Failure to do so may render the tender incomplete and therefore
subject to rejection.
11.2.8All rates pertaining to labour and building works shall be referred to Fixed–
11.3.1 All supply and installation of electrical works, air-conditioning and mechanical
ventilation works, pumping system works, and piped gas installation shall be
based on the following specifications described in the contract documents.
11.4.1 If labour rates are used for Mechanical and Electrical works, it shall be based
on the labour rates in the Fixed Schedule of Rates, Volume I, 2010. The
Mechanical and Electrical works refer herein are air-conditioning and
mechanical ventilation works, pumping system, electrical works, lift
installation, communication, security system, fire protection system, gas
installation, carpark and auto-barrier system.
S-10
AIR-CONDITIONING AND MECHANICAL VENTILATION WORK
PARTICULAR REQUIREMENTS
1 SCOPE OF WORKS
1.1 The works embraced in this Contract comprise the supply and installation of
new, modification and repairing of existing air-conditioning and mechanical
ventilation works. These works shall include air conditioning equipments, fans,
dampers, ductworks, electrical and control panels, accessories, brackets and
supports, etc.
1.2 The Contractor shall carry out the works in accordance with the Specification in
the best workmanship like manner and commercial practice and shall comply
with the following:
a All current local regulations, safety codes and other relevant statutes in
force in Singapore.
the
American Sheet Metal and Air-conditioning Contractors' National
Association (SMACNA).
1.3 The works shall be executed to the satisfaction of the SO. The SO reserves the
right to instruct the Contractor to carry out the installation, cleaning and/or
repair works in any Government Buildings anywhere in Singapore including
off-shore islands of Singapore under SECTOR IV as may be required from time
to time.
1.4 The Contractor shall ensure that he is clear of the actual extent and nature of
works required under this Contract and shall clarify any doubt of the same with
the SO before the submission of tender. No claim arising out of the lack of
clarity or availability of information will be entertained.
S-11
AIR-CONDITIONING AND MECHANICAL VENTILATION WORKS
TECHNICAL SPECIFICATIONS
1 T E C H N I C AL S P E C I F I C AT I O N F O R AI R - C O N D I T I O N I N G AN D
MECHANICAL VENTILATION INSTALLATION
1.1 The Technical Specification shall be read in conjunction with this Tender
Document, the Conditions of Contract and all other documents in respect of this
contract.
'The Contractor shall supply, deliver and install extractor fans where directed by
the Engineer including the provision of all necessary material, labour, mounting
support/brackets, anti vibration mounting and electrical wiring run in surface
conduits up to the fan points provided by others. The extractor fans shall
comply with the following specifications: -
S-12
2 SPECIFICATION FOR OTHER MECHANICAL SYSTEMS (CONT’D)
Ceiling extract fans shall be selected suitable for operation on 230V/1 Ph/50Hz
supply. The fans shall consist of impellers, fan duct and grille moulded in
plastic. In addition, a back draught prevention shutter shall be provided and
installed as and when required by the Engineer at no price increase over the
contracted price for the fan. Resilient mountings shall also be provided for the
fan. All fan motors shall fully comply with BS2613 or BS170 and with IEC
publication 34-1. Motor insulation shall comply with Class E of BS2725 and IEC
Publication 85. All motors shall be totally enclosed in aluminium alloy and
suitable for continuous operation in ambient temperatures up to 40°C. The
motor bearings shall be self-aligning "Sealed for life" oil impregnated porous
bronze bushes with an ample oil reservoir. The sound level of the fans shall be
in the region of 50 to 60 dBA or below.
2.2.1 For larger fume extraction systems, corrosion resistant aerofoil axial-flow type,
Fume Handling fans shall be provided. Such fans shall have resistance to the
corrosive gases/reagents/chemicals and suitable for temperatures of up to
40°C.
2.2.2 Casing
The fan casing shall be of heavy gauge steel with a 3mm thick PVC lining over
all metal parts, including the flange facings. The outside of the casing is painted
with epoxy polyamide enamel. A sealed terminal box shall be fitted on the
casing and with a breather tube for the motor to breath.
2.2.3 Impeller
S-13
2 SPECIFICATION FOR OTHER MECHANICAL SYSTEMS (CONT’D)
2.2.4 Motor
2.2.5 Mounting/Installation
2.3 F u m e Cu pbo a rd Fa ns
2.3.1 Such fans shall have high resistance to the corrosive gases as listed below and
suitable for temperatures to 40°C. Smaller sizes up to 300mm diameter shall
have spigotted end for direct connection to fume cupboard, or PVC circular duct
by means of neoprene flexible connectors end hose clips.
2.3.2 Casing
Fan casing shall be of rigid PVC and have two extended ribs along its length,
pre-drilled to allow for fixing support brackets. The ends of the casing shall be
spigotted for attachment of neoprene (corrosion resistant) connectors. Such
duct/pipe connector together with the cupboard piece and sufficient hose clips
shall be provided for direct mounting of the fan to the circular PVC pipe and roof
of the fume cupboard respectively.
S-14
2 SPECIFICATION FOR OTHER MECHANICAL SYSTEMS (CONT’D)
2.3.3 Impeller
This shall be of moulded phenolic resin material and preferably aerofoil section
in construction to ensure non-leading characteristic. It shall be directly coupled
to the fan motor.
2.3.4 Motor
2.3.5 Mounting/lnstallation
S-15
2 SPECIFICATION FOR OTHER MECHANICAL SYSTEMS (CONT’D)
2.3.6.1 The Contractor shall supply and install round PVC ducts including elbows,
sockets, tees, etc for connection to fume cupboard/fume handling fans or
where directed by the Engineer.
2.3.6.2 The round PVC ducts shall have the following dimensions and thickness:
Minimum
Nominal Diameter Outer Diameter Thickness
2.4.2 The impellers shall be of steel construction comprising of four blades for 355 to
500mm diameter fans and three blades for 630 to 800mm diameter fans. Hubs
shall be of steel construction for 355 to 500mm diameter fans and of aluminium
construction for 630 to 800mm diameter fans. Hubs shall be secured to the
motor shaft with taper lock or equivalent.
2.4.3 Motors shall be totally enclosed, squirrel-cage induction type, of short length,
aluminium construction designed for efficient cooling and generously rated to
ensure reliability in service. Motors shall be rated for handling saturated air at
ambient temperatures up to 40°C. Insulation and rating is to BS 170 or BS 2613
and IEC 34-1 with protection to IEC 34-5, Group IP44. Single phase motors
shall be of the start-and-run type. All three phase motors shall be suitable for
direct-on-line starting. When motor exceeds 3.6 Kw, it shall be of star delta
type.
S-16
2 SPECIFICATION FOR OTHER MECHANICAL SYSTEMS (CONT’D)
2.5.1 Speed controllers for single phase and three phase motors shall be of the same
make as the extractor fans and suitable for operation on 50Hz power supply.
2.5.3 Three speed controller shall have a rotary switch giving full-speed and off, and
four stepped speed reductions down to 20-30% of full speed. The controller
shall be housed in a die-cast aluminium alloy or pressed steel casing. The
current rating for each extractor fan shall be as recommended by the
manufacturer of the fan.
2.6 PVC T ru n k in g
2.6.1 The PVC trunking shall be PSB approved, of flame retardant and of adequate
mechanical strength. The covers shall be snap-lock and shall be so constructed
that they remain secure without deflection even when the maximum allowance
number of cables are accommodated.
Regulating unit shall operate on 24/230 VAC power supply and of the reversible
motor type incorporating built-in positioner. The fitting of the end positions of the
motor drives, the zero point and the span shall be available and adjustable on
the positioner.
S-17
2 SPECIFICATION FOR OTHER MECHANICAL SYSTEMS (CONT’D)
The control modulating valves shall be sized for a pressure drop of not more
than 42 kPa at full capacity. Valve shall be rated for a minimum pressure of
1600 kPa. The valves shall have single seated stainless steel plug wit h
travel position indicator and provide equal percentage characteristic of flow.
The flow through the 3-way valve shall remain constant regardless of valve
position. Valve body shall be bronze screwed for sizes 75mm and below
and cast iron flanged for six 100mm and above. The control valve shall be
quiet in operation.
2.9.1 The PLC control system shall consists of a master control station (located in
the General Office) and remote local stations. Failure of any PLC stations
shall not affect the manual operation of all equipment. Every PLC shall have
additional slots for future expansions (30% spare).
2.9.2 Hardwire link-ups from equipment to the PLC exceeding 10m are not
allowed. Instead, terminal devices which allow high -speed signal
transmission shall be used.
2.9.3 The central monitoring shall be a 10” active-control colour touch screen
programmable terminals located in the General Office.
2.9.4 The following points are to be monitored and controlled by the remote local
station.
S-18
2 SPECIFICATION FOR OTHER MECHANICAL SYSTEMS (CONT’D)
2.9.5 The following points are to be monitored and controlled by the master
control station.
Equipment Run/Start Run/Start Fault Power Low High High
Control Status Trip Supply Water Water Temp
Alarm Status Level Level Status
Alarm Alarm
Per Booster Pump 2 1
Per Hosereel Pump 2 1
Per Storage Tank 1 1
Toilet Exhaust Fan 1 2 1
Kitchen Exhaust Fan 1 2 1
Per VRV Air-conditioner 2 1 1
Per Air-Cooled Package 1 2 1
Unit
2.10.1 The Controllers shall be of modular and compact type suitable for panel
mounting. Controllers shall be multi-range function with integral digital
indicator. Selection of sensor input type and range shall be selectable
through dip switches. Adjustment of the zero point and the span range shall
not be acceptable.
2.10.2 The Controllers shall operate on 24VAC power supply and have a
continuous DC output of 2 to 1 0V. The single DC output shall be capable of
several regulating units tied together to obtain different control sequences.
2.10.3 Each controller shall be equipped with local or remote one-touch shift of 3
set- point values to make over-ride changes of set point from the controllers.
2.10.4 The facilities for set-point, room temperature set-point compensation range
and integral action time are to be included and capable of adjustment on the
front panel without opening the control panel. Digital indicator shall be
4-digit 7-segment LED type or equivalent, integral with the controller.
S-19
2 SPECIFICATION FOR OTHER MECHANICAL SYSTEMS (CONT’D)
The Contractor shall supply and install Programmable Timer as the Central
Control Console for the automatic start/stop of the refrigeration plant and all
air-handling units. The Programmable Timer shall have the following
functions and features: -
a) 7 day p ro gramming.
b) 365 days calendar with leap year automatic adjustment. (Correction up
to the year of 2100 AD).
c) 32 holidays duration per year
d) 20 On/Off event per unit circuit (Total of 240 events)
e) 12/24 hour clock
f) Repeat Pro gramming
g) Ma n u a l Ove rride
h) Duty Cycle Programming
i) Battery powered carryover of minimum four (4) months accumulated
outages.
2.12 Cleaning
The entire grille and diffuser surfaces, adjustable vanes and louvers shall be
wiped clean with damp cloth and then wiped with dry cloth. Care must be
taken not to scratch and scrape off the paintwork. Volume control damper
adjustment shall not be tampered with.
Extractor fans shall be completely removed from its mounting for proper
cleaning. The fan impellers and motors shall be wiped clean with damp cloth
and then wiped with dry "cloth. The shutters, outside louvres and brackets
shall be washed in soapy water, thoroughly rinsed and then wiped dry. The
Contractor shall then assemble and install back the extractor fan to its
original position including connection of wires. Care must be taken to ensure
that the direction of rotation is correct in the case of three-phase motors.
The Contractor shall not tamper with the pitch angle adjustment, if any, of
the fan or attempt to remove the impellers from the motors. The Contractor
shall also ensure that the fans are properly fixed back with original
anti-vibration mounting.
S-20
2 SPECIFICATION FOR OTHER MECHANICAL SYSTEMS (CONT’D)
2.13.1 Duct mounted smoke detector shall have adjustable sensitivity setting and
be completed with integral power supply unit suitable for 230V 50Hz
operation and relay contacts for alarm and trouble condition monitoring and
control. Alarm status and power supply indicating lights shall be visible on
the front of the detector. All duct mounted smoke detectors shall be
furnished with air sampling tubes extending through the width of the air duct.
The smoke detectors shall be of either ionisation type or photoelectric type.
2.13.2 The Contractor shall supply and install smoke detectors for air - cooled
ducted packaged units. Where the return air is brought to the unit by a return
air duct, a duct mounted smoke detector is to be used. Where there are two
or more return air ducts entering the air-conditioning plant room, a duct
mounted smoke detector shall be installed for each duct.
2.13.3 On activation of the smoke detector, the unit shall be shut down and an
alarm light shall appear on its local control panel. The unit shall only be
restarted with a manual reset button.
2.14 Drawings
2.14.1 As and when instructed by the SO the Contractor shall undertake the
followings:
S-21
2 SPECIFICATION FOR OTHER MECHANICAL SYSTEMS (CONT’D)
2.14.3 The Contractor shall ensure that, as far as possible, the drawing can fill up
most of the space on the paper/negative/print leaving only adequate space
for the boundary. Determination of the drawing format shall lie as tabulated
below:
less than A3 A3
between A3 and A2 A2
between A2 and A1 A1
between A1 and A0 A0
more than AO A0
1 Negative $ 25.00
2 Linen-backed Prints $ 50.00
$130.00
2.15.1 Where the height of work using step ladders/extension ladders or tower
ladders exceed more than 3.5 metres, the Contractor shall make use of
scaffolding, staging and elevated platform. The Contractor shall claim for
work that is 3.5m and above, but not less.
2.15.2 The Contractor shall seek the approval of the SO if the access of high
places requires the hiring of truck crane. The Contractor shall hire the
telescopic boom range truck crane which is capable of reaching distance in
the range of about 30m to 50m.
S-22
PUMPING
PARTICULAR REOUIREMENTS
1 SCOPE OF WORKS
1.1 The scope of work for the pumping system shall include but not limited to the
following equipment: -
a. E le c t ric m o t o r d ri v e n p u mp s e t s ;
e. Conduits and control wirings from the various control panels in the
pump rooms to the consolidated indicating lamps and alarm panel;
1.2 T he Contractor shall carry out the works in accordance with the
Specification in the best workmanlike manner and commercial practice and
shall comply with the following:
a. All current local regulations, safety codes and other relevant statutes in
force in Singapore.
S-23
1 SCOPE OF WORKS (CONT’D)
1.4 The tenderer shall ensure that he is clear of the actual extent and nature of
works required under this Contract and shall clarify any doubt of the same
with the SO before the submission of tender. No claims arising out of the
lack of clarity or availability of information will be entertained.
2 OPERATION INSTRUCTIONS
b. S t a rt u p s e qu e n c e o f o p e ra t io n ;
3 CONTROL PANELS
The Contractor shall ensure that only weatherproof control panels shall be
used if the panels are located outdoors.
S-24
TECHNICAL SPECIFICATION
1 GENERAL
All materials and equipment supplied shall be new and of best quality in
design and manufacture.
Only PSB approved fittings, appliances and pipes shall be used for the
water pumping installations.
All works shall be carried out to the best accepted engineering practice by
fully competent tradesmen.
All pumps offered shall be tested at the factory to confirm performance data
and hydrostatically tested for at least 5 minutes at 17 bars (250 psi) or 1.5
times the maximum working pressure, whichever is greater. Certified shop
test results shall be submitted to the SO.
The Contractor shall supply all materials and equipment and shall perform
any work which is necessary to the effective functioning of the installation
even though such materials or works may not be explicitly mentioned in the
specifications.
S-25
2 PERFORMANCE REQUIREMENTS
2..1 All pumping systems shall meet the minimum performance requirements spelled
out below. All components shall comply to the clauses in the Technical
Specification with regards to the design, construction and materials used.
2.2 All pumps and motors shall be suitably selected such that the maximum
noise level during operation shall not exceed 65 dBA at 1 m distance.
2.3 Every pump shall be provided with an automatic relief valve (20mm
diameter) set below the shut-off pressure at minimum expected discharge
pressure. It shall provide circulation of sufficient water to prevent the pump
from overheating when operating with no discharge. The relief valve shall
come with two gate valves and 50mm diameter discharge pipe leading back
to the suction tanks.
2.4 Efficiency of each pump at the operating flow rate and pump discharge need
shall not be less than 55%.
2.5 The speed of each pump shall be less than 2,900 rpm.
3.1 Each water pressure booster system shall consist of two (2) units
automatically controlled electric pump sets, two units pressure control
switch providing operating control, automatic/manual reset limit protection.
a The pumps shall be suitable for pumping potable water and flush
water.
b Each pump shall have stable characteristics and the operating point
shall fall within the acceptable range on the pump curve.
d Pumps shall have cast iron casings, bronze impellers and BS 316
stainless steel shafts.
S-26
3 COLD WATER PRESSURE BOOSTER SYSTEM FOR FLUSH WATER
AND POTABLE WATER (CONT’D)
f Each pump shall be of balanced flow design, space saving and shall
operate near its maximum efficiency over the specified range of
operation and be designed to give minimum noise, no vibration and no
pitting.
a Each pump and motor shall be coupled through flexible coupling and
mounted on to a mild steel base plate.
b The base plate shall be supported with two mild steel channel sections
welded lengthwise on the sides of the plate in such a way as to
facilitate easy installation on to foundation bolts.
S-27
3 COLD WATER PRESSURE BOOSTER SYSTEM FOR FLUSH WATER
AND POTABLE WATER (CONT’D)
b The tanks shall be mounted parallel with the pump sets. Each tank
consists essentially of a pre-pressurized tank with a sealed-in
diaphragm that prevent contact of the water with air. The tank shall
have a capacity that shall provide smooth discharge of water to the
water service installation as well as to limit the number of start/stop of
the pumps to no more than six per hour. The pressure rating of the tank
and the sealed in diaphragm shall be able to withstand at least 1 1/2
times of the maximum pressure of the pump sets supplied.
i Manual Mode
i. Automatic Mode
S-28
3 COLD WATER PRESSURE BOOSTER SYSTEM FOR FLUSH WATER
AND POTABLE WATER (CONT’D)
4.1 The direct transfer pumping system shall pump water from the low level
tanks to the high level tanks.
b. Level switches mounted on high level tanks for control and low level
tanks for automatic shutdown.
c. One control panel complete with control cabling from the control panel
to all level switches;
c. Pumps shall have cast iron casings bronze impellers and BS 316
stainless steel shafts.
S-29
4 DIRECT TRANSFER PUMP SYSTEM (CONT’D)
f. Each pump set shall operate under all conditions. Pump body shall be
of robust construction, corrosion and wear resistant. The pumps shall
have minimum rotating assembly
g. Each pump set shall operate near its maximum efficiency over the
specified range of operation and be designed to give minimum noise,
no vibration, no cavitations and pitting.
b. Each pump shall be capable of delivering the specified flow rate and
head subject to variable positive suction head.
c. The high level tanks shall have four pre-determined control levels
serving the following functions: -
L e ve l 2 - s t a rt d u t y p u m p L e ve l
3 - s t a rt b o t h p um p Level 4 -
S-30
4 DIRECT TRANSFER PUMP SYSTEM (CONT’D)
The low level tank (suction) shall have two predetermined control levels
serving the following functions: -
Level 2 - reset
e. The two duty pumps shall alternate as Duty and Standby units using an
automatic changeover relay.
f. Manual selector switch shall be incorporated to select any of the
pumps as the standby unit.
g. In the event that anyone duty pump failed to start, or trip while in
operation, the standby pump shall take over automatically after a
pre-set time delay.
4.5 Alarms
b pump fault
S-31
5 HOSEREEL PUMPING SYSTEM
5.1 The hosereel pumping system shall consist of two (2) units automatically
controlled electric pump sets, one pipeline pressure unit and two (2) units
pressure control switch providing operating control, automatic/manual reset
limit protection.
c. Pumps shall have cast iron casings, bronze impellers and BS 316
stainless steel shafts.
f. Each pump set shall operate under all conditions. Pump body shall
be of robust construction, corrosion and wear resistant. The pump
shall have minimum rotating assembly.
g. Each pump set shall operate near its maximum efficiency over the
specified range of operation and be designed to give minimum noise,
no vibration, no cavitations and pitting.
S-32
5 HOSEREEL PUMPING SYSTEM (CONT’D)
b. The air pressure tank shall be mounted parallel with the pump sets. It
shall consist of a pre-pressurized tank with a sealed-in diaphragm
that prevent contact of the water with air. The tank shall have a
capacity that shall provide smooth discharge of water to the
hosereels of the system. The pressure rating of the tank and the
sealed-in diaphragm shall be able to withstand at least 1 1/2 times
the maximum pressure of the pump sets supplied.
i.Manual Mode
ii.Automatic Mode
S-33
5 HOSEREEL PUMPING SYSTEM (CONT’D)
c. If the duty pump does not raise the pressure in the pipeline
after the call in from the first pressure switch, the standby
pump shall be started by the second pressure switch after a
time period;
6.1 General
The submersible pumps are to be installed in the pump sump for pumping
drainage water from the sump into the discharge chamber. The system shall
comprise of two (2) units pump sets, stainless steel float switches, electrical
and control wiring and all associated pipe work.
S-34
6 SUBMERSIBLE DRAINAGE PUMPING SYSTEM (CONT’D)
c. In the event that the duty pump fails to start or is tripped, the standby
pump shall take over as the Duty pump automatically.
d. When the water level exceeds the design top water level, both pumps
shall operate at the same time.
6.6 Approval
S-35
6 SUBMERSIBLE DRAINAGE PUMPING SYSTEM (CONT’D)
The Contractor shall arrange with ENV to carry out inspection and test and
to approve the whole installation before the whole project is completed. All
fees involved shall be borne by the successful contractor, including the
Professional Engineer's fee.
The whole work shall be carried out in accordance with the Sewerage
Procedures and Requirements (Ministry of the Environment) and to the full
satisfaction of the relevant authority (Sewerage Department) and the SO,
who reserves the right to reject wholly or partly the work if in their, opinion
the materials used and workmanship are unsatisfactory.
7.1 The submersible pumps are to be installed in the pump sum for pumping
sewage water from the sump into the discharge chamber. The system shall
comprise of two (2) units pump sets, stainless steel float switches, electrical
and control wiring and all associated pipe work.
c. The estimated capacity and total head of each pump shall be about
as stated in the performance requirements. These performances
shall be checked and verified by the registered Professional
Engineer employed by the Contractor.
e. Each pump shall operate near its maximum efficiency over the
specified range of operation and be designed to give minimum noise,
vibration and pitting.
S-36
7 SUBMERSIBLE SEWAGE PUMPING SYSTEM (CONT’D)
i. Each pump shall be able to cope with 100% of the design inflow rate.
S-37
7 SUBMERSIBLE SEWAGE PUMPING SYSTEM (CONT’D)
A suitably sized control panel shall be provided in the Pump House 1500mm
above floor level, facing outwards and provided with a padlock. Its
construction and contents shall be as specified.
One (1) lot cast-iron inlet, discharge and vent pipe work complete with all
necessary fittings and valves shall be provided and installed as shown in the
tender drawing. Flexible rubber sleeve and hose clamps shall also be
provided for the inlet and outlet pipe.
The whole work shall be carried out in accordance with the Sewerage
Procedures and Requirements. (Ministry of the Environment) and to the full
satisfaction of the relevant authority (Sewerage Department) and the SO,
who reserve the right to reject wholly or partly the work if in their opinion the
materials used and workmanship are unsatisfactory.
7.7 Approval
The Contractor shall arrange with ENV to carry out inspection and test and
to approve the whole installation before the whole project is completed. All
fees involved shall be borne by the successful contractor, including the
Professional Engineer's fee.
S-38
8 CONSOLIDATED INDICATING LAMPS AND ALARM PANEL
b. Pump 'run' and 'fault' condition (one set for each pump)
c. Low and high water level alarm (for all water sumps and water tanks)
Instructions
a. Healthy Conditions
b. A c t i o n s
ii. To cancel the 'Alarm' set the 'Bell Isolator' switch to 'OFF'
position.
..
S-39
8 CONSOLIDATED INDICATING LAMPS AND ALARM PANEL
(Cont'd)
Instructions (Cont'd)
All electrical wiring from the control panel inside the pump room to the
indication panel shall be run in 20mm concealed conduit.
9 ELECTRICAL REQUIREMENT
9.1 General
All electrical installation works shall meet the requirement of the Singapore
Standard CP5: Wiring of Electrical Equipment of Buildings and the
Electricity Regulations of the Public Utilities Act.
All cables used shall be of 600/1 000V grade. The minimum cross-sections
of cables for power circuits shall be 2.5 sq mm and for control circuits shall
be 1.5 sq mm. The conductor of the cable shall be of high conductivity
annealed copper to BS 6360 or approved equivalent standard.
The power and control cables shall be segregated and run in separate cable
trays/trunki ng/conduits.
All cables drawn into conduit systems or laid in trunking shall be PVC
insulated cables conforming to SS 358 and BS 6231 or approved
equivalent.
9.3 Trunking
All cable trunking shall be manufactured and tested to SS249: steel surface
cable trunking and accessories.
S-40
9. ELECTRICAL REQUIREMENT (CONT’D)
Trunking and fittings shall have removable lids extending over their entire
lengths. The lids shall be of the same material, thickness of sheet and finish
as that of the trun king.
Trunking shall be run neatly on the surface of the building and truly vertical,
horizontal or parallel with the features of the building and at least 150mm
clear of plumbing and mechanical services.
9.4 Conduit
Conduit runs shall not obstruct equipment and shall be run neatly and truly
vertical, horizontal or parallel with the features of the building. Written
approval of the positioning of trunking and conduit runs shall be obtained
from the SO before the installation of any trunking or conduit commences.
No cable shall be drawn into the conduit system until all conduits including
the draw-in boxes have been fixed in place.
S-41
9 ELECTRICAL REQUIREMENT (CONT’D)
a. Type : Automatic
S-42
9 ELECTRICAL REQUIREMENT (CONT’D)
9.7 Fuses
All fuses used on power circuits and directly connected control circuit shall
be of the general purpose, cartridge type with high rupturing capacity (HRC)
and shall fully comply with BS 88 or approved equivalent.
Separate fuse protection shall be provided for each circuit and fuse ways
shall be clearly marked to show the circuit that is protected and the rating of
the cartridge fuse link fitted.
9.8 Contactors
Indicating lamps shall be arranged so that the bulbs may be replaced from
the front. They shall have shallow bezels which incorporate plastic lenses of
the specified colour.
Engraved legend plates shall be fitted with all pushbuttons, indicating lamps
and key switches. The minimum character height shall be 5mm.
S-43
9 ELECTRICAL REQUIREMENT (CONT’D)
Operating knobs shall be of the type which positively indicate the position of
the switch. The switch positions shall be clearly marked on engraved legend
plates.
They shall be of a totally enclosed type and their operation shall not be
impaired or prevented by external interference.
9.13 Meters
Meters and relays for external panel mounting shall be of the flush pattern,
with square escutcheon plates finished matt black and pressed steel cases.
Indicating instruments shall be to BS 89 1st grade or approved equivalent
standards moving iron spring controlled with 100mm diameter dials (240
scale) with external zero adjustment, integrating meters shall be to BS 37
Parts 1 and 2 and Part 4 or approved equivalent standards with cyclometer
registers and protective relays to BS 142 or approved equivalent standards.
All the measuring meter shall be calibrated by the relevant local testing
authority before installation, testing certificates from the relevant authority
on the calibration shall be submitted to the SO. All cost associated with the
calibration by local authority shall be deemed to be included in the contract.
9.14 Relays
S-44
9 ELECTRICAL REQUIREMENT (CONT’D)
Relays contacts shall be suitable for making and breaking the maximum
current which they may be required to control in normal service but where
the contacts of the protective relays are unable to deal directly with the
tripping current, approved auxiliary contractors relays or auxiliary switches
shall be provided. Separate contacts shall be provided for alarm and tripping
functions. Relays contacts shall make firmly without bounce and the whole
of the relay mechanisms shall be as far as possible unaffected by vibration
or external magnetic fields.
Relays with provision of manual operation from outside the case, other than
resetting, will not be accepted, and time delay relays shall not be of the
dashpot type.
Approved means shall be provided on the relay panels for the testing of
protective relays and associated circuits, withdrawable type cases and
plug-in type test facilities being preferred.
S-45
9 ELECTRICAL REQUIREMENT (CONT’D)
All relays shall be heavy duty pattern, unaffected by external vibration and
capable of operation in any position. Meter panels shall be hinged to
provide ready access to connections and small wiring shall be enclosed in
flexible plastic conduit. All meters and relays shall be fully tropicalised. All
terminals shall be completely insulated and potential circuits shall be
suitably fused.
Current transformer shall have short circuit rating not less than those of the
circuits with which they are concerned. They shall be of the air-cooled type
and encapsulated in case epoxy resin. Current transformers supplied with
measuring instruments shall have Class 1 accuracy in BS 3938 or approved
equivalent and all protective current transformers Class SP or Class 10P
accuracy in BS 3939 or approved equivalent according to the requirements
of the associated protective systems and relays. Each current transformer
shall be capable of supplying the necessary energy to operate the
correlated instruments and protective functions.
The control panel shall be fabricated from mild steel sheets of 14 gauge and
be adequately braced to form a rigid housing and be damp-proof and
rustproof. Cubicles shall be of Hanger-make or approved equivalent.
S-46
9 ELECTRICAL REQUIREMENT (CONT’D)
It shall incorporate all the electrical components necessary for the automatic
operation of the system, including motor starting equipment, control
transformer and programmable controllers etc.
It shall be designed for wall mounting with an access door which is hinged
and fitted with an approved lock.
b. Pump 'run' and 'fault' condition (one set for each pump)
The motor starters shall be approved reputable make, suitably rated for the
motor.
Each and every motor shall be protected using suitably rated rupturing
capacity Moulded Case Circuit Breaker (MCCB). Every control circuit shall
be protected using Miniature Circuit Breaker (MCB).
S-47
9 ELECTRICAL REQUIREMENT (CONT’D)
Each pair of wirings in the control panels shall be labelled with identification
tags of at least 25mm x l0mm in size. All wiring shall be neatly arranged and
tied together in small bundles.
All instruments, indicating lights, switches on the front of the control panel
shall be labelled with engraved lettering of at least 12mm high letterings.
Each cable compartment shall have sufficient space for cable terminations.
Blank gland plates for top entry incoming cables shall be provided for drilling
to suit incoming cables at site. Where single conductors cables are used,
means shall be provided to reduce eddy-current heating in plates.
S-48
9 ELECTRICAL REQUIREMENT (CONT’D)
10 CONTROL EQUIPMENT
10.1 General
Water level switches shall be of stainless steel electrode type for all
pumping systems except for drainage water pumping system where
stainless steel mercury float level switches of approved type and
manufacture shall be used.
11 PIPEWORK
11.2 Materials
a. Marking
All parts, where applicable, shall be legibly marked with the following:
S-49
11 PIPEWORK (CONT’D)
b. Only approved fittings, appliances and pipes shall be used for the
water service installation.
d. Valves
e. Flexible Connection
f. Pressure Gauge
S-50
11 PIPEWORK (CONT’D)
h. Copper Pipes
S-51
11
PIPEWORK (CONT’D)
11.3
Table for maximum distance between supports
Ductile-Iron
Galvanised Pipe or cast
Pipe Steel Pipe Iron Pipe Copper Pipe
Nominal Hori- Hori- Hori-
Size zontal Vertical zontal Vertical zontal Vertical
(mm) Run(m) Run(m) Run(m) Run(m) Run(m) Run(m)
75 2.7 2.7
S-52
11.4 Clearance for maintenance
12.1 The entire pumping systems shall be installed in accordance with good and
sound engineering practice:
13.1 The work specified in this section includes the painting and identification of
all the Works in this Contract, including but not limited to: -
a. p a in t in g o f e qu ip me n t a n d p ip in g
b. pipe markers
c. e qu ip m e n t n a me p la t e s a n d la b e ls
d. va l ve id ent if ic at ion
e. le a t h e r s t ra p s wit h lo c k s / k e ys
f. c h a in s wit h p a d lo c k s / k e y s
S-53
13 PAINTING, COLOUR CODING AND LABELLING (CONT’D)
All valves on the fire-fighting pipelines including those valves which affect
the performance of the fire-fighting installations shall be padlocked open or
closed as appropriate using leather straps.
All valves shall be labelled by painting the valve with identification numbers
or fixed with identification tags. The size of the letterings and tags is to be
decided by the SO.
14.1 The Contractor shall be responsible to carry out testing of the pump sets
after installation is completed and shall supply all the necessary testing
equipment and measuring instruments required for the testing and for the
recording of test results.
S-54
14 TESTING AND COMMISSIONING (CONT’D)
14.2 When all the necessary tests on the pump sets have been completed to the
entire satisfaction of the SO, the I Contractor shall commission the pump
sets for official handover to the user department in the presence of the SO.
The pumps are expected to be in perfect operational condition by then.
14.3 The Contractor shall ensure that the installation is commissioned in the
presence of the relevant authority's representative (Fire Service Bureau for
fire-fighting pumps) and the SO.
14.4 The testing and commissioning procedure shall include, but shall not be
limited to the following operational tests: -
b. All water service and distribution pipes and pumps shall be subjected
to a hydrostatic test pressure of 12 bars or 11/2 times the maximum
working pressure, whichever is greater. The test period shall be two
(2) hours during which no leakage is allowed.
c. All pumps shall be tested to confirm that the operating head and flow
rates are in accordance with the operating characteristics as
submitted. The pump speed, suction pressure and discharge
pressure of each test point shall also be recorded. Flow meters and
pressure gauges shall be provided and installed temporarily to record
the test results.
e. All pumps controls shall be tested for correct oper ation and
sequencing. Pump 'cut in' and 'cut out' pressures and water levels
shall be adjusted and recorded.
f. All fire pumps shall be tested in accordance with the test procedure
as spelled out in NFPA 20 Standard For Installation Of Centrifugal
Pumps or approved equivalent.
S-55
14 TESTING AND COMMISSIONING (CONT’D)
This section sets out the Contractor's responsibility for the. maintenance
and servicing of the pumping installation during the maintenance period.
During the maintenance period, the Contractor shall carry out servicing and
maintenance of the entire pumping installation.
The Contractor shall prepare a detailed inspection and service report form
showing the functions to be carried out and the intervals between each
function to enable records of servicing to be maintained. The functions shall
include all the maintenance responsibilities outlined herein for each specific
system plus any other special maintenance requirements recommended by
the equipment manufacturers. The inspection and servicing report duly
signed by the user department shall be submitted to the SO every quarter of
the year during DLP.
The Contractor shall inform the SO within the last week of the quarter, the
date and time for the next quarterly, servicing of the installation.
During the maintenance period, the Contractor shall attend to any complaint
calls promptly at no expense to the Government. After the attendance to a
complaint call and the completion of the necessary repair work, a copy of
the fault report or service chit duly signed by the user department shall be
forwarded to the SO for information and record.
The Contractor shall be responsible for the conduct and behaviour of his
workmen. Upon arrival at the user department for servicing or repair works,
the workmen shall inform the officer-in-charge or duty officer in the
department of the purpose of their visit. The Contractor shall ensure that
minimal inconvenience is caused to the user department in the course of
their work.
