Sie sind auf Seite 1von 39

UJI PEMADATAN

Modified Proctor Test AASHTO T 180 - 74 Metode A


Sampel : Limestone
Lokasi : Jimbaran
Lab. : Politeknik Negeri Bali
Tanggal : 10 Januari 2018
Diuji Oleh : Kelompok 4

No Mold 1 2 3 4 5
1 Berat Sample gr 2500 2500 2500 2500 2500
2 Penambahan Air cc 0 50 100 200 300
Berat isi basah
3 Berat mold + tanah W1 gr 6000 6225 6229 6220 6219
4 Berat mold W2 gr 4315 4315 4315 4315 4315
5 Volume mold V cm³ 942.166 942.166 942.166 942.166 942.166
6 Berat Isi basah (γ) (W1-W2) / V gr/cm³ 1.79 2.03 2.03 2.02 2.02
Kadar air
7 Berat cawan W3 gr 9.9 9.7 10 10 10.2
8 Berat cawan + tanah basah W4 gr 46.96 43.33 51.74 51.1 62.27
9 Berat cawan + tanah kering W5 gr 43 39.8 46.93 45.15 52.89
(W4 - W5) /
10 Kadar Air % 11.96 11.73 13.02 16.93 21.97
(W5 - W3)
11 Berat Isi Kering (γd) gr/cm³ 1.60 1.81 1.80 1.73 1.66
ZAV
12 Berat jenis (Gs) 2.605
13 Z.A.V 1.986 1.995 1.945 1.808 1.657

Resume
No Uraian -59818.7311
1 Kadar air asli ω % 11.964 -598.187311 ml
2 Kadar air optimum ω %
3 kepadatan kering maksimum γd maks gr/cm³
4 95% kepadatan kering maksimum gr/cm³ 0.000

Berat jenis
Konsolidasi Limstone
Berat piknometer kosong W1 gr 37.93 39.68
Berat pikno + tanah W2 gr 66.8 73.15
Berat pikno + tanah + air W3 gr 154.61 159.895
Berat pikno + air W4 gr 138.48 139.275
Gs 2.26609105 2.60466926
ume Kering (gr/cm³)

f(x) = - 0.001977552x^2 + 0.0595163184x + 1.3013472729


R² = 0.1587833614
Berat Volume Kering (gr/cm³)
f(x) = - 0.001977552x^2 + 0.0595163184x + 1.3013472729
R² = 0.1587833614

Kadar AIr (w)%


6

2.605
-0.002 -0.45
0.059 0.885
1.301 1.301
15 1.736

3.04
151.813
UJI PEMADATAN
Standard Proctor Test AASHTO T 99-81
Sampel : Limestone
Lokasi : Jimbaran
Lab. : Politeknik Negeri Bali
Tanggal : 02 Januari 2018
Diuji Oleh : Kelompok 1

No Mold 1 2
1 Berat Sample gr 2000 2000
2 Penambahan Air cc 0 100
Berat isi basah
3 Berat mold + tanah W1 gr 5610 5660
4 Berat mold W2 gr 4374 4374
5 Volume mold V cm³ 116.265 116.265
6 Berat Isi basah (γ) (W1-W2) / V gr/cm³ 10.6308863 11.0609384
Kadar air
7 Berat cawan W3 gr 9.6 10
8 Berat cawan + tanah basah W4 gr 31.6 43.3
9 Berat cawan + tanah kering W5 gr 29.55 39.05
(W4 - W5) /
10 Kadar Air % 10.2756892 14.6299484
(W5 - W3)
11 Berat Isi Kering (γd) ϒd=ϒ/(1+w) gr/cm³ 9.64028102 9.64925705
ZAV
12 Berat jenis (Gs) Gs 2.5665137615
13 Z.A.V Gs/(1+ω.Gs) 2.03090842 1.86590458
2.1 4.3
Resume 1236.0 1286.0
No Uraian
1 Kadar air asli ω % 10.276
2 Kadar air optimum ω % 11.750
3 kepadatan kering maksimum γd maks gr/cm³ 1.660
4 95% kepadatan kering maksimum gr/cm³ 1.577

