Tebodin Project No: 80371-10
Schedule: Basis of Assumption
____________________________________________________________________________________________________________
j) The GCU/propane compressor control shall be implemented in the existing Honeywell DCS system and he safeguarding will be implemented
Page 2 of 3
ACTION ITEMS
1. GRE bulk header over pressure protection is by IPF. Since IPF is used as ultimate protection,
requires approval from CFDH(C&A), variance is under process.
2. As per the previous SIL classification IPF Closeout report ref. PAR0390/RPT/5002 dated
08/03/06, Separator V-2661 level high high function resulted with SIL 3 class and pressure
high high function resulted with SIL 2 class. The previous SIL classification was used on the
oil deferment cost of 4$ /bbl. Sensitivity check carried out with revised deferment cost of
10$/bbl. The overall SIL class remains same. Ensure implementation (PFD calculation) with
new tie-in from Lekhwair C meets the SIL class.
Page 3 of 3