S-56
WATER PUMPS, HOSEREEL PUMPS, TRANSFER PUMPS, SUBMERSIBLE
DRAINAGE PUMPS & SEWERAGE PUMPS
Frequency
Points to be checked and serviced Every Every Every
3 months 6 months 12 months
1. T e s t ru n of pu m p s x
9. Clean strainers x
S-57
ELECTRICAL COMPONENTS
Frequency
Check Item/Maintenance Requirement Every Every Every
3 months 6 months 12 months
5. C h e c k t h e s y s t e m o p e r a t io n a n d x
control
11. C h e c k c u r r e n t / v o l t a g e r e a d i n g s x
during pump operation
12. I n s p e c t a l l a m m e t e r s , v o l t m e t e r s x
and re-calibrate
S-58
OTHER COMPONENTS
Frequency
Check Item/Maintenance Requirement Every Every Every
3 months 6 months 12 months
1. Level Switches x
2. P r e s s u r e T a n k s
3. Pressure Switches x
S-59
ELECTRICAL INSTALLATION
PARTICULAR REQUIREMENTS
1 SCOPE OF WORKS
The works embraced in this Contract comprises the supply and installation of
new, modification and repairing of existing electrical works. These works
shall include equipments, devices, fittings, accessories, electrical and control
panels and devices, brackets and supports, etc
The Contractor shall carry out the works in accordance with the Specification
in the best workmanlike manner and commercial practice and shall
comply with the following:
a. All current local regulations, safety codes and other relevant statutes in
force in Singapore.
The tenderer shall ensure that he is clear of the actual extent and nature of
works required under this Contract and shall clarify any doubt of the same
with the SO before the submission of tender. No Claim arising out of the lack
of clarity or availability of information will be entertained.
S-60
1 MATERIALS
1.1 All materials shall be new and unused. All equipment and materials previously
installed or used shall be rejected. Materials and equipment shall be stored in
such a manner as to be in a new condition when installed and to avoid damage
from weather and site conditions. Damaged, deformed and cracked equipment
or materials shall be rejected. Replacement shall be the responsibility of the
Contractor at no additional cost to the Government.
1.2 Materials and equipment to be incorporated into the Works as called for in this
specification are required to meet the quality/testing standards of designated
institutes, societies and standard associations. However, equivalent materials,
and equipment items meeting other authoritative standards, which ensure an
equal or higher quality than the standards mentioned may also be accepted, if
the SO gives his approval.
1.3 Should the Contractor propose to furnish materials and equipment other than
those specified, as permitted by the "or approved equivalent" clause, he shall
submit a written request for any such substitution. Such requests shall be
accompanied by complete descriptive (manufacturers, brand name, catalogue
number, etc) and technical data for all items, samples of both the specified and
the proposed substitute items.
1.4 Where such substitutions alter the design or space requirement indicated on
the plans, the Contractor shall include all items of cost in the revised design and
construction including the cost of all allied trades involved.
1.6 The expenses incurred by any such exercise shall be borne in full by the
Contractor.
2.1.1 The Contractor shall supply and install distribution boards at the location as
instructed on site or on the sketches or drawings. Drawings detailing the
essential dimensions and layout of the switchgears and bus bars together with
component list shall be approved by the SO before fabrication.
S-61
2 ELECTRICAL DISTRIBUTION EOUIPMENT (CONT’D)
2.1.2 The Contractor shall be required to take site measurements and take note of all
constraints affecting the actual dimensions of the Distribution Board and any
difficulties involved.
2.1.3 Distribution boards shall be of wall mounted, totally enclosed, front connected,
cabinet type. Knockouts shall be provided for cable entries. The front shall be
covered by a metal door with hidden hinges and chrome-plated lockable
handle. Approved type gaskets shall be provided between all doors and covers
and the cabinets. They shall be constructed of the stove enamel or epoxy
powder coated GI sheet of not smaller than 16 gauge, welded to form a rigid
and robust unit capable of withstanding, without any deformation or warping the
electrical and mechanical stresses which they are likely to experience in normal
service and under short-circuit conditions.
2.1.4 All isolators, fuse switches or MCCBs, etc used as switchgears for the boards
shall form part of the distribution boards and busbars of all distribution boards
shall have a rating of not less than their incoming gear. No cables shall be used
in lieu of busbar without the approval of the SO.
2.1.5 Miscellaneous distribution board wiring shall be carried out using approved
switchboard wiring coloured for easy identification. Adequate lengths of cables
shall be provided to facilitate re-arrangement of circuits within the distribution
board if required. Neutral bars and earth shall be of copper and of square or
rectangular cross-section, and shall be provided with adequate number of
terminal cable lugs and bolts.
2.1.6 The distribution boards shall be constructed in accordance with current Power
Grid regulations and relevant British Standard Specification, and busbar shall
be painted and marked to comply with standard codes and practice.
2.1.7 Each item of equipment shall be clearly labelled with engraved black Perspex
labels with white vertical lettering, and a schedule of circuits is to be mounted
on the back of the board covers. Colour of distribution board shall be semi-glass
grey or other approved colour.
S-62
2 ELECTRICAL DISTRIBUTION EOUIPMENT (CONT’D)
2.2.1 Fuse switches and isolators shall be of totally enclosed, metal-clad, double
break and quick action type. They shall comply fully with BS 3189 and shall
have a breaking capacity of not less than 31 MVA at 415 volt at 50 Hz certified
by ASTA or other recognised testing authority.
2.2.2 The metal boxes shall be made of best quality mild steel sheet of adequate
thickness. They shall be so arranged that the front surface of the unit is flat and
flush with the front face of the switchboard, the only permissible projection
being an operating handle, which, however, should preferable be of a type
which retract into the unit when not in use. Each pole of the switch should be
double break.
2.3 Fuses
2.3.1 Fuses, when specified for use in mains current L carrying circuits, shall be of
the cartridge type, Type Q1 having a rupturing capacity of not less than 43 KVA
at 41 5V AC, 50 Hz certified by ASTA or other recognised testing authority.
2.3.2 Fuses used in any circuit shall have the correct fusing factor. Fuse units of
rating 100 amps or less shall be of the air insulated, back connecting, black
moulded type, consisting of a base and separate fuse carrier. Fuse units with
rating above 100 amp shall consist of fixed panel contacts (back connecting)
with protecting shrouds and a separate fuse carrier, the later arranged with a
clamping device, operated from the front of the carrier to provide high contact
pressure.
S-63
2 ELECTRICAL DISTRIBUTION EOUIPMENT (CONT’D)
2.4.1 The MCB shall be arranged for manual closing and opening and for automatic
tripping on over-current. The mechanism shall be fitted with an automatic
release which shall at all times function independently of the means used to
close the circuit breaker.
2.4.2 Both the 'on' and 'off' position of the circuit breaker shall be clearly indicated.
The indication shall be clearly visible to the operator when the circuit breaker is
mounted in the normal manner.
2.4.3 The metallic portions of the mechanism shall be either inherently resistant to or
so treated as to make them resistant to atmospheric corrosion. The operating
mechanism shall be effectively sealed by the manufacturer to prevent access to
the mechanism. The case may be of insulating material or metal and shall be
designed to withstand reasonably rough usage without fracture or permanent
distortion.
2.4.4 The construction shall be such that when the circuit breaker is mounted as in
service, any person operating the circuit breaker shall be safeguarded from
injury.
2.4.5 Live parts shall not be accessible to the standard test finger specified in BS
3042.
2.4.6 Provision shall be made for earthing of exposed metal parts which require
earthing in accordance with the current edition of CP 5 Wiring Regulations.
2.4.7 The maximum breaking capacity of the circuit breaker shall be adequate for the
maximum prospective fault current at the place where the circuit breakers are to
be installed in the supply system or network. The MCB shall comply with BS
3871 Part II and shall have a fixed unadjustable time/current tripping
characteristic with calibration complying with BS 3871 Table 5 and 6 for
operating duties and test currents at ambient temperature of 40°C.
2.5.1 The various layout designs are as depicted in the drawings provided. All single
phase lighting and power distribution boards shall be metal-clad with hinged
covers suitable for surface mounting.
2.5.2 A double pole isolating switch shall be incorporated for the purpose of
interrupting the incoming supply. Final sub-circuit circuits shall be protected by
means of single pole MCBs capable of carrying their full rated current without
tripping.
S-64
2 ELECTRICAL DISTRIBUTION EOUIPMENT (CONT’D)
2.5.3 For three phase loads, triple pole circuit breakers shall be used. 3 numbers of
Single Pole MCB shall not be used.
2.5.4 All miniature circuit breakers shall have a rated breaking capacity of not less
than M6 and shall comply with the requirements of BS 3871 Part II.
2.5.5 The MCB shall incorporate time delay device to ensure that it will tolerate
harmless transient overload unless this is well in excess of 25% of its rated
value for a sustained period.
2.5.6 A short circuit current of the order of six to ten times the full load rating should
cause instantaneous isolation of the faulty circuit by the MCB.
2.5.7 Samples of the MCBs shall be submitted for the approval of the SO prior to their
use.
2.5.8 Phase identification colours shall be provided for all MCB Board and in addition,
the Contractor shall provide a label within the cover of 'each distribution board,
details of the circuits controlled by the circuit breakers.
2.5.9 Distribution boards shall be wall mounted, totally enclosed, front connected for
DIN rail mounting. They shall be constructed of the stove enamel or epoxy
powder coated GI sheet of not smaller than 16 gauges. Polyester type MCB
boards shall only be used on instruction of the SO. Knockouts shall be provided
for cable entries.
3.1 All socket outlets shall be of the three-pin rectangular (two-pole and earthing
pin) type.
3.2 All 1 3A power outlets shall conform to SS 145. All power outlets shall be of 13
amps rating, surface-mounted, rectangular, metal-clad, switch-socket type.
Socket outlets should either be installed at 1500mm (eye level) or at a height of
300mm above the finished floor level. Actual mounting position shall be to SO
instruction.
3.3 All 1 5A power outlets for air conditioning and water heating units shall be of 15
amps rating, unless otherwise specified. They shall be used in conjunction with
a fused (15A rating) plug complete with indicator lamp and situated beside the
lighting switches for the room.
S-65
4 SWITCHES
4.1 All switches shall conform to BS 3676. All switches shall be so mounted that the
knob is in the raised position when the switch is 'OFF' and in the depressed
position when 'ON'. They shall be of the silent type conforming to BS 3676.
4.2 No multiple pole switch or circuit breaker which also incorporates a switch in a
neutral control shall connect any live conductor before the neutral conductor is
made, or breaks the neutral conductor before all live conductors have been
opened.
4.4 Lighting switches shall be single-pole or 2-way as required, rated for 5 amps,
240V AC and of the quick make, quick break type.
4.5 Multi gang switches shall be used at locations where the number of switches
exceed 4 or as directed by SO. Where more than one phase of supply is
brought into a multi-gang switch box, the switches and accessories and wiring
connected to one phase shall be adequately separated from those connected
to the other phases.
4.6 All switches shall be engraved and the groove painted black with one of the
following words to depict the usage of the switch: LIGHT, FAN, HEATER,
E/FAN.
5.1.2 Trunking shall be flame retardant and of adequate mechanical strength. Covers
shall be snap-lock, and shall be so constructed that they remain secure without
deflection even when the maximum allowable number of cables is
accommodated.
5.1.3 Trunking shall be sized so that a space factor of 45% is not exceeded.
S-66
5 PVC TRUNKING INSTALLATION (CONT’D)
5.2 Accessories
5.2.1 Boxes shall be white moulded plastic and comply to BS 3676. Boxes shall be
equipped with knockouts at the side points.
5.3 Cables
5.3.2 Cables shall be 2.5 mm2 for lighting and circuits and 4 mm2 minimums for
power and 4 mm2 for earth continuity conductor.
5.3.3 All earth continuity conductors shall be PVC insulated green or green/yellow
colour coded.
5.3.4 The cables size shall be selected to ensure that it has adequate current carrying
capacity and that the voltage drop at the apparatus supplied does not exceed
the approved limit. Derating of cables shall also be taken into a ccount for
anticipated adverse conditions.
5.4 Wiring
5.4.1 Continuous runs of cables shall be used wherever possible. Connectors are only
permitted at terminal inspection boxes.
5.4.4 Where cables penetrate walls or floors, approved PVC/metal conduits shall be
used.
5.4.5 At expansion joints, cables shall be threaded through PVC conduits and
provided with adequate slag.
S-67
5 PVC TRUNKING INSTALLATION (CONT’D)
5.4.8 Joints between trunking shall be preferably by purpose made PVC joint boxes
for both straight- through and right angle joints. These boxes shall be capable of
accepting all sizes of PVC trunking. PVC trunking terminating onto accessory
boxes shall butt squarely without gaps.
5.4.9 Trunking runs shall be straight along the upper edge of walls or on the ceiling.
Except for branch-offs to ceiling or wall fixtures, all cable runs must be located
within a 75 mm corridor 100 mm away from the ceiling-wall junction. Where an
accessible ceiling space is available, a metallic trunking shall be installed just
above the ceiling with PVC branch trunking below. Branches to switches and
power accessories shall be along a plumb line.
5.4.10 The Contractor shall seek the concurrence of the SO to the location and
direction of all cable routes before the commencement of works.
6.1 Cables
Cables used shall be PVC insulated 450/750V grade conforming to latest
edition of Singapore Standard 50, 2.5mm 2 minimum for lighting, 4mm 2
minimum for power and earth continuity conductor. For water heaters an d
air-conditioning power points, conductor size shall be 4 mm 2 or larger as
appropriate.
S-68
6 CONCEALED CONDUIT INSTALLATION (CONT’D)
6.2.1 Conduits shall conform to BS 6099 and shall be heavy gauge of wall thickness
of 1.9 mm rigid tubes which are unscrewed without coupling and with plain
ends. All conduits used shall not be less than 25 mm in diameter.
6.2.2 All conduits used shall be of standard white colour, not unless stated otherwise
by the SO.
6.2.3 A protective coat of white enamel paint shall be painted on conduit mounted
outside building exposed to weather.
6.3.1 Accessories used for conduit wiring shall be of an approved type complying to
BS 4607.
6.3.2 All accessories used shall be of standard white colour, identical to conduit
used, not unless stated otherwise by the SO.
6.3.3 Plain conduits shall be jointed by slip type of couplers with manufacturer's
standard sealing cement.
6.3.4 All conduit entries to outlet boxes, trunking and switchgear shall be made with
adaptors female thread and male bushes screwed.
6.3.5 White PVC-switch and socket boxes with round knockouts shall be used and
shall be surface mounted.
6.3.6 Standard PVC circular junction boxes shall be used with conduits for
intersection, TEE-junction, angle junction and terminal. For the drawing-in of
cables, standard circular through boxes shall be used.
6.4.1 Conduits shall conform to SS 100 and shall be of heavy gauge screwed at both
ends, solid drawn or seamed by welding, show no appreciable unevenness and
free from internal burns, fins and the like which may cause damage to cables.
The internal and external surface of the conduit shall be hot-dip galvanised and
of approved reputable manufacture. All conduit used shall not be less than 25
mm diameter. Except where thickness of floor slab permit conduits used shall
not exceed 30 mm diameter.
S-69
6 CONCEALED CONDUIT INSTALLATION (CONT’D)
6.4.3 The protective coating on conduit and its associated fittings shall be identical.
6.4.4 Steel conduit used for fire alarm system shall be painted with a coat of red
enamel paint over the entire length. For other conduits, they shall be painted
throughout to match existing or as approved by SO.
Conduits shall be heavy gauge welded GI steel complying with SS 100 and
free from internal burrs, fins and the like which may cause damage to cables.
6.5 Accessories
6.5.1 All conduit outlet boxes and junction boxes are to be malleable iron and of
standard circular pattern with spout to BS 31/1 940.
6.5.2 Standard circular pattern boxes are to be used with conduits. For the
drawing-in of cables, standard pattern through boxes are to be used. All
conduit boxes are to be galvanised finish.
6.5.3 All conduit boxes shall be provided with gaskets and lids. Adaptable boxes
are to be of mild steel of not less than 12 swg with galvanised finish. Boxes
are to be not more than 2" deep and of such dimensions as will enable the
largest size cable 50mm for which the conduit run is suitable, to be drawn in
without excessive bending of the cables. Lids of the same gauge with brass
fixing screws are to be provided. All such boxes are to be drilled for holes
according to the conduit entries required.
6.5.4 Socket outlet boxes are to be constructed of sheet steel galvanised finish and
are to comply with BS 1299 and 1363. Socket and switch boxes are to be
recessed into wall and suitable for flush mounting accessories. For sockets
and switches mounted on structural columns, surface mounting type outlet
boxes shall be used.
6.5.5 All conduit entries to adaptable boxes, outlet boxes and switchgear are to be
made with coupling and hexagon male bush.
S-70
6 CONCEALED CONDUIT INSTALLATION (CONT’D)
6.6.1 Wiring routes will be indicated by the SO or his representative on site and his
instruction shall be strictly adhered to.
6.6.2 For penetrations into walls, slabs, etc suitable battens and blocks shall be
installed in the shuttering before concrete is poured to form chases in the
concrete work where applicable. It is emphasized that the above work needs
close liaison with the Building Contractor and must not interfere with or delay
the progress of the building work.
6.6.3 Prior permission shall be obtained from the SO for hacking and chasing on
RC structures. Any unauthorised hacking and chasing shall render the
Contractor liable for damages for repair to the structure and subsequent
penalty to be determined by the SO.
6.7.1 The whole conduit system shall be installed to comply fully with the relevant
PSB CPs and SSs and Power Grid Regulations and to enable wiring to be
carried out on the loop in system.
6.7.2 All conduits shall be of sufficiently large section and so arranged (with draw-in
boxes) to allow for the easy drawing in or out of any cable through it. No
conduit shall be less than 25mm diameter.
6.7.4 All conduits shall be run continuous between outlets with a minimum number
of bends. Where bends are unavoidable, the conduit shall be bent cold,
without altering their sections with standard tools and equipment
manufactured especially for this purpose.
6.7.5 A draw-in box shall be used to limit any pull to 30m. Runs between draw-in
boxes are not to have more than two 90° bends and the length of such runs
shall be limited to 12m to permit easy draw-in of cables.
6.7.6 Conduit runs shall be perpendicular to floor except where they are within
300mm of floor or ceiling, where they may run parallel to the floor.
S-71
6 CONCEALED CONDUIT INSTALLATION (CONT’D)
6.7.7 Conduits in structural slabs shall be placed between the upper and the lower
layers of reinforcing steel. This will require bending of conduits.
6.7.9 Conduits running parallel to slab supports, such as beams, columns and
structural walls, shall be installed not less than 300mm from such supporting
elements, the outlet box so that it is flush to the final plastering.
6.7.10 Where conduits are set in column or beams, each end shall be terminated into
a coupling and a threaded metal plug, to permit subsequent joining.
6.7.11 Except where the thickness of the floor slab permit, conduits used shall not
exceed 25mm diameter.
6.7.13 Each run of conduit shall be assembled complete with draw -in wires in
position before drawing in cables. Wire and cable shall not be pulled into
conduit until the conduits have been completed, cleaned, and freed from
obstructions and sharp corners. Wire and cable shall be installed in such
manner that there will be no cuts or abrasions in the insulation, protective
braid or jacket. There shall be no chinks in the conductor. The number of
wires installed in any conduit shall not exceed that permitted by CP 5.
S-72
7 SURFACE CONDUIT INSTALLATION
7.1 Cables
Cables used for conduit wiring shall be PVC insulated 450/750V grade
conforming to latest edition of Singapore Standard 50.
7.2 Conduits
7.3 Accessories
7.3.1 Accessories used for conduit wiring shall be of an approved type, each
conforming to its appropriate British Standard.
7.3.2 All boxes shall be of the same make conforming to BS 31 and shall be made
of malleable galvanised iron.
7.4.1 The conduit throughout shall be of sufficiently large section and so arranged
with draw in boxes to allow of either easy draw-in or out of anyone or all the
cables which must not exceed the number set in the relevant Regulations and
the whole conduit system shall comply with the Regulation. The conduit shall
be laid as far as possible in straight lines with easy sets or bends. Where
conduits are bent, they must be bent cold without altering their sections with
an approved type of bending machine or bending block to give results
consistent with the best grade of craftsmanship. The conduit shall be run so
as to be self drawing, incorporating as necessary approved means of
drainage.
7.4.2 Galvanised spacer bar double saddles shall be used for securing conduits on
surfaces other than on structural steel members for which an approved type
of clamp shall be devised. Spacing of saddles shall not exceed 1 .2m for
conduit sizes up to and including 25 mm and 1.8 m for sizes 32 mm and
above.
7.4.3 In addition, conduit fixing shall be located not less than 32 mm and 150 mm
and 300 mm respectively from each surface box or switch and shall be one
per conduit to each such box or switch.
7.4.4 All conduits are to be threaded so that the end butts close together in
sockets and when terminating in conduit boxes and other fittings provided with
tapped spouts, the conduit shall be threaded for the correct length to ensure
a light full length connection in the spout.
S-73
7 SURFACE CONDUIT INSTALLATION (CONT’D)
7.4.5 Conduit terminations to loop-in boxes shall consist of a screwed socket and
smooth bore bush. The Contractor shall remove all burrs from the ends by
means of a reamer, filing is not considered sufficient. No exposed threads
shall be visible after erection, other than at running joints, and where such
joints are used, they shall be thoroughly coated after erection with good
quality red lead paint. Lock nuts shall be provided at running joints.
7.4.6 Where the conduit is or maybe in contact with any structural steel work an
efficient and permanent metallic connection shall be made between the
conduit and such metalwork. The conduit shall be in no part under mechanical
stress. Outlet boxes for fittings etc shall be used as draw boxes and other
draw boxes reduced to a minimum except that draw boxes shall be provided
so that the minimum run of conduit without a draw box does not exceed 12m
or more than two right angles bend.
7.4.7 All conduits shall be mechanically and electrically continuous throughout and
is to be efficiently earthed with heavy copper wire or taps and screw on clips.
No conduit shall be less than 20 mm outside diameter and brass screws be
used throughout for fixing. Conduits shall not come into contact with any other
pipes and shall in all cases be at least 150 mm away from gas pipes.
7.4.8 Conduits shall be thoroughly swabbed out after fixing and immediately prior to
the drawing in of cables. Cables shall only be drawn into the conduit after the
conduit installation has been completed.
S-74
8 CABLE TRUNKING INSTALLATION
8.1 Cable trunking shall be fabricated from GI sheet steel stove enamel paint with
18 SWG for trunking of sizes 2500mm2 and below and 16 SWG for sizes
above 2500mm 2 complete with dividing fillet where specified and with
overlapping and removable covers finished off with two coats of stove grey
e n a m e l p a in t af te r p rim in g wit h a n t i - c o rro s i ve p a in t . A l l b e n d s
interconnections at fuse-boards and other trunking runs are to be purpose
made. Lengths of trunking shall be joined together by means of fixed sleeve
type coupling, complete with external copper earth bonding link.
8.4 Appropriate purpose made metal brackets shall be used to support the
trunking, at spacing not exceeding 2m. Where the trunking is suspended, the
installation must not be subjected to any vertical and horizontal forces.
Suspension parts are to be purpose made of suitable length, and facilities
shall be provided for allowing adjustments to be made to the suspension
brackets. The maximum deflection of the suspended trunking must not
exceed 12.5mm when fully loaded between suspension points 5m apart.
Trunking covers shall not face downwards.
8.5 All wall mounting brackets to support trunking shall be secured with approved
metal threaded studs and washer complete with two lock nuts.
8.7 In instances, where the Contractor elects to use trunking to avoid a multiplicity
of conduits following the same run, cables shall be installed so that a space
factor of 40% is not exceed. Trunking shall be fabricated from the correct
gauge of sheet steel as specified in paragraph one.
8.8 Where the trunking is installed in a vertical position insulated cable supports
shall be provided and packing shall be used at positions where trunking goes
through floors. In the case of horizontal trunking runs, cable retaining straps
and cable separators shall be used respectively where trunking covers are
fixed underneath. Trunking covers shall be fixed with centre and sideways
captive screws or spring-on type, and not self-tapping screws will be
accepted.
8.9 The trunking system shall be erected complete and thoroughly cleaned out
before any cable are drawn in.
S-75
8 CABLE TRUNKING INSTALLATION (CONT’D)
8.10.1 nder floor trunking shall be fabricated from sheet steel 16 SWG and installed
on the structural slab prior to any screed being poured. Contractor shall liase
with the building Contractor closely and the work must not interfere with or
delay the progress of the building works.
8.10.2 Changes in direction of under floor trunking should be made with square
metal junction boxes which are fitted with removable inspection traps.
9.1 Cable trays shall be perforated made of 16 SWG mild steel, galvanised finish,
and with returned edges.
9.2 Cable trays shall be supported from the rib of structural slab, beams etc by
mild steel rods, galvanised, and not less than 35 mm diameter with under
slung steel angle supports, or similar fixing methods as described In
paragraph 7.3 and 7.4 above.
9.3 Appropriate purpose made metal brackets shall be used to support the
trunking, at spacing not exceeding 800mm. Where the trunking suspended
the installation must not be subjected to any vertical and horizontal forces.
Suspension parts are to be purpose made of suitable length, and facilities
shall be provided for allowing adjustments to be made to the suspension
brackets. The maximum deflection of the suspended trunking must not
exceed 12.5mm when fully loaded between suspension points apart.
9.4 All wall mounting brackets to support trunking shall be secured with approved
metal threaded studs and washer c/w lock nuts.
10.1 Cables
S-76
10 SURFACE WIRING INSTALLATION (CONT’D)
10.1.2 The cable size shall be selected to ensure that it has adequate current
carrying capacity and that the voltage drop at the apparatus supplied does not
exceed the approved limit. Derating of cables shall also be taken into account
for anticipated adverse conditions.
10.1.3 Cables shall be 1.5mm2 minimum of lighting and 2.5mm2 minimum for power
outlets. Continuous cable runs shall be used wherever possible but if it is
necessary to join cables approved junction boxes shall be used. All junction
boxes containing connectors shall be located in positions readily accessible
for inspection. Wiring connection shall be by the 'loop-in' method and joins
other than within accessories are not permitted.
10.2 Woodblocks
10.2.1 Woodblocks or base blocks for mountin g tumbler switches and other
accessories may be made from properly tantalised teak wood of minimum
25mm thickness.
10.2.2 The dimensions of woodblocks shall depend on the size and number of
cables and accessories to be mounted and shall provide adequate space and
support for connections.
10.3.1 Cables exposed to risk of mechanical damage or installed less than 1.8
metres above floor level shall be protected by one of the following methods:
S-77
10 SURFACE WIRING INSTALLATION (CONT’D)
All woodblocks shall be rigidly fixed to partitions walls, columns etc by means
of brass wood screws.
11.1.1 The wiring shall be carried out in MlCC wiring system and shall comply with
the following:
11.1.2 Unless otherwise specified all equipment for flameproof installation shall be
certified by appropriate authorities and bear accredited make for such
articles.
11.1.3 Insulated copper sheathed cable system are to be installed where indicated
on the electrical installation drawings. A copper split plates shall be provided
at termination boxes to reduce eddy currents.
11.1.5 The current rating of the cables is to be in accordance with the relevant lEE
and local Regulations.
11.1.6 Cables are to be run on GI trays on the surface of walls and ceilings and in
roof spaces.
11.1.7 When sitting MICC cable run, care is to be taken to avoid locations where the
cable would be exposed to damage. Where cables are liable to mechanical
damage they are to be adequately protected.
11.1.8 MICC cables are not to be installed in position where deleterious chemical
action will, for example, certain plastered walls or metals would ensure.
Where necessary, cables are to be protected by the application of bitu mastic
paint, or other approved processes.
S-78
11 FIRE-RESISTANT WIRING INSTALLATION (CONT’D)
11.1.9 MICC cable runs on GI trays shall be screwed by copper saddles. Where a
number of cables are run together single cable saddles will not be permitted
but multiple way saddles are to be used. The maximum number of cables
supported by anyone saddle is to be such that no bulging occurs in the saddle
due to the weight of cables carried. Saddles are to be of the spacer bar type
where directed by the SO or his representative.
11.1.10 Terminal and other jointing connections are to be made in compliance with the
cable manufacturer's instructions.
11.1.11 Where MICC cables are used in flameproof installations, flameproof junction
boxes and end boxes and flameproof glands seals are to be used throughout.
11.2.1 The fire resistant cable shall be of 600/1000 volts grade, suitable for surface
wiring and wiring in conduit or duct. The cable shall be both fire resistant and
flame retardant to IEC 331 and IEC 332 respectively. It shall be approved by
the local authority for use as fire resistant cables in emergency circuits
applications. Test certificates to substantiate the compliance to IEC standards
shall be submitted with the tender.
11.2.2 The conductor shall be made of stranded, soft anneal copper wires to BS
6360. The outer jacket shall be made of fire retardant low chlorine PVC. Core
identification of the cable shall be by colour of the insulation according to CP
5. The maximum resistance of the conductors at 20°C shall not exceed that
specified in BS 6360.
11.2.3 The cable and accessories shall be designed for operation up to a conductor
temperature of 70°C.
11.2.4 The cable shall be suitable for installation by conventional methods without
requiring expensive special tools, seals or terminations. They shall be
non-hygroscopic, maintenance free and insensitive to vibrations.
12.1.1 Cables of this type shall be 600/1000 volt grade complying to BS 6346 of
sizes as specified.
S-79
12 UNDERGROUND CABLE DISTRIBUTION SYSTEM (CONT’D)
12.1.2 PVC insulated cores shall be sheathed with PVC which shall serve as a
bedding for galvanised steel wire armouring. The armouring shall be covered
with an outer PVC sheath.
12.1.3 Cables shall be terminated in a brass gland fitted with armour clamp and
supported by mild steel brackets. The gland body shall be provided with an
internal conical sealing to receive the armour clamping cone and clamping nut
which shall secure the armour clamping cone firmly to the armour cables.
Cables shall be continuous and no joints are permitted.
12.2.1 Underground cables shall be laid 750 mm below the finished ground level and
protected by cable warning tile manufactured according to details shown in
the relevant drawings. Under no circumstances shall the cables be laid within
450 mm of Power Grid electricity and water mains or Telecom cables.
12.2.2 Only selected soft earth free from stone should be filled and well rammed to a
depth of 150 mm over the cables, above which the necessary warning tiles
shall be laid. Thereafter the trenches shall be filled in layers of not exceeding
300 mm in depth, each layer being thoroughly rammed before the next layer
is placed over. Surplus soil should be filled on the top of the filling to allow for
probable subsidence, after which any excess soil must be removed by the
Contractor, the cost of which shall be included in the relevant Schedule of
Rates. If necessary, mechanical ram shall be used to reinstate the ground. All
surface reinstatement shall be carried out to the satisfaction of the SO. Where
surface has been turfed, the grass shall be carefully removed, kept alive by
watering and replaced as soon as possible after the trench is backfilled.
12.2.3 Upon completion of all cable trenching, the Contractor shall advise the SO in
advance, the date and time when cable laying is to be executed to enable him
or his representative to be present during cable laying and jointing. Any
cables laid in the absence of the officer will have to be exposed for inspection
at the Contractor's own expense.
12.2.4 Where road crossing is necessary, HDPVC pipes shall be provided. The
Contractor shall maintain the road surface until it is premixed by others.
12.2.5 All underground cables shall be tested with a 500 volt insulation tester prior to
laying, after laying and after jointing. Before the underground cable work is
energised, an insulation test shall be carried out in the presence of the SO or
his representative.
S-80
12 UNDERGROUND CABLE DISTRIBUTION SYSTEM (CONT’D)
12.2.6 Approved cable markers shall be placed above the cable routes to SO's
directions at a distance of 30m on straight runs.
12.2.7 The dimension of each protective cable slab shall be 300 x 225 x 38 mm
with a concrete mixture of 1: 2: 4 reinforced with SW G 8 wire mesh
of approximately 100mm square. A sample of the slab shall be submitted to
the SO for his approval prior to laying of the slabs.
12.2.8 The Contractor shall arrange so that all works shall be adequately watched
outside normal working hours and shall supply all necessary warning signs,
obstruction lights and fencing around excavation, so as to permit the safe
passage of traffic and pedestrians. Any claim for damages arising from
accidents caused by inadequate precaution taken by the Contractor shall be
met by the Contractor.
12.2.10 Where there are existing cables along the prop osed cable route, the
Contractor must be extremely cautious when excavating the cable trenches
and must make good if any damage occasioned thereto during the excavation
works and shall indemnify government against any claim arising therefrom.
S-81
13 LOW TENSION SWITCHBOARDS (CONT’D)
i Cubicle Structure
e All the doors shall be fitted with neoprene gasket cemented to the
frame.
ii Surface Finishing
S-82
13 LOW TENSION SWITCHBOARDS (CONT’D)
b All metal parts exposed by cutting and any part of the painted
surfaces that has been scratched or marked shall be prepared and
finished to match the original paint finish.
iii Labelling
iv Cable Termination
v Ventilation
S-83
13 LOW TENSION SWITCHBOARDS (CONT’D)
v Earthing
S-84
13 LOW TENSION SWITCHBOARDS (CONT’D)
i Busbars shall comprise four (4) air -insulated, hard drawn high
conductivity copper of adequate rectangular cross sections as
determined in accordance to SS CP5: Code of Practice for Wiring of
Electrical Equipment of Buildings, to carry continuously the currents
required or as specified in the drawings. In any case, a current density of
155 amp/ cm2 of cross sectional area shall not be exceeded. The busbar
shall be rigidly supported by means of heavy duty busbar holders of
glass fibre reinforced polyester which are securely bolted to the
framework so as to enable the busbars to withstand the mechanical and
thermal stresses to which they would be subjected under maximum fault
conditions. Busbar clearance to earth and between phases shall be in
accordance to BS 159 or the current edition thereof.
iii The busbar shall be provided with facilities for connection to incoming
and outgoing switchgear. All joints in the busbar shall be securely bolted
or clamped, with contact surface suitably prepared to prevent oxidation
in service and shall not cause any deformation or distortion of the busbar
or connection rod.
v All jumpers from MCCB or fuse switches of 100 amps and above to main
busbars shall be tinned copper busbars. Busbars and cables of all
incoming and outgoing circuits within the switchboards shall be rated not
less than the frame size of the switchgear protecting it or not less than
the outgoing circuit if specified in the drawings whichever is the more
stringent of the two.
S-85
13 LOW TENSION SWITCHBOARDS (CONT’D)
13.4 Tests
i Type Tests
S-86
13 LOW TENSION SWITCHBOARDS (CONT’D)
ii Routine Tests
b dielectric test
a After the equipment has been erected on site, and before final
connection to power supply, all necessary adjustment shall be
carried out to comply with the requirements of this specification.
