Building Project
Participants
o Mayor
o School Department Administrators
o Teachers
o Students
o Parents
o Community Members
Conceptual Design Options
Costs Comparison
Maple Only
Repairs
Addresses
Maple, Center &
Pepin Only
Addresses
Maple, Center,
Pepin AND
White Brook
issues
Cost Comparison: Repair
Existing vs. Build New Pre-K to 8
Total Repairs Only Cost
• Total Repair & Code Compliance Cost for all 4 schools (Maple ES,
Center ES, Pepin ES & White Brook MS) estimated at $135 million
• MSBA will participate in only one building project at a time.
• Repairs do not provide facilities for a 21st century educational program
• Repairs do not meet MSBA space standards
• When or if MSBA will invite another (third) future Easthampton project is unknown
therefore leaving 2 century-old elementary schools and White Brook unimproved
Potential
Tennis Courts
Proposed
School
Potential Track
New Football
Field
Building Organization
Elementary and Middle School Communities:
Separate M.S. and E.S. Entrances
Separate Cafeterias
Separated Nurse Access
Separate Gym Entrances
Shared Program Buffer ACADEMIC
NEIGHBORHOOD
Program Requirements:
5 Classrooms / Wing
3-Station Gym ACADEMIC
NEIGHBORHOOD
Adaptive P.E. SHARED
M.S.
3 Lunch Sittings
Distributed Administration
Entrance PROGRAM
Functional Relationships:
Flexible Gathering Space at
Entrances
Cafeteria Adjacencies to
Kitchen
Controlled Entry/ Secure E.S.
Classroom Wings Entrance
Building Security
= Security Door
Security Provisions:
Public Access through ES or MS
Entrances Only
Controlled Entry Sequence
Bullet Resistant Glass at Secure Interior
Vestibule Doors
Shatter-Proof Glass at All First Fl.
Windows Below 7’-0” High.
Security Doors at Classroom Wings
Video Surveillance, Viewable from PD
Dispatch
Lockdown Hardware at Classroom Doors
Window Treatments at Exterior Windows
and Classroom Doors
Building Entrances
Secure Entrance Sequence:
View of Approaching Visitors All Visitors Must Be Buzzed Into
Outer Vestibule Doors unlocked Office
Interior Vestibule Doors Locked Guests Sign-In Prior to Admittance
Video Monitored Office Door (Locked) to Lobby
View
View
A.P. SRO
Office
Office