Table of Content
1. General information
3. Calculation sheet
Page 2
March 15, 2018 [MS OF OUTSIDE SCAFFOLDING FOR PODIUM FLOORS]
1. General information
For the outside scaffolding of podium floors, we will install one H1700 – frame
system supported by a cantilever I150x75 beam system anchored on 1st floor.
Parameter Value
Cantilever I beam I150x75
Floor to anchor the cantilever I beam 1st floor
Length of cantilever I beam 1800mm
Maximum spacing among cantilever I150x75 beams 1600mm
Width of working platform 1250mm
Total Height of the scaffolding set ~14200mm
Distance from structure to scaffolding 300mm
Page 3
March 15, 2018 [MS OF OUTSIDE SCAFFOLDING FOR PODIUM FLOORS]
Page 4
March 15, 2018 [MS OF OUTSIDE SCAFFOLDING FOR PODIUM FLOORS]
CALCULATION SHEET
Note:
Page 5
ETABS by adguard
Unit: kN.m
Shear force diagram I150x75 beam
Unit: kN
Page 6
March 15, 2018 [MS OF OUTSIDE SCAFFOLDING FOR PODIUM FLOORS]
Select, Ln = 150mm
Page 7
March 15, 2018 [MS OF OUTSIDE SCAFFOLDING FOR PODIUM FLOORS]
Designation -- M16
---
Grade - 8.8
Page 8
March 15, 2018 [MS OF OUTSIDE SCAFFOLDING FOR PODIUM FLOORS]