Such test shall include but not limited to the following:
S-87
13 LOW TENSION SWITCHBOARDS (CONT’D)
13.5.1 Air circuit breakers shall be the draw out type, manually operated with position
'ON' and 'OFF' indication, mechanically trip push button complete with current
transformers and under voltage trip coil. The ACB interrupting capacity shall
be 31 MVA at 415 volts to BS 3659/1 963.
13.5.2 The Contactor shall submit a test certificate from ASTA or any recognised
international testing authority to SO together with one complete set of
operating manual, maintenance manual and spare part list.
13.5.3 Panels for air circuit breakers shall be completely compartmentalised with
free barriers conforming to Power Grid's requirements.
Where IDMTL relays are required, they shall be Power Grid approved type
working in conjunction with 5PI0 type Current Transformers of 30 VA burden.
High set elements for instantaneous tripping shall be provided. Separate
indicating flags shall be provided. For DTL relays continuous adjustable
setting from 0% to 120% shall be provided.
Earth leakage relays shall be DTL type with continuous adjustable current
setting from 5% to 40% Relay operation indicator and reset facilities shall be
provided. Relays shall be in dust-proof casing provided with viewing glass.
S-88
13 LOW TENSION SWITCHBOARDS (CONT’D)
The scheduled rates for switchboard shall include the cost of 2 sets as-fitted
single line drawing, one for the SO's retention and one laminated and fixed to
the switchroom wall with 4 numbers expansion bolts.
The successful contractor shall provide 5 mm thick rubber mats for the full
length of the main switchboard and sub-switchboards complying with the
relevant Power Supply and/or Power Grid requirements.
14.1 Design
Lighting poles shall present good visual appearance acceptable to the SO.
The pole shall have a circular cross section, dimensions and design of which
are detailed in the relevant drawings. All poles shall be manufactured in
accordance with the requirements of BS 1840 and the following
specifications.
14.2 Labelling
14.3 Baseboard
14.3.2 All necessary brackets for mounting the basebo ard and cable gland
terminations shall be provided at the internal surface of every poles/masts.
S-89
14 OUTDOORS LIGHTING SYSTEM (CONT’D)
14.4 Tolerances
14.4.1 The cross-section of all poles and bracket arm shall be as circular as possible
except at the door opening. The tolerance on the outside diameter of the
poles shall be +1.5% of the specified diameter. The tolerance on thickness of
the material shall be +1.5% of the thickness as indicated on the drawings. The
complete pole shall not deviate from the straightness by more than the
amount calculated at a rate of 2mm per meter.
i The poles shall be continuously tapered hot dip galvanised steel poles or
centrifugalise reinforced concrete pole of circular cross section as
specified.
iii Hot dipped galvanised steel pole, base plate and bracket arm shall be
constructed from mild steel complied to BS 4360. The whole pole shall
be manufactured in one section, formed either by the continuous weld or
one of the seamless processes. The pole so formed shall be free from all
injurious defects. The pole shall penetrate into the full depth of the base
plate and shall be welded above and below. No welding on site is
permitted. All welding shall comply to BS 938, BS 1856 and BS 2642. All
welds shall be neatly finished off and acceptable to the SO.
14.5.2 Spigot
The dimension of spigot for the bracket arm is indicated on the drawing. The
spigot shall not be swaged to the steel pole and for concrete pole, it shall be
cast with the pole.
Bracket arms (single or double) shall be made of heavy duty galvanised steel
pipes as detailed on the drawing. It shall be manufactured as separate unit
suitable for mounting on to the pole in any of the four 90° position in relation to
the door. Bracket arm shall be secured to the pole with stainless steel screws
and has an integral anti-rotation device.
S-90
14 OUTDOORS LIGHTING SYSTEM (CONT’D)
Car park lighting poles shall be straight, seamless, extended aluminium poles
of circular cross section with dimension as indicated on the drawings. The
poles shall be welded to a piece of cast aluminium base plate.
S-91
14 OUTDOORS LIGHTING SYSTEM (CONT’D)
14.6.6 Finish
The complete assembly shall be satin anodised to dark bronze colour to blend
with the luminaire finish.
14.7.1 The protective coating of the steel poles shall comply with BS 5493, ‘Code of
Practice for Protective Coating of Iron and Steel Structures a gainst
Corrosion'. Welding and drilling shall be completed before galvanising. The
entire mast shall be grit blasted before hot dip galvanised internally and
externally to a minimum thickness of 8 5 microns (610g/m sq). Reference
shall be made to BS 2451 for pickling process. The surface shall be pickled to
the requirement of BS 2451 before galvanising. The hot dip galvanising shall
comply with BS 729.
14.7.2 All instruments and facilities shall be provided for checking of coating
thickness. All necessary precautions shall be taken to protect the galvanised
surface during transportation. All defects to the coating shall be remedied at
all stages of transportation, fabrication and erection. The galvaniser shall
submit test reports and certificates to certify the galvanising, procedure,
surface preparation, coating thickness, etc. A schedule including galvanising
procedure, checking procedure, protection during transportation, handling,
storage and erection shall be submitted for SO's approval. A maintenance
schedule shall be submitted for the galvanised coating.
S-92
14 OUTDOORS LIGHTING SYSTEM (CONT’D)
14.8 Foundation
14.8.2 The soil bearing capacity at the site shall be ascertained so that its foundation
is correctly designed in the first place and without alteration at the later stage.
15.1.1 The Contractor shall provide an architectural reflected ceiling plan drawing
with the details of exact sizes, mounting and locations before ordering of
fitting and installation. It shall be the sole responsibility of the Contractor to
ensure through site measurements or co- ordination with the SO or main
contractor on the appropriate Imperial or Metric size fittings to be installed.
15.2 Components
15.2.1 All fittings shall have metal housing and shall be designed for grounding and
shall be securely grounded (earthed) to the electrical system grounding (earth
continuity) conductor by screws, bolts or position clips provided by the fitting
manufacturer for that purpose. All fluorescent ballasts shall be positively
grounded to the metal fitting housing and to ground (earth) and shall make
good thermal contact with the housing to ensure adequate heat transfer.
15.2.2 All fluorescent ballasts shall be power-factor corrected, 240V, 50Hz, internally
protected; and certified by PSB to conform to the relevant BS.
15.2.3 All fluorescent fittings shall incorporate moulded fuse holders, complete with
2A fuses, leading caps and spring fixing clips and facilities for looping. The
moulded leading clips with fuses shall be easily accessible.
S-93
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.3 Installation
15.3.1 The location of the lighting points shown on the drawings, if any, are
approximate only. It shall be understood that any lighting fixture may be
relocated 1.5 meter from the position shown on the drawings if so directed by
the SO and such provision shall be made in the installation work. All lighting
fixtures shall be securely hung or mounted as follows:
15.3.2 Surface mounted fittings (pendant, suspension and ceiling types) shall be
secured with expansion bolts with washer and two lock nuts. The expansion
bolts shall penetrate into hard concrete to a depth of not less than 32mm. For
the pendant fittings, the down rods shall be securely fixed to the ceiling with
conduit terminating boxes (and not teak boxes). The conduit boxes should
likewise be secured to the slab as above.
15.3.3 Recessed fittings shall be supported directly from the structural ceiling and
independent of the suspended ceiling grid work. There should be no
noticeable ceiling deflection when the fittings are installed. The fittings shall
be directly secured to the floor slab above with by means of GI wires tied to
metal studs penetrated into the concrete at a depth of not less than 32mm. All
the high bay recessed fittings shall be further supported by a chain threaded
around nearby structural truss. The lighting control gears of these high bay
fittings shall be remotely mounted on supporting brackets located around the
fittings.
15.3.4 All light fitting shall be wired from a light point. For recessed fittings, the points
(metallic junction boxes) shall be sited above the suspended ceiling at a
distance of 300 - 450 mm from the respective fittings.
15.3.5 For surface ceiling mounted fittings; the points (ceiling roses) shall be
mounted not more than 300mm for the respective fittings.
15.3.6 Recessed fittings shall be connected to the junction box by means of flexible
conduit, of length not less than 1200 mm or more than 1800mm. The flexible
conduit shall be of 20 mm diameter minimum.
15.3.7 Wiring from the light points to the lamp holders shall be by means of 2.5mm2
asbestos insulated, heat-resistant, 250V, 105 degrees C fitting wire.
S-94
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.3.8 Each fitting shall contain a permanent marking on the inside of the lamp
housing where it is clearly visible to anyone changing a lamp, stating the
type and wattage of lamp recommended. This must be legible and
permanent.
15.3.9 Conduit stems, rods and strong backed supports for light fittings shall be
painted with one coat of primer and two coats of exterior synthetic enamel,
alkyd resin type, or approved equal, coloured to match the fitting body.
15.3.10 The supply, packing, handling, storage, cartage, delivery to site, installation
and commissioning of all the lighting fittings as indicated on the drawings,
where applicable, shall be allowed for together with all tubes and lamps. The
compatibility of the ceiling and light fitting shall be closely coordinated. All
light fittings shall be delivered to the site completely equipped with ballasts,
capacitors, starters, lamp holders or sockets, diffusing materials, refractors,
reflectors, fuse holders, brackets, stems, plates and the like (with the
exception of lamps) , wired, assembled and tested by the fitting
manufacturer.
15.3.11 After the delivery of the lighting fixtures to site the adequate storage and
protection for the lighting fixtures shall be provided. The replacement or
satisfactory repair of any damaged or defective fitting, including paint finish,
metal work, lenses, diffusers etc up to the time of final acceptance shall be
allowed for. All lighting fixtures shall be thoroughly cleaned and shall be free
from dirt, grease etc before being installed into the final position.
15.3.13 Samples of light fittings shall be submitted to the SO for approval prior to
installation. When the SO has approved all the samples, they shall be so
tagged and left on site to be used as a guide to the standard of all other light
fittings of similar type delivered to site.
15.3.14 Light fittings used in conjunction with the pre-wired trunking system shall
come with power plug for plugging onto sockets on the trunking.
S-95
15 INDOORS LIGHTING SYSTEM (CONT’D)
Moulded plastic type non-flammable with quick connect sockets for the
connection of wiring shall be suitable for bipin lamp caps with a rotary twist
back pin contact. When installed, the lamp-holders shall be adjustable to
allow for manufacturing tolerance (within the manufacturer's specification)
in the length of lamps.
15.5.1.1 Internal wiring shall be carried out in suitable heat resistant insulated flexible
cable. Terminations for connection to quick connect terminals shall be
machine made, and shall be covered with insulated shrouds. Bared cable
ends for insertion in lamp holder sockets shall be sweated before insertion
to prevent spread or breaking of strands.
15.5.1.2 Wiring shall be grouped and tied into looms within the fitting and clipped to
the housing adjacent to each terminal and at maximum 230 mm centres.
Wiring shall be kept well clear of ballasts.
15.5.1.3 Wiring shall be brought to a 3 or 4 way fused terminal block in each fitting for
the connection of external switch wire and dimmer lead and neutral and
earth conductors. Terminals shall be large enough to connect 2 x 2.5 mm2
conductors per terminal. Live metal in terminals shall be separated by at
least 25 mm in all directions from earthed metal, measuring around any
insulating barriers. A cartridge type fuse of appropriate rating shall be
provided in the active conductor connection to the fittings.
S-96
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.5.1.4 Where wiring passes through or past the edge of any metal section of the
fitting, it shall be protected by an approved grommet or be doubly insulated
in an approved manner. All connection of wires to terminals shall be of
approved type. All wiring shall be concealed from view with the fitting
installed.
15.5.1.5 Two amperes fuse and holder shall be provided for all luminaires.
15.5.2.1 Incandescent fittings and HPMV fittings shall incorporate a wiring chamber
in a cool zone of the fitting to enclose the circuit connection. Heat resisting
cables terminal blocks shall be provided for the connection of circuit wiring.
15.5.3 Provision shall be made for the connection of earthing conductors.
15.6 Fabrication Of Fluorescent Fittings
15.6.1 The body of the luminaires shall be pressed or rolled from panel quality steel
sheet to form a rigid, robust, first quality body as a basis for the complete
unit. The gauge and metalwork and material to be used shall be stated in the
tender, however it shall not be less than 20 BG zinc coated sheet steel. Any
metalwork, which in the opinion of the SO is flimsy, inadequate and not of
good quality shall be rejected and replaced in the gauge as requested by the
SO.
15.6.2 Metalwork and other components shall be jig or die formed to ensure
uniformity. Particular attention shall be paid to the finish of welds which shall
be ground off and filled. Fittings shall have no sharp edges likely to cause
injury during handling and special care shall be taken to ensure that
deformation does not take place during assembly.
15.6.3 After fabrication, fittings shall be thoroughly degreased and cleaned, given a
rust inhibiting treatment, etc primed and given two coats (wet on wet) of
white stove enamel. Finish coat shall be with an acrylic based paint using a
Titanium Dioxide pigment.
S-97
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.6.4 All screws used in assembly of fittings shall be of the cadmium plated type
and shall engage in nuts or taped holes. Self tapping screws are not
permitted. Screw heads on the outside of fittings shall be countersunk to
preserve a smooth finish. Mounting screws etc shall be spot welded to the
toffer.
15.6.5 Fittings shall have separate enclosures for lamps and control gear and shall
be so designed that the maximum operating temperature of each in service
shall not exceed the limits laid down in AS 3137.
15.6.6 Cable entry knock-outs shall be provided in the back of the fittings adjacent
to the terminal blocks and also in each end of those fittings to be in-line
mounted. Any cables used for through wiring of in-line mounted fittings shall
be suitable for use in ambient temperatu res equal to the operating
temperature within the fitting.
15.6.7 Control gear shall be fixed hard against the main body of each fitting and all
bolts for this purpose shall be fixed to prevent turning when nuts are
tightened so that all control gear may be dismantled and reinstalled while
the body of the fitting remains in situ. Where possible, capacitors shall be
mounted at least 150 mm clear of ballasts.
15.6.8 A brass threaded terminal post, not less than 5 mm (3/16") diameter and
12.5 mm (1/2") long, complete with an approved brass solderless lug shall be
secured to the metal body of the luminaire as closely as possible to the
terminal block. The metal portions of all components shall be in effective
electrical contact with the earth terminal.
15.6.9 Fittings shall be fitted with diffusers as specified. Design of fittings and trims
shall be such that no light leaks are visible either above or below the ceiling.
Particular care in this regard shall be paid to joints in the trim and to the
fixing of the trim to the fitting particularly at the ends. Recessed fittings with
diffusers shall be complete with hinged aluminium frames with at least two
numbers of lock-catch to hold frames in place.
15.7.1 Light diffusers shall be of the carolite type of diffusers and shall be 5.5 mm
thick whereas K-lite type of diffuser shall be 3.8mrn thick.
S-98
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.7.3 Each diffuser shall be mounted in an aluminium frame hinged from the fitting
to provide ready access to tubes and auxiliaries. The diffuser shall be
accurately manufactured with regard to dimensions and shape and any
warped or twisted diffusers shall be rejected. The diffusers shall be free from
cracks or graze marks and any visible evidence of stress concentration at
corners or bends.
15.7.4 Diffusers shall be generally of the size, shape and length to suit the supplied
fittings. They shall not exceed 2 metres in length, being butted together
when necessary to form longer lengths. The butted joints so formed shall be
provided with a cover strip to prevent light leaks.
15.7.5 All fixings shall allow for expansion of the diffuser by using elongated holes
in the diffuser and cup washers with cork pads under the screw heads. All
fixing clips, etc. shall be fabricated from steel or aluminium and painted
white.
15.7.6 Fixing clips shall be fixed to the structure with No 6 wood screws and shall
contain tapped holes for the fixing of diffusers with 5/32 in BSF chrome
plated bolts.
15.7.7 Where angle diffusers meet at a corner they shall be mitred in a factory
made glued joint with a butt joint being provided on either side of the corner.
The fluorescent lamp shall be white with 4,000oK colour temperature and
with a minimum Colour Rendering Index of 85 and shall be of approved
manufacture fitted with standard bi-pin caps. The lamp shall be rated at
18W, 36W or 58W and shall have a minimum efficacy of 90 1m/watt. The
guaranteed minimum life expectancy of the lamp shall be 5,000 hours. The
lamp shall conform to BS 1853 and SS 122/1 979.
S-99
15 INDOORS LIGHTING SYSTEM (CONT’D)
The fluorescent lamp shall be white with 4,000oK colour temperature and
with a minimum Colour Rendering Index of 85 and shall be of approved
manufacture fitted with standard bi-pin caps. The lamp shall be rated at
18W, 32W or 50W and shall have a minimum efficacy of 100 1m/watt. The
guaranteed minimum life expectancy of the lamp shall be 10,000 hours. The
lamp shall conform to BS 1853. With the grid of high frequency ballast, the
lighting shall be regulated either manually or automatically over a range of
25 - 100%.
a A lamp mortality curve for 10 hours per start and for continuous
operation.
S-100
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.9.1 General
15.9.1.1 All fluorescent ballasts shall be power -factor corrected, 230V, 50Hz
internally protected, and certified by PSB to Singapore Standards.
15.9.1.2 Lamp control gears of fluorescent tubes shall be designed to reliably start
and operate the lamp in the ambient conditions and within the limit specified
by the lamp manufacturer.
15.9.2 Capacitors
15.9.2.2 Capacitors shall be fitted with leads in lieu of terminals so that no live metal
is exposed when a fitting is opened. A discharging resistor shall be provided
across the terminals of the capacitor.
15.9.2.3 Power factor capacitors shall be located as far as practicable from the
ballast, and in no case closer than 80 mm.
Shall be standard for two pin lamps unbreakable plastic, end compression
type of HPM Pierlite or other approved manufacture.
15.9.4 Ballasts
S-101
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.9.5 Starters
Shall be with non inflammable case, and with ceramic enclosed type radio
interference suppression capacitor, rapid start. Holders shall allow two-third
of starters to be exposed for easy replacement.
15.9.6 Wiring
Where specified as plug-in type, light fittings shall be provided with a 3 pin
plug and 1050 mm of 24/.02 mm (23/.0076") flex, terminated and secured
within the light fitting. Heat resistant flexible cables shall be used for internal
wiring in luminaires.
15.10.1 General
15.10.1.1 Electronic high frequency control gear shall be designed to reliably start and
operate the lamp in the ambient conditions and within the limit specified by
the lamp manufacturer.
15.10.1.3 Each fluorescent fitting shall be provided with electronic high frequency twin
lamp ballast i.e. one ballast for two lamps within the same fitting.
15.10.2.1 The control gear shall come with a low-pass filter AC/DC rectifier HF power
oscillator which is used for light regulation via dimming equipment. The HF
voltage generated shall be such that the frequency will be well within the
limit set by VDE 0871 on electro- magnetic interference (EMI).
15.10.2.2 The HF ballast shall be fitted with a fuse, situated immediately after the
low-pass filter.
15.10.2.3 The HF ballast shall be provided with additional circuit to receive input for
light regulation achieved through a change in frequency. The control voltage
variation shall be between 1 and 10 volt. A control voltage of 1 0V or an open
control input shall correspond to the 100% position. A control voltage of 1V
or a short-circuited control input shall correspond to the minimum position.
In the undimmed state the HF ballast shall operate at 28 KHz.
S-102
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.10.2.4 The electronic ballast shall be guaranteed for a service life of 10 years under
the operating and temperature conditions specified. If there is any failure of
electronic ballast it shall be replaced free of charge.
15.10.2.5 Fluorescent fittings shall be provided with high frequency electronic ballasts
with dimming module where specified.
15.10.2.6 Ballasts shall be minimum loss type and comply with relevant IEC and BS
requirements.
15.10.2.7 Control gear together with power factor correction equipment shall not
generate excessive third harmonic current flow in the natural conductors.
Maximum fundamental natural current flow shall be limited to 25% of all
lighting loads on any one phase. Total harmonic current flow in the neutral of
each balanced 3 phase lighting distribution system shall be less than 25% of
each phase conductor load current.
15.10.3.1 Dimming of high frequency ballasts and lamps shall be continuous from
25% to 100%.
15.10.3.2 The complete dimming control system where specified shall be of proven
type and fully compatible with the high frequency electronic ballasts.
Dimming control system for individual offices and conference rooms shall be
equipped with light sensor combined with an amplifier unit which can
automatically control up to 50 HF ballasts. In this case it shall also be
possible to connect the amplifier with a control potentiometer and switch by
means of which the light sensor control can be manually overridden, if
required.
15.11.1.1 The high pressure mercury vapour lamp shall be ellipsoidal in shape and
shall be fitted with standard E40 nickel plated cap and suitable for use on
230V mains supply. The lamp shall be rated at 250V and shall have a
minimum efficacy of 55 1m/watt. The apparent colour temperature shall be
3300oK. The lamp shall conform to BS 3677.
S-103
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.11.1.2 The start-up time for the lamp to start from cold to reach its 80% of full light
output shall be within 3 to 4 minutes and the maximum restrike time of the
lamp shall not exceed 5 minutes.
15.11.1.3 The rated average lamp life at 10 hours per start at which 50% of the lamps
fail shall be greater than 15,000 hours. The guaranteed minimum life
expectancy of the lamp shall be 10,000 hours. The lumen depreciation
factor at rated average life shall be 0.9.
15.11.2.1 The high pressure sodium vapour lamp shall be ellipsoidal in shape (except
for SON/T which shall be tubular in shape) and shall be fitted with standard
E40 nickel plated cap (except for 70W SON lamp which shall have a E27
cap) and suitable for use on 230V mains supply. The lamp shall have a
minimum efficacy of 90 1m/watt. The apparent colour temperature shall be
2,1 00oK.
15.11.2.2 The start-up time for the lamp to start from cold to reach its 80% of full light
output shall be within 3 to 4 minutes and the maximum restrike time of the
lamp shall not exceed 1 minute.
15.11.2.3 The rated average lamp life at 10 hours per start at which 50% of the lamps
fail shall be greater than 15,000 hours. The guaranteed minimum life
expectancy of the lamp shall be 10,000 hours. The lumen depreciation
factor at rated average life shall be 0.9.
S-104
15 INDOORS LIGHTING SYSTEM (CONT’D)
a A graph showing the variation in starting current and luminous flux for
a period of 5 minutes from switching on.
b A lamp mortality curve for 10 hours per start and for continuous
operation.
15.12.1 Lamp control gears (ballasts, ignitors, capacitors) of the high pressure
sodium lamp shall be designed to reliably start and operate the lamp in the
ambient conditions and within the limit specified by the lamp manufacturer.
15.12.2 Ballast shall be auto-regulator; precision wound type, with high power factor
and shall have a guaranteed life of 10 years. The ballast shall be
tropicalised and encapsulated in non-melt resin (155°C) to ensure
maximum protection from moisture and corrosion. The noise level shall be
less than 30 dBA at a distance of 1 meter. All ballasts shall reliably operate
the high pressure sodium lamps at mains voltage of 200V to 245V.
15.12.3 Ballast temperature shall not exceed the maximum permissible operating
temperature of the ballast insulating materials. Ballast with known cooler
temperature will be preferred. Ballast offered shall be the low loss type.
15.12.4 Power factor of the lamp circuit shall be maintained above 0.85 lagging.
Power correcting capacitor shall comply with SS 123 and BS 4017 and shall
be of MPP (Metalised Polypropylene) type.
S-105
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.12.5 Electronic ignitors shall be totally enclosed type. It shall ensure quick
start-up and quick restrike of the high pressure sodium lamp. The ignitor
shall have the ability to sense a failed lamp and switch off to avoid high
voltage stress and high current on the ballast and avoid creating radio
interference.
15.13.1.1 The lamp shall be rated at between 35W to 90W and shall have a minimum
efficacy of 140 1m/watt. Low pressure sodium lamps shall have BX 22 cap
and shall be suitable for use on the mains voltage of 220V to 245V and
comply to BS 3767 and IEC 192.
15.13.1.2 The start-up time for the lamp to start from cold to reach its 80% of full light
output shall be within 6 to 11 minutes and restrike immediately.
15.13.1.3 The rated average lamp life at 10 hours per start at which 50% of the lamps
failed shall be greater than 15,000 hours. The lumen depreciation factor at
rated average life 15,000 hours shall be 0.9.
15.13.2.1 The performance characteristics of the low pressure discharge lamps shall
be stated and substantiated with all relevant and necessary supporting
documents such as manufacturer's catalogue, and testing reports from
independent testing laboratory, preferably Singapore Institute of Standards
and Industrial Research, to the satisfaction of the SO.
a A graph showing the variation in starting current and luminous flux for
a period of 5 minutes from switching on.
b A lamp mortality curve for 10 hours per start and for continuous
operation.
S-106
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.14.1 Lamp control gears (ballasts, ignitors, capacitors) of the low pressure
sodium lamps shall be designed to reliably start and operate the lamp in the
ambient condition and within the limit specified by the lamp manufacturer.
15.14.2 Ballast for low pressure sodium lamps shall comply to BS 4782, precision
wound type, with high power factor and shall have a guaranteed life of 10
years. The ballast shall be tropicalised and encapsulated in non-melt resin
(155oC) to ensure maximum protection from moisture and corrosion. The
noise level shall be less than 30 dBA at a distance of 1 meter. All ballasts
shall reliably operate the low pressure sodium lamps at mains voltage 200V
to 245V.
15.14.3 Ballast temperature shall not exceed the maximum permissible operating
temperature of the ballast insulating materials. Ballasts with known cooler
temperature will be preferred. Ballasts offered shall be the low loss type.
The ballast loss anticipated shall be indicated.
15.14.4 Ignitors for low pressure sodium lamps shall be totally enclosed type. It shall
ensure quick start-up and quick restrike of the low pressure sodium lamp.
The ignitor shall have the ability to sense a failed lamp and switch off to
avoid high voltage stress and high current of the ballast and avoid creating
radio interference. The control gear shall ensure immediate re-ignition of the
low pressure sodium lamp when there is momentary interruption of power.
15.14.5 Power factor of the lamp circuit shall be maintained above 0.85 lagging. The
power factor correcting capacitor shall comply with SS 123 and BS 4017
and shall be of MPP (Metalised polypropylene) type.
S-107
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.15.1 The luminaire shall come with stepped mirror louver. The body shall be
sheet steel, high grade with stove enamel finish. Parabolic mirror louver
shall be aluminium louver with V shaped longitudinal vanes and stepped
transverse vanes made of chemical brightened and anodised aluminium.
Exceptional precise thickness of transverse vanes minimum 2.3mm in light
control, high visual comfort with a minimum of glare. Additional parabolic
mirror behind the lamps to ensure light output ratio to be greater than 0.8.
Electrical connections shall come with cable entry via grommets, all wiring
using heat resistant (105 deg C) cable. The fitting shall be complete with
aluminium trimming. The attachment itself which can be hinged for simple
lamp replacement. Radio interference suppressed to EEC 76/890.
15.15.2 Performance of the parabolic mirror louver shall not be inferior to the
following:
S-108
15 INDOORS LIGHTING SYSTEM (CONT’D)
Fittings shall be basically similar to batten fittings but with the addition of a
close fitting wrap around prismatic diffuser and suitable moulded end plates.
The down light shall be extra low brightness, porcelain ES lamp holder with
adjustable mounting clips, prewired to junction box cable clamp for incoming
cables and black baffle, and complete with 200W ES Par 38 lamp.
The exit lights shall be directional sign fitting, 1 with lettering on 1-2-3 or 4
sides as required and comply to CP 19. The self-contained emergency
lighting unit shall consist of hermetically sealed nickel cadmium secondary
battery, a solid state inverter and charger unit. Solid state switching in
conjunction with 2-20 Watt lamps for normal illumination and 2-6 Watts
lamps for emergency illumination. The unit shall be rated for 1/2 hour to take
up lighting the exit sign and the down light on the bottom of the fixture giving
a spread of light over doorway lighting the means of egress. The fittings
shall have die cast aluminium front with 20 gauge metal housing.
S-109
15 INDOORS LIGHTING SYSTEM (CONT’D)
15.21 .3 Diffuser shall be injection moulded acrylic with internal prising and sharp rim
for excellent seal and is ultra violet stabilized with a guaranteed minimum
life of 10 years.
Walkway bollard light fittings shall be 1 metre high with one 70W high
pressure sodium vapour (SON) lamp. The control gear, fuse cut-off and
cable looping connectors shall be mounted on a removable carriage within
the luminaries. The column of the bollard light shall be fixed on to a metal
base plate anchored to concrete block. The bollard light fitting shall be
vandal proof, insect proof, dust proof and splash proof to BS 4533 class I
IP55. The light transmitting window of the bollard shall be made of ultra
violet stabilized clear LEXAN. The bollard lights used shall have double
asymmetrical distribution and completely light cut-off at 90o to ensure glare
free performance. The finish of the luminaries shall be satin anodised
bronze colour.
16.3 A 25 x 3.2 mm copper tape shall be provided from the main earth point to the
main switchboard.
S-110
16 EARTHING OF ELECTRICAL INSTALLATION (CONT’D)
16.4 The Contractor may be required to construct earth pits where good earthing
cannot be obtained from single rod electrodes.
16.5 All earthing materials must be of approved type from the relevant authority.
17 LIGHTNING PROTECTION
17.1 Air terminations shall consist of 16 mm diameter 1850 mm long hard drawn
solid copper or Aluminium rods having single discharge point and fixed to
the roof with purpose made base and saddle on concrete blocks.
17.3.1 Down tapes shall consist of 25 x 3.2 mm high conductivity, Aluminium tape
fixed at 1000 mm intervals by means of purpose made Aluminium clips.
Down tapes shall be so routed that there shall be neither sharp bends or
horizontal runs.
17.3.2 Down tape shall be connected to a approved bi- metallic connector and
brass test clamp at a height indicated by SO. Down tape shall be connected
to roof tapes by means of end or ridge air termination clamping device.
Joints in runs of all tapes shall be made by means of double riveted and
sweated overlapping joints. Scaffoldings or staging may have to be erected
to allow work on vertical surfaces of high buildings.
S-111
17 LIGHTNING PROTECTION
17.5.1 Earthing rods shall consist of 16 mm diameter solid copper clad steel rods in
individual length not less than 1800 mm total and shall be installed at least 2
metres away from the building. Down tapes connections to earth rods shall
be by means of purpose made clamps but tapes shall not be cut off short
until satisfactory tests have been obtained.
17.5.2 Earthing rods shall be driven into the ground by means of hammers with
protection for the screw threads and in locations at a minimum of 2000 mm
away from the building.
17.5.3 A GI inspection pit with cover shall be provided for each electrode
measuring 200 x 200 x 250 mm deep. The concrete cover shall be fixed
flush with the ground level and shall be provided with means for easy
removal for inspection.
17.5.4 Testing of earthing resistance shall be carried out in dry weather conditions
by the Contractor or after a minimum of 3 rainless days. The earthing
resistance shall not be more than 10 ohms.
17.5.5 The Contractor shall also carry out tests to ensure that the structural steel
columns provide a good conducting path in lieu of down tapes and inform
the SO of need to install down tapes where the continuity is unsatisfactory.
18.1.1 Lamps, fluorescent tubes, ballasts, capacitors, starters and igniters shall be
of reputable quality. All tubes used shall be 600mm, 1200mm or 1500mm,
26mm diameter, bi-pin cap, warm white/daylight energy saving tube of
colour 84 or equivalent. The tubes shall comply with SS181 and BS 1853
and suitable for use on 240V supply.
18.1.2 All light fittings shall be delivered to the job site completely equipped with
ballasts, capacitors, starters, lamp holders or sockets, diffusing materials,
refractors, reflectors, canopies, brackets, stems, plates and the like (with the
exception of lamps), wired, assembled and tested by the fitting
manufacturer.
S-112
18 CLEANING, RE-LAMPING AND REPLACEMENT OF CONTROL GEARS
ANDACCESSORIES OF LIGHTING FIXTURES (CONT’D)
18.1.4 The Contractor shall submit appropriate certification that the fittings are
covered by a three-year manufacturer's guarantee. The Contractor shall
supply and install the light fittings complete with all necessary suspension
rods of appropriate length if required.
18.1.5 Samples of light fittings shall be submitted to the SO for approval prior to
installation.
18.2 Lamps
18.2.1 All fittings shall be cleaned and fresh lamps before final acceptance.
18.2.2 All lamps shall meet the requirements of Section 13 of the Specification.
Remove shade/reflector and wash with soapy water, rinse and dry. Clean
bulb, down rods or brackets and lamp holder with damp cloth, replace
shade/reflector. Wipe clean switch and box/teak block, remove stains with
cleansing powder.
Remove Globe and wash thoroughly with soapy water, rinse and dry. Clean
bulbs, down rods or brackets and lamp holder with damp cloth, replace
globe. Wipe clean switch and box/teak block, remove stains with cleansing
powder. Means to protect the lighting fitting from rain, etc shall be provided
by Contractor for the duration the globe is removed.
S-113
18 CLEANING, RE-LAMPING AND REPLACEMENT OF CONTROL GEARS
ANDACCESSORIES OF LIGHTING FIXTURES (CONT’D)
Remove tube and clean with damp cloth. Remove reflector and/or diffuser
and wash with soapy water, rinse and dry. Wipe clean down rods with damp
cloth. Replace reflector, diffuser and tube. Wipe clean switch and box/teak
block, remove stains with cleansing powder.
18.3.4 Fans
Remove accumulated dirt and clean with damp cloth fan blades, safety
cover and the rest of fan including down rods. The interior of the speed
regulator of ceiling fans is to be cleaned by means of an electric air blower,
and the cover wiped clean with a damp cloth.
Wipe clean body and glass of clock with a damp cloth and dust clean face of
clock with dry cloth.
18.3.6 Floodlights
Wipe clean inside and outside of reflector, glass and bulb with a damp cloth
and then with dry cloth. Focusing adjustments shall not be tampered with.
A floodlighting fitting under the terms of this Contract refers to any large
weatherproof enclosed lighting fitting for illuminating the external
surroundings of a building, car park or playground fitted with a lamp rated at
200 watts or more. Fluorescent through fittings used in exposed areas are
classified under this category.
Stage lighting fittings and spotlights in Hall are not classed under
floodlighting fittings nor are dental chair spotlights and other local lighting
fittings attached to equipment and machinery.
Wipe clean inside and outside of reflector, glass and bulb with damp cloth
and then wipe with dry cloth. All tumbler switches and teak blocks shall be
wiped clean of dust and dirt.
S-114
18 CLEANING, RE-LAMPING AND REPLACEMENT OF CONTROL GEARS
ANDACCESSORIES OF LIGHTING FIXTURES (CONT’D)
If any fitting or fan is found to have been cleaned deviating from the method
indicated, the SO will withhold payment until such fan or fitting is properly
re-cleaned. The Contractor shall further be liable for debarment from future
tendering for a period of not less than one year if he further persists in
carrying out work not strictly in accordance with this whole subsection
herein.
