LC 24-A - Rai Bareli


E 1
(34.33 S+25.41 S) Skew CS UP APP ### Completed on 13.01.2017
LKO-II
LC 33B -Sultanpur
LKO-III 2 (42.70 S +25.20 S) on curve ### Completed on 28.04.2017

3 ROB at KM 10/23-25 near Amausi Rly. Stn. 1. Foundation and wall for pier RP1 and RP4 approved.
LKO-IV 3X33.004 DP UP APP F
(PSC)+1X46.029 (S)+1X26.070 (PSC)
(Skew 9°)
2. Foundation for RP2 is under proof checking and
feasibility signatures and yet to be submitted
Super str. - All referred.

(sh......)GA plan approved on 12.05.2016 Data awaited

LC 482- MB SRE
Soil report received & 0bservation sent. Reminder
4 CS UP APP ### sent on
PWD 26.09.2017
Loads- .Reply
letter sent for awaited.
want of load on F
(1X37.20 S) 31.10.2016.Reminder sent on 26.09.2017. Reply
( 43 degree skew )¯ awaited.
Super str.- one referred
GA plan approved on 16.02.2016. ROB (1-C & 418) Data awaited
Soil report received but given bearing capacity
does not match with the recommendation from
the field office.This has telephonically & by letter
dt.05.03.2017 & 02.11.2017.conveyed to field.
Reply awaited.
LC-1C
( 21.60 P+24.0 S + 21.60 P)
5(A) ( skew 8°) Sub str.- (Chourasia)
PWD loads- Letter send on 03.05/23.06 &
17.08.2016/05.03.2017 & 02.11.2017. reply F
awaited.

Super str. -ROB 1-C -All three spans referred.


CS UP APP ### GA plan approved 16.02.2016. ROB (1-C & 418) in Data awaited
one GA.
Sub str. -(Khalique)

MB 418

5 (B) F
NW
PWDSoil report
loads- received.
Letter send on(Bearing capacity
03.05/23.06 &
received but it does not &
17.08.2016/05.03.2017 match with theReply
03.11.2017.
(1x 46.029 S ) recommendation from field office. This has
awaited.
telephonically & by letter dt. 05.03.2017 &
03.11.2017.conveyed to field.Reply awaited.
Super str. - To be designed
Sub str. (Smt.Rajshree) P1, P2 & CP1 Consultant
approved.P3 & CP2 pending due to design of design awaited
(42.70 consult. Design) Foundation will be
redesigned as pile foundation . Approval for
design of pile foundation obtained.Test pile
approved on 23.06.2017.Design of substr. awaited.
Loco Shed MB
6 (3X21.60 DP UP APP ### F
P+1X47.5 S) Pier cap;- P1,P2 & CP1 approved. P3 & CP2
pending as above.

Super Str( Anuj).-3 X 21.6 referred & 42.7 desig


pending with field Dy.

LC 22-A (Jawalapur) DOU


7 (1x31.906 S) BLIN UK APP ### Completed on 11.08.2017
(32degree skew) G
Completed on 6.10.17
Km 510/33-34 - (Bhandari pul)
JUC 8
Amritsar DP PB APP ###

Completed on 03.11.2017
Talara
JAT 9
1x 14.4 (RCC) DP HP APP
GAD Awaited. Approval of
GAD awaited
LC 26 (Khurja- Meerut) Super str. - (1X25.24) & (1X 37.240) - Already
1 X 25.240 + 1X 37.24 + 1X15.876 approved
10 steel compo. High stress CS UP U/APP 1X15.876 (Steel)- based on 18.00m high strength, F
(skew 0 degree) to be designed in house.

ROB at KM 16/18-20 near Br. No 234


11
(Hindon Br.) DP UP APP ### Completed on 20.04.2017

CSB
LC 79- Khairanthi
12
2X17.25 (P)+31.28 (S) CS HR APP ### Completed

13 Soil report received

LC 54- Khukrana Road 1X25.08 PWD reports received


(S)+1X37.280 (S)+2X31.280(S) HR APP
+1X19.08 (S) Design of pile group in rpogress

Super str.- All referred (RDSO)

Partialy Soil investigation report received on In progress


24.08.2016 and observations sent on 22.09.2016
& 21.10.2016. Soil report received on
04.01.2017.Levels received on
11.01.2017.Recommendation awaited.
LC-153 (Dhobi Ghat)
CENTR 4x18.0 (S)+2 X 76.500 (Bow string)
AL 14 CS UP APP Sub str.(Khalique)- substr. for 18.0m span (LP2 , F/D
+8x18.0 (S) ={12x18.0+2x76.50} LP3 &LP4) approved. Design of RP2,RP3
(skew 0.0 degree) ,RP4,RP5,RP6, RP7 & RP8 approved.

