Sie sind auf Seite 1von 6

Date:07.03.

16
CLIENT : NMC HEALTHCARE
PROJECT:BPH-5th FLOOR
SCOPE:Mechanical - HVAC, Plumbing & Drainage
LOCATION:ABUDHABI
BPH 5th floor Pricing
S No Description of work Apprx Qty Unit Unit Price
1 Supply & Installation of Duct Work for Airconditioning 450 Sqm 125
2 Supply of installation of Duct Work for ventilation 200 Sqm 125
3 Supply & installation of insulation for duct insulation 700 Sqm 25
4 Supply & Installation of Sound attenuator 2 nos 8000
VAV box for individual control of patient rooms,
5 Feeding, milk preparation, well baby nursery 14 nos 3500
6 VCD for air balancing 1 lot 20000
7 Diffusers 1 Lot 15000
Dismantling of existing Supply & ventilation duct
8 Work 1 Lot 25000

Relocation of existing AHU with chilled water modification as per


new architectural layout
9 (Civil works excluded) 1 Lot 6000
10 Plumbing works(Just piping & Water heater) 1 nos 18000
10 Dismantling of existing Plumbing & Drainage works 1 lot 20000
11 Drainage Works(for soil & waste pipe) 1 lot 20000
12 Coring works for new drainage points 50 nos 250
Total price for Mechanical system
Total Price
56250
25000
17500
16000

49000
20000
15000

25000

6000
18000
20000
20000
12500
300250
Date:07.03.16
CLIENT : NMC HEALTHCARE
PROJECT:BPH-5th FLOOR
SCOPE:Mechanical - Plumbing qty
LOCATION:ABUDHABI

S No Room Description Wash Basin W.C Shower Tray

FemaleToilet Near Plant Room


1 1 1

MaleToilet Near Plant Room


2 1 1
Equipment Store Near Plant
3 Room
4 Telephone Room

Corridor Near Telephone room


5
6 Office
7 Sub DU 1
8 General Store
9 Plant Room
10 Patient Room 1 1
11 Bath 1 1 1 1
12 Majlis 1
13 Patient Room 2 1
14 Bath 2 1 1 1
15 Sitting area 2
16 Patient Room 3 1
17 Bath 3 1 1 1
18 Sitting area 3
19 Corridor Near Plant Room 1
20 Corridor Near Staff Station 3

Corridor Near Patient room 6


21 1
22 SterileStore
23 General Store Nr PR3
24 Patient Room 4 1
25 Bath 4 1 1 1
26 Majlis 4
27 Patient Room 5 1
28 Bath 5 1 1 1
29 Majlis 5
30 Clinical Handover
31 Staff Station
32 Equipment Store
33 H.K 1
34 FemaleToilet 1 1
35 Male Toilet 1 1
36 Store
37 Bed Lift Lobby
38 Patient Room 6 1
39 Bath 6 1 1 1
40 Majlis 6
41 CU 1
42 Milk preparation 1
43 Main Lift Lobby
44 Corridor Near Elec Room
45 PTS Raiser Room
46 Electrical Room
47 Well baby nursery 1
Utility Sink