19 FANS
19.1.1 Ceiling fans shall be 1.5m sweep complete with speed regulator and
approved for FWD use. The fans shall be able to deliver 270 m3/min of air at
full speed and mounted at approximately 2.5m above floor level. They shall
comply with SS 15 and operate at 50 Hz, 230V single-phase AC. Motors of
ceiling fans shall be of the totally enclosed type. No readily flammable
materials shall be used in the construction of fan and regulator. Moulded
parts of use shall be of such materials as will withstand the maximum
temperature attained in the adjacent component parts. Only suitable
materials resistant to moisture shall be used and the fan shall be capable of
withstanding the moisture proof test specified in Clause 17 of SS 15. Electric
fans shall be either of the following two types:
S-115
19 FANS (CONT’D)
19.1.2 The suspension rod of ceiling fan shall be of adequate strength and shall not
be threaded. The down rod shall be supplied with an. adequately strong
shackle capable of carrying the fan motor, blades and canopies where
provided. The shackle shall embody a bush or reel of resilient material. The
down rod shall be of a steel tube through which the cable supplying power to
the fan shall be drawn. The wall thickness of the tube shall not be less than
2.5mm. No screwed connections are allowed in the rod. All surfaces of the
assembly and mechanism of both fan and regulator if any, shall be of
corrosion resisting materials or shall be suitably and durably protected
against corrosion. Bolts used for any joint shall be at least SAE grade E.
Bolts used shall have unthreaded portion if they are inside the suspension
rod. All joints shall have the design as shown in attached sketch. Other type
of joint design shall be submitted for approval.
19.1.3 All fans shall be provided with safety wire. The safety wire shall be properly
secured onto the motor shaft at one end and the fan hook at the other end.
The safety wire shall be made of stainless steel, preferably stainless steel
aircraft cable and shall have a safety factor of at least 20 times the static
load of the fan. An adequate length of safety wire shall be provided such that
failure of the fan components causing the fan to drop shall be easily
observable. Test certificates issued by independent testing authorities
verifying the maximum allowable loading of the safety wire shall be
submitted. The hook shall be made of mild steel rod of minimum 1 cm
diameter. The hook shall be rigidly embedded into the ceiling beam, floor
slab or clamped to the trusses, wherever applicable. It shall be so fitted as to
securely support the whole weight of the fan even under adverse operating
condition. Supports including additional timber blocks for the fixing of the
hook shall be provided where necessary. The various acceptable methods
of installation of fan hooks are illustrated in the schedule of drawings and
shall be followed by the Contractor.
S-116
19 FANS (CONT’D)
19.1.4 Regulators shall be capable of reducing the speed of the fan by at least 40%
of the full speed at the test voltage. Fans shall be capable of starting up and
running at any speed step indicated on the regulator at the rated voltage or
voltages or within the whole rated voltage range (whichever applicable). The
regulator shall have an 'OFF' position next to the lowest speed contact, and
shall be provided with running positions, with the speed steps being equal
as far as possible. Where a regulator is provided with a capacitor not
permanently connected across the motor terminals, provision shall be made
so that the capacitor is discharged when the regulator is in the 'OFF'
position. The regulator handle or knob, if of metal, shall be adequately
insulated electrically and thermally. The mechanism of the regulator shall be
so designed to ensure positive contact at each speed position.
19.1.5 In the case of induction type regulators no position of the induction winding
can remain permanently short-circuited in any of the running positions. In
the case of resistance type regulators, the materials used for the casing
must be such, that it is capable of withstanding the maximum operating
temperature for a continuous period without discoloration or distortion.
19.1.6 All ceiling fans installed shall be provided with an approved durable and
heavy duty sticker with the following information:
Date installed:
Company Name:
Company stamp:
19.2.1 Wall fans shall be either 400mm or 500mm diameter, oscillating type,
intended for use off a 220/230V 50 Hz line.
S-117
19.2 Wall Fans (Cont’d)
19.2.2 The angle of oscillating shall be no less than 80oC (i.e. 40 degrees off both
sides of the "straight-ahead" position). The speed of the fan shall be in the
range of 920 rpm - 520 rpm with a 3-step speed selector. Air velocity shall
be in the range of 3.8m/sec to 13.7m/sec.
19.2.3 The mounting of all wall fans shall be with expansion type anchor bolts with
washer and two locknuts. The bolts shall penetrate into concrete to a depth
of not less than 32mm. In any case the mounting system shall allow for a
factor of safety of not less than 10.
S-118
CERTIFICATION OF SAFETY OF CEILING FAN
INSTALLATION BY CONTRACTOR
I hereby certify that the following ceiling fans installed are in accordance with
the safety requirements in this term contract specifications and that they are safe for
operation: -
Total:
Contractor's Stamp:
S-119
20 T HE RM O G RAP HI C I NF RARE D S URVEY F O R E LE CT RI CAL
INSTALLATION
20.2 Equipment
20.2.1 The infrared camera shall be of long wavelength (between 8-12 micrometer)
so that it is immune from false alarm due to solar radiation.
20.2.2 It shall be able to measure image scene temperature ranging from -20°C to
+400°C at humidity expected of local conditions.
20.2.4 Image resolution of at least 180 by 200 pixels per image to facilitate
correlation to actual object/equipment that one is looking at.
20.3 Report
20.3.3 Clear description of the problem, classification of faults and the condition in
which it was recorded.
20.3.4 Each fault/problem detected shall be supported with colour infrared image
with temperature indication and colour photograph of the faulty equipment.
S-120
1.0 LOW TENSION ELECTRICAL INSTALLATION
1.1.1 It is deemed that the yearly inspection and testing of the electrical
installation shall include the whole electrical installation and as
specified herein.
1.1.2 All the tests and checks as specified in the following paragraphs
shall be supervised by an appropriate grade of LEW (Licensed
electrical worker) under PUB Act & Regulations and the minimum
qualification of this person shall be a diploma holder. The
Contractor shall submit the names of the person with their relevant
qualifications and experience in the submission. Only these
persons named shall sign on the test reports.
1.1.3 Verification/tracing out of all mains and sub mains cables main &
sub-switchboards and final distribution boards fitted on site and
updating of single line drawings (negative) shall be carried out. The
Contractor shall submit one set of single line drawings in tracing A1
size and one set in print and also laminate all the single line
drawings and put one complete set of this updated single line
drawings on site in the enclosures provided. Where there are no
enclosures provided, the Contractor shall supply and install
powder-coated metal enclosures of 400mm(H) x 400mm(W) x
100mm(D) complete with handle at no cost to the Government. If
the existing single line diagrams are in different sizes of negatives,
the Contractor shall redraw all the existing single line diagrams of
the electrical installation into A1 sizes. This shall deem to be
included, as part of the scope of works and no claim for this item
shall be entertained.
1.1.4 The Contractor shall print/type the relevant PUB licence application
form and obtain user's signature on both the test report and the
application form after carrying out the inspection and testing of the
installation. The form E1 shall be submitted to the SO six weeks
before the expiry of the installation. The test reports shall be
submitted together with the monthly report within the first week of
the following month after the test.
1.1.5 The Contractor shall replace all blown indicating bulbs including the
transformer, indicating instruments and other small parts on the
switchboard/sub-switchboards to final distribution boards which are
faulty, missing, broken, etc.
S-121
1.0 LOW TENSION ELECTRICAL INSTALLATION (CONT’D)
1.1.6 All safety regulations are to be strictly adhered to. The Contractor
shall ensure the posting of danger signs, "isolation of power" signs,
shut down signs, "Do not operate" signs etc for the safety of the
workers and the safety of personnel in the premises. Any persons
injured in the course of the testing and checking of the installation
as a result of the Contractor's negligence to prov ide safety
measures shall be the Contractor's responsibility.
1.1.7 The Contractor shall perform the inspection and testing on an
annual basis and submit a full test report on the installation. This
test report shall be endorsed by the Contractor's LEW.
1.1.8 The inspection and testing of electrical installation shall include the
following:
1.1.9 The Contractor shall investigate further if the Meggar readings are
below One (1) Mega ohm and submit a report to the SO on the
investigation within one week of the discovery of his low Meggar
readings.
1.1.10 The Contractor shall also check and trace those circuits which have
shared neutral and to submit a report and recommend remedial
actions to be taken.
1.1.11 The above tests shall be conducted for the entire electrical
installation in the locations as listed in Schedule VIII which shall
include from the main switchboards to sub mains switchboards to
final distribution boards and including final sub circuits. A typical
single line diagram of the electrical installation is as attached in
Appendix H.
S-122
1.0 LOW TENSION ELECTRICAL INSTALLATION (CONT’D)
b) For the mains and sub mains switchboards up to the final Dbs,
the Contractor shall label all circuit protective devices on these
switchboards or Dbs.
e) The Contractor shall after tracing out the cables for the entire
electrical installation, verify and authenticate these on the
drawings.
f) The Contractor shall carry out the following works for the LV
switch rooms and cable chambers (including trenches),
electrical risers/closets, etc :
S-123
1.0 LOW TENSION ELECTRICAL INSTALLATION (CONT’D)
i) Signs of corrosion
a) The Contractor shall de-energize the busducts and carry out the
following :
i) Inspect and torgue all electrical joints and terminations using
an approved trogue wrench to the value recommended by
manufacturer.
S-124
1.0 LOW TENSION ELECTRICAL INSTALLATION (CONT’D)
1.1.15 The Contractor shall check and ensure that all earthing conductors
and connections are sound for the entire electrical earthing system.
1.2.1 The Contractor shall arrange for and schedule a once in three
years shutdown maintenance of all the switchboards including sub-
switchboards and emergency boards. This testing can only be
done after office hours. The Contractor shall make all necessary
arrangements with the User Department of the electrical installation
under test, including shutting down or deenergization of supply,
displaying warning signs, test schedule, and subsequent re -
energization of supply etc. for carrying out the work to avoid
disruptions to the User Department operations. The Contractor
shall also display notices of the intention to shutdown on prominent
locations to inform the users on the date and time of shutdown.
S-125
1.0 LOW TENSION ELECTRICAL INSTALLATION (CONT’D)
1.2 THREE YEARLY MAINTENANCE OF SWITCHBOARDS /
SWITCHGEARS
1.2.2 The Contractor's LEW shall also arrange and liase with Power
Supply for the shutdown of the incoming feeder so that the
incoming connections can be checked. This shall include the cost
for shutdown of the incoming feeder(s) and this is payable to Power
Supply directly. Any cost incurred this clause shall not be payable.
1.2.3 The Contractor shall shutdown all Low Tension Switchboards and
carries out the following test/checks on these switchboards :
h) Final checks for proper operation and ensure all fastenings are
tight and good contact is made.
1.2.4 The Contractor shall engage authorised agent for the air-circuit
breakers and moulded case circuit breakers, transfer switches, and
isolators to check and test the following items :
S-126
1.0 LOW TENSION ELECTRICAL INSTALLATION (CONT’D)
1.2 THREE YEARLY MAINTENANCE OF SWITCHBOARDS /
SWITCHGEARS
1.2.4 The Contractor shall engage authorised agent for the air-circuit
breakers and moulded case circuit breakers, transfer switches, and
isolators to check and test the following items: (Cont’d)
1.2.5 If there is any rectification works to be carried out due to the failure
in the above items, the Contractor shall arrange during the
shutdown to replace the entire circuit breaker, transfer switches or
isolators and to get the authorised agent to repair and subsequent
reinstallation of the faulty breaker, transfer switches or isolators.
This shall be done so as to minimize disruption to the users. This
cost shall deem to be included in the tender and there shall be no
claim by the Contractor for this item.
1 .2.7 The Contractor shall fill up all cable trenches for all switchrooms
with sand up to the floor level of the switch room.
S-127
COMMUNICATION
PARTICULAR REOUIREMENTS
1 SCOPE OF WORKS
The works embraced in this Contract comprises the supply and installation of new,
modification and repairing of existing communication installations. These works shall
include equipment, devices, fittings, accessories, electrical and control panel, brackets
and supports, etc
The Contractor shall carry out the works in accordance with the Specification in the
best workmanlike manner and commercial practice and shall comply with the
following:
a. All current local regulations, safety codes and other relevant statutes in
force in Singapore.
The tenderer shall ensure that he is clear of the actual extent and nature of works
required under this Contract and shall clarify any doubt of the same with the SO before
the submission of tender. No Claim arising out of the lack of clarity or availability of
information will be entertained.
S-128
COMMUNICATION
TECHNICAL SPECIFICATION
1.2 LAN points shall be provided to rooms as ind icated in the Design
Handbooks/Circulars.
1.4 All trunking and conduits passing through/terminating in the LAN and
Central Server Rooms shall be properly sealed internally and externally to
avoid condensation in these rooms.
2.1 TELEPHONES
2.4 Cable trunking (for a dedicated lease line) shall be installed between the
Central Server Room and the Telecom Equipment Room
S-129
3.0 SOUND REINFORCEMENT SYSTEM (CONT’D)
S-130
SECURITY SYSTEM
PARTICULAR REOUIREMENTS
1 SCOPE OF WORKS
The works embraced in this Contract comprises the supply and installation of new,
modification and repairing of existing security systems works. These works shall include
equipments, devices, fittings, accessories, electrical and control panels, brackets and
supports, etc
The Contractor shall carry out the works in accordance with the Specification in the best
workmanship-like manner and commercial practice and shall comply with the following:
a. All current local regulations, safety codes and other relevant statutes in force
in Singapore.
The tenderer shall ensure that he is clear of the actual extent and nature of works
required under this Contract and shall clarify any doubt of the same with the SO before the
submission of tender. No Claim arising out of the lack of clarity or availability of information
will be entertained.
S-131
SECURITY SYSTEM
TECHNICAL SPECIFICATION
1.2 Electronic Security Alarm shall be provided to rooms as indicated in the Design
Handbooks/Circulars. The system shall comprise dual tech-motion detectors,
magnetic door contacts, siren and strobe lights, panic button at the principal’s
table and key holding services.
1.3 Each room shall be considered as one zone.
1.4 Note that relevant authorities from MHA shall inspect and approve the security
alarm system for the Armoury.
1.5 Consultants shall co-ordinate with the relevant telecommunication companies
and ensure that a dedicated lease line is provided and connected to MHA
approved alarm monitoring company for the key holding services.
S-132
FIRE PROTECTION SYSTEMS
SCHEDULE OF MAINTENANCE
A GE NE RAL
3 The Contractor shall provide a logbook in the form shown in the latest
CP10 Appendix C. This logbook shall be of hard cover type in A5 size
(210 x 148mm) and shall be kept inside the Main Fire-Indicator-Board
(FIB) for record purposes. The Contractor shall also ensure that their
serviceman record their activities inside the record book (log book).
B WEEKLY SERVICING
2 Carry out a simulated fire alarm call by operating any alarm zone so as
to transmit a fire alarm signal to the monitoring station and reset the
system.
4 On completion of the tests ensure that all switches are in the correct
operating condition, and should fault(s) condition exist take immediate
steps to rectify the fault(s).
5 The person carrying out the test shall record in the log any fault(s)
identified and that the above test has been carried out.
S-133
C MONTHLY SERVICING
3 Simulate fire conditions on all alarm zones and reset the system to
normal. Confirm with the monitoring station when the test has been
completed.
7 Check to ensure that all indicating lights are operating correctly and
replace if faulty.
9 Disconnect the battery supply and ensure that the visual and audible
fault signals are activated at the main alarm panel. Check the battery
voltage by disconnecting the battery from the charger output and ensure
that the operating voltage is correct.
10 Simulate main power supply failure and ensure that the system will
operate correctly with the standby battery power supply.
11 Simulate fire alarm conditions and check the output signals available to
initiate the remote auxiliary functions that are required to be in operation
in the event of fire as in accordance with the appropriate codes. It is
recommended that where the air handling plant shut down facilities are
provided these should be operated at least on a monthly basis. The
persons responsible for maintaining the air handling plant should
however, be notified prior to shutdown and it shall be the responsibility of
the client to provide qualified personnel to be in attendance and to re-
start the plant. The initiation facilities shall also include the lift homing
devices and security/auto doors that are connected to the fire alarm
system. All these initiation facilities shall be tested.
S-134
C MONTHLY SERVICING (CONT’D)
12 Simulate fault conditions on all alarm zones to ensure that the main
alarm panel is operating correctly.
13 Check that the main alarm panel is in a clean and operative condition
and ensure that the enclosure is maintaining a satisfactory dust seal.
15 Ensure that faulty parts are replaced and the replacement h as been
carried out satisfactorily. Record in the logbook any circuit fault that
required repair or which are subject to alteration or extension.
16 Check that all switches are returned to their operating position after the
test.
17 Record in the log any fault(s) identified and that the above test has been
carried out including fault response visits if any.
19 All smoke detectors shall be cleaned every six months, including Beam
master where applicable.
20 The beam master shall be tested in the monthly servicing of the fire
alarm panel, where applicable.
22 The Contractor shall also provide a sticker as below to indicate the date
the detector/manual call point tested. This sticker shall be prominently
displayed for easy checking.
S-135
D ANNUAL SERVICING
The annual servicing shall consist of all the weekly and Monthly
servicing as specified above and including the following:
1 The Contractor shall arrange to check the operation of one-third of all the
detectors in the installation each year. The checking shall take the form
of either:
5 Record in the log any fault(s) identified and that the above test has been
carried out including fault response visits if any.
6 The Contractor shall spray paint all the panels (including FIBS and SIBs)
at least once for the period of the contract as follow: (touch-up painting
shall be carried out for the interior of the panel as and when necessary
or as directed by the SO, at no extra charge).
a prepare (brush down, sand, etc.) and apply one coat of zinc -
chromate and
d all the painting works shall be carried out on site. The Contractor
shall bring to site all necessary equipment required for the above
work.
S-136
GAS INSTALLATIONS
PARTICULAR REQUIREMENTS
1 SCOPE OF WORKS
The works embraced in this Contract comprises the supply and installation
of new, modification and repairing of existing gas installations works. These
works shall include equipment, devices, fittings, accessories, electrical and
control panel, brackets and supports, etc
The Contractor shall carry out the works in accordance with the
Specification in the best workmanship-like manner and commercial practice
and shall comply with the following:
a. All current local regulations, safety codes and other relevant
acts in force in Singapore.
b. The latest edition of IEE regulations and appropriate British
Standards
The tenderer shall ensure that he is clear of the actual extent and nature of
works required under this Contract and shall clarify any doubt of the same
with the SO before the submission of tender. No claims arising out of the lack
of clarity or availability of information will be entertained.
S-137
GAS INSTALLATIONS
TECHNICAL SPECIFICATION
1 STANDARD OF WORKMANSHIP
1.1 Only the highest standard of workmanship will be permitted and should
it be decided by the SO or his representatives that any section of work
is sub-standard, then the Contractor will remove and replace at no
extra cost to the Government.
1.2 The pipe work must be in accordance with good gas fitting practice and
generally includes cutting, bending and threading of pipes, jointing of
pipes and fittings, fixing of all brackets, cutting of holes on floor, walls
etc and making good when the work is completed.
1.3 All work shall comply with all local regulations, safety codes, codes of
practice and other relevant acts in force in Singapore.
1.4 The gas installation work must comply with the Singapore Standard CP
51: 1990 Code of Practice for Manufactured Gas Installation, Public
Utilities Act (Chapter 261) - revised edition 1992 and Public Utilities
(Gas Supply) Regulation 1992.
1:5 Further to CP51, the Contractor shall also comply with the guidelines in
t h e " Ha n d bo o k o n P u b lic Ut il it ie s B o a rd ' s P ro c e d u re s a n d
Requirements for Gas Supply". This handbook is obtainable from
Power Grid.
The successful tenderer shall provide his own labour, transport and
materials required for the installation of gas pipe work.
The successful tenderer must supply his labour force with good quality
tools, ladder etc, in order that no pipes or fittings are damaged during
installation. Suitable scaffolding must also be provided as required.
S-138
4 MATERIALS
Materials used for gas service pipes should comply with the
requirements of the following standards or equivalent.
4.1 Pipes
For pipe work from the property boundary line up to the building line,
pipe work shall be ductile iron to BS 4772 Class K9.
Pipe work within the building line shall normally be galvanized iron
complying with SS 17 or BS 1387 or copper tube complying with BS
2871: Part 1, Table X. For 15mm copper tube, joints shall be made of
brass compression fittings utilising brass internal gripper rings. For the
following category of gas pipes, the pipe thickness should be of heavy
gauge:
For all pipes other than those listed above, the pipe thickness shall be
of medium gauge.
S-139
4 MATERIALS (CONT'D)
(f ) Leak detectors
BS 6020 Instruments for the detection of combustible gases
Part 1: Specification for general requirements and test
methods.
Part 4: Specification for performance requirements for Group II
instruments reading up to 100% lower explosive limit.
S-140
4 MATERIALS (CONT'D)
4.3 Flanges
BS 4504 Flanges and bolting for pipes, valves and fittings. Metric
series.
S-141
4 MATERIALS (CONT'D)
4.5 Others
(b) Su rfa ce bo x an d co ve r
BS 5834 Surface boxes, guards and underground chambers
for gas and waterworks purposes.
Part 2: Small surface boxes.
5 METHOD OF INSTALLATION
5.1 General
Pipe sleeve shall be provided for any pipe passing through a wall or
floor.
5.2 Slope
All installation pipes should have a fall of at least 1 in 120 towards the
service. Where this is not permissible, a siphon leg should be provided.
This is simply a tee-piece with a tail pipe which is capped or plugged
off and from which condensate can be drained off by loosening the
plug or cap when required.
S-142
5 METHOD OF INSTALLATION (CONT'D)
5.3 Jointing
All joints shall be made with PTFE tape and Power Gas gas jointing
compound. Yarn must never be used on all gas joints.
5.5 A sleeve with minimum 150mm projection above the floor level needs
to be provided for gas pipe run through the floor slab. In the case of a
wet area the projection needs to be at least 300mm. The gas pipe
within the sleeve needs to be wrapped with petrolatum tape and the
gap between the sleeve and the pipe to be sealed with sealant.
5.6 The Gas pipe needs to be coated with primer for corrosion protection
before the final colour coat. For identification purpose the word “gas”
needs to be printed along the pipe if the colour code used is other than
No. 356 (BS381 C) canary yellow.
General
S-143
5 METHOD OF INSTALLATION (CONT'D)
General (Cont’d)
Piping shall not be sprung into place but shall hang freely and shall not
transmit vibration to the building structure. Sway bracing shall be
provided where necessary to prevent undue pipe movement under
operating conditions.
Anchors shall be full pipe "D" clamp type formed of flat bar of minimum
width 38mm. The use of "U" bolt anchors for pipe size 65mm and
above shall not be acceptable.
S-144
5 METHOD OF INSTALLATION (CONT'D)
up to 40 mm 8 mm dia
50 mm to 65 mm 10 mm dia
80 mm to 150 mm 12.5 mm dia
b. From nylon coated steel sections 20mm wide x 5mm thick for
piping up to 150mm.
S-145
5 METHOD OF INSTALLATION (CONT'D)
Bolts and Nuts: All bolts and coach screws shall be sized to suit the
load but in no case shall the diameter be less than 8mm for fastening
to timber or less than 12mm for fastening to steel, masonry or
concrete.
S-146
5 METHOD OF INSTALLATION (CONT'D)
The distance between pipe supports shall not exceed the following: -
Nominal size of piping (mm) Steel piping (metres)
15 2.5
20 3.0
25 3.0
32 4.0
40 4.0
50 4.0
65 4.5
80 4.5
100 and over 6.0
All buried piping and pipes in channels shall be wrapped complete with
petrolatum tapes. All other piping shall be painted with PWD approved
brand paint to BS 381C Colour No 365 (Canary Yellow) or approved
equivalent standard.
5.13 Painting
S-147
5 METHOD OF INSTALLATION (CONT'D)
5.15 Finishes
5.15.1General
For surfaces which shall operate below 93oC, the finishing coat
shall be high grade alkyd enamel.
6 PROHIBITED AREAS FOR GAS PIPING
The installing Contractor shall ensure that gas pipes are not laid
through the following areas for safety reasons: -
b. Lift shafts.
S-148
7 INSPECTIONS AND TESTING
The completed internal gas pipe installation shall first be tested by the
Contractor for soundness as follows:
(b) All gas pipes installed by Contractors shall be left exposed for
inspection and approval by the relevant authority. The following
will be checked during the inspection:
b) The air pressure in the mains shall be raised to the test pressure
of about 140 kpa. A pressure gauge range from 0 - 200 kpa
should be used;
c) The tester shall wait for about 10 min to allow the temperature in
the system to stabilize before recording down the pressure-
gauge reading;
f) If there is a fall in pressure at the end of the test, the leak should
be traced with soap solution, rectified and retested.
S-149
7 INSPECTIONS AND TESTING (CONT'D)
a) Cap or plug off all outlets of the system leaving only one
opening which shall be fitted with a T-piece having a gas cock
on one end and a manometer (U-gauge) / or a pressure gauge,
on the other;
b) Pump air into the system through the gas cock on the T-piece
until a pressure of 300 mm w.g. is registered on the U-gauge.
For service pipe or installation pipe buried in the ground, the
required test pressure is 2,000 mm w.g.;
c) Shut the gas cock and allow 2 min for stabilization of pressure;
e) If there is a fall in pressure at the end of the test, the leak should
be traced with a soap solution, rectified and retested.
8 REPAIR WORKS
8.1 The successful tenderer shall attend to all repair or breakdown calls
from the appointed Managing Agent. Such attendance shall be made
within 24 hours of the receipt of the call. Any cost incurred by the
Contractor as result of such attendance shall be borne by him and
deemed to be covered by the unit rates.
8.2 Upon attendance, if repairs are required, the Contractor shall submit a
quotation within two (2) days following the attendance of repair call to
the user department and shall extend a copy of the Quotation to the
appointed Managing Agent.
S-150
9 VALVE
Non-return valve shall be installed on the gas line for gas appliances
installed with a blower. Such valves shall be of the diaphragm type and
when installed should not cause a pressure drop of more than 7.5 mm
w. g. in the gas supply pressure.
The two-way laboratory bench taps must be suitable for use on both: -
The two-way laboratory bench taps are to be made of brass and shall
be in black Epoxy Resin Base surface finish.
Each two-way laboratory bench tap should have two separate hose
nozzle outlets at 90o of movement between the 'on' and 'off' positions.
Both cocks are to be mounted in conical base having mounting flanges
with countersunk screw fixing holes and inlet connection screwed 8mm
(0.3”) BS Taper Pipe Thread-Male or approved equivalent standard.
The gas control cock shall be ball-type suitable for use to the approval
of Power Gas.
S-151
9 VALVE (CONT'D)
Tenderers must submit at least one roll of tape as sample together with
trade literature and detailed specifications to the Chief Estates
Manager, Development & Management Services Division.
11 METAL GRATING
The metal grating shall be constructed with 10 x 50mm flat steel bar
spaced 50mm apart with 13mm rods passing through the flat steel bar.
Frame shall be provided so that the grating sits in the channel.
The gas meter box shall be fabricated from 16 SWG (1.63 mm)
aluminium plate complete with welded seamed joints and secured to
the wall so as to provide the required rigidity. The base of the box shall
be ventilated with grilles at 50mm centres. One (1) padlock with three
(3) sets of keys shall be provided.
S-152
13 LPG GAS METER
The counter shall have a minimum scale reading of 0.2 litres and
maximum scale of 9,999 m3.
14 GRILLE
Unless otherwise specified, all grilles shall have a clear opening of 280
x 140 mm approximately.
15 PRESSURE GAUGE
S-153
16 PRESSURE TAPPING
17 PRESSURE REGULATOR
S-154
PREAMBLES
1.1 GENERAL
1.1.1 The Fixed Schedule of Rates shall form the basis for valuing all
variations. It is to be read in conjunction with other Contract
Documents and the relevant Preambles in these Sections
1.2.3 Quantities measured in tonnes and quantities less than half a unit
shall be given to two places of decimals. Other quantities shall be
given to the nearest whole unit (i.e. 0.5 and over shall be
regarded as 1).
1.2.4 Words in the singular shall include the plural and words in the
plural shall include the singular according to the context. Words
importing the masculine gender shall include the feminine or
neuter as the case may require.
P-1
1.0 GENERAL (CONT’D)
1.3.5 Where an item is described as “Add to (or deduct from) ...... For
each 5mm thickness over (or under)...”, the difference for any
thickness less than 5mm shall be paid/deducted based on 5mm
thick
1.3.6 Where an item is described as “Add to the last item for the
increase in stages of 150mm deep”, the difference of any depth
less than 150mm shall be paid on 150mm depth.
1.3.7 The Fixed Schedule of Rates shall be deemed to include for all
cost in connection therewith including equipment, storage, tools,
plant, labour in unloading, transferring, setting, hoisting, fitting of
materials and goods in position, including materials required for
lapping, jointing and the like, preparing surfaces to receive new
finishes and all costs in connection therewith such as
conveyancing, duties and taxes, delivering, unloading, storing,
returning packing, handling, hoisting and lowering; for all cutting
and waste of materials; for all incidental materials such as nails,
screws, spikes, plugs, putty, tow, solder, etc. whether or not
specifically mentioned in the Fixed Schedule of Rates; cleaning
up on completion and making good all work disturbed, for all
establishment costs, overheads and profit; compliance with laws,
regulations and government departments’ requirements, access
such as staging, professional engineer’s certification for safe
access.
P-2
1.0 GENERAL (CONT’D)
1.4 ALTERATIONS
1.4.1 Rates
(c) removing all old materials, debris etc off Site including
paying all dumping fees, charges etc
P-3
1.0 GENERAL (CONT’D)
1.3.2.2 The term "taking down" or "taking up" or "taking out" and
"setting aside for re-use" shall mean the execution
complete by the Contractor of the work of taking down or
taking up, or taking out an existing article, fitting, or
material, and setting same aside on Site for subsequent
re-use and, notwithstanding the requirements of the
Standard Method of Measurement clause 3.01(d), the
rates shall be deemed to include for:
P-4
1.0 GENERAL (CONT’D)
P-5
1.0 GENERAL (CONT’D)
1.4.4 Obtaining signed receipts for handing over materials and goods
to the Employer.
2.1 MATERIALS
P-6
3.0 WORKMANSHIP
m3 - Cubic metre
m2 - Square metre
m - metre
mm - Millimeter
No - Number
N - Newton
kN - Kilonewton
kW - Kilowatt
A m p - A m pe re
kA - Kiloampere
Btu - British Thermal Unit
°C - Degrees Celsius
l - Litre
kg - Kilogramme
dB - De cibe l
Hz - Herz
HVCA - Heating and Ventilating Contractors Association
SMM - Standard Method of Measurement
BS - British Standard
CP - Code of Practice
SS - Singapore Standard
P-7
4.0 FORMAT OF DESCRIPTIONS (CONT’D)
4.3 Descriptions are usually given in the plural but secondary phrases
which qualify or describe work in addition to the main part of a
description are in the singular. These secondary phrases are
defined by the use of colons which take the place of “and”,
“including” and other conjunctions.
4.4 Every description is to be read as if the phrase “and the like” were
incorporated in it.
5.1 DEFINITIONS
5.3 “Extra over”. The price shall be the extra cost of the fittings, etc.,
over the cost of the straight length of pipe or ducting which it
replaces.
P-B
6.0 PIPEWORK
6.1 Definitions
7.1 INSULATION
P-9
8.1 STANDBY GENERATOR
P-10
SECTION A
NON INVERTER
A100001 New No 1,113.00
ME-A1
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
NON INVERTER
A100007 New No 1,336.50
NON INVERTER
A1 00010 New No 2,080.25
ME-A2
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
NON INVERTER
A100016 New No 1,690.50
NON INVERTER
A100022 New No 1,993.75
ME-A3
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
NON INVERTER
A100028 New No 2,191.25
NON INVERTER
A100034 New No 2,179.25
NON INVERTER
A1 00037 New No 2,629.75
ME-A4
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ITEM NO. DESCRIPTION UNIT RATES
(S$)
NON INVERTER
A1 00043 New No 2,326.25
NON INVERTER
A100046 New No 2,911.00
ME-A5
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
NON INVERTER
NON INVERTER
A1 00055 New No 3,013.50
NON INVERTER
A1 00061 New No 2,719.50
ME-A6
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ITEM NO. DESCRIPTION UNIT RATES
(S$)
NON INVERTER
A1 00064 New No 3,416.00
NON INVERTER
A100070 New No 2,129.00
ME-A7
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
NON INVERTER
A1 00074 New/ Replacement No 2,750.00
NON INVERTER
A1 00076 New/ Replacement No 3,400.00
NON INVERTER
A1 00078 New No 2,462.75
NON INVERTER
A1 00080 New/ Replacement No 2,900.00
ME-A8
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
2.6 Kw
3.5 Kw
4.7 KW
5.2 Kw
7.0 Kw
ME-A9
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
8.8 Kw
10.5 Kw
12.9 Kw
14.07 Kw
21.1 Kw
28.0 Kw
ME-A10
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A100104 A 28 to A 40 No 15.00
A100105 A 41 to A 60 No 20.00
A100106 A 61 to A 80 No 26.00
A100107 B 28 to B 40 No 20.00
A100108 B 41 to B 60 No 26.00
A100109 B 61 to B 80 No 30.00
ME-A11
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A12
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
No 155.00
A1 00127 To supply labour, materials, tools, transport and etc to install (only)
window air-conditioner complete with drip pans (22 gauge
aluminium sheet painted to match the casing of the window air-
conditioner) and 20mm dia. PVC drain pipe through reconstruction
of air-conditioner frame through 6" or 9" brick wall.
No 160.00
A1 00128 To supply labour, materials, tools, transport and etc to install (only)
window air-conditioner complete with drip pans (22 gauge
aluminium sheet painted to match the casing of the window air-
conditioner) and 20mm dia. PVC drain pipe through window or
vent with Area not exceeding 9 ft2.
No 175.00
A1 00129 To supply labour, materials, tools, transport and etc to install (only)
window air-conditioner complete with drip pans (22 gauge
aluminium sheet painted to match the casing of the window air-
conditioner) and 20mm dia. PVC drain pipe through window or
vent with Area exceeding 9 ft2.
No 170.00
A1 00130 To supply labour, materials, tools, transport and etc to dismantle
and reinstall window air-conditioner complete with drip pans (22
gauge aluminium sheet painted to match the casing of the window
air-co nditio ner) a nd 20 mm dia. PV C drain pip e throug h
reconstruction of air-con frame on window/vent with Area not
exceeding 9 ft2.
No 195.00
A1 00131 To supply labour, materials, tools, transport and etc to dismantle
and reinstall window air-conditioner complete with drip pans (22
gauge aluminium sheet painted to match the casing of the window
air-co nditio ner) a nd 20 m m dia. PV C drain pip e throug h
reconstruction of air-con frame on window/vent with Area
exceeding 9 ft2.
ME-A13
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A1 00133 To supply labour, materials, tools, transport and etc to dismantle No 90.00
and reinstall window air-conditioner complete with drip pans (22
gauge aluminium sheet painted to match the casing of the window
air-conditioner) and 20mm dia. PVC drain pipe through existing air-
conditioner hole equal size to the air-conditioner.
A1 00134 To supply labour, materials, tools, transport and etc to install (only) No 260.00
window air-conditioner complete with drip pans (22 gauge
aluminium sheet painted to match the casing of the window air-
conditioner) and 20mm dia. PVC drain pipe through window or
vent c/w construction of angle iron or rods bracket.
