APPLICATION NUMBER: Estimate Reference

Categor Uni Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Cost
y t Estimate Comments Current Construction Costs
Construction Specification Institute
Division 1 General Requirements
District may itemize General Conditions or Apply a
a General Conditions percentage to the estimated subtotal of construction costs.
General Conditions $0
Mobilization, On & Off $0
Non-Distributable Labor $0
Permits, Licenses & Fees $0
Temporary Utilities, Structures & Fences $0
Equipment Rental $0
Other General Conditions $0
$0
$0
Sub Total $0
Division 2 Site Work
a Site work
Site Demolition: $0
General Building Demolition: $0
Excavation, Fill & Grading: $0
Piling $0
Caissons & Drilling $0
Shoring & Bulkheading $0
Site Utilities $0
Storm Drainage & Sanitary Sewer $0
Water, Steam & Gas Distribution $0
Valves & Specialties $0
Mechanical Utilities, Accessories $0
Miscellaneous Site Equipment $0
Electrical Distribution, Underground $0
General Site Work, Paving & Walks $0
Miscellaneous Site Improvements $0
Irrigation, Sprinkler Head Systems $0
Landscaping $0
$0
Sub Total $0

Page 1
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Uni Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Cost
y t Estimate Comments Current Construction Costs
Division 3 Concrete
a
Precast Concrete $0
Specialty Concrete $0
Excavation & Backfill $0
Concrete Forms $0
Foundation forms $0
Footing Forms $0
Forms, Slab on Grade $0
Reinforcing steel $0
Concrete placement $0
Slab Finishes $0
Vertical surface Finishes $0
Insulating Decks $0
Fiber Deck $0
$0
Sub Total $0
Division 4 Masonry
a
Brick Masonry $0
Concrete Unit Masonry $0
$0
Sub Total $0
Division 5 Metals
a
Structural Steel $0
Decking & Siding $0
Misc Iron $0
$0
Sub Total $0
Division 6 Carpentry
a
Rough Carpentry $0
Vertical Framing, Walls $0
Horizontal Framing $0
Misc. Framing & Materials $0
Sheathing $0
Carpentry Specialties $0
Finish Carpentry $0
Beams, trusses $0
Stairs, Wood $0
Rough Hardware $0
$0
Sub Total $0

Page 2
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Uni Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Cost
y t Estimate Comments Current Construction Costs
Division 7 Thermal & Moisture Protection
a
Waterproofing $0
Thermal & Sound Insulation $0
Roofing $0
Composite Building Panels $0
Sheet metal & Fabricated Skylights $0
Architectural Sheet Metal $0
Caulking & Sealants $0
$0
Sub Total $0
Division 8 Doors, Windows & Glass
a
Hollow Metal Doors & Frames $0
Wood Doors & Frames $0
Wood Garage Doors $0
Wood Door Specialties $0
Special Doors $0
Vinyl, Windows & Doors $0
Aluminum, Windows & Doors $0
Wood Windows & Doors $0
Finish & Hardware $0
Glass & Glassing $0
Curtain Walls $0
$0
Sub Total $0
Division 9 Finishes
a
Studs $0
Furring $0
Lathing $0
Plaster & Lath $0
Gypsum Wall board, Studding & Furring $0
Gypsum Wall board, Secularities $0
Ceramic Tile $0
Terrazzo $0
Acoustic Treatment $0
Wood Flooring $0
Resilient Flooring $0
Painting & Wall covering $0
Plastic & Factory Finish Wall Surfaces $0
Sub Total $0

Page 3
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Uni Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Cost
y t Estimate Comments Current Construction Costs
Division 10 Specialties
a
Chalk & Tack Boards $0
Toilet Partitions & Compartments $0
Partitions Toilet Accessories $0
Misc. Building Specialties $0
$0
Sub Total $0
Division 11 CTE Program Equipment to be supplied on separate sheet.
a
Sub Total $0
Division 12 Furnishings Indicate F&E included in a construction contract
(i.e., built-in equipment)
Blinds & Shades $0
Cabinets $0
Laminated& Plastic
Laminated Plastic Tops
& Simulated Marble
Tops $0
Carpets $0
Draperies & Curtains $0
Other $0 Must Provide a Description of "Other"
Sub Total $0
Division 13 Special Construction