Berat jenis
Konsolidasi Limstone
Berat piknometer kosong W1 gr 39.75 38.55
Berat pikno + tanah W2 gr 62.13 61.74
Berat pikno + tanah + air W3 gr 152.8 151
Berat pikno + air W4 gr 139.14 138.12
Gs 2.56651376 2.24927255
81

f(x) = - 0.0384368332x + 2.5177676936


R² = 0.9929390378
3 4 5
2000 2000 2000

Berat Volume Kering (gr/cm³)


200 400 600
f(x) = - 0.0007707059x^2 + 0.0187537797x + 1.5463463
5774 5952 5946 R² = 0.6664440858
4374 4374 4374
116.265 116.265 116.265
12.041457 13.5724423 13.520836 12.165312

10.1 10.1 10.1


52.9 27.9 50.3 Kadar AIr (w)%
45.4 23.48 38.6
21.2464589 33.0343797 41.0526316
9.93138861 10.2022066 9.58566733 9.8017601

2.5665137615
1.66085867 1.38893249 1.24975018 1.6392709
7.5 4.4 11.7
1400.0 1578.0 1572.0

7371.55388
73.7155388 ml
4368332x + 2.5177676936
90378

^2 + 0.0187537797x + 1.5463463226

(w)%

0.805714
TES KEPADATAN DI LAPANGAN
( SAND CONE TEST )
Sampel : Limestone
Lokasi : Jimbaran
Lab. : Politeknik Negeri Bali
Tanggal : 08 November 2017
Diuji Oleh : Kelompok 2

No Keterangan
Hasil pengujian pemadatan di laboratorium
1 Berat Volume Kering Lab gr/cm3 1.66
Pengujian di laboratorium
2 Berat Botol + Corong W1 gr 2085
3 Berat Air Penuh W2 gr 3780
4 Berat Pasir Penuh W3 gr 3253
5 Berat Pasir Secukupnya di Gelas + Corong W4 gr 7225
6 Berat Sisa Pasir di Gelas + Corong W5 gr 5714
Pengujian di lapangan
7 Berat Pasir + Corong + Gelas(kosong) W6 gr 6686
8 Berat Sisa Pasir + Gelas + Corong W7 gr 3115
9 Berat Sample Basah W8 gr 1922
Analisa
11 Berat Pasir dalam Corong + Lubang (W6 - W7) gr 3571
12 Berat Pasir dalam Corong (W4 - W5) gr 1511
13 Berat Pasir di dalam Lubang W10 = (W6 - W7) - (W4 - W5) gr 2060
14 Berat Isi Pasir (ɤp) (W3 - W1)/(W2 - W1) gr/cm3 0.69
15 Volume Pasir dalam Lubang V = W10/γp cm3 2989.469
16 Berat Sample Basah W8 gr 1922
17 Berat Isi Tanah Basah (ɤb) W8/V gr/cm3 0.642924
Kadar Air
18 Berat Container W11 gr 22.770
19 Berat Container + Sample Basah W12 gr 69.200
20 Berat Container + Sample Kering W13 gr 62.000
21 Berat Air W14 = (W12 - W13) gr 7.200
22 Berat Sample Kering W15 = (W13 - W11) gr 39.230
23 Kadar Air (ω) (W14/W15)*100 % 18.353
Perhitungan Berat Volume
24 Berat Isi Kering Lapangan γd = γb/(1 + (ω/100)) gr/cm3 0.543
25 Derajat Kepadatan Lapangan (D) (γd lap/ γd lab)*100% % 32.724
TES KEPADATAN DI LAPANGAN
( SAND CONE TEST )

Sampel : Limestone
Lokasi : Jimbaran
Lab. : Politeknik Negeri Bali
Tanggal : 03/01/2018
Diuji Oleh : Kelompok 1