A1 00135 To supply labour, materials, tools, transport and etc to dismantle No 280.00
and reinstall (only) window air-conditioner complete with drip pans
(22 gauge aluminium sheet painted to match the casing of the
window air-conditioner) and 20mm dia. PVC drain pipe through
window or vent c/w construction of angle iron or rods bracket.
No 260.00
A1 00136 To supply labour, materials, tools, transport and etc to install (only)
window air-conditioner complete with drip pans (22 gauge
aluminium sheet painted to match the casing of the window air-
conditioner) and 20mm dia. PVC drain pipe through 6" concrete
wall c/w wooden air-cond frame
A1 00137 To supply labour, materials, tools, transport and etc to install (only) No 340.00
window air-conditioner complete with drip pans (22 gauge
aluminium sheet painted to match the casing of the window air-
conditioner) and 20mm dia. PVC drain pipe through 9" concrete
wall c/w wooden air-cond frame
ME-A14
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ITEM NO. DESCRIPTION UNIT RATES
(S$)
ME-A15
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ITEM NO. DESCRIPTION UNIT RATES
(S$)
ME-A16
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A17
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A18
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ITEM NO. DESCRIPTION UNIT RATES
(S$)
Note
The Contractor shall also carry out works related to the air-
cooled packaged unit (split type) which shall include, but not
limited to, the installation of ductworks, electronic control
equipment and accessories, electrical trunking, control panel,
air-distribution equipment, fire-damper and incidentals
necessary for the complete operation of the air-cooled ducted
packaged air-conditioning system. The detailed installation
dr aw ing (s) of th e a i r -co ol ed duct e d p ac ka ge d a ir -
conditioning system shall either be issued by the SO or SO's
appointed Consultant(s). The cost for these installation
w or k s s ha l l be ba s e d on t he u ni t r a te s i n d i c a te d i n
subsequent schedule of rates.
ME-A19
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A20
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A200015 Supply and install (Ducted Type) Single Split Unit for capacity up Set 6,000.00
to 60,000Btuh. (New / Replacement)
ME-A21
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A200031 3-phase 150A Circuit Breaker TERASAKI Electric Type TG-225 No 140.00
AC 600V, DC 250V or equivalent
A200032 No 180.00
3- phase 200A Circuit Breaker TERASAKI Electric Type TG-225 or
equivalent
ME-A22
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A200035 panel mounted CELSA Ammeter or equivalent for range of 0 - 40A No 50.00
A200036 panel mounted CELSA Ammeter or equivalent for range of 0 - 60A No 55.00
No 70.00
A200038 panel mounted CELSA Ammeter or equivalent for range of 0 -
200A
No 100.00
A200039 panel mounted CELSA Ammeter or equivalent for range of 0 -
600A
ME-A23
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A200044 4-way throw chilled water FCU with capacity up to 18,500 BTU or No 2,160.00
5.4kW
A200045 Ditto - 24,500 BTU or 7.2kW No 3,000.00
ME-A24
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A200047 Ducted chilled water FCU with capacity up to 12,500 BTU or No 1,320.00
3.7kW
ME-A25
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A26
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A27
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A28
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A29
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A200135 Capacity up to 120,000Btuh/ 35.2kW but not less than Sys 42,450.00
1 00,000Btuh / 29.0kW
ME-A30
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A300000
REFRIGERANT PIPES
Refrigerant pipes
ME-A31
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A300000
REFRIGERANT PIPES
ME-A32
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A33
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A400013 Supply and install 100mm nominal diamater galvanized steel pipe m 63.00
to ApI 5L-1 972 grade A for condenser water piping with
screwed- on or welded on flanges and flanges
A400014 Supply and install 125mm nominal diamater galvanized steel pipe m 81.00
to ApI 5L-1 972 grade A for condenser water piping with
screwed- on or welded on flanges and flanges
A400015 Supply and install 150mm nominal diamater galvanized steel pipe m 105.00
to ApI 5L-1 972 grade A for condenser water piping with
screwed- on or welded on flanges and flanges
A400016 Supply and install 100mm nominal diamater long radius bends for m 20.00
galvanized steel pipes for condenser water piping, flanged jointed
A400017 Supply and install 125mm nominal diamater long radius bends for m 39.00
galvanized steel pipes for condenser water piping, flanged jointed
A400018 Supply and install 150mm nominal diamater long radius bends for m 50.00
galvanized steel pipes for condenser water piping, flanged jointed
A400019 Supply and install 25mm nominal diameter galvanized steel pipe joint No 8.40
size (shall be the size of the smaller pipe at the joint)
A400020 Supply and install 40mm nominal diameter galvanized steel pipe joint No 12.20
size (shall be the size of the smaller pipe at the joint)
ME-A34
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A400021 Supply and install 50mm nominal diameter galvanized steel pipe No 16.20
joint size (shall be the size of the smaller pipe at the joint)
A400022 Supply and install 65mm nominal diameter galvanized steel pipe No 22.50
joint size (shall be the size of the smaller pipe at the joint)
A400023 Supply and install 80mm nominal diameter galvanized steel pipe No 30.20
joint size (shall be the size of the smaller pipe at the joint)
A400024 Supply and install 90mm nominal diameter galvanized steel pipe No 40.00
joint size (shall be the size of the smaller pipe at the joint)
A400025 Supply and install 100mm nominal diameter galvanized steel pipe No 40.00
joint size (shall be the size of the smaller pipe at the joint)
A400026 Supply and install 125mm nominal diameter galvanized steel pipe No 50.00
joint size (shall be the size of the smaller pipe at the joint)
A400027 Supply and install 150mm nominal diameter galvanized steel pipe No 76.00
joint size (shall be the size of the smaller pipe at the joint)
m 35.00
ME-A36
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A400030 To supply al materials, labour, transport and tools for the m 42.00
installation/replacement of stainless steel pipes (B.S. 4127) up to
35 mm nominal diameter with necessary fittings, supports and
h a n g e rs . Mi n i mu m 3 m p e r jo b s ha ll be g i ve n f o r t h e
installation/replacement.
A400031 To supply al materials, labour, transport and tools for the m 50.00
installation/replacement of stainless steel pipes (B.S. 4127) up to
42 mm nominal diameter with necessary fittings, supports and
h a n g e rs . Mi n i mu m 3 m p e r jo b s ha ll be g i ve n f o r t h e
installation/replacement.
A400032 To supply al materials, labour, transport and tools for the m 60.00
installation/replacement of stainless steel pipes (B.S. 4127) up to
54 mm nominal diameter with necessary fittings, supports and
hange rs . Mi ni mum 3 m p er job s h al l be gi ven f or the
installation/replacement.
ME-A37
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ITEM NO. DESCRIPTION UNIT RATES
(S$)
A500000
uPVC CONDENSATE DRAIN PIPES
ME-A38
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A600000
PIPE INSULATION
ME-A39
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A40
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A600030 Supply all materials, labour and transport to install/replace 1/4" m2 40.00
thick ARMAFLEX foam rubber thermal insulation sheet for drip
pans, drain pans etc.
A600032 Supply all materials, labour and transport to install /replace 3/4"
thick ARMAFLEX foam rubber thermal insulation sheet for drip m2 60.00
pans, drain pans etc.
ME-A41
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
m
A600040 Supply and install pipework thermal insu lation of fibre-glass material 63.00
with factory installed vapour barrier of thickness 125mm nominal
diameter (insulation size shall be the nominal size of the
piping being insulated)
A600041 Supply and install pipework thermal insulation of fibre -glass material m
with factory installed vapour barrier of thickness 150mm nominal
72.00
diameter (insulation size shall be the nominal size of the piping
being insulated)
ME-A42
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A700000
FRESH AIR GRILLES/LOUVRES
150 x 150mm
200 x 150mm
200 x 200mm
200 x 250mm
250 x 250mm
ME-A43
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A44
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Up to 26mm
Up to 40mm
Up to 51mm
Up to 64mm
Up to 80mm
ME-A45
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Up to 102mm
Up to 127mm
Up to 153mm
Up to 204mm
Up to 254mm
Up to 305mm
Up to 350mm
Up to 26mm
ME-A46
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Up to 40mm
Up to 51mm
Up to 64mm
Up to 80mm
Up to 102mm
Up to 127mm
Up to 153mm
ME-A47
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Up to 204mm
Up to 254mm
Up to 305mm
ME-A48
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A49
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A900026 Washable netting air filter with permanent plastic frame No 18.00
A900033 Centrifugal fan blower for unit capacity less than or equal 3 RT No 160.00
A900037 Propeller fan blade for unit capacity less than or equal to 3 RT No 247.00
ME-A50
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A900043 Up to 3 RT No 1,800.00
ME-A51
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A900056 Supply labour, tools and materials to repair gas leaks, leak test Per Job 180.00
(after repair incl. nitrogen) vacuum system and charge
(labour only) for air-cooled/ water cooled package unit up to 20
RT and above. By tightening of loose parts
A900057 Ditto - By flaring, replacing of flare nuts (incl. copper fittings) Per Job 220.00
A900058 Per Job 340.00
Ditto - By brazing of cracks (incl. copper pipes, copper fittings and
modification of pipe lines)
ME-A52
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A900000
MISCELLANEOUS WORKS FOR AIR-CONDITIONING WORKS
A900077 No 920.00
Fan motor for air-cooled package unit including removal off site and making good
work disturbed
A900078 No 160.00
Fan blade for air-cooled package unit including removal off site and making good
work disturbed
A900085 200V - 240V swing motor for FCU - VRV system No 60.00
A900092 No 1,650.00
Replacement of Inverter compressor for VRV system up to 4 H.P including installation,
changing filter drier, flushing and vacuuming system, recharging gas,
recommissioning, removal and disposal off faulty unit
ME-A53
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A900107 No 60.00
Stainless steel remote control holder c/w and key - Split unit air- con
A9001 08 Remote Control - Daikin / Sanyo (not for VRV system) No 137.00
A9001 16 Trane wall mounted type FCU Auto swing Motor No 70.00
A900118 No 500.00
Relocate existing fan coil unit inclusive of necessary system operations like pump
down, vacuum, leak test, regrigerant recharge inclusive of any electrical works
ME-A54
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A900119 No 25.00
Remove window unit air conditioner, seal up air condition hole to match existing and
discard off site
A900120 No 50.00
Remove split unit air conditioner, seal up air condition hole to match existing and
discard off site
A900121 No 144.00
Dismantle air-cooled package unit acoustic panel above fan motor and removal
off site or re-install including staging and/or supporting frame and make good work
to disturbed
Supply labour, transport, materials and tools to dismantle, remove and dispose
AHU or FCU . The rates include removal of unwanted equipment, parts,
rubbish, debris, etc off site
Supply labour, tools, material, transport, hoisting and etc for the dismantling
and removing of existing split type of air- conditioner (incl. condensing unit,
pipes, bracket, wiring and trunking at any location) and off site and make
good to disturbed.
ME-A55
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ITEM NO. DESCRIPTION UNIT RATES
(S$)
A900135 Supply labour, tools, material, transport, hoisting and etc for the dismantling and removing System 80.00
of existing multi-split type of air- conditioner up to 12,000Btuh / 3.5kW x 2 fan coil
units (incl. condensing unit, pipes, bracket, wiring and trunking at any location)
and remove off site and make good to disturbed
Supply labour, tools, material, transport, hoisting and etc for the dismantling,
removing and reinstalling of existing split unit (cost inclusive remove old
refrigerant pipes, drain pipes, changing new refrigerant pipes, drain pipes,
checking of leaks, charging of gas, commissioning, labour, tools and
transportation)
A900136 For capacity 9,000Btuh / 2.6kW and below (single). Set 300.00
Supply labour, tools, material, transport, hoisting and etc for the
A900143 Sys 500.00
dismantling, removing and reinstalling of existing multi -split unit
(cost inclusive remove old refrigerant pipes, drain pipes, changing
new refrigerant pipes, drain pipes, checking of leaks, charging of
gas, commissioning, labour, tools and transportation) for capacity
25,000Btuh / 7.3kW and below (1 CU to 2 FCUs).
A900144 Ditto - for capacity 48,000BtuH / 14.4kW and below (1 CU to 2 Sys 700.00
FCUs)
A900145 Ditto - for capacity 25,000BtuH / 7.3kW and below (1 CU to 3 Sys 750.00
FCUs)
A900146 Ditto - for capacity 48000BtuH / 14.4kW and below (1 CU to 3 Sys 850.00
FCUs)
Supply labour, tools, material, transport, hoisting and etc for the
A900147 Sys 1,150.00
dismantling, removing and reinstalling of existing multi -split unit
(cost inclusive remove old refrigerant pipes, drain pipes, changing new refrigerant
pipes, drain pipes, checking of leaks, charging of gas, commissioning, labour, tools
and transportation) for fan coil capacity up to 9,000Btuh each (1 CU to 4 FCUs).
ME-A56
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
VRV System
A900157 AHU/ FCU & Condensing unit (Only to non contract area) No 20.00
Maintenance and servicing of air -cooled chilled water package unit. Rate
shall be for completed set (incl. starter panels & chilled-water pump sets) (Only
to non contract area)
A9001 62 Up to 5 RT
No 1,050.00
A900163 Above 5 RT but less than 10 RT No 1,430.00
ME-A57
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A900169 No 200.00
Supply and install remote sensor-dial type thermometer c/w dust cap installed on
mounting board and labeled as specified
A900170 Supply and install pressure tap with cook rising above insulation No 25.00
(if any) as specified
A900171 No 80.00
Supply and install pressure gauge with dial face installed on mounting board and
connected to pressure taps as specified
A900172 No 350.00
Supply and install differential pressure gauge with dial face
installed on mounting board and connected to pressure taps as
A900173 Supply and install differential pressure flow switch for condenser No 800.00
& chilled water pump syste
A900174 No 146.90
Supply and install pipe mounted dial thermometer TK or
equivalent range -6 deg C to 60 deg C
A900175 No 84.50
Supply and install pipe mounted dial pressure gauge masta or equivalent range 0
kPa to 1000 kPa
ME-A58
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Flow-meter Sensor
FAN BLOWER
ME-A59
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A900201 No 300.00
To supply and replace steel shaft including machine key, key way and end threads
up to 1" (25.4 mm) Dia.
A900202 No 350.00
To supply and replace steel shaft including machine key, key way and end threads
up to 1 1/4" (32 mm) Dia.
A900203 No 420.00
To supply and replace steel shaft including machine key, key way and end threads
up to 1 1/2" (38 mm) Dia.
A900204 No 490.00
To supply and replace steel shaft including machine key, key way and end threads
up to 1 5/8" (41 mm) Dia.
A900205 No 560.00
To supply and replace steel shaft including machine key, key way and end threads
up to 1 3/4" (45 mm) Dia.
A900206 No 620.00
To supply and replace steel shaft including machine key, key way and end threads
up to 2" (50 mm) Dia
A900207 No 720.00
To supply and replace steel shaft including machine key, key way and end threads
up to 2 1/4" (57 mm) Dia.
A900208 No 920.00
To supply and replace steel shaft including machine key, key way and end threads
up to 2 5/8" (70 mm) Dia.
A900209 No 400.00
Supply and install shaft sleeve (316 stainless steel) for centrifugal pump)
ME-A60
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A900210 Supply and install shaft sleeve (bronze) for centrifugal pump No 350.00
A90021 1 lb 40.00
Supply and install 1/8" gland packing, asbestos graphite type for air-con and
domestic water centrifugal pump
A900212 lb 35.00
Supply and install 3/16" gland packing, asbestos graphite type for air-con and
domestic water centrifugal pump
A900213 lb 30.00
Supply and install 1/4" gland packing, asbestos graphite type for air-con and
domestic water centrifugal pump
ME-A61
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
UNIT RATES
ITEM NO. DESCRIPTION
(S$)
lb 25.00
A900214 Supply and install 5/6" to 1" gland packing, asbestos graphite type
for air-con and domestic water centrifugal pump
A900215 Supply and install 1/8" gland packing, synthetic fibre with graphite, lb 155.00
teflon and silicon oil type for air -con and domestic water centrifugal pump
A900216 Supply and install 3/16" gland packing , synthetic fibre with
graphite, teflon and silicon oil type for air-con and domestic water centrifugal pump lb 140.00
A900217 Supply and install 1/4" gland packing, synthetic fibre with graphite,
teflon and silicon oil type for air -con and domestic water centrifugal pump lb 135.00
A900218 Supply and install 5/16" gland packing, synthetic fibre with
graphite, teflon and silicon oil type for air-con and domestic water centrifugal pump lb 135.00
A900219 Supply and install 3/8" to 1" gland packing, synthetic fibre with
graphite, teflon and silicon oil type for air-con and domestic water centrifugal pump lb 105.00
A900220 Supply special machined stainless steel stud and stainless steel
nut of any shape and size approximately not exceeding 15mm diameter and
No 10.00
80mm long (as per sample)
ME-A62
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A1 000005 No 82.00
Supply and install aluminium opposed blade ducted volume
control damper of size 150 mm x 150 mm or equivalent area
A1 000006 No 85.00
Supply and install aluminium opposed blade ducted volume
control damper of size 200 mm x 250 mm or equivalent area
A1 000007 No 88.00
Supply and install aluminium opposed blade ducted volume
control damper of size 250 mm x 250 mm or equivalent area
A1 000008 No 91.00
Supply and install aluminium opposed blade ducted volume
control damper of size 300 mm x 300 mm or equivalent area
A1 000009 No 125.00
Supply and install aluminium opposed blade ducted volume
control damper of size 350 mm x 350 mm or equivalent area
A1 000010 No 132.00
Supply and install aluminium opposed blade ducted volume
control damper of size 400 mm x 400 mm or equivalent area
A1 000011 No 150.00
Supply and install aluminium opposed blade ducted volume
control damper of size 450 mm x 450 mm or equivalent area
A1 000012 No 164.00
Supply and install aluminium opposed blade ducted volume
control damper of size 500 mm x 500 mm or equivalent area
ME-A63
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Supply and install aluminium opposed blade ducted volume No 175.00
A1 000013 control damper of size 600 mm x 600 mm or equivalent area
ME-A64
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Note
Rates for other sizes of fire dampers, with effective face area
bigger than the listed sizes above, shall be determined by
combining any sizes to give an approximate size close to the
required damper. Rates for the required damper shall then be
taken as the sum of costs of the combined dampers (round
up to the next dollar).
ME-A65
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A66
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Note
All items mentioned below must have the approval of the S.O.
A1 200001 The Contractor shall refer to the building rates for scaffolding /
staging
Elevated platform
A1 200002 Transportation cost for providing elevated platform on the site and No 220.00
subsequent removing off site on completion of work
A1 200003 Rental of elevated platform for access to high places including all day 340.00
necessary e.g. fuel, operator/drivers, clearance with LTA and
Traffice Police, etc. (transportation cost measured separately)
ME-A67
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
No 1,350.00
A1 300007 Supply and replace Condenser and Chilled water pump motor
bearings for all pump at secondary chilled water pump rooms,
work include of alignment of pump & motor, check rotor shaft,
motor winding and coupling and submissioning of report
ME-A68
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Note
ME-A69
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A70
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A71
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Note
ME-A72
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Note
ME-A73
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A1 900007 Speed controller (single phase) for items (A1900004) and No 110.80
(A1 900005)
204mm diameter
A1 900008 No 157.60
A1 900009 242mm diameter No 243.00
ME-A74
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A75
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A76
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A2000026 Single phase speed controller for items (A2000020) and No 368.00
(A2000021)
A2000027 No 683.00
Three phase speed controller for items (A2000002) to (A200001 1),
(A2000013), (A2000014) and (A2000016)
A2000028 Three phase speed controller for items (A2000012) and No 500.50
(A200001 7)
A2000029 Three phase speed controller for items (A2000015), (A2000018), No 612.50
(A2000020) to (A2000022)
ME-A77
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Motors
Balancing Standards
A2100003 610mm diameter, 940 or 1440 Rpm, 8o - 32o pitch angles No 2,660.00
ME-A78
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A79
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A80
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A2400012 No 328.50
Add for above items (A2400006) to (A2400008) for single phase
speed controller
A2400013 No 364.50
Add for above items (A2400007) or (A2400008) for single phase
speed controller
A240001 4 No 420.00
Add for above items (A2400001) to (A2400004) and (A2400005)
for three phase speed controllers
A2400015 Add for above item (A2400007) for three phase speed controllers No 490.00
A240001 6 Add for above items (A2400006),(A2400008) and (A2400009) for No 767.00
three phase speed controllers
ME-A81
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A82
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A2600001 No 1,056.50
305mm diameter, 1350 Rpm, 8o - 32o pitch angle
A2600005 381mm diameter, 2850 Rpm, 20o - 27o pitch angle No 1,322.50
A2600007 483mm diameter, 900 Rpm, 21o - 35o pitch angle No 1,341.00
ME-A83
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ITEM NO. DESCRIPTION UNIT RATES
(S$)
ME-A84
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A2800000
CYLINDRICAL SILENCERS
Cylindrical silencers
ME-A85
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A86
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A2900002 No 24.60
Cutting holes on timber panel and not timber frames for extractor
fans
A2900003 No 38.60
Timber panels with frames and hole for all window/wall fans and
propeller fans
ME-A87
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3000000
DUCTWORK
ME-A88
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3000000 DUCTWORK
ME-A89
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3000000 DUCTWORK
A3000035 To supply all materials, labour and transport to install neprene m 28.00
flexible connection for duct
ME-A90
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3100005 Removing of old insulation and drying of existing duct before re-
insulation (subject to a minimum of $50.00 per job if the
reinsulated duct area is less than 8 m2)
m2 8.00
A3100006 Dismantling and removing existing ducts and insulations m2 59.00
A3100007 Hybrid plaster only (after insulation)
ME-A91
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3200000
FLEXIBLE DUCTS
150mm diameter
175mm diameter
200mm diameter
225mm diameter
250mm diameter
300mm diameter
350mm diameter
ME-A92
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
400mm diameter
450mm diameter
500mm diameter
ME-A93
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Supply registers
300 x 150mm
400 x 150mm
500 x 150mm
400 x 200mm
500 x 200mm
600 x 200mm
ME-A94
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Ceiling diffusers
150 x 150mm
200 x 200mm
300 x 300mm
400 x 400mm
500 x 500mm
600 x 600mm
ME-A95
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
0.6m x 1 slot
0.6m x 2 slot
0.6m x 3 slot
0.6m x 4 slot
1.2m x 1 slot
1 .2m x 2 slot
ME-A96
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
1 .2m x 3 slot
1 .2m x 4 slot
1.8m x 1 slot
1 .8m x 2 slot
1 .8m x 3 slot
1 .8m x 4 slot
ME-A97
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
0.6m x 1 slot
0.6m x 2 slot
0.6m x 3 slot
0.6m x 4 slot
1.2m x 1 slot
1 .2m x 2 slot
ME-A95
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
1 .2m x 3 slot
1 .2m x 4 slot
1.8m x 1 slot
1 .8m x 2 slot
1 .8m x 3 slot
1 .8m x 4 slot
ME-A96
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3300083 Air flow up to 1000 litre per sec and above No 240.00
ME-A97
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3300000
AIR DIFFUSION EQUIPMENT
Return/exhaust grilles
Note
Other sizes of grilles and diffusers with area between any two
sizes above shall be charged on the rate for the larger size.
ME-A98
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3300000
AIR DIFFUSION EQUIPMENT
Back-draft dampers
Note
Other sizes of back-draft damper with area between any two
sizes above shall be charged on the rate for the larger size.
A3300104 To supply all materials, labour and transport to fabricate and install No 150.10
split damper for branch duct (20 BG)
ME-A99
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A1 0
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3400000
PREFABRICATED DUCTWORK
ME-A101
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3400000
PREFABRICATED DUCTWORK
Note
80mm diameter
A3400040 No 21.00
90o elbows
A3400041 45o elbows No 12.60
ME-A12
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
100mm diameter
A3400045 No 26.60
90o elbows
A3400046 45o elbows No 15.40
125mm diameter
A3400050 No 31.50
90o elbows
A3400051 45o elbows No 19.60
140mm diameter
A3400055 No 35.00
90o elbows
A3400056 45o elbows No 22.50
ME-A13
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
160mm diameter
A3400060 No 42.00
90o elbows
A3400061 45o elbows No 25.20
180mm diameter
A3400065 No 49.00
90o elbows
A3400066 45o elbows No 28.00
200mm diameter
A3400070 No 52.50
90o elbows
A3400071 45o elbows No 31.50
ME-A14
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
224mm diameter
A3400075 No 56.00
90o elbows
A3400076 45o elbows No 35.00
250mm diameter
A3400080 No 63.00
90o elbows
A3400081 45o elbows No 38.50
280mm diameter
A3400085 No 70.00
90o elbows
A3400086 45o elbows No 45.60
ME-A15
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
31 5mm diameter
A3400090 No 80.50
90o elbows
A3400091 45o elbows No 49.00
355mm diameter
A3400095 No 91.00
90o elbows
A3400096 45o elbows No 56.00
400mm diameter
A3400100 No 105.00
90o elbows
A3400101 45o elbows No 66.50
ME-A16
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
450mm diameter
A3400105 No 119.00
90o elbows
A3400106 45o elbows No 73.60
500mm diameter
A3400110 No 133.00
90o elbows
A3400111 45o elbows No 77.00
560mm diameter
A3400115 No 147.00
90o elbows
A3400116 45o elbows No 91.00
ME-A17
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
61 0mm diameter
A3400120 No 140.00
90o elbows
A3400121 45o elbows No 84.00
630mm diameter
A3400125 No 147.00
90o elbows
A3400126 45o elbows No 87.50
660mm diameter
A3400130 No 157.50
90o elbows
A3400131 45o elbows No 98.00
ME-A18
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
71 0mm diameter
A3400135 No 175.00
90o elbows
A3400136 45o elbows No 108.50
760mm diameter
A3400140 No 189.00
90o elbows
A3400141 45o elbows No 115.50
800mm diameter
A3400145 No 196.00
90o elbows
A3400146 45o elbows No 122.60
ME-A19
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
900mm diameter
A3400150 No 248.60
90o elbows
A3400151 45o elbows No 154.00
1000mm diameter
A3400155 No 273.00
90o elbows
A3400156 45o elbows No 168.00
1120mm diameter
A3400160 No 308.00
90o elbows
A3400161 45o elbows No 189.00
ME-A110
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3500000 PIPEWORK
ME-A111
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3500000 PIPEWORK
ME-A112
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A113
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A114
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A115
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
Note
a)
Without insulation refers to without insulation but includes
painting
b)
With insulation refers to polyurethane insulation with hyrid
plaster or with aluminium jacketing (to be decided by SO) and
painting
c)
Rate is applicable if only valves, strainers and/or automatic air
vent complete w ith stop cocks is/are replaced. If the
replacement includes dismantling of pipes, the rate shall be
charged under the new installation. Dismantling or pipework
can be found in items (A3800023)
d)
Material used are bronze for size up to 80mm and cast iron for
size 102mm and above
Gate valves
ME-A116
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000
VALVES
ME-A117
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000
VALVES
ME-A118
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
Globe valves
ME-A119
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
ME-A120
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
ME-A121
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
Check valves
ME-A122
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000
VALVES
ME-A123
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
ME-A124
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
A3700137 No 2,640.00
To supply and replace globe valve include painting for diameter up
to 350 mm
Strainers
ME-A125
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000
VALVES
Strainers (Cont'd)
ME-A126
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000
VALVES
Strainers (Cont'd)
ME-A127
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
A3700200 No 170.00
To supply and replace butterfly valve include painting for diameter
up to 80 mm
A3700201 No 220.00
To supply and replace butterfly valve include painting for diameter
up to 104 mm
A3700202 No 270.00
To supply and replace butterfly valve include painting for diameter
up to 127 mm
A3700203 No 320.00
To supply and replace butterfly valve include painting for diameter
up to 154 mm
ME-A128
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
A3700204 To supply and replace butterfly valve include painting for diameter No 550.00
up to 204 mm
A3700205 To supply and replace butterfly valve include painting for diameter No 935.00
up to 254 mm
A3700206 To supply and replace butterfly valve include painting for diameter No 1,200.00
up to 304 mm
A3700207 To supply and replace balancing valve include painting for No 75.00
diameter up to 20 mm
A3700208 To supply and replace balancing valve include painting for No 85.00
diameter up to 26 mm
A3700209 To supply and replace balancing valve include painting for No 95.00
diameter up to 32 mm
A3700210 To supply and replace balancing valve include painting for No 115.00
diameter up to 40 mm
A370021 1 To supply and replace balancing valve include painting for No 145.00
diameter up to 51 mm
A3700212 To supply and replace balancing valve include painting for No 445.00
diameter up to 65 mm
A3700213 To supply and replace balancing valve include painting for No 590.00
diameter up to 80 mm
A3700214 To supply and replace balancing valve include painting for No 750.00
diameter up to 104 mm
A3700215 To supply and replace balancing valve include painting for No 1,000.00
diameter up to 127 mm
A3700216 To supply and replace balancing valve include painting for No 1,160.00
diameter up to 154 mm
A3700217 To supply and replace balancing valve include painting for No 2,490.00
diameter up to 204 mm
A3700218 To supply and replace balancing valve include painting for No 3,500.00
diameter up to 254 mm
ME-A129
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
A3700219 To supply and replace balancing valve include painting for No 3,650.00
diameter up to 304 mm
A3700220 To supply and replace balancing valve include painting for No 6,740.00
diameter up to 350 mm
A3700221 To supply and replace constant flow valve include painting for No 100.00
diameter up to 20 mm
A3700222 To supply and replace constant flow valve include painting for No 110.00
diameter up to 26 mm
A3700223 To supply and replace constant flow valve include painting for No 155.00
diameter up to 32 mm
A3700224 To supply and replace constant flow valve include painting for No 165.00
diameter up to 40 mm
A3700225 To supply and replace constant flow valve include painting for No 355.00
diameter up to 51 mm
A3700226 To supply and replace constant flow valve include painting for No 545.00
diameter up to 65 mm
A3700227 To supply and replace constant flow valve include painting for No 590.00
diameter up to 80 mm
A3700228 To supply and replace constant flow valve include painting for No 885.00
diameter up to 104 mm
A3700229 To supply and replace constant flow valve include painting for No 1,380.00
diameter up to 127 mm
A3700230 To supply and replace constant flow valve include painting for No 1,760.00
diameter up to 154 mm
A3700231 To supply and replace constant flow valve include painting for No 2,200.00
diameter up to 204 mm
A3700232 To supply and replace constant flow valve include painting for No 3,025.10
diameter up to 254 mm
A3700233 To supply and replace constant flow valve include painting for No 4,021.00
diameter up to 304 mm
ME-A130
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
A3700234 To supply and replace constant flow valve include painting for No 6,000.00
diameter up to 350 mm
ME-A131
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3700000 VALVES
A3700250 Supply and replace electric actuator valve for size F777-012 or No 1,425.00
equivalent
A3700251 No 1,800.00
Supply and replace electric actuator valve for size F777-018 or
equivalent
A3700252 No 1,903.00
Supply and replace electric actuator valve for size F777-050 or
equivalent
ME-A132
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Pre-insulated pipes
ME-A133
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3800000
PRE-INSULATED PIPEWORK
Pre-insulated Pipe
Dismantling of pipeworks
A3800024 To supply and install test plug complete with pipe fitting, insulation No 35.00
(for chilled water pipe) and etc.
A3800025 To supply and install test plug complete with pipe fitting, insulation No 45.00
(for chilled water pipe) and etc. But with extra 13 mm ball valve for
isolation purposes
A3800026 To supply and install test plug complete with pipe fitting, insulation Set 60.00
(for chilled water pipe) and etc. But with "hot tapping" method
A3800027 To supply all material.labour and transport for the install or replace No 100.00
of automatic air vent complete with stop cock without insulation but
include painting for diameter up to 26 mm
A3800028 No 125.10
To supply all labour, materials and transport for the install/replace
of automatic air vent valve complete with stop cock with
polyurethane foam insulation, aluminium jacketing and painting for
diameter up to 26 mm
ME-A134
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3900000
PIPE INSULATION
Polyurethane insulations
ME-A135
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3900000
PIPE INSULATION
ME-A136
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3900000
PIPE INSULATION
ME-A137
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3900000
PIPE INSULATION
ME-A138
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A139
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3900000
PIPE INSULATION
ME-A140
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3900000
PIPE INSULATION
A3900112 m3 500.00
Supply and install polyurethane foam for thermal insulation of
pipework, fittings, equipment surfaces etc. as specified
A3900113 Supply and install galvanized steel casing for use on polyurethane foam m2 40.00
for thermal insulation constucted for split-casing removal of thermal
insulation as specified, measured on area of casing
A3900114 Supply and install 25 mm nominal diameter long radius bends for No 10.00
chilled water piping to API Std. 5l-1972 grade A thermally insulated
ME-A141
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A3900115 Supply and install 40 mm nominal diameter long radius bends for No 11.00
chilled water piping to API Std. 5l-1972 grade A thermally insulated
A3900116 Supply and install 50 mm nominal diameter long radius bends for No 13.00
chilled water piping to API Std. 5l-1972 grade A thermally insulated
A3900117 Supply and install 65 mm nominal diameter long radius bends for No 20.00
chilled water piping to API Std. 5l-1972 grade A thermally insulated
A3900118 Supply and install 80 mm nominal diameter long radius bends for No 27.50
chilled water piping to API Std. 5l-1972 grade A thermally insulated
A3900119 Supply and install 90 mm nominal diameter long radius bends for No 34.50
chilled water piping to API Std. 5l-1972 grade A thermally insulated
A3900120 Supply and install 100 mm nominal diameter long radius bends for No 52.50
chilled water piping to API Std. 5l-1972 grade A thermally insulated
A3900121 Supply and install 125 mm nominal diameter long radius bends for No 77.50
chilled water piping to API Std. 5l-1972 grade A thermally insulated
A3900122 Supply and install 150 mm nominal diameter long radius bends for No 107.50
chilled water piping to API Std. 5l-1972 grade A thermally insulated
ME-A142
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Note
ME-A143
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A41 00000
PVC DUCTS
ME-A144
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
PVC sockets
ME-A145
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Note
Other sizes of grease filters with area between any two sizes
above shall be charged on the rate for the larger size.
ME-A146
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4300000 PAINTING
A4300001 Painting of new ducts including hangers and supports as specified m2 8.25
A4300002 Repainting of existing ducts with hangers and supports including m2 10.20
scrapping of existing paint and primer as specified
A4300004 Exceeding 500 x 500mm but not exceeding 900 x 900mm No 28.00
A4300010 No 38.00
Supply labour and tools to cut hole opening on main duct up to 255
mm dia.