Super str.-( sh Anuj) Bow string girder to be


designed by consultant & substr. of track span.
Steel composit girder -Referred.
SERd
15 Barapullah DP DLI APP Completed
(Raj shree) Sub str.:- CP1, P1 & CP2 (3 foundns.) In progress
approved.
16 DP DLI APP Pier cap- (CP1,P,CP2). All design completed & drgs.
under preperation.
ROB connecting Narela-Bawana sub
city (Rly. KM 24/18-20) Super str.- (i) Steel composite:- (Anuj)- D
18.8 P+ 42.7 S Demensional details,splice detail,bearing loads of
42.7m steel girder approved and a.) X-girder and
b.) deck slab to be being designed.
(ii) PSC :- (Ansari) 18.80m
span -approved

Data awaited
GAD approved on 16.09.2016.
Substr.- (Sh.Khalique) Letter for net SBC sent on
LC11-MTC-KRJ 18.01.2017 & reminder on 26.09.2017. Reply
(1X25.00 P + awaited.
2x 48.920 S+
NDWCS 17
1X 25.00 P) CS UP APP ### PWD loads - Letter sent for want of load F
( 57.5 degree skew ) dt.18/01/2017 & reminder on 26.09.2017. Reply
awaited.

Super str. :-All referred


LC 48- Mansurpur
18
(31.28 S +25.08 S) CS UP APP ### Completed.
CSB-II
19 530-B/2E (Baliakheri) CS UP APP ### Completed.
LC 227 - Kotfateh All Sub Str. and Super Str.drgs. Approved. Bearings
20 (43.965 S + 17.15 P) CS PB APP ### approved on 20.09.17.
(30.216 degree skew)
SPL Substr. :- Approval for pile foundatin granted by In progress
CAO/C on 01.09.2016.Drawing of test pile
UMB approved 03.10.2017.Test result awaited.
LC 109 Barara
21
2 x 25.080 (straight) CS PB APP ### PWD loads- letter issued to field Dy. Dt. 4.11.16 & D
Reminder on 26.09.2017. Reply awaited.

Super str. - Referred(RDSO)


22 Grade Separater Rani Jhansi Road DP DLI APP ### Completed.
GAD approved on 08.12.2016. Data awaited
Soil report-letter sent on 18.01.2017 & reminder
sent on 26.09.2017.Reply awaited.
LC 89- Shamli
23
13.536 P+ 46.029 S+ 13.536 P CS UP APP ### PWD loads-Letter sent on 23.01.2017 & reminder F
sent on 26.09.2017. Reply awaited.

Super str. - All referred.


NC TKJ
GAD approved on 08.12.2016. In progress
Soil report reply received on 21.06.2017
Sub;- (Sh .Rajesh) Dimensional Drg of
substructor under approval.
LC 22- Jhajjar
24
1x 42.717 {S] CS UP APP ### F
PWD loads- Load received on 21.06.2017.

Super str. -based on already referred.


Modifications are required.
1. Drawing of foundation for pier P1&P2 approved . In progress

2.Common pier loads for pier CP1 and CP2 recd. On


10.01.2018 and foundation for common piers are under
LC 39C-Patli design.
25 25.08 (S)+2x19.08 (S) CS HR APP ### D
3. Pier caps for all piers are to be taken up..

LC 48- Ichhapuri
26 19.08 (S)+37.28 (S) CS HR APP ### Completed

GAD approved on 12.05.2016.Soil report receied Data awaited


SURVEY SSB on 06.06.2016.Observations sent on 16.06.2016 &
reminder on 24.08.2016. Reply awaited.

LC 23-A- Gurgaon
27 1X 55.0(fish belly) CS HR APP ### PWD loads - Letter issued to field Dy. on dt. F
18.01.2017. Reply awaited.

Super str. -based on already referred.


Modifications are required.
All drgs. Approved except bearing loads which is in In progress
progress.
LC-34B-Garhi-Harsaru
28 2x18.0 (S)+1 X 31.20 CS HR APP. ###
(skew 0.0 degree)