Studied FPSO
Schiehallion needed to
Challis Venture be replaced by 2015
High
Polytropic Switchboard
tubing connections
Manageability
1 5 10 20 40
Subsea Systems
Main Field Wells
Subsea Flowline Systems
Mooring System
FPSO Hull
Topsides – Utilities
Mooring System
SPM Buoy
Data was stored and secured
in a unique database and
accessible in real-time by
anyone who was acting on
the AIM activities.
AIM Process
General Facility Data Metocean Certification Authority Heat & Mass Balance
Production Limitations
Production Rates
Risk Assessment
Analyse data to build a trend for lifecycle
management - look at all the implications Structural Assessment
and determine how these will be managed
for the life of the asset.
Gap Analysis Methodology
Complete a couple of rounds of gap analysis to ensure all data and information has been captured
and correlated to the AIM program.
Component Data
Breakdown Requirements
CDMS
(data
management
Gap Analysis system)
Received /
Conclusions
Required Data
1 Represents performance
2 2 degradation that survives
3
through life extension
Performance standard
5 Represents performance
3
degradation that survives to end
Minimum acceptable Life of design life
performance level extension
Structural Integrity Represents performance
4
degradation requiring repair /
Assessment confirms that replacement but still following
acceptance level is the “bath tub” wear out curve
achieved, exceeded or not
achieved Represents rapid degradation
5
before end of design life
Time
Original design life
Asset Integrity Assessment Criteria
Complete a couple of rounds to optimize and develop the Asset Integrity program, and to develop
an action list.
Condition Risk
Assessment Assessment
Optimized
AIM program
Minimum
Action List
Acceptance
Release Event
Risk Management
Critical throughout the management of an asset’s integrity program.
Risk identification
3. Risk assessment
2. 5.
Communication and Risk analysis Monitoring and
consultation review
Risk evaluation
Probability of
Asset Hierarchy Qualitative failure
Risk
Subdivision Tag Assessment
Ranking
System (HAZID) Consequences of
failure
Inspection
Plan
Detailed
Quantitative
Review of the Component RBI of
Assessment
Documentation Selection Failure
(FDF)
(FDF <10)
Risk Rating and Prioritizing
The risk matrix for the project was simplified into three
ratings, helping to prioritize maintenance:
AIM
Manual Maintenance
Philosophy Specifications
Workflow
Inspection RCM
Specifications
Specifications
Workflow
Component
Specifications
Work Package
Workflow
SMR CMMS /
Database
Risk Assessment
Software/Database RBI
Conclusions