Well Services

A major service provider to Assets / Basins of the organization in the field of

 Work Over
 Well Testing & Completion
 Well Stimulation
 Wireline

Objectives

 To confirm physical presence of hydrocarbons and to acquire valuable


data for evaluating the commercial viability of a reservoir with a view
to maximizing reserve accretion.
 To design and complete newly drilled wells and prepare them for flow
as per the development plans.
 To plan and schedule engineered well interventions and implement
them for optimizing production of oil and gas.
 To carry out all operations through safe and cost effective methods.
 To introduce new emerging technologies and innovative engineering
techniques which will guarantee optimum and sustained production
with the ultimate goal of maximum recovery.

Major Services Provided By Team Well Services

Workover :

 Engineered well Intervention by deployment of work over rigs for


remedial measures.

Types of jobs handled

 Water Shut off


 Gas Shut off
 Servicing
 Safety - SSSV failure / annulus pressure
 Side track - Long Drift / short drift / Drainhole/
 Artficial lift installation / Removal / Change / repair
 Layer Transfer
 Profile Modification
 Convert to Injector / Producer – Single / Dual
 Well Abandoning
Workover Rig Fleet

Onland
 Mobile Work over rigs Owned – 56 nos.
 Capacity – 50 MT, 100 MT, 150 MT
 Mobile Work over rigs Charter Hired – 23 – 28 nos.
 Capacity – 30 MT, 50 MT, 100 MT, 150 MT
Offshore
 Charter hired Modular Platform work over rigs – 2 +1
 Drilling Jack up rigs – 6-10 as per need / availability – Charter hired &
owned
 PSV Support vessels for Modular rigs

Work centre wise distribution of Workover rigs:

Asset / Rig ON Char Tot


Basin Capa
30T GC
Nil ter
3 al
3
Ahmeda city
50T Own
7 Hire
2 W
9
bad 100T ed
1 d
1 or
2
Total Rigs Rigs k
14
50T 14 4 Ov
18
Mehsana 100T 1 0 er
1
Total rig
19
s
50T 3 1 4
Ankleshw 100T 9 1 10
ar 150T 1 1 2
Total 16
50T 3 0 3
Cambay
Total 03
100T 11 3 14
Assam 150T 1 3 4
Total 18
100T 1 1 2
Jorhat
Total 02
100T 1 1 2
Tripura
Total 02
CBM, 50T 1 0 1
Bokaro Total 01
Rajahmu 150T 0 1 1
ndry Total 01
50T 1 0 1
Cauvery 100T 2 1 3
Total 04
Total Onshore Work Over rigs 80
Mumbai Modul 0 1 1
Offshore ar Rig
Total 01
Total ONGC Work Over rigs 81
WELL STIMULATION SERVICES:

To stimulate reservoir for enhancing / sustaining production.

Main Stimulation Services

 Fracturing
 Acidisation
 Solvent Treatments
 Specialized Services
 Sand Control
 Coil Tubing
 Nitrogen
 Hot Oil

Other Services Rendered

 Laboratory Services
 Mechanical Services
 Training Services

Brief Services Details

Hydraulic Fracturing

 Hydraulic fracturing is a widely used technique to improve well


productivity and recovery of hydrocarbon in low permeability
reservoirs.
Acidisation

 Acidisation is used to clear / create flow channels near well bore for
improving hydrocarbon production.
Coil Tubing Services

 Coil tubing units are used for well servicing under pressure. This is
very efficient and cost effective method of servicing a well in
comparison to conventional methods.
Nitrogen Services

 Nitrogen is widely used for flow initiation by unloading the well fluids
as it is safe and environment friendly.
Sand Control Services

 In unconsolidated / loose formations, sand is produced along with


oil and gas resulting in decline / ceasure of production in the long
run. Sand control methods are :
Gravel Pack

 Pre-pack Screens
 High Rate Water Pack
 Frac-pack
Hot Oiler Services

 Hot oiler is used for removal of blockage in oil field tubulars formed
by paraffin and asphaltenes.

Well Stimulation Service (WSS) Bases

Ahmedabad

o First WSS base of ONGC


o Equipped to take up complete range of stimulation
operations with inhouse Equipment / design and manpower
o Designated at Centre for excellence & Nodal centre for
stimulation operations across ONGC.
o Equipped with Hydrofracturing units
Assam

o Equipped to take up complete range of stimulation


operations with inhouse Equipment / design and manpower
except hydrofracturing
Jorhat

o Equipped to take up complete range of stimulation


operations with inhouse Equipment / design and manpower
except hydrofracturing
Bokaro

o Equipped to take up complete range of stimulation


operations with inhouse Equipment / design and manpower
including hydrofracturing
Rajahmundry

o Equipped to take up complete range of stimulation


operations with inhouse Equipment / design and manpower.
Second full-fledged Hydrofracturing units being set up.
Karaikal