Special Construction $0
Prefabricated Structures $0
$0
Sub Total $0
Division 14 Conveying Systems

Conveying Systems $0
$0
Sub Total $0
Division 15 Mechancial

Equipment $0
Fixtures $0
Piping $0
Valves & Specialties $0
Insulation, Piping $0
Miscellaneous Plumbing Specialties $0
Medical & Laboratory Equipment & Pipe $0
Fees, Permits & Sterilization $0
Industrial Piping Insulation $0
HVAC $0
Equipment, Furnaces $0

Page 4
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Uni Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Cost
y t Estimate Comments Current Construction Costs
Equipment, Hot Water & Steam Boilers $0
Equipment, Cooling $0
Equipment, Heating & Cooling
Combinations $0
Auxiliary heating & Cooling Equipment $0
Air Handling Equipment, Primary $0
Distribution, Terminal Equipment $0
Miscellaneous Equipment $0
Controls $0
Duct Work, Grills & Registers $0
Piping & Insulation $0
Fittings $0
Valves & Specialties $0
Insulation, Piping $0
Fire Protection Systems $0
$0
$0
Sub Total $0
Division 16 Electrical

Total Electrical $0
Cost, Work
, Buildings
Electrical In-Place, Prelim
Estimates $0
Main Switchboards, 600v, Service &
Distribution $0
Distribution Panels to 600v $0
Transformers $0
Raceway & Wire, Combined $0
Under floor Distribution Systems $0
Lighting Fixtures, In-Place $0
Branch Circuit Runs, Sp Purpose
Conduit & Wire $0
Signal & Communications Systems $0
Branch Circuit Outlets & Devices $0
Fees, Permits, Testing $0
Equipment, Unit Substations $0
Equipment, Switchgear & Transformers $0
Equipment, High Voltage Transformers $0
Service Sections $0
Combination Service & Distribution,
Switchboards $0
Motor Control 600v
Centers $0
Panelboards, Max, Bolt-On
Breakers $0
Transformers, Dry, Low Voltage $0
Panelboards For Bolt-On Breakers,
1240/240v, 1ph, 3w Lug & Circuit $0
Load Circuits, Main
Breaker Types, 240v Max $0
Plug-In Circuit Breakers, Type So $0
Special Gear $0
PVC, RSC, IMC & AL Raceway $0

Page 5
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Uni Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Cost
y t Estimate Comments Current Construction Costs
PVC,RSC,IMC, & AL Condit Term,
Elbows & Fittings $0
ENT Raceway, Terminations & Elbows $0

Page 6
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM
COST ESTIMATE GUIDELINE

APPLICATION NUMBER: Estimate Reference

Categor Uni Architect's Saylor Publications, Inc.


Plan Location Item Quantity Unit Cost
y t Estimate Comments Current Construction Costs
ENT MI Cable & Terminations $0
Special Raceway Assembly Systems $0
Conductor Only $0
Busways $0
Lighting Fixtures $0
Electric & Signal Intercom,
Devices Public $0
Communication,
Address $0
Special Hospital Systems $0
Soft Wire Systems,Management
3 Wire $0
Energy & Building
Systems $0
$0
$0
$0
Sub Total $0
Estimate Sub-total $0
The percentage is allowed in lieu of all Division 1 line items
General Conditions (includes from above. If Division 1 is completed, then this section will
Soft Costs) 9% $0 automatically populate with "N/A".

General Requirements,
Overhead & Profit, Bonds 9% $0
Design Fees 8% $0
Inspection 1% $0
Escalation 4% $0
DSA fees 0.7% $0
Contingency 10.0% $0
Estimate Sub-Total $0

Equipment Total (Division 11) $0

Cost Estimate Total $0


* All percentages are compounded and apply to all Divisions, excluding Division 11- Equipment.
* Percentages are based on the industry standards in the Saylor Publications Guide and represent the maximum amount typically allowed.

Page 7

Das könnte Ihnen auch gefallen