A430001 1 No 48.00
Supply labour and tools to cut hole opening on main duct up to 355
mm dia and above
ME-A147
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4300000 PAINTING
To cut opening on the supply/ return/ fresh air duct and install
access panels.The access panel shall be of double skin
construction with at least 25 mm thick fibreglass insulation
fame and panel shall be constructed by high grade, heavy
grade galvanised sheet complete with approved gasket,
positive sealing latches and hinges
ME-A148
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4400000 CLEANING
A4400002 Face area bigger than 500 x 500mm up to 900 x 900mm No 9.10
ME-A149
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4400000 CLEANING
ME-A150
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4400000 CLEANING
ME-A151
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4400000 CLEANING
ME-A152
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4400000 CLEANING
A4400061 Supply labour, tools, materials and transport to install Electronic cell 1,300.00
Air Cleaner (complete with pre-filter, electronic cells, activated
carbon filter, detectable filter flames structure, internal power
modules and controls, ON/OFF switch and indicator, Alarm signal
indicators, BMS interface Card etc.) for standard dimension of 665
x 610 x 165 mm per filter cell modular (2 cells front loading type,
filtration efficiency: 95% at 1 m/s and 85% at 2m/s, pressure drop:
0.04 inch w.c at 1m/s and 0.10 inch w.c at 2m/s). In the event of
additional odd sizes filter cell module needed, payment shall based
on pro-rated of the standard filter cell area (665 x 610 mm). The
rate herein includes one year warranty from the date of completion
and 4 quarterly servicing during the one year defects liabilities
period. (External power supply and BMS interfacing shall be
separately measured.)
A4400062 Supply labour, tools, materials and tranport for quarterly (3 cell 30.00
monthly) servicing and maintenance for (standard dimension filter
cell modular) Electionic Air Cleaner. The rate herein includes
changing of used cells with clean cells, checking on power pack,
pre-filter and overall checking etc. (Any faulty spare-parts need to
be replaced will be quote separately.)
The rate herein is for per system per month and includes
testing of water qualities, monthly plate test and quarterly LG
test
ME-A153
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4500000
DRAWING
ME-A154
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4500000 DRAWING
ME-A155
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4600000
ELECTRICAL CABLES, TRUNKING AND ACCESSORIES
ME-A156
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Up to 20mm diameter
Up to 26mm diameter
ME-A157
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Up to 32mm diameter
Up to 40mm diameter
Up to 52mm diameter
Up to 20mm diameter
Up to 26mm diameter
ME-A158
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ITEM NO. DESCRIPTION UNIT RATES
(S$)
Up to 40mm diameter
Metal Trunking
ME-A159
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4600000
ELECTRICAL CABLES, TRUNKING AND ACCESSORIES
ME-A160
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Timer
Water-proof isolator
ME-A161
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A162
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
C o n t r o l p a ne l s fo r m e c h a ni c a l v e n t i l a ti o n f a n s a n d
airconditioning systems (Cont'd)
ME-A163
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A164
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A165
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A166
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4900011 Modulating motor actuator for chilled water valves for AHU No 1,015.00
A4900014 Modulating motor actuator for chilled water valve for FCU No 210.00
ME-A167
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Control valves
Smoke detectors
ME-A168
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A169
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A170
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A171
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4900000
ELECTRONIC CONTROL EQUIPMENT AND ACCESSORIES
ME-A172
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A4900091 DDC with motherboard, intercom power supply, cabinets, locks No 3,250.00
and BASIC complement of AI, AO, DI and DO points
Expansion cards
ME-A173
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Note
A5000001 Up to 3.75kW (5 Hp) full load range 0.3 - 9 Amp operating coil 240 No 70.00
volts or 24 volts
A5000002 AC Starter Panel 3 hp DOL Starter BBC or equivalent (Rate per No 140.00
set)
A5000003 Up to 7.5kW, 10 Hp, full load ranges, 2.5 - 5 Amp, 4.5 - 9 Amp, 6 - No 210.00
12 Amp, 12-18 Amp, operating coil 240 volts or 24 volts
A5000004 Up to 11.2 kW, 15 Hp, full load ranges, 16-24 Amp, operating coil No 245.00
240 volts or 24 volts
A5000005 Up to 15 kW 20 HP, full load ranges, 22-34 amp, operating coil set 350.00
240 volts or 24 volts
A5000006 Up to 22 kW 30 HP, full load ranges, 32-48 amp, operating coil set 420.00
240 volts or 24 volts
A5000007 Up to 30 kW 40 HP, full load ranges, 32-48 amp, 45-65 amp set 750.00
operating coil 240 volts or 24 volts
ME-A1 74
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5000008 AC Starter Panel 10kW Star Delta Starter BBC or equivalent (Rate No 417.00
per set)
A5000009 No 856.00
AC Starter Panel 37kW Star Delta Starter BBC or equivalent (Rate
per set)
A5000010 No 1,378.00
AC Starter Panel 55kW Star Delta Starter BBC or equivalent (Rate
per set)
Auto-transformer 60-65%
A5000011 Up to 5 kW No 126.00
ME-A1 75
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5000026 Up to 11.2 kW 124 Amp, operating coil 240 volts or 24 volts No 91.00
A5000030 Magnetic contactor (coil voltage AC 240V/ 11 5V/ 24V, 4 poles with No 70.00
2 or more auxiliary contacts, suitable for AC 415/440V, 3 Phase,
50Hz, conform to IEC Pub 158 - 1 / 292 - 1 and BS 775 and with
long life rating) for rating up to 2.25KW
ME-A176
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5000042 Up to 50 VA No 63.00
A5000043 Up to 10 HP No 56.00
A5000044 Up to 20 HP No 70.00
A5000045 Up to 30 HP No 91.00
A5000046 Up to 40 HP No 105.00
A5000047 Up to 60 HP No 119.00
A5000048 Up to 80 HP No 133.00
ME-A177
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Time Delay Relay Pin delay - 8 pin c/w socket 1-30 second
delay
A5000065 0.30
1 x 1 mm2 PVC insulated cable to S'pore Std 50: 1981 450/750V per m
grade run
A5000066 0.30
1 x 1.5 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m
450/750V grade run
A5000067 0.40
1 x 2.5 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m
450/750V grade run
A5000068 0.50
1 x 4.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m
450/750V grade run
A5000069 0.90
1 x 6.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m
450/750V grade run
A5000070 1.10
1 x 10.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m
450/750V grade run
A5000071 1.50
1 x 16.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m
450/750V grade run
A5000072 2.00
1 x 25.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m
450/750V grade run
ME-A178
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5000073 1 x 35.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m 2.80
450/750V grade run
A5000074 1 x 50.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m 3.50
450/750V grade run
A5000075 1 x 70.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m 4.80
450/750V grade run
A5000076 1 x 95.0 mm2 PVC insulated cable to S'por e Std 50 : 1981 per m 6.80
450/750V grade run
A5000077 1 x 120.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m 7.60
450/750V grade run
A5000078 1 x 150.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m 9.00
450/750V grade run
A5000079 1 x 185.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m 12.00
450/750V grade run
A5000080 1 x 240.0 mm2 PVC insulated cable to S'pore Std 50 : 1981 per m 15.20
450/750V grade run
A5000081 1 x 1 mm2 PVC/PVC insulated cable to S'pore Std 50 : 1981 per m 0.30
450/750V grade run
A5000082 1 x 1.5 mm2 PVC/PVC insulated cable to S'pore Std 50 : 1981 per m 0.30
450/750V grade run
A5000083 1 x 2.5 mm2 PVC/PVC insulated cable to S'pore Std 50 : 1981 per m 0.40
450/750V grade run
A5000084 1 x 4.0 mm2 PVC/PVC insulated cable to S'pore Std 50 : 1981 per m 0.50
450/750V grade run
A5000085 1 x 6.0 mm2 PVC/PVC insulated cable to S'pore Std 50 : 1981 per m 0.90
450/750V grade run
A5000086 1 x 10.0 mm2 PVC/PVC insulated cable to S'pore Std 50 : 1981 per m 1.30
450/750V grade run
A5000087 1 x 16.0 mm2 PVC/PVC insulated cable to S'pore Std 50 : 1981 per m 1.70
450/750V grade run
A5000088 1 x 25.0 mm2 PVC/PVC insulated cable to S'pore Std 50 : 1981 per m 2.20
450/750V grade run
ME-A179
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5000089 1 x 35.0 mm2 PVC/PVC insulated cable to S'pore Std 50 : 1981 per m 3.00
450/750V grade run
A5000090 1 x 50.0 mm2 PVC/PVC insulated cable to S'pore Std 50 : 1981 per m 3.80
450/750V grade run
Surface
Concealed in wall/floor
Conduit Only
ME-A180
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Metal Trunking
ME-A181
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5100002 Tracing out of circuits and production of single line drawing of the No 80.00
installation on A4 size tracing paper
A5100003 No 120.00
Tracing out of circuits and production of single line drawing of the
installation on A3 size tracing paper
A5100004 No 160.00
Tracing out of circuits and production of single line drawing of the
installation on A2 size tracing paper
ME-A182
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Note
Replace bearings
A520001 1 To supply and replace fan housing up to 280 mm (1 1") Dia. No 145.00
A5200012 To supply and replace fan housing up to 305 mm (12") Dia. No 160.00
A5200013 To supply and replace fan housing up to 330 mm (13") Dia. No 190.00
A5200014 To supply and replace fan housing up to 355 mm (14") Dia. No 220.00
ME-A183
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5200016 To supply and replace fan housing up to 406 mm (16") Dia. No 300.00
A5200017 To supply and replace fan housing up to 460 mm (18") Dia. No 400.00
A5200018 To supply and replace fan housing up to 508 mm (20") Dia. No 500.00
A5200019 To supply and replace fan housing up to 559 mm (22") Dia. No 610.00
A5200020 To supply and replace fan housing up to 610 mm (24") Dia. No 730.00
A5200021 To supply and replace fan housing up to 762 mm (30") Dia. No 970.00
A5200022 To supply and replace fan housing up to 915 mm (36") Dia. No 1,210.00
ME-A184
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A185
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A186
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A187
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5300000
REPAIR WORKS
A5300042 610 x 610 x 305mm width with bottom, top and below No 315.00
ME-A188
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5300000
REPAIR WORKS
ME-A189
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5300000
REPAIR WORKS
A5300069 AHU filters of average efficiency 82%-87% base on ASHRAE 52- m2 25.00
76 Gravimetric Test of the 18mm thickness
A5300070 AHU filters of average efficiency 82%-87% base on ASHRAE 52- m2 30.00
76 Gravimetric Test of the 20mm thickness
A5300071 AHU filters of average efficiency 82%-87% base on ASHRAE 52- m2 50.00
76 Gravimetric Test of the 50mm thickness
A5300072 Galvanized metal frame c/w filter media of average efficiency 82%- m2 50.00
87% base on ASH RAE 52-76 Gravimetric Test of the 25mm (with
18mm filter media ) thickness
A5300073 Galvanized metal frame c/w filter media of average efficiency 82%- m2 70.00
87% base on ASH RAE 52-76 Gravimetric Test of the 25mm (with
20mm filter media ) thickness
A5300074 Galvanized metal frame c/w filter media of average efficiency 82%- m2 70.00
87% base on ASH RAE 52-76 Gravimetric Test of the 50mm (with
18mm filter media ) thickness
A5300075 Galvanized metal frame c/w filter media of average efficiency 82%- m2 80.00
87% base on ASH RAE 52-76 Gravimetric Test of the 50mm (with
20mm filter media ) thickness
A5300077 80-85% dust spot efficiency filter size 24" x 24" x 4" for AHU No 38.00
A5300078 80-85% dust spot efficiency filter size 12" x 24" x 4" for AHU No 23.00
A5300079 AHU filter frame size up to 24" x 1 2" x 4" for AHU No 80.00
A5300080 90-95% dust spot efficiency filter size 24" x 24" x 4" for AHU No 40.00
A5300081 90-95% dust spot efficiency filter size 12" x 24" x 4" for AHU No 30.00
A5300082 90-95% dust spot efficiency filter size 24" x 24" x 1" for AHU No 4.30
A5300083 90-95% dust spot efficiency filter size 12" x 24" x 1" for AHU No 2.90
ME-A190
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Note
ME-A191
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5400023 Mitsubishi Transformer Type TR-2K 2KVA Primary Voltage 415V; No 266.60
Secondary Voltage 2000V; Insulation Class A 1 ph 50Hz or
equivalent
A5400024 No 5,369.00
Alsthom-Unelec Air-Circuit breaker Type CN-2 500VAC 1 250A
and interrupting rating 55KA rms.or equivalent (3 poles)
A5400025 No 6,994.00
Alsthom-Unelec Air-Circuit breaker Type CN-2 500VAC 1 250A
and interrupting rating 55KA rms.or equivalent (4 poles)
A5400026 220V 50Hz hour meter (Range : Max 99999 hours) No 110.50
A5400027 SAFT Battery cell Type KPLP 10 (or SLP 1) or equivalent 1 .2V No 37.50
A5400030 No 250.00
Saginomiya temperature regulator Type TNS-C1034CQ1 or
equivalent
ME-A192
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5400036 Michiden Solenoid Valve Type SD20-MNA AC 200V 50Hz - 60Hz No 148.20
A5400038 Air Dryer air regulator of Max. Air Pressure 21 bar and Max. No 76.70
Operating Air Temp 79 deg C
A5400039 No 2,000.00
Saginomiya Type UCK-5020 or equivalent current temp controller
for Mitsubishi Chiller
A5400040 No 50.00
Time Delay Relay ON - time Mitsubishi type SRT-N 307 or
equivalent
A5400041 No 50.00
Time Delay Relay OFF - time relay Mitsubishi Type SRT-F 307 or
equivalent
A5400042 shape model JBI mirco control for auto tube cleaning system No 960.00
A5400043 No 280.00
plastic drain valve come with solenoid control for auto tube
cleaning system
A5400044 Micro timer 0 - 30 sec/1 10 a/c OMRON Type H2A or equivalent No 50.00
A5400048 Oil temp switch Nichidon or equivalent Range 10 deg C to 70 deg No 125.00
C
A5400049 No 110.00
Low pressure switch Saginomiya or equivalent Range MP 15kg/sq
cm
A5400050 No 150.00
Dual pressure switch saginomiya or equivalent Range 15kg/sq cm
to 33kg/sq cm
ME-A193
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
No 350.00
A5400051
Low water temp switch Saginomiya or equivalent Range -15 deg C
to 15 deg C
ME-A194
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5400054 Saginomiya Suction Gas temp switch Range 10 deg C to 20 deg C No 150.00
A5400065 No 150.00
Mitsubishi Osaka Low pressure compound gauge or equivalent
range 76 cmHg - 20kg/ sq cm or -50 deg C to 50 deg C
A5400066 No 65.00
Mitsubishi Osaka Low pressure compound gauge or equivalent
range 76 cmHg - 20kg/sq cm
ME-A195
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5400075 Filter-Drier For chiller unit with capacity above 50 RT and up to No 160.00
250 RT
A5400076 Filter-Drier For chiller unit with capacity above 250 RT and up to No 200.00
450 RT
ME-A196
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5400084 Maintenance and servicing of exhaust fan as per schedule ( Rate No 90.00
per number per annum )
A5400085 No 25.00
Omron MK 3P' or approved equivalent relay, 3NC contact ,
complete with front connection socket
A5400086 No 25.00
Omron MK 2P' or approved equivalent complete with 2NO, 2NC
contact, 230VAC 50Hz complete with front connection socket
A5400087 No 31.25
Siemens' or approved equivalent contactor relay, 4NO, 2NC, 20A,
415VAC or 230V 50Hz
A5400088 BBC SLA 12 II' or approved equivalent AC block contactor with No 55.00
2NO, 2NC coil rated at 415V 50Hz class AC3
A5400089 No 47.50
415V 50Hz, BBC SLA 16 II, 2NO & 2NC AC block contactor or
equivalent
A5400090 No 112.50
415/230V 50Hz, BBC SLA 32, 2NO & 2NC AC block contactor or
equivalent
A5400091 No 51.25
Omron HK 2P' impulse relay complete with front connection
socket, 230VAC operating coil 50Hz
A5400092 No 50.00
Telemecanique or equivalent thermal overload relay for range (2A
to 4A) up to (7A to 1 0A)
A5400093 No 75.00
Telemecanique or equivalent thermal overload relay for range (9A
to 13A) up to (12A to 18A)
ME-A197
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5400099 Control relay c/w socket 8 to 12 pins, coil voltage AC 230V/ 11 5V/ No 50.00
24V
A5400100 Time delay relay c/w socket 8 to 12 pins, coil voltage AC 230V/ No 80.00
11 5V/ 24V Delay time: 1 - 30 sec
A54001 04 LX1 -D09220 Telecanique spare coil for 220V AC contactor No 17.25
A54001 05 LX1 -D40220 Telecanique spare coil for 220V AC contactor No 34.50
A5400112 Dual pressure control Ranco type or equivalent main scale No 400.00
10.5kg/sq m to 31.5kg/sq m differential 0.7kg/sq m to 2.8kg/ sqcm
high event 0.7kg/sq m to 6.3kg/sq cm
ME-A198
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
Sys 40.00
A5400116 Supply all labour, tools and chemicals for the water treatment of
chilled water system (including submit of monthly water treatment
report of chilled water system for central chillers) for system total
capacity less than or equal to 250RT. The rate herein is for per
system per month and include testing of water qualities.
A5400117 Supply all labour, tools and chemicals for the water treatment of Sys 50.00
chilled water system (including submit of monthly water treatment
report of chilled water system for central chillers) for system total
capacity up to 500RT. The rate herein is for per system per month
and include testing of water qualities.
A5400118 Supply all labour, tools and chemicals for the water treatment of Sys 75.00
chilled water system (including submit of monthly water treatment
report of chilled water system for central chillers) for system total
capacity up to 1 000RT. The rate herein is for per system per
month and include testing of water qualities.
A5400119 Supply all labour, tools and chemicals for the water treatment of Sys 100.00
chilled water system (including submit of monthly water treatment
report of chilled water system for central chillers) for system total
capacity up to 2000RT. The rate herein is for per system per
month and include testing of water qualities.
A5400120 Supply all labour, tools and chemicals for the water treatment of Sys 200.00
chilled water system (including submit of monthly water treatment
report of chilled water system for central chillers) for system total
capacity up to 3000RT. The rate herein is for per system per
month and include testing of water qualities.
A5400121 Supply all labour, materials and transport to install Hydroball auto Sys 19,440.00
tube cleaning system model: CS040816 or equivalent for (shell
and tubes) condenser water system of capacity up to 200RT and
condenser pipe diameter 100mm (including pipe works, wiring,
control panel, brackets, hangers, testing and commissioning etc.).
The rate herein include one year warrantly and 4 quarterly
servicing per annum. (Power supply are not included it will be
seperately measured)
ME-A199
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5400122 Supply all labour, materials and transport to install Hydroball auto Sys 23,760.00
tube cleaning system model: CS050816 or equivalent for (shell
and tubes) condenser water system of capacity up to 300RT and
condenser pipe diameter 100mm (including pipe works, wiring,
control panel, brackets, hangers, testing and commissioning etc.).
The rate herein include one year warrantly and 4 quarterly
servicing per annum. (Power supply are not included it will be
seperately measured)
A5400123 Supply all labour, materials and transport to install Hydroball auto Sys 27,000.00
tube cleaning system model: CS061018 or equivalent for (shell
and tubes) condenser water system of capacity up to 400RT and
condenser pipe diameter 150mm (including pipe works, wiring,
control panel, brackets, hangers, testing and commissioning etc.).
The rate herein include one year warrantly and 4 quarterly
servicing per annum. (Power supply are not included it will be
seperately measured)
A5400124 Supply all labour, materials and transport to install Hydroball auto Sys 30,240.00
tube cleaning system model: CS081421 or equivalent for (shell
and tubes) condenser water system of capacity up to 500RT to
1000RT and condenser pipe diameter 200mm (including pipe
works, wiring, control panel, brackets, hangers, testing and
commissioning etc.). The rate herein include one year warrantly
and 4 quarterly servicing per annum. (Power supply are not
included it will be seperately measured)
A5400125 Supply all labour, materials and transport to install Hydroball auto Sys 34,560.00
tube cleaning system model: CS101622 or equivalent for (shell
and tubes) condenser water system of capacity up to 500RT to
1000RT and condenser pipe diameter 250mm (including pipe
works, wiring, control panel, brackets, hangers, testing and
commissioning etc.). The rate herein include one year warrantly
and 4 quarterly servicing per annum. (Power supply are not
included it will be seperately measured)
A5400126 Supply all labour, materials and transport to install Hydroball auto Sys 43,200.00
tube cleaning system model: CS122026 or equivalent for (shell
and tubes) condenser water system of capacity up to 500RT to
1200RT and condenser pipe diameter 300mm (including pipe
works, wiring, control panel, brackets, hangers, testing and
commissioning etc.). The rate herein include one year warrantly
and 4 quarterly servicing per annum. (Power supply are not
included it will be seperately measured)
ME-A200
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5400127 Supply all labour, materials and transport to install Hydroball auto Sys 49,680.00
tube cleaning system model: CS142428 or equivalent for (shell
and tubes) condenser water system of capacity up to 800RT to
1500RT and condenser pipe diameter 350mm (including pipe
works, wiring, control panel, brackets, hangers, testing and
commissioning etc.). The rate herein include one year warrantly
and 4 quarterly servicing per annum. (Power supply are not
included it will be seperately measured)
A5400128 Supply all labour, materials and transport to install Hydroball auto Sys 64,800.00
tube cleaning system model: CS162630 or equivalent for (shell
and tubes) condenser water system of capacity up to 1 500RT to
2000RT and condenser pipe diameter 400mm (including pipe
works, wiring, control panel, brackets, hangers, testing and
commissioning etc.). The rate herein include one year warrantly
and 4 quarterly servicing per annum. (Power supply are not
included it will be seperately measured)
A5400129 Supply all labour, materials and transport to install Hydroball auto Sys 75,600.00
tube cleaning system model: CS183039 or equivalent for (shell
and tubes) condenser water system of capacity up to 1 500RT to
2000RT and condenser pipe diameter 450mm (including pipe
works, wiring, control panel, brackets, hangers, testing and
commissioning etc.). The rate herein include one year warrantly
and 4 quarterly servicing per annum. (Power supply are not
included it will be seperately measured)
A5400132 Supply (only) motorized power valve (316 grade stainless steel, No 2,500.00
flange mount, 150lbs etc.) of size up to 51mm diameter for
hydroball auto tube cleaning system
A5400133 Supply (only) motorized power valve (316 grade stainless steel, No 2,500.00
flange mount, 150lbs etc.) of size up to 40mm diameter for
hydroball auto tube cleaning system
A5400134 Supply (only) flange joint rubber seal (all sizes) for hydroball auto No 100.00
tube cleaning system
ME-A200
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5400135 Supply (only) ball catch sight-glass (all sizes) for hydroball auto No 250.00
tube cleaning system
A5400136 Supply (only) sponge ball of up 23mm diameter (100 pcs per pack) Pack 150.00
for hydroball auto tube cleaning system
A5400137 Supply (only) PLC/GSM Controller (complete with Auto -Manual Set 3,800.00
selection mode) for hydroball auto tube cleaning system
A5400138 Supply labour, tools, materials and transport for maintenance and Hr 2,500.00
servicing of Hydroball auto tube cleaning system (include
comprehensive replacement of static components, spongeballs,
attend to system fault alarms, upgrading of hardware and software
etc.). The rate herein is based on quarterly servicing per annum.
A5400139 Supply labour, tools and transport to replace or install Hydroball Hr 120.00
system components (replacement, installation, testing and
commissioning etc.) for the first one hour without welding works.
A5400140 Supply labour, tools and transport to replace or install Hydroball Hr 50.00
system components (replacement, installation, testing and
commissioning etc.) for subsequent hours after the first one hour
without welding works.
A5400141 Supply labour, tools and transport to replace or install Hydroball Hr 150.00
system components (replacement, installation, testing and
commissioning etc.) for the first three hours with welding works.
A5400142 Supply labour, tools and transport to replace or install Hydroball Hr 50.00
system components (replacement, installation, testing and
commissioning etc.) for subsequent hours after the first three
hours with welding works.
ME-A201
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A202
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5500017 Supply all labour, materials and transport to loan and install No 20.00
A5500018 Supply all labour, tools, transport and materials to replace original No 2,416.00
ME-A203
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A204
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A205
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A206
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5500092 No 60.00
Supply all labour, materials and transport to collect cooling tower water
or fresh water samples to SGH Lab for the testing of Standard
Plate Count (SPC)
A5500093 No 150.00
Supply all labour, materials and transport to collect cooling tower water
or fresh water samples to SGH Lab for the testing of
Legionella Pnuemophila
ME-A207
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5600018 Supply and install ELKAY water cooler button for bubbler No 57.00
A5600019 Supply and install FRIGERIA water cooler button for bubbler No 40.00
A5600020 Supply and install ELKAY water cooler glass filler No 170.00
ME-A208
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5600021 Supply and install FRIGERIA water cooler glass filler No 35.00
A5600022 Supply and install FRIGERIA water cooler glass filler press button No 30.00
A5600023 Supply and install SENTRY water cooler glass filler press button No 35.00
A5600024 Supply and install SENTRY water cooler glass filler No 12.00
A5600025 No 350.00
Flushing of water cooler condenser coil (interior) inclusive of
replacement of strainer and capillary tube.
A5600026 No 7.00
Supply labour and material to maintain and service of water cooler
according to specific maintenance standard
A5600027 No 50.00
Supply and install or replace 5 inch water filter including all
fittings, piping and adjustment
A5600028 No 77.00
Supply and install or replace 10 inch water filter Model GE HP-5
including all fittings, piping and adjustment
A5600029 Supply and install or replace 5 inch water filter refill cartridge No 6.00
A5600030 Supply and install or replace 10 inch water filter refill cartridge No 8.00
A5600031 Supply and install or replace 10 inch 'carbon' water filter refill No 40.00
cartridge for Model GE-HP 5
ME-A209
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A210
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
CENTRAL EQUIPMENT
ME-A211
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5700041 ECHELON LonPointTM Router Base Plate Type 2D, 48222 No 40.00
A5700042 ECHELON LonPointTM Controller Base Plate -Type 1D, 48111 No 40.00
A5700050 CNA LON VAV Controller IEPOINTTM Smart VAV W7751 H No 730.00
ME-A212
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
A5700055 CSI High Level Interface Unit (Chiller) 7797 ICI No 800.00
ME-A213
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A214
A : AIR-CONDITIONING AND MECHANICAL VENTILATION
ME-A215
SECTION B: PUMPING
B: PUMPING
Note: The price for each pumping system shall include the
supply and installation of the equipment (except air pressure
tanks where applicable) as specified in the drawi ng/
specification. This shall include but not limited to the
following:
B100001 Potable or flushwater booster pumping system as specified with One lot 800.00
each pump capacity of 2.0 litres/second at a total discharge head
of 15 metres
B100002 Potable or flushwater booster pumping system as specified with One lot 1,000.00
each pump capacity of 2.0 litres/second at a total discharge head
of 25 metres
B100003 Potable or flushwater booster pumping system as specified with One lot 1,100.00
each pump capacity of 2.0 litres/second at a total discharge head
of 35 metres
B100004 Potable or flushwater booster pumping system as specified with One lot 850.00
each pump capacity of 3.0 litres/second at a total discharge head
of 15 metres
B100005 Potable or flushwater booster pumping system as specified with One lot 1,050.00
each pump capacity of 3.0 litres/second at a total discharge head
of 25 metres
B100006 Potable or flushwater booster pumping system as specified with One lot 1,150.00
each pump capacity of 3.0 litres/second at a total discharge head
of 35 metres
B100007 Potable or flushwater booster pumping system as specified with One lot 1,650.00
each pump capacity of 4.0 litres/second at a total discharge head
of 15 metres
ME-B1
B: PUMPING
B100008 Potable or flushwater booster pumping system as specified with One lot 1,850.00
each pump capacity of 4.0 litres/second at a total discharge head
of 25 metres
B100009 Potable or flushwater booster pumping system as specified with One lot 2,150.00
each pump capacity of 4.0 litres/second at a total discharge head
of 35 metres
B100010 Potable or flushwater booster pumping system as specified with One lot 1,700.00
each pump capacity of 6.0 litres/second at a total discharge head
of 15 metres
B100011 Potable or flushwater booster pumping system as specified with One lot 1,900.00
each pump capacity of 6.0 litres/second at a total discharge head
of 25 metres
B100012 Potable or flushwater booster pumping system as specified with One lot 2,200.00
each pump capacity of 6.0 litres/second at a total discharge head
of 35 metres
B100013 Potable or flushwater booster pumping system as specified with One lot 2,350.00
each pump capacity of 8.0 litres/second at a total discharge head
of 15 metres
B100014 Potable or flushwater booster pumping system as specified with One lot 2,650.00
each pump capacity of 8.0 litres/second at a total discharge head
of 25 metres
B100015 Potable or flushwater booster pumping system as specified with One lot 3,150.00
each pump capacity of 8.0 litres/second at a total discharge head
of 35 metres
B100016 Potable or flushwater booster pumping system as specified with One lot 2,400.00
each pump capacity of 10 litres/second at a total discharge head
of 15 metres
B100017 Potable or flushwater booster pumping system as specified with One lot 2,700.00
each pump capacity of 10.0 litres/second at a total discharge
head of 25 metres
B100018 Potable or flushwater booster pumping system as specified with One lot 3,200.00
each pump capacity of 10.0 litres/second at a total discharge
head of 35 metres
ME-B2
B: PUMPING
The price for each pumping system shall include the supply
and installation of the equipment (except air pressure tanks
where applicable) as specified in the drawing/specification.
This shall include but not limited to the following:
B200001 Testing and commissioning Transfer pumping system a s One lot 5,390.00
specified with each pump capacity of 4.0 litres/second at a total
discharge head of 30 metres
B200002 Testing and commissioning Transfer pumping system a s One lot 5,950.00
specified with each pump capacity of 4.0 litres/second at a total
discharge head of 50 metres
B200003 Testing and commissioning Transfer pumping system a s One lot 6,090.00
specified with each pump capacity of 6.0 litres/second at a total
discharge head of 30 metres
B200004 Testing and commissioning Transfer pumping system a s One lot 6,650.00
specified with each pump capacity of 6.0 litres/second at a total
discharge head of 50 metres
B200005 Testing and commissioning Transfer pumping system a s One lot 6,790.00
specified with each pump capacity of 8.0 litres/second at a total
discharge head of 30 metres
B200006 Testing and commissioning Transfer pumping system as One lot 7,350.00
specified with each pump capacity of 8.0 litres/second at a total
discharge head of 50 metres
ME-B3
B: PUMPING
The price for each pumping system shall include the supply
and installation of the equipment (except air pressure tanks
where applicable) as specified in the drawing/specification.
This shall include but not limited to the following:
B300001 Testing and commissioning Ho sereel pumping system a s One lot 4,410.00
specified with each pump capacity of 1.5 litres/second at a total
discharge head of 30 metres
B300002 Testing and commissioning Hosereel pumping system a s One lot 4,760.10
specified with each pump capacity of 1.5 litres/second at a total
discharge head of 40 metres
B300003 Testing and commissioning Hosereel pumping system a s One lot 5,110.00
specified with each pump capacity of 1.5 litres/second at a total
discharge head of 50 metres
B300004 Testing and commissioning Hosereel pumping system a s One lot 5,810.10
specified with each pump capacity of 1.5 litres/second at a total
discharge head of 60 metres
B300005 Testing and commissioning Hosereel pumping system a s One lot 6,300.00
specified with each pump capacity of 1.5 litres/second at a total
discharge head of 70 metres
ME-B4
B: PUMPING
B 4 0 0 0 0 0 S U BM E R S I B LE D R AI N AG E AN D S E W AG E P UM P I N G
SYSTEM
The price for each pumping system shall include the supply
and installation of the equipment (except air pressure tanks
where applicable) as specified in the drawing/specification.
This shall include but not limited to the following:
B400001 Testing and commissioning Submersible drainage pumping One lot 3,430.00
system as specified with each pump capacity of 4.0 litres/second at
a total discharge head of 10 metres
B400002 Testing and commissioning Submersible drainage pumping One lot 4,200.00
system as specified with each pump capacity of 6.0 litres/second at
a total discharge head of 10 metres
B400003 Testing and commissioning Submersible sewage pumping One lot 5,740.10
system as specified with each pump capacity of 6.0 litres/second at
a total discharge head of 10 metres
ME-B5
B: PUMPING
B400004 Testing and commissioning Submersible sewage pumping One lot 6,300.00
system as specified with each pump capacity of 8.0
litres/second at a total discharge head of 10 metres
B400005 Testing and commissioning Submersible sewage pumping One lot 7,070.00
system as specified with each pump capacity of 10.0
litres/second at a total discharge head of 10 metres
B400006 Wall mounted weather proof cabinets for control panels in item One lot 455.00
(B4000001) to (B4000005)
B400007 1/2 ton chain hoist c/w chain and trolley (I-beam support to be One lot 385.00
provided by others)
ME-B6
B: PUMPING
ME-B7
B: PUMPING
ME-B8
B: PUMPING
Strainers
Isolating Valves
Check valves
ME-B9
B: PUMPING
B700026 Two 4-probe electrode complete with holder and relay No 105.00
ME-B10
B: PUMPING
B800000 PIPEWORK
ME-B11
B: PUMPING
ME-B12
B: PUMPING
B900004 Up to 3 kW No 262.00
B900006 Up to 3 kW No 230.00
B900015 Up to 30 kW No 1,210.00
B900016 Up to 45 kW No 1,370.00
B900017 Up to 60 kW No 1,530.00
B900018 Up to 75 kW No 1,720.00
B900019 Up to 90 kW No 1,927.50
ME-B13
B: PUMPING
B900028 Up to 15 kW No 677.50
B900032 Up to 30 kW No 1,110.00
B900033 Up to 45 kW No 1,252.50
B900034 Up to 60 kW No 1,585.00
B900035 Up to 75 kW No 2,195.00
B900036 Up to 90 kW No 2,800.00
ME-B14
B: PUMPING
B900047 Up to 11 kW No 487.50
B900048 Up to 15 kW No 599.30
B900050 Up to 22 kW No 793.00
B900051 Up to 30 kW No 910.00
ME-B15
B: PUMPING
B1000007 Up to 15 kW No 175.50
B1000011 Up to 30 kW No 315.00
B1000012 Up to 45 kW No 340.50
B1000013 Up to 60 kW No 400.00
B1000014 Up to 75 kW No 502.50
B1000015 Up to 90 kW No 605.00
ME-B16
B: PUMPING
B1100014 Up to 15 kW No 1,205.00
B1100017 Up to 30 kW No 2,302.50
B1100019 Up to 45 kW No 3,560.00
B1100021 Up to 75 kW No 5,800.00
ME-B17
B: PUMPING
B1100022 Up to 90 kW No 6,100.00
ME-B18
B: PUMPING
ME-B19
B: PUMPING
The cost for overhaul of water pump shall also include the
labour for replacement of shaft when necessary (B1300009 -
B1 300015).
