INTRODUCTION
1 .1 . Authority
The requirements of this Design and the report are spelled out in the terms of reference of the
contract between PPTA Consultant (KECC jv Tetira) and PT. Prana Kurnia Consultant dated May
Scope of Works:
I-1
1 .2 . General Features of Ciujung River
The Ciujung river with total catchment area 2,144.86 km2 and a river length about of 119.6 km has
three major tributaries Ciberang river, Cisimeut river and upper of Ciujung river. Situated between
1060 01’ 00” - 1060 29’ 05” Eastern Longitude and between 60 15’ 30” - 60 43’ 45” Southern
Latitude. The biggest flood occurred on 14 January 2012 caused flooding areas of settlement of
more than 10,000 houses, paddy fields of about 4,000 ha, fishponds 150 ha, industrial areas 20
Barrage up to beginning of existing dike (Nagara Village) is to reduce flood inundation area,
The design work includes topographic survey, soil survey and laboratory test work and hydrology
and hydraulics design to determine the water level caused by the flood discharge whit 25-year
return period.
I-2
1 .5 . Structure of The Report
I-3