No Keterangan
Hasil pengujian pemadatan di laboratorium
1 Berat Volume Kering Lab gd lab gr/cm3 1.66
Pengujian di laboratorium
2 Berat Botol + Corong W1 gr 1934
3 Berat Air Penuh W2 gr 3289
4 Berat Pasir Penuh W3 gr 3792
5 Berat Pasir Secukupnya di Gelas + Corong W4 gr 6474
6 Berat Sisa Pasir di Gelas + Corong W5 gr 4857
Pengujian di lapangan
7 Berat Pasir + Corong + Gelas(kosong) W6 gr 7348
8 Berat Sisa Pasir + Gelas + Corong W7 gr 3121
9 Berat tanah + tempat W8 gr 5429
10 Berat tempat tanah W9 gr 2124
Analisa
11 Berat Pasir dalam Corong + Lubang (W6 - W7) gr 4227
12 Berat Pasir dalam Corong (W4 - W5) gr 1617
13 Berat Pasir di dalam Lubang W10 = (W6 - W7) - (W4 - W5) gr 2610
14 Berat Isi Pasir (ɤp) (W3 - W1)/(W2 - W1) gr/cm3 1.371218
15 Volume Pasir dalam Lubang V = W10/γp cm3 1903.418
16 Berat Tanah Basah (W8-W9) gr 3305
17 Berat Isi Tanah Basah (ɤb) (W8-W9)/V gr/cm3 1.73635
Kadar Air
18 Berat Container W11 gr 16.640
19 Berat Container + Sample Basah W12 gr 105.070
20 Berat Container + Sample Kering W13 gr 98.720
21 Berat Air W14 = (W12 - W13) gr 6.350
22 Berat Sample Kering W15 = (W13 - W11) gr 82.080
23 Kadar Air (ω) (W14/W15)*100 % 7.736
Perhitungan Berat Volume
24 Berat Isi Kering Lapangan γd = γb/(1 + (ω/100)) gr/cm3 1.612
25 Derajat Kepadatan Lapangan (D) (γd / γd lab)*100% % 97.088
SUDAH SELESAI
PERMEBILITAS (Standard)
( Constant Head Test )
Sampel : Limestone
Lokasi : Jimbaran
Tempat pengujian : Politeknik Negeri Bali
Tanggal : 13 November 2017
Diuji Oleh : Kelompok 2

Koefisien Permebilitas
k = Q.L / h.A.t
No Keterangan
(cm/dt)
1 2 3 4 5 6
1 Diameter Pipa d 5.4 cm
2 Tinggi Sampel L 15 cm
3 Tinggi Muka Air h 74 cm
4 Luas Penampang Sampel A 22.89 cm²
Q1 50 cm³
Q2 50 cm³
Q3 50 cm³
5 Volume Air
Q4 50 cm³
0.0080 0.0052 0.0053 0.0074 0.0064 0.0064
Q5 50 cm³
Q6 50 cm³
t1 56 dt
t2 85 dt
t3 83 dt
6 Waktu Pengamatan
t4 60 dt
t5 69 dt
t6 69 dt
k rata-rata 0.0065
PERMEBILITAS (Standard)
( Constant Head Test )

Sampel : Limestone
Lokasi : Jimbaran
Tempat pengujian : Politeknik Negeri Bali
Tanggal : 04 Januari 2018
Diuji Oleh : Kelompok 1

Koefisien Permebilitas
k = Q.L / h.A.t
No Keterangan
(cm/dt)
1 2 3 4
1 Diameter Pipa d 4.94 cm
2 Tinggi Sampel L 15 cm
3 Tinggi Muka Air h 69.5 cm
4 Luas Penampang Sampel A 19.17 cm²
Q1 100 cm³
Q2 100 cm³
5 Volume Air 0.0057 0.0061 0.0046 0.0046
Q3 100 cm³
Q4 100 cm³
t1 199.2 dt
t2 184.8 dt
6 Waktu Pengamatan
t3 243.6 dt
t4 242.4 dt
k rata-rata 0.0053
SUDAH SELESAI
CBR Laboratorium 15 x Pukulan