B1300003 Up to 30 kW No 245.00
B1300005 Up to 45 kW No 406.00
B1300006 Up to 60 kW No 490.00
B1300007 Up to 75 kW No 581.00
B1300008 Up to 90 kW No 700.00
ME-B20
B: PUMPING
Gate Valve
Check Valve
ME-B21
B: PUMPING
Globe Valve
Strainer
ME-B22
B: PUMPING
ME-B23
B: PUMPING
B1400085 Pressure gauge with oil damping effect for replacement. No 71.00
B1400087 Water flow switch for repair (max height 3m) No 140.00
ME-B24
B: PUMPING
Foot Valve
ME-B25
B: PUMPING
B1500001 Up to 25 mm No 70.00
B1500002 Up to 38 mm No 84.00
B1500003 Up to 51 mm No 98.00
B1500004 Up to 64 mm No 119.00
B1500005 Up to 76 mm No 140.00
B1500012 Up to 25 mm No 52.50
B1500013 Up to 38 mm No 84.00
B1500014 Up to 51 mm No 98.00
B1500015 Up to 64 mm No 119.00
ME-B26
B: PUMPING
B1500016 Up to 25 mm No 98.00
B1500017 Up to 38 mm No 126.00
B1500018 Up to 51 mm No 140.00
B1500019 Up to 64 mm No 157.50
B1500020 Up to 76 mm No 210.00
B1500025 Up to 25 mm No 84.00
B1500026 Up to 38 mm No 112.00
B1500027 Up to 51 mm No 126.00
B1500028 Up to 64 mm No 140.00
B1500029 Up to 76 mm No 182.00
ME-B27
B: PUMPING
ME-B28
B: PUMPING
ME-B29
B: PUMPING
B1700001 Up to 35 mm m 10.50
B1700002 Up to 55 mm m 12.60
B1700003 Up to 65 mm m 14.70
B1700004 Up to 77 mm m 17.50
B1700005 Up to 82 mm m 21.00
ME-B30
B: PUMPING
The rate for each pumpset shall include the supply delivery,
installation and commissioning of the equipment as
specified below. This shall include but not limited to the
following :
c) Di s pos a l o f t he ol d p u mps e t a n d a c c e s s or i e s .
Note: Pump operation efficiency must not be less than 55% pump
characteristic curves and the Contractor shall submit
technical details and data to the S.O. for approval before
commencement of work.
B1800001 120 litres / min at a total discharge head of between 15 and 35 set 2,100.00
metres 2.2 kW
B1800002 180 litres / min at a total discharge head of between 15 and 35 set 2,520.00
metres 3.0 kW
B1800003 240 litres / min at a total discharge head of between 15 and 35 set 2,590.00
metres 3.2 kW
B1800004 360 litres / min at a total discharge head of between 15 and 35 set 2,870.00
metres 5.0 kW
B1800005 480 litres / min at a total discharge head of between 35 and 50 set 3,290.00
metres 5.5 kW
B1 800008 90 litres / min at a total discharge head of 50 metres ( 1.5 kW) set 2,240.00
ME-B31
B: PUMPING
The rate for each pumpset shall include the supply, delivery,
installation and commissioning of the equipment as
specified below. This shall include but not limited to the
following:
c) Di s pos a l o f t he ol d p u mps e t a n d a c c e s s or i e s .
Note: Pump operating efficiency must not be less than 55% pump
characteristic curves. The Contractor shall have to submit
technical details and data to the S.O for approval before
commencement of work.
B1900001 120 litres/min at a total discharge head of 10 metres (single- set 1,890.00
phase)
B1900002 240 litres/min at a total discharge head of 10 metres (single- set 1,960.00
phase)
B1900003 300 litres/min at a total discharge head of 10 metres (double- set 2,100.00
phase)
ME-B32
B: PUMPING
The rate for each pumpset shall include the supply, delivery,
installation and commissioning of the equipment as
specified below. This shall include but not limited to the
following :
Note: Pump operating efficiency must not be less than 55% pump
characteristic curves. The Contractor shall have to submit
technical details and data to the S.O for approval before
commencement of work.
B2000001 200 litres/min at a total discharge head of 8 metres (single-phase) set 2,030.10
B2000002 200 litres/min at a total discharge head of 8 metres (three-phase) set 2,065.00
B2000003 500 litres/min at a total discharge head of 8 metres (three-phase) set 2,450.00
ME-B33
B: PUMPING
ME-B34
SECTION C: ELECTRICAL INSTALLATION
C: ELECTRICAL INSTALLATION
BASIC WIRING POINTS
NOTES:
1 For this purpose of this Section, the rate for PVC SURFACE installation of wiring
points shall be taken as the BASE RATE. Percentage increase is allowed for
other type of wiring methods, e.g. GI conduit :full concealed" equivalent under
the "TABLE OF ADJUSTMENT FOR DIFFERENT WIRING METHODS" on next
page. Where multiple adjustment are allowed under this sections, the ultimate
adjustment is taken as the mathematical sum of all the plus/minus adjustments
based on the BASE RATES only i.e. the adjustments will not be compounded.
3 Star rates will not be considered for RED TOGGLES or SWITCHES instead of
conventional WHITE TOGGLES or SWITCHES or for neon indicators. Instead,
additional cost listed at Item C1 00015 and C1 00016 of this section shall apply.
4 For PVC and GI conduits, 20% increase over the Scheduled Rates wi ll be
allowed for the cost of primer coat and enamel painting to any colour by SO.
6 All wiring points shall be considered not to exceed 20 metre run from the source
of supply to the first immediate wiring point. For subsequent points wiring
distance shall be considered as distance between wiring points on the same
circuit.
7 For multiple wiring points on 2-way switch circuits, only one 2-way switch rate
will be payable. The rest of the points will be treated as that of unswitched
circuits.
8 All socket outlets shall be ivory white for base rate c/w spring shutters on both
Live and Neutral openings. For switches engraved labeling a 10% increase over
the Scheduled Rates for switches will be allowed.
9 For wiring point with corresponding metal clad switch or socket plate c/ w the
necessary metal-clad box as appropriate, a 10% increase over the Scheduled
rates will be allowed.
ME-C1
C: ELECTRICAL INSTALLATION
BASIC WIRING POINTS
DEFINITIONS:
"Full concealed: means that the trunking or conduit protecting the cables are
encased within walls, floor throughout the whole length of t he wiring point.
Normally it would have been necessary to chase and make good (at least rough
patching) of walls, floors, etc. New cast-in-situ conduit wiring will be treated as
"full concealed".
"Part concealed" means that only part of the trunking or conduit protecting the
cables are encased within walls, floors within the whole wiring point. This applies
to the following cases:
i) Concealed installation below false ceiling but surface installation above false
ceiling.
"Surface" means that the entire length of the trunking or conduit is mounted on
the surface including the case of entire wiring length within false ceiling.
The following table will be used as the basis for adjusting the Schedule of Rates cost for wiring
methods other thanthat of PVC SURFACE TRUNKING/ CONDUIT WIRING:
PLEASE QUOTE THE SUFFIX NO PROVIDED FOR ITEM NO IN QUOTATIONS AND INVOICES.
ME-C2
C: ELECTRICAL INSTALLATION
C100006 Hand dryer points complete with moulded fuse connection units No 28.80
C100009 15 Amp round pin single gang for higher capacity equipment or No 46.80
DOL start air-conditioner
C100010 No 68.40
Water heater/equipment points complete with 20 A mp DP
switches with neon indicator lights, fused connection units
ME-C3
C: ELECTRICAL INSTALLATION
C100014 No 43.20
Fire alarm points with 2 lengths 2.5mm2 PVC cables in GI conduit
up to 20 metres (for ring circuits the notes for "BASIC WIRING
POINTS - NOTES item 7" are applicable.)
ME-C4
C: ELECTRICAL INSTALLATION
ME-C5
C: ELECTRICAL INSTALLATION
DP metal-clad isolators
ME-C6
C: ELECTRICAL INSTALLATION
ME-C7
C: ELECTRICAL INSTALLATION
ME-C8
C: ELECTRICAL INSTALLATION
ME-C9
C: ELECTRICAL INSTALLATION
ME-C10
C: ELECTRICAL INSTALLATION
ME-C11
C: ELECTRICAL INSTALLATION
C200109 5 Amp 3 pin lighting switch socket outlets (shuttered type) No 3.10
C200119 Time switch electric operated 230 volt 10-30 amp Quartz reserve No 60.30
(150 hours) 24 hour dial with 15 minutes interval settings
ME-C12
C: ELECTRICAL INSTALLATION
Contactors
ME-C13
C: ELECTRICAL INSTALLATION
DP metal clad
ME-C14
C: ELECTRICAL INSTALLATION
DP metal clad
ME-C15
C: ELECTRICAL INSTALLATION
Others
C200168 SOB c/w telephone/data module 2 outlet twin gang and twin gang Set 230.00
1 3Amp switched socket outlet with hinged cover
C200169 Floor recessed power supply outlet unit with spring guard cover No 120.00
ME-C16
C: ELECTRICAL INSTALLATION
ME-C17
C: ELECTRICAL INSTALLATION
ME-C18
C: ELECTRICAL INSTALLATION
ME-C19
C: ELECTRICAL INSTALLATION
750V
PVC! PVC insulated cables complying with SS 358 450!
grade (Cont'd)
ME-C20
C: ELECTRICAL INSTALLATION
ME-C21
C: ELECTRICAL INSTALLATION
ME-C22
C: ELECTRICAL INSTALLATION
C400000
TRUN KINGS, CONDUITS AND CABLE TRAYS
ME-C23
C: ELECTRICAL INSTALLATION
ME-C24
C: ELECTRICAL INSTALLATION
Surface mounted
Surface mounted
ME-C25
C: ELECTRICAL INSTALLATION
Metal type
ME-C26
C: ELECTRICAL INSTALLATION
ME-C27
C: ELECTRICAL INSTALLATION
ME-C28
C: ELECTRICAL INSTALLATION
Lightning protection
C500001 No 128.40
Lightning earth electrodes 3600 x 16mm diameter copper clad steel
rod complete with brass or copper clamps and 20 x 20cm GI
inspection boxes with heavy duty hinged covers, fibre glass
bases and rivetted traffolyte labelling:
C500009 Taking down of existing galvanised steel wires, tapes or finials m 2.20
ME-C29
C: ELECTRICAL INSTALLATION
ME-C30
C: ELECTRICAL INSTALLATION
Surge protectors
C500019 13 Amp
No 43.00
C500020 15 Amp No 69.30
No 69.30
C500021 Surge protection modules for modem lines, PZ -024-HA or
equivalent, impulse breakdown voltage<58.5V DC, current
capacity 10 KA (8/20 characteristics)
C500022 Single phase surge protection module for DB board DIN rail No 105.00
mounting as SP-200-2D or equivalent, impulse breakdown
voltage < 1KV, current capacity 20 KA (8/20 characterisitcs) with
thermal fault indications as an integral unit with Live, Neutral and
Earth connections.
ME-C30
C: ELECTRICAL INSTALLATION
Monir Works
C500025 Supply and install Over voltage arrester module per phase 80.00
C500026 Supply and install television protection protector c/w adaptor No 110.00
C500027 Supply and install surface moulded box c/w 4-6 way DIN rail and No 30.00
teak block for connection of surge arrestors or MCBs/ RCCBs
C500028 Supply & fuse two different metals through cadweld bonding for No 110.00
lightning conductor
ME-C31
C: ELECTRICAL INSTALLATION
C600000 EARTHING
N ote : R e fe r t o "C 8 0 0 0 0 0 S W I T C H GE AR S AN D
SWITCHBOARDS" for adjustment on all rates for installation
of switchgears into enclosure
C600001 Earthing electrodes 16mm diameter copper clad steel rod No 128.33
complete with brass or copper clamps and 20 x 20cm galvanised
steel inspection boxes with heavy duty hinged covers, fibre glass
bases and engraved with words:
C600008 Not exeeding 4.0 m deep and not exceeding 6.0m deep No 1,512.00
C600009 Not exeeding 6.0 m deep and not exceeding 8.0m deep No 1,728.00
ME-C32
C: ELECTRICAL INSTALLATION
Miscellaneous
C600012 Supply and install 200 x 200 x 3mm thick hot dipped galvanised No 44.00
hinged lid inspection box c/w plastic moulded pot including
termination, excavation, backfilling, compacting, returfing and
making good of the surrounding
C600013 Supply and install 320mm x 320mm cast concrete inspection pit No 165.00
on the road or carpark in compliance to the requirements and
cover including termination, excavation, backfilling, compacting,
returfing and making good of the surrounding
C600014 Supply and install brass or copper clamp c/w revetted traffolyte No 14.40
labellings
C600015 Supply and fill 300mm x 300mm x 150mm (Depth) inspection box kg 1.50
with fine sand
ME-C33
C: ELECTRICAL INSTALLATION
C700010 Twin 13A socket outlets complete with RCCB 10mA 0.1 sec trip No 126.00
ME-C34
C: ELECTRICAL INSTALLATION
NOTES:
1 For the purpose of this section, the BASE RATE will be taken as the rate to
supply and install the switchgear of the stated FRAME SIZE alone without
enclosure, the busbars, labelling, etc. The rate shall be applicable for supply
and installation of switchgears in OG boxes.
3 The Mark up table is applicable for switchgear installation only and not
applicable to MCB installation and to other sections of this Schedule
ME-C35
C: ELECTRICAL INSTALLATION
Switchgears
ME-C36
C: ELECTRICAL INSTALLATION
Switchgears (Cont'd)
Switchgears as per the notes in the preceding page for the
stated interrupting capacity (3 phase symmetrical) (Cont'd)
ME-C37
C: ELECTRICAL INSTALLATION
Switchgears (Cont'd)
3-pole 10KA
C800033 5A No 60.90
3-pole 25KA
3-pole 36KA
3-pole up to 50KA
ME-C38
C: ELECTRICAL INSTALLATION
ME-C39
C: ELECTRICAL INSTALLATION
Switchboard accessories
C800072 IDMTL overcurrent and earth fault relay for low tension No 800.00
(Analog/Digital type)c/w 105 deg C small wiring with / without
highset element (complete set w/o highset element)
C800073 IDMTL earth fault relay for high tension (Analog/Digital type) c/w No 2,200.00
105 deg C small wiring(complete set with highset element)
C800074 IDMTL overcurrent relay for high tension (Analog/Digital type) c/w No 4,000.00
105 deg C small wiring(complete set with highset element)
C800075 IDMTL overcurrent and earth fault relay for high tension No 4,000.00
(Analog/Digital type) relay c/w 105 deg C small wiring(complete
set with highset element)
C800076 Indicator lights in set of 3 complete with low voltage transformers No 96.00
& covers, holders
C800077 No 48.00
Fuse holders in set of 3 complete with 2 Amp HRC cartridge
fuses and wirings
ME-C40
C: ELECTRICAL INSTALLATION
C800079 m2 640.00
Additional frame space for switchboards (For non-Power Grid
meter compartments)
C800080 Additional frame space for switchboards for three phase Power No 540.00
Grid metering compartments including teak blocks, small wirings
and openings for meter wirings and transparent windows with
viewing perspex
C800081 No 112.50
96 x 96mm flush mounted instantaneous type Class 1 Ammeters
complete with selector switches
C800082 96 x 96mm flush mounted (8 min) maximum demand type Class No 120.00
1 Ammeters
C800083 No 200.00
96 x 96mm flush mounted combined (8 min) maximum demand
and instantaneous type (2 dial) Class 1 Ammeters
C800084 No 160.00
96 x 96mm flush mounted Class 1 500V Voltmeters complete
with 7 way selector switches and wirings
ME-C41
C: ELECTRICAL INSTALLATION
ME-C42
C: ELECTRICAL INSTALLATION
Voltmeter
Selector switch
ME-C43
C: ELECTRICAL INSTALLATION
ITEM NO. DESCRIPTION UNIT RATE
(S$)
Copper busbar
ME-C44
C: ELECTRICAL INSTALLATION DISTRIBUTION BOARDS AND MCBS
NOTES:
1 For the purpose of Item No. C900001 to C900009 only of this section, the
scheduled rates for TYPE a will be treated as BASE RATE for the purpose of
allowing markups for the other design types. The various tyoes of Distribution
Board configuarations (Design TYPE a to e) are as given below.
2 The table of adjustment for the other design types are listed below:
PLEASE QUOTE DESIGN TYPE AS SUFFIX TO ITEM NO FOR QUOTATIONS OR INVOICES WHERE
APPLICABLE
ME-C45
C: ELECTRICAL INSTALLATION
Distribution boards
Metal clad distribution boards complete with hinged doors,
BI connectors, neutral bars, earth bars and internal
connecting wires, including short length cables up to 2
metres run, lugs and terminators, etc. less MCBs or MCCBs
Supply and install 500V metal clad DB c/w hinged cover and
neutral connectors with the facilities for mounting outgoing
circuit breaker (excluding protecting devices)
Single pole
ME-C46
C: ELECTRICAL INSTALLATION
Triple pole
MCBs
ME-C47
C: ELECTRICAL INSTALLATION
1-pole
ME-C48
C: ELECTRICAL INSTALLATION
MCBs (Cont'd)
2-pole
3-pole
ME-C49
C: ELECTRICAL INSTALLATION
Tap-offs
Steel
Polyester
ME-C50
C: ELECTRICAL INSTALLATION
ME-C51
C: ELECTRICAL INSTALLATION
C1000001 Termination of outdoor lightting underground cable (any size and No 43.20
core) complete with approved type 3-way looping connectors, 6 to
20A MCB, small wiring to fittings, 2 to 3 sets of cable glands, heat
shrinks, brackets, teak blocks and earth brass connections, etc.
ME-C52
C: ELECTRICAL INSTALLATION
High bay fittings with rugged, heavy duty die cast aluminium
housings and either upright or direct high purity heavy gauge
aluminium reflectors complete with lamps, control gears and
mounting arms, safety chains and dust covers.
No 522.00
ME-C53
C: ELECTRICAL INSTALLATION
ITEM NO. DESCRIPTION UNIT RATE
(S$)
High bay fittings with rugged, heavy duty die cast aluminium
housings and either upright or direct high purity heavy
gauge aluminium reflectors complete lamps, control gears
and mounting arms, safety chains and dust covers (Cont'd)
ME-C54
C: ELECTRICAL INSTALLATION
C1000046 1 x 100W
No 400.00
ME-C55
C: ELECTRICAL INSTALLATION
C1000047 Bracket fittings consisting of one vandal resistant luminaires with No 126.00
integral control gears and one 18W sodium lamps and brackets.
Black polymide housings and black carbonate covers with clear
prismatic refractor windows
C1000048 Street light fittings with reinforced polyester housings in blue-grey No 301.50
and high purity anodized aluminium mirrors, high-pressure die-
cast aluminium housings for electrical control gears. (The bowl
hinges automatically on the housing when the clips have been
unfastened) complete with 60mm OD mast-arm or 76mm OD
mast-top mounting and 150W sodium bulbs and control gears and
mounting arms
C1000049 Pole top fittings, 500mm diameter striped spherical diffusers in No 301.50
borosillicate with aluminium casting supports and heat deflectors
and aluminium casting baseplates complete with 125W mercury
lamps & control gears
C1000050 Wall mounted fittings with removable one piece injection moulded No 270.00
polycarbonate doors and prismatic lens hinges for full front
access. (Lens is UV stabilised and interior door surfaces finished
in bronze). One piece, heavy duty die cast aluminium housings
complete with 80W or 125W mercury lamps and control gears
C1000051 Wall mounted fittings with prism glass refractors mounted on No 256.50
hinged frames with weatherproof gaskets (IP 555 protection)
complete with 70W HPSV lamps and control gears housed in
aluminium beige finished base
C1000052 Wall mounted fittings with prismatic polycarbonate refractors and No 202.50
one piece injection moulded bronze polycarbonate housings
(interior surface is vacuum metalized aluminium for maximum
reflectivity and secularity). All weather gaskets is provided and
using vandal resistant screws to retain refractors and protect
lamps complete with 70W high pressure sodium lamps and
control gears
C1000053 Enclosed polycarbonate wall mount lumin aires with 70W No 171.00
SON/80W MBF lamps and gears, giving IP65 protections and
using vandal resistant fixings
C1 000054 Heavy duty dust-tight jetproof bulkhead fittings complying with BS No 171.00
4533:2.1 IP65 complete with 80W mercury lamps and control
gears
ME-C56
C: ELECTRICAL INSTALLATION
ME-C57
C: ELECTRICAL INSTALLATION
ME-C58
C: ELECTRICAL INSTALLATION
ME-C59
C: ELECTRICAL INSTALLATION
Wall mounted security light fitting c!w metal halide lamp and
gear with prismatic polycarbonate diffuser
ME-C60
C: ELECTRICAL INSTALLATION
Others
C1000113 No 120.00
Revolving warning light, dual face reflector, IP23 (weatherproof)
c/w bracket
C1000124 Power pack for 28w 2D light fittings (round type) No 42.00
ME-C61
C: ELECTRICAL INSTALLATION
Note: All fluorescent tube (T8 and T5) shall have colour
rendering index level of greater than 85, colour temperature
of 4000 K and minimum 3250 lumens.
ME-C62
C: ELECTRICAL INSTALLATION
ME-C63
C: ELECTRICAL INSTALLATION
C11 00000
FLUORESCENT LIGHTING FITTINGS (CONT'D)
ME-C65
C: ELECTRICAL INSTALLATION
ME-C66
C: ELECTRICAL INSTALLATION
Prismatic diffuser
ME-C67
C: ELECTRICAL INSTALLATION
Prismatic diffuser
ME-C68
C: ELECTRICAL INSTALLATION
ME-C69
C: ELECTRICAL INSTALLATION
Prismatic diffuser
ME-C70
C: ELECTRICAL INSTALLATION
Wired Guard
Metal Reflector
ME-C71
C: ELECTRICAL INSTALLATION
Prismatic diffuser
ME-C72
C: ELECTRICAL INSTALLATION
ME-C73
C: ELECTRICAL INSTALLATION
Prismatic diffuser
ME-C74
C: ELECTRICAL INSTALLATION
ME-C75
C: ELECTRICAL INSTALLATION
ME-C76
C: ELECTRICAL INSTALLATION
C1100240 1 x 7W No 67.60
C1100241 2 x 7W No 81.00
C1100242 1 X 9W No 90.00
C1100243 2 X 9W No 108.00
ME-C77
C: ELECTRICAL INSTALLATION
ME-C78
C: ELECTRICAL INSTALLATION
ME-C79
C: ELECTRICAL INSTALLATION
C1100275 2 X 9W No 78.00
C1100279 2 X 9W No 130.00
C1100283 2 x 9W No 110.00
ME-C80
C: ELECTRICAL INSTALLATION
LED type Exit light fitting and self-contained battery unit c/w
LED charging indicating light and test discharge button
(slimline design) on surface mounted (maintained type) with silk-
screen letterings to FSB requirement
C1100297 2 x 8W No 120.00
ME-C81
C: ELECTRICAL INSTALLATION
C1100298 8W No 81.00
C1100302 1 x 18W lamps and minimum 2 hours duration Ni-cd batteries No 315.00
C1100304 1 x 36W lamps and minimum 2 hours duration Ni-cd batteries No 414.00
C1100306 2 x 36W lamps and minimum 2 hours duration Ni-cd batteries No 414.00
ME-C82
C: ELECTRICAL INSTALLATION
Others
C1100321 14W Recessed Fluorescent Fitting c/w dimming electronic ballest No 332.00
/ Equivalent.
C1 100322 2 x 11W IP65 Weather Proof PL compact flourescent light fitting No 76.00
C1100323 1 X 36W Batten Fluorescent Luminaries c/w mirror reflector with No 80.00
Tubes
C1100325 light fitting for 18w PLC M2 including mirror optic surface mount No 48.00
(300 x 300mm)
ME-C83
C: ELECTRICAL INSTALLATION
C1 100328 22/ 32/ 40w Circular light fitting c/w low loss ballast, capacitor, No 60.00
starter and colour rendering index level of greater than 85, colour
temperature of 4000 K and minimum 3250 lumens fluorescent
tube
ME-C84
C: ELECTRICAL INSTALLATION
C1 200004 No 14.40
Mains wiring points for bell transformers (same as lighting point
without switch)
C1 200005 Bell push poins complete with bell push 30 metre run bell wires No 18.00
and mounting blocks from transformers to bells in PVC trunkings
ME-C85
C: ELECTRICAL INSTALLATION
C1 300000 REMOVALS
C1 300007 Taking down existing ceiling fans, wall bracket fans, oscillating No 3.30
fans
C1300009 To take down one tungsten light fitting (ceiling, pendant or No 3.00
recessed) Contractors are not allowed to claim for cost where the
removal of a particular fitting/accessory is for the purpose of
shifting, adjustment or replacement.
C1 300010 To touch up light point/power point including plastering & painting No 2.00
etc to match existing wall surface. Contractors are not allowed to
claim for cost where the removal of a particular fitting/accessory is
for the purpose of shifting, adjustment or replacement.
C1 300011 To remove electric clock point including wiring and make good No 5.00
wall/ceiling surface (excluding touch up). Contractors are not
allowed to claim for cost where the removal of a particular
fitting/accessory is for the purpose of shifting, adjustment or
replacement.
ME-C86
C: ELECTRICAL INSTALLATION
C1 300012 To take down perimeter & security light fitting c/w arm & bracket No 7.00
(any type) Contractors are not allowed to claim for cost where the
removal of a particular fitting/accessory is for the purpose of
shifting, adjustment or replacement.
C1 300013 To remove TV antenna. Contractors are not allowed to claim for No 30.00
cost where the removal of a particular fitting/accessory is for the
purpose of shifting, adjustment or replacement.
C1300014 To remove DB-4 way to 18-way. Contractors are not allowed to No 60.00
claim for cost where the removal of a particular fitting/accessory is
for the purpose of shifting, adjustment or replacement.
C1 300015 To remove DB-24 way to 48-way. Contractors are not allowed to No 80.00
claim for cost where the removal of a particular fitting/accessory is
for the purpose of shifting, adjustment or replacement.
C1 300016 To remove alarm bell/electric bell point. Contractors are not No 6.00
allowed to claim for cost where the removal of a particular
fitting/accessory is for the purpose of shifting, adjustment or
replacement.
ME-C87
C: ELECTRICAL INSTALLATION
C1 400000 INSTALLATION
C1 400003 Wall brackets, ceiling oscillating or exhaust fans (all sizes) No 4.30
No 7.60
C1 400005 Perimeter and security light fittings (any type)
No 4.00
C1 400006 Install only socket outlet of any type (ceiling, pendant or
recessed) up to 10 nos. including connecting up to existing wiring
point (excluding socket outlet)
C1 400007 Install only socket outlet of any type (ceiling, pendant or No 3.00
recessed) above 10 nos. including connecting up to existing
wiring point (excluding socket outlet)
C1 400008 Install only wall bracket or exhaust fan (all sizes) including No 6.00
connecting up to existing wiring point (excluding fan)
C1 400009 Install only ceiling oscillating fan (all sizes) including connecting No 8.00
up to existing wiring point (excluding fan)
C1 400010 Install only task light point for system furniture including No 6.00
connecting up to existing wiring point (excluding fittings)
C1 400015 Install only fan regulator including connecting up to existing wiring No 5.00
point (excluding fan regulator)
ME-C88
C: ELECTRICAL INSTALLATION
C1500000 SHIFTING
No 6.90
C1500003 Lighting points with fittings (any type)
No 17.20
C1500004 Ceiling fan points and fans complete with fan hooks, regulators
and teak blocks
C1500005 Bracket fan points complete with fan mounting blocks and fans No 9.50
C1500006 Switch points complete with switches and teak blocks or metal No 6.00
boxes
No 35.00
C1500008 To shift air-con thermostat point including all necessary labour,
material etc. c/w maximum of 5 metres of cable length. (Cable will
be calculated separately if the length exceeds 5 m)
C1500009 To shift telephone outlet point including all necessary labour, No 30.00
material etc. c/w maximum of 5 metres of cable length. (Cable will
be calculated separately if the length exceeds 5 m)
C1500010 To shift computer outlet point including all necessary labour, No 70.00
material etc. c/w maximum of 5 metres of cable length. (Cable will
be calculated separately if the length exceeds 5 m)
C1500011 To shift alarm/electric bell push point c/w bell wire and mounting No 25.00
block including all necessary labour, material etc. c/w maximum
of 5 metres of cable length. (Cable will be calculated separately if
the length exceeds 5 m)
C1500012 To shift wall mounted hand-dryer including all necessary labour, No 15.00
material etc. c/w maximum of 5 metres of cable length. (Cable will
be calculated separately if the length exceeds 5 m)
C1500013 To shift clock point with electric clock including all necessary No 10.00
labour, material etc. c/w maximum of 5 metres of cable length.
(Cable will be calculated separately if the length exceeds 5 m)
C1500014 To shift isolator of rating up to 60A including all necessary labour, No 75.00
material etc. c/w maximum of 5 metres of cable length. (Cable will
be calculated separately if the length exceeds 5 m)
ME-C89
C: ELECTRICAL INSTALLATION
SHIFTING (CONT'D)
C1500000
Shifting not exceeding 5 metres including wiring, junction
box, conduits and other materials all ready to operate
C1500015 (Cont'd)
ME-C90
C: ELECTRICAL INSTALLATION
Filament lamps
Fluorescent tubes
ME-C91
C: ELECTRICAL INSTALLATION
C1 600023 Fluorescent starter, any sizes, electronic type c/w reset button No 4.50
C1 600030 6.5W low loss ballasts for 18W fluorescent lamps No 8.10
C1 600031 6.8W low loss ballasts for 36W fluorescent lamps No 8.50
C1 600032 11W low loss ballasts for 58W fluorescent lamps No 14.40
ME-C92
C: ELECTRICAL INSTALLATION
LPSV lamps
ME-C93
C: ELECTRICAL INSTALLATION
ME-C94
C: ELECTRICAL INSTALLATION
ME-C95
C: ELECTRICAL INSTALLATION
ME-C96
C: ELECTRICAL INSTALLATION
Electronic ballasts
PL lamps
C1600129 9W No 5.80
ME-C97
C: ELECTRICAL INSTALLATION
ME-C98
C: ELECTRICAL INSTALLATION
Halogen lamp
PLC lamps
C1600159 5W/ 7W/ 9W/ 10W/ 11W/ 13W/ 18W/ 26W No 4.00
Induction lamp
ME-C99
C: ELECTRICAL INSTALLATION
C1600166 5W or 7 W No 3.80
C1600167 9W or 11 W No 3.80
Compact lamp
ME-C10
C: ELECTRICAL INSTALLATION
ME-C11
C: ELECTRICAL INSTALLATION
ME-C12
C: ELECTRICAL INSTALLATION
ME-C13
C: ELECTRICAL INSTALLATION
ME-C14
C: ELECTRICAL INSTALLATION
ME-C15
C: ELECTRICAL INSTALLATION
C1 600258 5A No 24.00
Others
C1 600259 No 9.00
60W induction light bulb E.S Crompton for Zebra & Aircraft
warning light
C1 600268 Mains bell wiring pt 230 volts c/w tumbler switch No 31.00
C1 600269 No 60.00
6 volts DC door bell either operated by AA, AAA or C batteries
c/w 30 m wiring in PVC casing and bell push button
ME-C16
C: ELECTRICAL INSTALLATION
C1 600276 Vortice PC board for hand dryer (VAHD PBC) No 80.00
ME-C17
C: ELECTRICAL INSTALLATION
Others (Cont'd)
C1 600279 500mm dia semi-coated sphere for post-top light fitting No 180.00
C1 600280 No 240.00
500mm dia semi-coated sphere c/w cylindral lens for post-top
light fitting
Dimmer
ME-C18
C: ELECTRICAL INSTALLATION
Timer
C1 600295 No 70.00
24hrs time switch with spring assist, metal clad surface mounting
c/w bypass switch
C1 600296 No 45.00
24hrs time switch w/o spring assist, metal clad surface mounting
c/w bypass switch
C1 600297 No 120.00
24 hrs 7 day time switch with spring assist, metal clad surface
mounting c/w bypass switch
ME-C19
C: ELECTRICAL INSTALLATION
Teak blocks
ME-C20
C: ELECTRICAL INSTALLATION
ME-C110
C: ELECTRICAL INSTALLATION
ME-C111
C: ELECTRICAL INSTALLATION
C1600357 5A No -24.00
Dimmer
Stage luminaires
C1 600368 1200W high beam spot light for performance theater light No 950.00
ME-C112
C: ELECTRICAL INSTALLATION
C1700001 Lamp fittings with plastic shades or metal reflectors complete with No 2.15
1 or 2 lamp shades
ME-C113
C: ELECTRICAL INSTALLATION
Cabling works
C1 800001 Excavating cable pits for fault location 1.50 x 1.50 x 1 .50m deep on No 108.00
ground including backfilling, compacting, making-good and
returfing (Other size pits will be pro-rated according to volume)
ME-C114
C: ELECTRICAL INSTALLATION
1 core
2 cores
ME-C115
C: ELECTRICAL INSTALLATION
2 cores (Cont'd)
3 cores
ME-C116
C: ELECTRICAL INSTALLATION
4 cores
ME-C117
C: ELECTRICAL INSTALLATION
5 cores
ME-C118
C: ELECTRICAL INSTALLATION
Note: For the purpose of this Sub-setion, the BASE RATE shall be taken as the basis for markups
using the TABLE OF ADJUSTMENT FOR VARIOUS TERMINATION METHODS for the various other
types of terminations defined as follows:
These rates are applicable for ALL types of underground or surface cables
CATEGORY RATES TYPE OF TERMINATION/ SCOPE
OF WORKS
ME-C119
C: ELECTRICAL INSTALLATION
1 core
2 - 3 cores
ME-C120
C: ELECTRICAL INSTALLATION
4 - 5 cores
C1 800106 Breaking down and melting down of end-box (any size) No 90.00
C1 800107 Hour 27.00
Attendance by qualified jointer per hour (Applicable only for stand-
by jobs. For jointing and terminations, the costs would have been
included in the various schedules)
ME-C121
C: ELECTRICAL INSTALLATION
2 - 4 cores
ME-C122
C: ELECTRICAL INSTALLATION
1 core
2 - 3 core
ME-C123
C: ELECTRICAL INSTALLATION
4 - 5 core
ME-C124
C: ELECTRICAL INSTALLATION
Others
C1800145 No 35.00
Supply and lay 100mm or 150mm dia heavy duty PVC pipe in
prepared trench for underground cable
C1 800146 Supply and lay 50mm dia GI pipe in prepared trench No 40.00
C1 800147 No 60.00
Supply all labor remove and breakup cable and box and
connection
C1 800149 Supply and install PVC brass gland termination of any size No 16.60
C1 800150 To supply labour and test equipment to locate faulty underground No 2,000.00
LV cables by licensed cable detector c/w test report.
C1 800151 To supply labour and test equipment to locate faulty underground No 2,500.00
HV cables by licensed cable detector c/w test report.
