‘SITE ACCEPTANCE TEST REPORT FOR UNDERVOLTAGE RELAY
euieWTr CONSULTANT? TAIN CONTRACTOR:
wm Vola eet! A E ENERGOPROJEKT
QATAR POWER TRANSMISSION SYSTEM EXPANSION [Contract No. 2 GTCIG4IA2014
PHASE 12 SUBSTATIONS ~ PACKAGES St, S2, S5 & S7 Date > 18/037017
Nem of Substaion _ 192/60/14 KV WAKRAM REPLACEMENT Bay Narr A60MVARTCCI
Name of Equipment UNDER VOLTAGE RELAY Manufacturer BENDER
ist Of Content:
SLNo Description Page No
1 Purpose of Test, ong 2
2 Reference Drawing and Documents. 2
3 Initial Cheeks...... 2
4 List of Schematic Drawings... 2
5 Relay betalls 3
6 Visual Check... 3
7 Pickup and Drop out Measurement 3
8 Timing Test. 3
9 Relay Output Contact Check... 4
10 Functional Check 4
11 Instruments Used... 4
12 Remarks... 4
ENERGOPROJEKT-ENTEL/ KAHRAMAA
Signature Signeture /
Name VENKATESAN RAMU Name Yosi
Date 8103/2017 Dale
DecNo. | PH12-3A-10.36-P031 [ Rev. 0 [Amene [1 Page No.1 of4SITE ACCEPTANCE TEST REPORT FOR UNDERVOLTAGE RELAY
we Don Un aMule!
cess (a erally 8 Wate Cpeaton
‘CONSULTANT?
iE
ENERGOPROJEKT
IRIN CONTRACTOR:
SIEMENS
Siuens aa a sieueNs¥AL coNsoATIM
QATAR POWER TRANSMISSION SYSTEM EXPANSION [Contract No.
PHASE 42 SUBSTATIONS ~ PACKAGES S1, S2, S6 & S7 Date
4192/65/11 kV WAKRAH REPLACEMENT.
Namo of Substation
Bay Number
GTO/643A/2014
19/03/2017
180 MVA-RTCC4
Name of Equipment
UNDER VOLTAGE RELAY
1, PURPOSE OF TEST:
‘These tests are intended to check the equipment healthiness, Proper Operation and Accuracy.
2, REFERENCE DRAWING AND DOCUMENTS:
Manufacturer
Electrical drawing for 40MVA, 160MVA, SOOMVA RTC & Under voltage relay manual
B.INITIAL CHECKS:
Isolate the secondary voltage wirings
Confirm rating of the relay matching with approved document
4.LIST OF SCHEMATIC DRAWING:
40MVA RTCC DRAWING
1G0MVA RTCC DRAWING
Drawing No.
PH12-3A-10-23-1017_RA
PH12-3A-24-22-2017_RA
BENDER
Checked (i)
a
‘SIEMENS Z ENERGOPROJEKT-ENTEL/ KAHRAMAA
Name VENKA Namo YOGE! fAN S
Date 18/03/2017 Date 18/03/2017
Doc No. PH12-3A -10-36-P031 Rev. oO Annexure: 1 Page No. Zof 4SITE ACCEPTANCE TEST REPORT FOR UNDERVOLTAGE RELAY
cuENT: CONSULTANT: MAIN CONTRACTOR:
| pwn on Uo Sepilitat gl ME ENERGOPROJEKT | CUE DVJENS
CSE uu entity Copia erie unaett aac
QATAR POWER TRANSMISSION SYSTEM EXPANSION [Contract No. 3 GTCIABA2014
| PHASE 12 SUBSTATIONS ~ PACKAGES S14, S2, S6 & S7 Date 48/03/2017,
Nama of Substation 1182/68/11 KV WAKRAH REPLACEMENT Bay Number 160MVA-RTCC1
Name of Equipment UNDER VOLTAGE RELAY Manufacturer BENDER
UNDER VOLTAGE RELAY
. RELAY DETAILS:
make : BENDER Designation + KSOL
Type SUA 143 (8932801) Feeder No. : 160 MVARTCC 1
Location To. AVR PANEL Rated Voltage: DC/AC 50-150 V
Relay Sl.No, 1611506087 Response Value 50-150
6. VISUAL CHECK: Tested (1)
Inspect for no physical damage. 3 x
Verify the wiring connection as per approved drawing, é Ed
7, PICKUP AND DROP OUT VOLTAGE MEASURMENTS TEST:
Response Voltage Setting (¥) Volts Response Voltage(Volts) Release Voltage(Volts)
so 51.80 53.20
90 90.60 93.80
8. TIMING TEST:
Delay on Response in msec
Response Delay on Release
Voltage | Voltage Change from | Voltage Change from | voltage Change from InmaRe
ae 1.1x¥ to Ox¥ 1,2xY to 0.6x¥ 1.3x¥ to 0.9%
Expected | Measured | Expected | Measured | Expected | Measured | Expected | Measured
50 10-30 | 17.80 | 60-90 | 61.60 | i60-210] 1639 | MPR | 65,20
o0 | 1930 | s040 | 6090 | 70.20 | se0-20| sexs | AMO | 77.50
Note: Response delay+ Additional Reaction time = 30ms
SIEMEI ENERGOPROJEKT-ENTEL/ KAHRAMAA,
Signature Signature d
Name ___ VENKATESAN RAMU lwame «| —SS~*CSGESPVARANS
Date 48/03/2017 Date - e/032017
DocNo. | PH12-3A -10-36-P031 Rew. 0 [Amewe | Page No d0f4SITE ACCEPTANCE TEST REPORT FOR UNDERVOLTAGE RELAY
(SuENT: ‘CONSULTANT
soso ENGI
wa Jor Ura G pis
Mogens Qs Genel bate Craton
all ENERGOPROJEKT
“| PAIE: tarainares [SIEMENS
TMIAIN CONTRACTOR:
QATAR POWER TRANSMISSION SYSTEM EXPANSION |Contract No, GICIE43AN2014
PHASE 12 SUBSTATIONS - PACKAGES S1, S2, S6 & S7 De 18/03/2017
ame ofSubloion + 1165/14 KV WAKRAH REPLACEMENT ayNunber = wOMVALRTECA
ame ofEqupment” UNDER VOLTAGE RELAY rufcuer BENDER
9. RELAY CONTACT CHECKS:
Relay Contacts check:
SL. No. | Contacts Terminal Reference Tested (Hl) | Resistance in
1 11-12 & 0.2
2 11-14 % 02
3 21-22 x 02
4 2-24 x 02
10. FUNCTION CHECK:
Functional Check:
SL.No. | Function Description
| checkea (Ey | Remarks
7] usp ieacaton Gre (eat
42. LeD indication Yelow (U>¥)
1.3.| Relay healthiness checked
11. INSTRUMENTS USED:
®
w
&
sino] vescription | make smoder | Fauipment | caiitrationdate | Calbrgtion due
1 aoe comicron KosieT 23/11/2016 22/11/2017
2. Multimeter FLUKE 11700221 26/11/2016 25/11/2017
12. REMARKS: _
ENERGOPROJEKT-ENTEL/ KAHRAMAA
‘SIEMENS
Signature
Neme VENKATESAN RAMU
[oete | ~«8!082017
neon Ala
‘i wala §
Date 18K
DocNo _| PH12-3A-10-36-P031
Res 7 [eee [1 Page No tot |