Sie sind auf Seite 1von 3

Traning Plan

TIME
11/6/2017

11/7/2017

11/8/2017

11/9/2017

11/10/2017
Traning Plan
CONTENT
protection relays

General introduction for the network structure and communication system

BCU relays and mimic introduction and synchro-check scheme

scada system and operation

gateway/GPS and conclusion


time table
1.LED indication
2.basical relay operation and cheking
1.network structure and communication
2.date and alarm check
1.BCU amd Mimic realys
2.software
1.scada system install and LED
2.Operation
1.network structure
2.soft configration and conclusion

Das könnte Ihnen auch gefallen