Time Penetration Dial Load


(minute) (inchi) Reading (lb)
Before 9.093
0 0 0 0
W.cyl+Sample
(Gr) 10781 0.25 0.0125 1 9.093
W.cylinder (gr) 7199 0.5 0.025 2.5 22.733
W.Sample (gr) 3582 1 0.05 3 27.279
V.Cylinder
(Cm3) 3,213.11 1.5 0.075 4 36.372
Unit Weight
gr/cm3) 1.11 2 0.1 4.5 40.919
Dry Density
(gr/cm3) 1.00 3 0.15 6 54.558
4 0.2 7.5 68.198
6 0.3 10 90.93
8 0.4 12 109.12
f(x) = - 922.7345046241x^2 + 1130.6882694768x + 24.3449199684
R² = 0.9928918506 10 0.5 14 127.3
L
O
Water content
A
D Before After
W.Cont 9.71 10 0.1"
( W.Cont + Sample (gr) 39.51 56.3
l
b W.Cont + D. Sample (gr) 36.34 46.6 130
) W.Water (gr) 3.17 9.7
W.Dry Sample (gr) 26.63 36.6 0.04
w = (4)/(5)x100(%) 11.9 26.5 4.33

CBR Laboratorium 35 x Pukulan

Time Penetration Dial Load


(minute) (inchi) Reading (lb)
9.093
Before
0 0 0 0
W.cyl+Sample
(Gr) 11257 0,25 0.0125 2.5 22.733
W.cylinder (gr) 7199.0 0,5 0.025 5 45.465
W.Sample (gr) 4058.0 1 0.05 12.5 113.66

V.Cylinder (Cm3) 3213.11 1,5 0.075 18 163.67


Unit Weight
gr/cm3) 1.26 2 0.1 24 218.23
Dry Density
(gr/cm3) 1.12 3 0.15 31 281.88
4 0.2 36.5 331.89
6 0.3 46.5 422.82
8 0.4 55 500.12
10 0.5 63 572.86
Water content
Before After
f(x) = - 2227.5299597841x^2 + 2924.4936433892x + 67.7594101853
R² = 0.9883336303 W.Cont 10.85 9.8 0,1"
W.Cont + Sample (gr) 40.525 51.5
L W.Cont + D. Sample (gr) 37.28 40.6 340
O
A W.Water (gr) 3.245 10.900
D W.Dry Sample (gr) 26.430 30.800 0.113
w = (4)/(5)x100(%) 12.278 35.390 11.333
(
l
b
)
PENETRATION (INCHI)

CBR Laboratorium 65 x Pukulan

Time Penetration Dial Load


(minute) (inchi) Reading (lb)
9.093
Before
0 0 0 0
W.cyl+Sample
11629
(Gr) 0.25 0.0125 3 27.279
W.cylinder (gr) 7383 0.5 0.025 8 72.744
W.Sample (gr) 4246 1 0.05 22 200.05

V.Cylinder (Cm3)
3,222.76 1.5 0.075 40 363.72
Unit Weight
1.32
gr/cm3) 2 0.1 51 463.74
Dry Density
1.17
(gr/cm3) 3 0.15 70 636.51
4 0.2 81 736.53
6 0.3 92.5 841.1
8 0.4 103 936.58
f(x) = - 7230.286761273x^2 + 7535.193480254x + 0.7222210492
R² = 0.9990714986 10 0.5 113 1027.5
L
O Water content
A
Before After
D
W.Cont 10.31 9.8 0,1"
( W.Cont + Sample (gr) 42.83 56.7
l W.Cont + D. Sample (gr) 39.27 46.1 660
b
) W.Water (gr) 3.560 10.600
W.Dry Sample (gr) 28.960 36.300 0.220
PENETRATION (INCHI)
w = (4)/(5)x100(%) 12.293 29.201 22.000
RESUME
15 x blow's 35 x blow's 65 x blow's
CBR (%) 4.33 11.33 22.00
Yd (gr/cm³) 0.00 0.00 0.00

