Sie sind auf Seite 1von 3

Project : FED for Lekhwair C to WBS : C. OM.LEK.DP.06.001.

1201
Tebodin Project No: 80371-10
Schedule: Basis of Assumption
____________________________________________________________________________________________________________

Basis and Assumptions


Lekhwair C
Following basis and assumptions are mentioned in context to the New Gas Conditioning unit.

a) LPS Station Handling Capacity:

Product Capacity Units


Gross liquid 80000 m3/d
Watercut 80 %
Net oil 13000 m3/d
Gas Capacity (inlet) 5.5 MMSm3/d
Gas lift flow 2.5 to 4.0 MMSm3/d
Gas Export Flow 1.0 MMSm3/d
b) Lekhwair C
Product Capacity Units
Gross liquid 6000 m3/d
Watercut 65-98 %
Net oil 1234(based on m3/d
forecast)
GOR 50-65 Sm3/m3

No. Basis and Assumptions (for IPF)


1 Capicity: 6000m3/day Bulk fluid with 50-65 GOR & 65-
98% water cut.
2 Lekhwair-C is unmanned and all data is transmitted to LPS
via telemetry. No spare pipeline.

c) Fault Rectification/ Response time

 LPS is 24 hrs. manned facility. Response time is 2 to 3 hours and fault


rectification time is 4 hrs (for minor fault).
 Lekhwair C is unmanned remote manifold , response time is approx. 2-3 hrs.
 Relief valve testing/ replacement time: 24 hrs.

d) Available Spares are


 Pipe and joints.

e) Flaring philosophy: No continuous LP flaring philosophy.

f) Start-up time after PSD:4 hrs

g) Start-up time after ESD:6 hrs

h) Standard Deferment Data


Oil deferment : US$ 10.0/ bbl
Oil : US$ 25.0/ bbl
Gas loss : US$ 35K/ sMM3

j) The GCU/propane compressor control shall be implemented in the existing Honeywell DCS system and he safeguarding will be implemented

in the FSC PLC system(SIL-1 and above)

Page 2 of 3
ACTION ITEMS

1. GRE bulk header over pressure protection is by IPF. Since IPF is used as ultimate protection,
requires approval from CFDH(C&A), variance is under process.
2. As per the previous SIL classification IPF Closeout report ref. PAR0390/RPT/5002 dated
08/03/06, Separator V-2661 level high high function resulted with SIL 3 class and pressure
high high function resulted with SIL 2 class. The previous SIL classification was used on the
oil deferment cost of 4$ /bbl. Sensitivity check carried out with revised deferment cost of
10$/bbl. The overall SIL class remains same. Ensure implementation (PFD calculation) with
new tie-in from Lekhwair C meets the SIL class.

Page 3 of 3