o Equipped to take up complete range of stimulation


operations with inhouse Equipment / design and manpower
except hydrofracturing
Ankleshwar

o Equipped to take up complete range of stimulation


operations with inhouse Equipment / design and manpower
except hydrofracturing
o Mumbai
o One ONGC Owned vessel Samudra Nidhi deployed since
1986 with Marine services hired from M/s SCI and stimulation
services hired from International Services providers
o Charter hired vessel – One deployed, second to be deployed
o New Base at Tripura being set up for Acid, Nitrogen and Coil
Tubing operations.
o Setting up a New HF Base for Eastern Sector under
consideration.
Tools & Equipment for carrying out WSS Operations:

o Acid Pumping Units


o Nitrogen Pumping Units
o Coil Tubing Units
o Fracturing Units
o Multi-Purpose Pumping Units
o Sand Blender
o Sand Dumper
o Acid tanker
o Data Acquisition Van
o Chemical Additive System
Well Completion & Testing (WC&T)

o To establish reserves through exploratory testing and


enhancing production through completion of development
wells.
o Exploratory well Testing for reserve accretion
o Development well Testing and Completion for production
enhancement
o Flow measurements at surface using Separators
o Intelligent Well Completion
o Deep Water well Testing and Completion

Production Testing is an operation to unveil the potential of


reservoirs and establish presence of hydrocarbon bearing zones
through various types of testing methods. The data so collected
during testing of well is used for establishing commercial viability
and future planning for development of fields.

The main modes of testing are:

o Conventional testing
o Drill Stem Testing (DST)- Nominal bore DST tools /Full bore DST
tools.

 Testing of a well involves risks / hazards of unknown pressures /


temperatures / behaviour and composition of reservoir fluids /
hydrate formations / flow of H2S and other hazardous fluids. Care
needs to be taken to ensure safety of wells, personnel and
environment.
 Completion of a well means making a well ready for production
using completion string (mainly known as production tubing),
subsurface safety and control tools and surface safety & control
equipment, suitable surface flow line

Well Testing and Completion of CBM Wells:

 Each CBM wells has around 6/8 coal seams depending on the
requirement of data generation, each coal seam may be flowed
and tested separately after stimulation or all the coal seams may be
stimulated and thereafter commingled production testing may be
taken up.

Production Testing in a CBM well is carried out in two phases:

 Initial production testing with rig in place


 Prolonged dewatering and gas flow measurement without rig.
The major activities of well testing and completion operations comprise of
sand cleaning of the well bore, lowering of artificial lift (PC pump/ SRP/
Macroni tubing/ESP), putting the well on dewatering. As the dewatering of a
well may continue for a very long time, depending on the nature of
formation, no norm is proposed for firm up for this activity. This phase of well
testing and completion starts after pre-frac and hydro-fracturing of the coal
seams have been completed.

The WC&T team is experienced in carrying out operations in variety of wells

o Exploratory wells – Onshore and offshore


o Development Wells – Onshore and offshore
o Subsea testing & Completion
o Testing and Completion of High pressure / High Temperature
wells
o Testing and completion of Deep Water wells
o Completion of High tech wells – Multi lateral / Side tracked /
Drain Hole Horizontal wells / Extended reach
o Intelligent and smart completions

Tools & Equipment for carrying out WC&T Operations:

o Downhole safety and producing strings like Packers / Plugs /


Sub surface safety valves / flow nipples/ Tubings
o Surface safety / X-mas tree / Flow head / Surface flow line/
Mobile Test Separator / Trip tanks / Heater / Mobile Flare
booms.
o Specialised equipment / tools for High Pressure / High
Temperature / High H2S environment.

WIRELINE SERVICES

To intervene in live wells to operate and resolve several downhole tools. This
technique is very useful to avoid costly rig deployment especially in offshore
for liquidation of wells and also to ensure safety of the wells.

o Wireline winches
o Offshore – 7 teams, including charter hired winches and
teams
o Onshore – mainly in Ankleshwar, also in Agartalla,
Ahmedabad, Rajahmundry, Cauvery & Assam as per the
need of the location.
o Capable of down hole tool manipulation, i.e., installation,
removal, operations
o Capable for reservoir studies
o Capable of fishing
o Ascertaining health of the wells and identifying scale
formations.

SAFETY, ENVIRONMENT & STANDARDISATION:

 While the operations of Well Services involve hazardous


environment, which includes, high pressure / high temperature,
inflammable and corrosive/ toxic fluids, hydrate formation etc, all
efforts are taken to carry out operations in safest manner as per the
existing guidelines and International industry practices.
 Similarly, due care is taken to protect environment.
 All operations are carried out in standard manner for which manuals
on Standard Operating Practices have been formulated.
 Training & certification programs related to safety in operations are
regularly conducted for personnel for skill development and
adherence to guideleines.

Das könnte Ihnen auch gefallen