Description Unit Value


Spesific Gravity [GS] gr/cm3 2.567
Optimum Moisture Content % 11.75
Dry Density Maximum [y.d.max] gr/cm3 1.660
90% x y.d.max gr/cm3 1.494
CBR 100% % 20
CBR 90% % 18

f(x) = - 0.0384368332x + 2.5177676936


R² = 0.9929390378
Berat Volume Kering (gr/cm³)

γ
d
f(x) = - 0.0007707059x^2 + 0.0187537797x + 1.5463463226 f(x) = 0.0105569471x + 1.4511768886
(R² = 0.9999485276
R² = 0.6664440858
g
r
/
c
m
Kadar AIr (w)% ³ CBR(gr/cm³
) )
0.2''

216

0.05
4.80
0,2"

565

0.126
12.556

0,2"

1210

0.269
26.889
CBR Laboratorium 10 x Pukulan

Time Penetration Dial Load


(minute) (inchi) Reading (lb)
Before After 9.093
0 0 0 0
W.cyl+Sample
(Gr) 10494 0.25 0.0125 3.5 31.8255
W.cylinder (gr) 7424 0.5 0.025 6 54.558
W.Sample (gr) 3070 1 0.05 9.5 86.3835
V.Cylinder
(Cm3) 193.80 1.5 0.075 11.5 104.57
Unit Weight
gr/cm3) 15.84 2 0.1 13 118.209
Dry Density
(gr/cm3) 12.31 3 0.15 15.5 140.942
4 0.2 18 163.674
6 0.3 22 200.046
8 0.4 26 236.418
f(x) = - 922.7345046241x^2 + 1130.6882694768x + 24.3449199684
10 0.5 29.5 268.244
R²L= 0.9928918506
O
Water content
A
D Before After
W.Cont 10.1 0.1"
( W.Cont + Sample (gr) 31.2
l
b W.Cont + D. Sample (gr) 26.5 130
) W.Water (gr) 4.7
W.Dry Sample (gr) 16.4 0.04
W.Cont w = (4)/ (5)
x100(%) 28.7 4.33

CBR Laboratorium 25 x Pukulan

Time Penetration Dial


(minute) (inchi) Reading Load (lb)
9.093
Before After
0 0 0 0
W.cyl+Sample
(Gr) 10475 0,25 0.0125 8 72.744
W.cylinder (gr) 6965.0 0,5 0.025 12.5 113.6625
W.Sample (gr) 3510.0 1 0.05 20.5 186.4065

V.Cylinder (Cm3) 193.99 1,5 0.075 27 245.511


Unit Weight
gr/cm3) 18.09 2 0.1 32.5 295.5225
Dry Density
(gr/cm3) 15.34 3 0.15 41.5 377.3595
4 0.2 48.5 441.0105
6 0.3 61 554.673
8 0.4 71 645.603
10 0.5 80 727.44

Water content
f(x) = - 2227.5299597841x^2 + 2924.4936433892x + 67.7594101853 Before After
R² = 0.9883336303 W.Cont 9.7 0,1"
W.Cont + Sample (gr) 30.05
L W.Cont + D. Sample (gr) 26.95 340
O
A W.Water (gr) 3.100
D W.Dry Sample (gr) 17.250 0.113
Water Content w = (4)/
( (5)x100(%) 17.971 11.333
l
b
)
PENETRATION (INCHI)

CBR Laboratorium 56 x Pukulan

Time Penetration Dial


(minute) (inchi) Reading Load (lb)
9.093
Before After
0 0 0 0
W.cyl+Sample
10,959
(Gr) 0.25 0.0125 13 118.209
W.cylinder (gr) 7242 0.5 0.025 23 209.139
W.Sample (gr) 3,716.50 1 0.05 40 363.72