C1 800152 To engage licensed cable detector to detect underground LV and per job site 700.00
HV cables per job site. Thereafter, submit a certified test report
complete with site drawings endorsed by Licensed Cable Detector
C1800153 No 130.00
Supply and install 300mm x 300mm three compartments metal
junction boxes with all necessary services compartments and
brackets panels for power, networks and AV
ME-C125
C: ELECTRICAL INSTALLATION
C1 900000 FANS
C1 900001 Ceiling fans 1.5/1.2 metres sweep complete with up to 1.5 metres No 92.18
down rods, safety wires, speed regulators and certifications
C1 900013 300mm diameter box fans complete with mounting brackets No 81.00
Exhaust fans
ME-C126
C: ELECTRICAL INSTALLATION
C1 900024 No 18.00
Fan hooks above beam complete with through bolts and safety
anchor points
C1 900025 No 45.00
Fan hooks welded on galvanised plates complete with expansion
bolts mounting and safety anchor points
C1 900028 Fan blades in set of 3 for 1.2 metres or 1.5 metres ceiling fans No 36.00
C1 900029 Capacitors for 1.2 metres or 1.5 metres ceiling fans No 8.55
ME-C128
C: ELECTRICAL INSTALLATION
C1 900036 Painting of ceiling fan 1.2 or 1 .5m sweep c/w speed regulator
No 10.00
C1 900037 Supply and replace complete no of bearings for ceiling fan No 10.50
C1 900043 Supply and replace oscillating gear to 400mm oscillating fan No 14.00
C1 900044 Supply and replace oscillating gear to 500/ 600mm oscillating fan No 10.00
No 12.00
C1 900047 Repair and make good to faulty fan and circuit No 4.00
No 5.00
Hand dryer
C1 900048 Supply and install sensor hand dryer with low noise ( <60DB),
safety cut-off, vandal proof features of 1600W to 1800W capacity.
The air temperature shall be less than 55 degree. No 225.00
C1 900049 Supply and install aluminium Alloy Cover with Powder Coated
Finish Automatic Hand Dryer including dismantling, adjustment,
connection and removal off site making good work disturbed. No 263.00
C1 900051 Supply and install Stainless Steel chrome finish Automatic Hand
Dryer including dismantling, adjustment, connection and removal
off site making good work disturbed. No 472.00
ME-C129
C: ELECTRICAL INSTALLATION
C2000000 MISCELLANEOUS
C2000002 Arranging for PUB testing and installation of lighting/power KWH No 43.00
meters for first consumer including all related LEW services
C2000003 Arranging for subsequent consumer unit within the same No 6.90
premises
C2000004 Scrapping and repainting O/G boxes or feeder pillars with one No 48.80
under coat of anti-rust paint and two coats of enamel paint
No 43.20
C2000006 Outdoor park lighting pole
No 36.00
C2000007 Breaking up concrete foundations, excavating, backfilling,
removing and disposing lighting poles complete with pole top
fittings
No 72.00
C2000008 Breaking up concrete foundations, excavating, backfilling,
removing lighting poles complete with pole top fittings and
reinstall same to new position including making new concrete
foundations and collars (including transportation)
No 51.30
C2000009 Scrapping and repainting street lighting, perimeter lighting or
overhead distribution RC poles with two coat of synthetic
emulsion paint
No 30.20
C2000010 Breaking up concrete foundations, excavating, backfilling,
straighten street light poles, or overhead mains, mild steel poles
and including making new concrete foundations and collars
(including transportation)
No 30.00
C200001 1 Breaking up concrete foundation, excavate, backfill, straighten
bollard or garden light pole, remake concrete foundation
(Height<3m)
ME-C130
C: ELECTRICAL INSTALLATION
C2000021 Supply all labour and materials to break con crete foundation,
remove the existing lamp pole and reinstate the new 10m No 2,275.00
concrete pole c/w lantern including making of new concrete
foundation
ME-C131
C: ELECTRICAL INSTALLATION
C2000023 Supply all labour and materials to break concrete foundation, No 1,000.00
remove the existing lamp pole and reinstate the new 12m hot
dipped galvanised steel pole less arm including making of new
concrete foundation c/w termination and testing.
C2000024 Supply and insatll 10m steel pole c/w single bracket arm with No 1,000.00
lantern mounted on existing concrete flange mounted foundation
c/w termination and testing
C2000025 Supply all labour and materials to break concrete foundation, No 1,325.00
remove the existing lamp pole and reinstate the new 12m hot
dipped galvanised steel pole c/w single bracket arm with lantern
including making of new concrete foundation c/w termination and
test
C2000026 Supply and install 2.5m Zebra crossing steel pole without lantern No 730.00
with norminal mounting height planted or flange mounted type,
hot- dip galvanised with bitumen coating c/w rotaflash time flasher
unit.
C2000027 Supply all labour and materials to break concrete foundation, No 1,500.00
remove the existing lamp pole and reinstate the new 12m hot
dipped galvanised steel pole c/w double bracket arm with lantern
including making of new concrete foundation c/w termination and
test
C2000028 Supply all labour and materials to break concrete foundation, No 900.00
remove the existing lamp pole and reinstate the new 10m hot
dipped galvanised steel pole less arm including making of new
concrete foundation c/w termination and testing.
C2000029 Supply all labour and materials to break concrete foundation, No 1,150.00
remove the existing lamp pole and reinstate the new 10m hot
dipped galvanised steel pole c/w single bracket arm with lantern
including making of new concrete foundation c/w termination and
test
C2000030 Supply all labour and materials to break concrete foundation, No 1,300.00
remove the existing lamp pole and reinstate the new 10m hot
dipped galvanised steel pole c/w double bracket arm with lantern
including making of new concrete foundation c/w termination and
test
C2000031 Supply all labour and materials to break concrete foundation, No 640.00
remove the existing lamp pole and reinstate the new 8m hot
dipped galvanised steel pole less arm including making of new
concrete foundation c/w termination and testing.
ME-C132
C: ELECTRICAL INSTALLATION
C2000032 Supply all labour and materials to break concrete foundation, No 850.00
remove the existing lamp pole and reinstate the new 8m hot
dipped galvanised steel pole c/w single bracket arm with lantern
including making of new concrete foundation c/w termination and
test
C2000033 Supply all labour and materials to break concrete foundation, No 940.00
remove the existing lamp pole and reinstate the new 8m hot
dipped galvanised steel pole c/w double bracket arm with lantern
including making of new concrete foundation c/w termination and
testi
C2000034 Supply all labour and materials to break concrete foundation, No 530.00
remove the existing lamp pole and reinstate the new 6 m hot
dipped galvanised steel pole less arm including making of new
concrete foundation c/w termination and testing.
C2000035 Supply all labour and materials to break concrete foundation, No 720.00
remove the existing lamp pole and reinstate the new 6m hot
dipped galvanised steel pole c/w single bracket arm with lantern
including making of new concrete foundation c/w termination and
testi
C2000036 Supply all labour and materials to break concrete foundation, No 800.00
remove the existing lamp pole and reinstate the new 6m hot
dipped galvanised steel pole c/w double bracket arm with lantern
including making of new concrete foundation c/w termination and
testi
C2000037 Supply all labour and materials to break concrete foundation, No 400.00
remove the existing lamp pole and reinstate the new 3-3.5m hot
dipped galvanised steel pole less arm including making of new
concrete foundation c/w termination and testing.
C2000038 Supply all labour and materials to break concrete foundation, No 580.00
remove the existing lamp pole and reinstate the new 3-3.5m hot
dipped galvanised steel pole c/w single bracket arm with lantern
including making of new concrete foundation c/w termination and
t
C2000039 Supply all labour and materials to break concrete foundation, No 650.00
remove the existing lamp pole and reinstate the new 3-3.5m hot
dipped galvanised steel pole c/w double bracket arm with lantern
including making of new concrete foundation c/w termination and
t
C2000040 Supply all labour and materials to break concrete foundation, No 320.00
remove the existing lamp pole and reinstate the new bollard
lighting fitting c/w control gear and lantern including making of
new concrete foundation c/w termination and testing.
C2000041 Supply labour, tools, vehicle and crane to replace street lamp per per day 350.00
day
ME-C133
C: ELECTRICAL INSTALLATION
C2000043 No 36.00
Brass type cam locks complying with specification, complete with
straight cam and 90º cam turn with key removable in locked
position only
C2000044 Approved type heavy duty brass hasps and staples of at least No 18.00
3mm thickness
KWHr meters
ME-C134
C: ELECTRICAL INSTALLATION
Signboards at switchrooms
C2000071 No 108.00
Rental of mobile generator (min 10KVA) for primary and
secondary injection testing of circuit breakers
ME-C135
C: ELECTRICAL INSTALLATION
C2000078 Provide, install and maintain (or hiring) personal computers, Month 400.00
communication equipments and all related hardwares and
softwares excluding EMS, arrange for a leased network
communication line with an approved firm and pay for all fees and
charges for connections and usages, all to comply with
requirements as set forth in the Preliminaries (minimum 2 months
operation) (Rates shall not be subject to tendered percentage
adjustment)
ME-C136
C: ELECTRICAL INSTALLATION
C2000081 Supply and install 1400VA Powerware Tower based UPS No 850.00
ME-C137
C: ELECTRICAL INSTALLATION
C2100000 DRAWINGS
ME-C138
C: ELECTRICAL INSTALLATION
Note 1: These rates are chargeable for all days of the week
when urgent or emergency works (without schedule of rates)
are executed. These rates are not applicable for items where
the installation cost has been included.
Note 2: The time stated below is for the time the service call
made by the SO, his representative, the PowerGrid Fault
Reporting Centre or the user department and the time at which
the Contractor attends to the site.
Note 3: For works requiring less than one (1) man hour a
minimum labour charge of one man hour shall apply.
ME-C139
C: ELECTRICAL INSTALLATION
ME-C140
C: ELECTRICAL INSTALLATION
C2300000 OG BOXES
C2300004 Concrete collar, plinth and foundation for OG box only No 324.00
ME-C141
C: ELECTRICAL INSTALLATION
Note 1: The rates in this Section is for the LEW services for
the duration of the project or Works and 1 (one) year defects
liability period including the submission of all applications,
drawings etc to PowerGrid and all necessary professional
a nd l ic e nce fe es . T hes e r a te s i ncl ude pr ofe s s i onal
attendance to all site work co-ordination and with PowerGrid
on all requirements pertaining to the Works such as timing
for switchboard delivery, all testing (less cost of injection
tests), metering, turn on of installation, etc. The rates
indicated are for the frame size of the main incoming
switchgear of Low Tension installations.
Installation size
ME-C142
C: ELECTRICAL INSTALLATION
C2500004 Exceeding 210 KVA but not exceeding 350 KVA No 1,200.00
C2500005 Exceeding 350 KVA but not exceeding 490 KVA No 1 ,440.00
C2500006 Exceeding 490 KVA but not exceeding 840 KVA No 1,680.00
C2500007 Exceeding 840 KVA but not exceeding 1000 KVA No 1,920.00
C2500008 Exceeding 1000 KVA but not exceeding 2000 KVA No 2,400.00
C2500009 Exceeding 2000 KVA but not exceeding 3000 KVA No 2,880.00
ME-C143
C: ELECTRICAL INSTALLATION
Secondary injection
C2600006 Arrange with EMA or LEW (approved by EMA) for the primary No 150.00
injection test including adjustment for 6.6/22KV board (IDMTL,
DTL or other make), subsequent breaker at the same time. Rate
shall include all materials, transport, labor charge, etc. necessary
for the test by ASIT
C2600007 Arrange with EMA or LEW (approved by EMA) for the secondary No 250.00
injection test including adjustment for 6.6/22KV board (IDMTL,
DTL or other make) Rate shall include all materials, transport,
labor charge, etc. necessary for the test by ASIT
C2600008 Arrange with EMA or LEW (approved by EMA) for the secondary No 100.00
injection test including adjustment for 6.6/22KV board (IDMTL,
DTL or other make), subsequent breaker at the same time. Rate
shall include all materials, transport, labor charge, etc. necessary
for the test by ASIT
ME-C144
C: ELECTRICAL INSTALLATION
C2700002 Exceeding 250 KVA but not exceeding 500 KVA No 400.00
C2700003 Exceeding 500 KVA but not exceeding 1000 KVA No 600.00
C2700004 Exceeding 1000 KVA but not exceeding 2000 KVA No 650.00
C2700005 Exceeding 2000 KVA but not exceeding 3000 KVA No 1,100.00
C2700006 Exceeding 3000 KVA but not exceeding 4000 KVA No 1,400.00
ME-C145
C: ELECTRICAL INSTALLATION
ME-C146
C: ELECTRICAL INSTALLATION
C2900006 Exceeding 151 KVA but not exceeding 500 KVA No 170.00
ME-C147
C: ELECTRICAL INSTALLATION
C2900012 Supply & lay 6.6 KV or 22KV 300sqmm 3-core XLPE/SWA/PVC & m 150.00
10 pairs pilot cables
C2900013 no 360.00
Opening up of existing 6.6 KV or 22KV cable straight through joint
of any size, clearing the joint boxes, testing of the cables and
C2900014 HT straight and end joint for any size of cables no 480.00
ME-C148
C: ELECTRICAL INSTALLATION
ME-C149
C: ELECTRICAL INSTALLATION
C31 00012 Three phase current recorder papers in box of 10 rolls No 400.00
C31 00013 Single phase current recorder paper in box of 10 rolls Set 300.00
C31 00014 No 30.00
Voltage tester with diodes & three step indicator for 11 0V, 230V,
400V AC by flourescent lamp
ME-C150
C: ELECTRICAL INSTALLATION
ME-C151
C: ELECTRICAL INSTALLATION
ME-C152
C: ELECTRICAL INSTALLATION
51 - 100 KVA
ME-C153
C: ELECTRICAL INSTALLATION
ME-C154
C: ELECTRICAL INSTALLATION
ME-C155
C: ELECTRICAL INSTALLATION
C3400014 Top up new lubrication oil including dispose old lubrication oil Liter 1.10
C3400017 Complete control panel with battery 12V 200AH Item 15,000.00
Note: The Contractor shall note that the above list is not an
exhaustive list and shall provide additional list for the
different type and makes of generator as deemed necessary,
if there is no additional list provided, the rates herein shall be
deemed to be for all generators as listed in Schedule I and
there shall be no claim for adjustment of prices in this
schedule.
ME-C156
C: ELECTRICAL INSTALLATION
C3400019 Plante battery complete with battery rack 24V (100AH) Set 2,200.00
C3400020 Plante battery complete with battery rack 24V (1 25AH) Set 2,500.00
C3400021 Plante battery complete with battery rack 24V (1 50AH) Set 2,800.00
C3400022 Plante battery complete with battery rack 24V (200AH) Set 3,300.00
C3400023 Plante battery complete with battery rack 24V (250AH) Set 3,900.00
C3400024 Plante battery complete with battery rack 24V (300AH) Set 4,500.00
ME-C157
C: ELECTRICAL INSTALLATION
C3400032 Provision of standby heavy duty locomotive lead acid batteries for No
the starting of generators as and when required (per lot - n200 x 2 2
pcs)). This shall include the locomotive lead acid battery 00.00
including the connection and disconnection of the existing battery.
ME-C158
C: ELECTRICAL INSTALLATION
ME-C159
C: ELECTRICAL INSTALLATION
Rates are for painting the day tank and when required as
directed by the SO.
C3500016 No 2,800.00
The day tank shall be coated with 2 coats of anti corrosive paint
and 2 coats of primer. The painting shall be including sand
papered rust surfaces and thoroughly clean.
ME-C160
C: ELECTRICAL INSTALLATION
C3600001 Performing nitrogen pressure check for leakages in underground Item 4,500.00
bulk fuel storage tank
ME-C161
C: ELECTRICAL INSTALLATION
ITEM NO. DESCRIPTION UNIT RATE
(S$)
C37 00005 2 x 18W 4ft T8 LED Tube c/w mirror louvre fitting No 73.00
C37 00006 2 x 10W 2ft T8 LED Tube c/w mirror louvre fitting No 62.00
C37 00007 3 x 18W 4ft T8 LED Tube c/w mirror louvre fitting No 101.50
C37 00008 3 x 10W 2ft T8 LED Tube c/w mirror louvre fitting No 85.00
ME-C162
C: ELECTRICAL INSTALLATION
ITEM NO. DESCRIPTION UNIT RATE
(S$)
C38 00001 To install a length (not excluding 4ft) of neon tubing Length 95.00
C38 00002 To install one metre length of 15KV High Tension m 45.00
weather resistant cable
C38 00004 Additional neon light for any moulded socket outlet plate or switch No 4.00
plate
ME-C163
SECTION D: LIFT INSTALLATION
D: LIFT INSTALLATION
D100000 LIFT
Car rear and side panels to one landing or one lift car
D100016 Stainless steel micro movement landing operating call button No 150.00
ME-D1
D: LIFT INSTALLATION
D100000
LIFT (CONT'D)
Others
ME-D2
D: LIFT INSTALLATION
Others (Cont'd)
authority
ME-D3
SECTION E: COMMUNICATION INSTALLATION
E: COMMUNICATION INSTALLATION
Intercom Station
ME-E1
E: COMMUNICATION INSTALLATION
ME-E2
E: COMMUNICATION INSTALLATION
Power amplifiers
E300027 Wall mounted column speaker, 20W to 30W power rating No 145.00
E300028 No 2,232.00
Microphone stations complete with cables and cable supporting
system as required
E300029 PVC insulated signal cable from speaker to control station No 142.60
E300030 Fire rated insulated signal cable from speaker to control station No 180.00
ME-E3
E: COMMUNICATION INSTALLATION
Others
E300000
PUBLIC ADDRESS AND SOUND REINFORCEMENT SYSTEM
(CONT'D)
Others (Cont'd)
E300062 logic line for the additional horn speaker and decoder card m 1.20
E300063 Integration with exisitng PA System for zonning and chime No 200.00
ME-E5
E: COMMUNICATION INSTALLATION
E400001 No 49.50
Work station patch cords (3.0m) and information outlets including
faceplate and Cat. 6 modular jack
Horizontal sub-systems
Backbone sub-systems
Administrative sub-systems
E400005 24 Port fiber optic patch panel complete with couplers No 522.60
Documentation
ME-E6
E: COMMUNICATION INSTALLATION
Splitter
Directional couplers
Cables - Belden
E500012 RG 6 m 2.00
E500013 RG 11 m 6.10
Others
ME-E7
E: COMMUNICATION INSTALLATION
E600005 LCD Projector (1024×768 pixels, brightness 3200 ansi lumens) No 2,100.00
E600016 No 33,500.00
7000 Lumens Multimedia projector complete with bracket,
installation and testing
E600017 No 2,400.00
2600 Lumens ultraprotable short range Multimedia projector
complete with bracket, installation and testing
ME-E8
SECTION F: SECURITY SYSTEM
F: SECURITY SYSTEM
F1 00009 PS21 smartcard door access system (double leaf wooden door) No 1,725.00
F100014 Control cable, twisted pair, PVC screeded, up to 1mm / 1 pair m 3.00
F100015 Control cable, twisted pair, PVC screeded, up to 1mm / 2 pair m 3.80
F100016 Control cable, twisted pair, PVC screeded, up to 1mm / 5 pair m 7.00
ME-F1
F: SECURITY SYSTEM
Control panels
F300001 No 1,001.00
32 zone (main panel) complete with housing cabinet and
transformer
ME-F2
F: SECURITY SYSTEM
Surge arrestors
Wiring
Backup battery
Relocation of accessories
F300025 No 275.00
Door contact, motion detector or security sensor (excluding
cabling)
ME-F3
F: SECURITY SYSTEM
Transmitter card
F400003 Pin hole type complete with lens and housing No 300.00
Lens
ME-F4
F: SECURITY SYSTEM
Camera housings
Mounting brackets
ME-F5
F: SECURITY SYSTEM
F400000
SECURITY CAMERAS (DIGITAL TYPE) AND TELEVISIONS
(CONT'D)
F400037 Control points at central control console inclusive of cables, cable No 850.00
supporting system such as concealed or surface conduits,
trunkings, trays, fittings, accessories, terminations, etc
ME-F6
SECTION G: FIRE PROTECTION SYSTEM
G: FIRE PROTECTION SYSTEM
ME-G1
G: FIRE PROTECTION SYSTEM
ME-G2
G: FIRE PROTECTION SYSTEM
G100000
FIRE FIGHTING WORK (CONT'D)
Refilling fire extinguisher (Cont'd)
G100044 No 9.00
Chemical foam type, single or dual seal, 150 to 153 litres
extinguisher, wheeled trolley unit
G100054 E96 9 litres foam charge complete with CO2 cartridge No 27.00
G100057 9 litres air foam cartridge for extinguisher (any brand or type) No 18.00
G100058 9 litres air pressure charge cartridge (any brand or type) No 18.00
ME-G3
G: FIRE PROTECTION SYSTEM
ME-G4
G: FIRE PROTECTION SYSTEM
G100100 Discharge hose complete with discharge nozzle for pressurised No 9.00
type
ME-G5
G: FIRE PROTECTION SYSTEM
G100104 Pressurised portable extinguisher valve central shaft and seal No 0.30
ME-G6
G: FIRE PROTECTION SYSTEM
Fire hosereel
G100116 No 313.90
Wall mounted double swivel and recessed hosereel complying with
BS 5274 complete with 30m long x 25mm diameter non-
kinkable reinforced rubber hose, a jet or spray type shut-off nozzle,
gunmetal control valves, wall brackets and fittings including
painting
G100117 No 270.00
Wall mounted fixed type hosereel c/w 30m long 25mm non -
kinkable reinforced rubber hose, a jet or spray type shut off nozzle,
gunmetal control valve, wall brackets and fittings
G100118 No 110.00
Replace hosereel complete with accessories and connections but
without hose, nozzle, stop cock, piping and cabinet
G100120 Replace controllable discharge nozzle c/w stainless steel clip No 30.00
G100121 No 70.00
Replace metal hosereel nozzle box with red epoxy coating
complete with breakglass key holder, lock and key
Fire hydrant
G100123 No 454.60
Approved 100mm diameter pillar fire hydrant complying with Code
of Practice with double outlets, flanged ends, three coats of paint
including all necessary excavation and backfill
G100124 Take out existing fire hydrant and removing off site No 12.20
G100125 No 350.00
100mm x 2-way cast iron breaching inlet c/w rubber blankcap and
chain inclusive of pressure testing and painting
G100126 No 500.00
150mm x 4-way cast iron breaching inlet c/w rubber blankcap and
chain inclusive of pressure testing and painting
G100127 No 200.00
63.5mm brass dry riser landing valve c/w plastic blankcap and
chain inclusive of pressure testing and painting
ME-G7
G: FIRE PROTECTION SYSTEM
G100130 25mm brass air release valve No 60.00
G100131 Cabinet for 2-way breaching inlet c/w wired glass and spring lock. No 220.00
Finishes of cabinet will be red epoxy powder coated
ME-G8
G: FIRE PROTECTION SYSTEM
G100133 Cabinet for 4-way breaching inlet c/w wired glass and spring lock. No 220.00
Finishes of cabinet will be red epoxy powder coated
G100134 No 770.00
Stainless steel cabinet for 4W breaching inlet c/w wired glass and
spring lock
G100135 Metal cabinet c/w wire mesh glass for breeching inlet for Dry/ Wet No 210.00
Riser.
G100136 Dry/ Wet Riser inlet box wired glass panel No 30.00
G100137 Hand wheel cast iron for Dry/ Wet Riser No 45.00
G100139 Brass chain for Dry/ Wet Riser landing valve cap No 8.00
G100140 Supply and fix blank brass cap with chain for Dry/ Wet Riser main. No 40.00
G100141 Brass blank cap c/w chain for Dry/ Wet riser landing valve No 8.00
G100142 No 120.00
Conduct pressure testing for piping up to 200 psi for 2 hours
regardless of pipe size
G100143 Repaint pipe regardless of size with 'signal red' paint c/w labelling m 10.00
G100152 Protective metal cabinet for 2.5kg fire extinguisher complete with
plastic lock/ key lock (include keys and glazing key holder),
brackets and faced with glass panel in fronts No 77.00
G100153 Protective metal cabinet for 4.5kg fire extinguisher complete with
plastic lock/ key lock (include keys and glazing key holder),
brackets and faced with glass panel in fronts No 82.00
G100154 Protective metal cabinet for 9.0kg fire extinguisher complete with
plastic lock/ key lock (include keys and glazing key holder),
brackets and faced with glass panel in front No 97.00
Hosereel cabinet
G100157 Stainless steel hosereel cabinet complete with visual glass, break-
glass key holder, aluminium handle, hinges, appropriate notice on
the operation of hosereel, lock and key
G100158 Hosereel sign of approx.dimension 400mm x 130mm complete No 450.00
with reflective vinyl cut-out letterings
No 135.00
No 300.00
ME-G10
G: FIRE PROTECTION SYSTEM
Touching up rust surface with red lead oxide and apply one
undercoat and one finishing coat of enamel paint wall
mounted/portable extinguisher (any make and type)
Accessories and spare for hose reel irrespective any type and
make
G100191 Refilling BC dry chemical for dry chemical fire extinguisher Kg 1.60
G100192 Refilling ABC dry chemical for dry chemical fire extinguisher Kg 1.80
G100193 No 15.00
Replacing top-cap valve assembly for dry chemical fire
extinguisher
G100194 Replacing top-cap gasket for dry chemical fire extinguisher No 2.00
G100195 Replacing pressure gauge for dry chemical fire extinguisher No 6.50
G100196 Replacing hose & nozzle for dry chemical fire extinguisher No 8.00
G100197 Heavy duty vehicle bracket for extinguisher (New/ Replacement) No 18.00
G100198 Plastic lock for fire extinguisher box (New / Replacement) No 5.00
G100199 No 5.00
Approved breakglass with wording for key holder of extinguisher /
hosereel cabinet
ME-G13
G: FIRE PROTECTION SYSTEM
G100202 Key for fire extinguisher box, hosereel nozzle box or fire panel No 2.00
G100203 No 6.00
Camlock c/w key for fire extinguisher box, hosereel nozzle box or
fire panel
G100204 No 150.00
To excavate trial hole of 1m x 1m x 1m to determine the location of
underground services
G100209 No 60.00
Servicing charges for fire alarm panel (regardless of capacity)
based on the maintenance standard specific in contract (exclude
parts replacement)
G100210 No 70.00
Servicing of hosereel/sprinkler/hydrant panel based on the
maintenance standard specific in contract (exclude parts
replacement)
G100211 No 78.00
Servicing of smoke vent/curtain/gas panel based on the
maintenance standard specific in contract (exclude parts
replacement)
G100212 No 78.00
Servicing of PA communication panel based on the maintenance
standard specific in contract (exclude parts replacement)
ME-G14
G: FIRE PROTECTION SYSTEM
ME-G15
G: FIRE PROTECTION SYSTEM
Sprinkler system
ME-G16
G: FIRE PROTECTION SYSTEM
Cut into pipe, take out length not exceeding 6m, remove off
site and prepare surface to receive new sections :
ME-G17
G: FIRE PROTECTION SYSTEM
G100269 New sprinkler point c/w pipes and fittings inclusive painting No 130.00
G100270 No 180.00
New sprinkler point c/w pipes and fittings inclusive painting more
than 5 points
G100272 Water borne fee to sprinkler system for A&A works Job 200.00
ME-G18
G: FIRE PROTECTION SYSTEM
ME-G19
G: FIRE PROTECTION SYSTEM
These rates are for the supply of all materials, labour and
transport for periodic servicing and main tenance of
additional fire detection and alarm systems (not listed in
schedule) as and when ordered by the SO including
response to faults as specified in the Scope of Contract and
in accordance to Schedule of Maintenance.
ME-G20
G: FIRE PROTECTION SYSTEM
Charger cards
Transformers
G300034 1 – 5 AH No 80.00
G300035 6 – 8 AH No 150.00
G300036 9 – 14 AH No 200.00
G300037 15 – 20 AH No 250.00
G300038 21 – 30 AH No 450.00
ME-G21
G: FIRE PROTECTION SYSTEM
G300039 1 – 5 AH No 300.00
G300040 6 – 8 AH No 500.00
G300041 9 – 14 AH No 600.00
G300042 15 – 20 AH No 1,000.00
G300043 21 – 30 AH No 1,500.00
ME-G22
G: FIRE PROTECTION SYSTEM
G300059 150 x 170 x 70mm metal boxes with locking eyes and hinges fixed No 30.00
to wall for 13 Amp socket outlet (measured separately)
G300060 No 50.00
13A power points complete with 13Amp switched socket outlets and
moulded boxes and not more than 20m surface run PVC
insulated copper wiring in PVC trunking
G300061 Manual call points/detector points complete with not more than No 115.00
20m surface run PVC insulated copper wiring in galvanized steel
conduit (Red)
G300062 Alarm bell points complete with not more than 20m surface run No 117.50
PVC insulated copper wiring in galvanized steel conduit (red)
G300067 50 x 25 mm m 5.60
G300068 50 x 50 mm m 7.60
G300069 50 x 75 mm m 8.50
ME-G23
G: FIRE PROTECTION SYSTEM
PVC trunking
G300070 25 x 12 mm m 1.80
G300071 50 x 12 mm m 2.00
G300072 50 x 12 mm m 2.40
ME-G24
G: FIRE PROTECTION SYSTEM
G300108 Weatherproof bell c/w box for fire alarm system No 120.00
G300109 Alarm bell c/w intergal strobe light and mounting base No 132.00
ME-G25
G: FIRE PROTECTION SYSTEM
G3001 16 24V DC rotating light c/w cable and conduit work < 5m No 150.00
G300124 Fire alarm flasher DC 24V c/w mounting and cables No 130.00
G300126 Metal box 400 x 200 x 150mm with perspex cover and wording No 100.00
G300127 Aluminium plate 750 x 500 x 3mm c/w reflective text vinyl cut out No 108.00
lettering
G300128 No 60.00
3/10W ceiling speaker flush-mounted c/w black box enclosure
with mounting and cables
G300129 No 91.00
10 - 15W ceiling speaker (a ny brand) c/w FR cables and
enclosure (first 5 points)
G300130 No 150.00
10 - 15W ceiling speaker (any brand) c/w FR cables and
enclosure (subsequent point)
G300134 No 700.00
450 - 650N of gas spring for smoke vent/ curtain system c/w
testing, calibration and modification
ME-G26
G: FIRE PROTECTION SYSTEM
G 3 0 0 0 0 0 R E P A I R I N G A N D R E PL A C E M EN T W O R K S O F F I R E
DETECTION AND ALARM SYSTEMS (CONT'D)
G300135 200 - 300N of gas plunger for smoke vent/ curtain system c/w No 750.00
testing, calibration and modification
G300136 4 zone fire alarm panel inclusive of system commissioning and No 960.00
testing and removal of existing panel and make good
G300137 6 zone fire alarm panel inclusive of system commissioning and No 1,200.00
testing and removal of existing panel and make good
G300138 8 zone fire alarm panel inclusive of system commissioning and No 1,440.00
testing and removal of existing panel and make good
G300139 10 zone fire alarm panel inclusive of system commissioning and No 1,800.00
testing and removal of existing panel and make good
G300140 Relocation of smoke/heat detector or call point c/w all wiring, No 75.00
conduits of max 3m and making good of existing
G300141 Relocation of LED, concealed heat detector c/w wiring and No 20.00
conduit (up to 3m and less than 5 points)
G300142 Relocation of LED, concealed heat detector c/w wiring and No 100.00
conduit (exceed 3m and more than 5 points)
G300144 Enclosure door for emergency fire intercom c/w bracket No 42.00
G300153 Repair Internal gas detector and sensor including testing and No 200.00
commissioning
G300154 Solenoid valve include calibration, testing and commissioning the No 400.00
board to its operation
ME-G27
G: FIRE PROTECTION SYSTEM
G300159 No 150.00
UPS at the console panel include calibration, testing and
commissioning
ME-G28
G: FIRE PROTECTION SYSTEM
The rate for each pumpset shall include the supply, delivery,
installation and commissio ning of the equipment as
specified below. This shall include but not limited to the
following :
a)
One (1) no of electric motor driven pumpset on common
base plate and mounting.
b)
One (1) lot of necessary pipework including any modification,
pipe fittings, pressure gauges and flexible rubber bellow
joints.
c)
Disposal of the old pumpset and accessories.
d)
Testing and commissioning
ME-G29
SECTION H: GAS INSTALLATION
H: GAS INSTALLATION
H100000 PIPING
Note: Rates for piping shall include all necessary fittings and
supports. However, excavation, painting and wrapping with
petrolatum tape measured separately
B complying with SS17
Galvanised steel pipes Class
including screw joints
ME-H1
H: GAS INSTALLATION
ME-H2
H: GAS INSTALLATION
H200000 VALVES
ME-H3
H: GAS INSTALLATION
Piping
No 84.00
H300001 Cast iron siphon to BS5834 (4 Quarter)
H400002 Pressure gauges (stainless steel) 111.100 1 kg/cm3 (0-20 PSI) No 59.50
complete with 1/4" NPT Bottom connections and all associated
fittings
No 45.50
H400003 Pressure gauges (bronze casing) 111.100 7 kg/cm3 (0-100 PSI)
complete with 1/4" NPT Bottom connections and all associated
fittings
H500001 Single (one) stage regulator complete with adaptors and all No 133.00
associated fittings
H500002 Second stage low pressure regulator complete with adaptors and No 112.00
associated fittings
H500003 Stainless steel Teflon hose 13mm diameter complete with LPG No 56.00
cylinder head adaptors to match and associated fittings not
exceeding 500mm in length
ME-H4
H: GAS INSTALLATION
ME-H5
H: GAS INSTALLATION
ME-H6
H: GAS INSTALLATION
H900001 No 21.00
Soundness testing of piping in a room/laboratory/workshop with a
main isolation valve
H900002 No 35.00
Locating leakages in piping in a room/laboratory/workshop with a
main isolation valve
ME-H7
H: GAS INSTALLATION
H1300000 DRAWINGS
Example:
Service charges 55.00
Negative 25.00
Linen-backed prints 50.00
130.00
ME-H8
SECTION J: CARPARK & AUTO-BARRIER SYSTEM
J: CARPARK & AUTO-BARRIER SYSTEM
J100001 Supply and install remote receiver for carpark barrier no 218.00
J100027 Supply only transponder w/o artwork c/w suction pad no 25.00
ME-J1
J: CARPARK & AUTO-BARRIER SYSTEM
J100038 Supply and install thermal paper for cashcard system no 50.00
J100048 no 365.00
Supply and install cash card reader power supply unit (for terminal
controllers of payment station)
J100049 no 2,360.00
Supply and install motherboard (for terminal controllers of
payment station)
J100050 no 480.00
Supply and install I/O card (for terminal Controllers of payment
station)
ME-J2
J: CARPARK & AUTO-BARRIER SYSTEM
J100052 Supply and install Hub (for terminal controllers of payment station) no 530.00
J100053 Supply and install station base (square mild steel hollow section) no 1,500.00
flanged mounted onto floor and terminal controller.
J100055 Photocell Housing for Auto barrier/ gate including trouble shooting no 815.00
& Commission
J100056 no 400.00
Supply & install photocell sensor c/w magnetic contactors for Auto
barrier/ gate
J100059 Mild Steel Carpark Barrier with counter weight and chain, including no 900.00
ME-J3