V.Cylinder (Cm3)
193.29 1.5 0.075 53 481.929
Unit Weight
19.23
gr/cm3) 2 0.1 67 609.231
Dry Density
15.38
(gr/cm3) 3 0.15 88.5 804.7305
4 0.2 104 945.672
6 0.3 131 1191.183
8 0.4 153 1391.229
f(x) = - 7230.286761273x^2 + 7535.193480254x + 0.7222210492
R² = 0.9990714986 10 0.5 173.5 1577.636
L
O Water content
A
Before After
D
W.Cont 9.6 0,1"
(
l
b
)
L
O
A
D

( W.Cont + Sample (gr) 37.7


l W.Cont + D. Sample (gr) 32.08 660
b
) W.Water (gr) 5.620
W.Dry Sample (gr) 22.480 0.220
PENETRATION (INCHI)
Water Content w = (4)/
(5)x100(%) 25.000 22.000

RESUME
15 x blow's 25 x blow's 56 x blow's
CBR (%) 4.33 11.33 22.00
Yd (gr/cm³) 0.00 0.00 0.00

Description Unit Value


Spesific Gravity [GS] gr/cm3 2.567
Optimum Moisture Content % 11.75
Dry Density Maximum [y.d.max] gr/cm3 1.660
90% x y.d.max gr/cm3 1.494
CBR 100% % 20.1
CBR 90% % 18.09

f(x) = - 0.0384368332x + 2.5177676936


R² = 0.9929390378
Berat Volume Kering (gr/cm³)

γ
d
f(x) = - 0.0007707059x^2 + 0.0187537797x + 1.5463463226 f(x) = 0.0105569471x + 1.4511768886
R² = 0.6664440858 R²(= 0.9999485276
g
r
/
c
m
Kadar AIr (w)% ³ CBR (%)
)
kurang grafik
MOUL 1 div 9.093
d 15.26

t 12.7
berat 7424
mould + pas 10.494

berat cawan 10.1

b.c.basah 31.2
b.c,kering 26.5

0.2''

216

0.05

4.80

MOUL
d 15.275
t 12.7

berat 6965
mould + pasir 10475

berat cawan 9.7

b.c.basah 30.05
b.c,kering 26.95

0,2"

565

0.126

12.556

MOUL
d 15.22
t 12.7

berat 7242
mould + pasir 10,958.50

berat cawan 9.6

b.c.basah 37.7

b.c,kering 32.08

0,2"
1210

0.269

26.889

17
14
Water Content and Unit Weight before after Vold ratio and degree of saturated before
Weigt of ring + wet sample ( gr) Height of sample (H0) cm
Weight of ring (gr) Void ratio e= (H-Ht)/Ht
Weight of wet sample (gr) Water Content (%)
Weight of dry sample (gr) Degree of Saturation (%)
Weight of water (gr) Specific gravity Gs
Water Content (%) C1
Unit Weight (gr/cm3) C2

Load (kg) 0.825 1.65 3.300 6.600 13.200 26.400 6.600


Stress ( kg/cm2) 0.25 0.50 1.00 2.00 4.00 8.00 2.00
0 second 14.00 13.475 13.11 12.51 11.83 11.05 10.28
9.6 13.75 13.43 13.06 12.48 11.74 10.93 10.415
21.4 13.74 13.42 13.05 12.47 11.72 10.92 10.42
38.4 13.735 13.415 13.03 12.46 11.71 10.91 10.42
1 minute 13.73 13.41 13.02 12.44 11.70 10.90 10.425
2.25 13.71 13.395 13.00 12.42 11.67 10.86 10.435
4 13.70 13.39 12.98 12.39 11.64 10.84 10.44
9 13.67 13.36 12.93 12.34 11.58 10.78 10.465
16 13.65 13.34 12.885 12.29 11.52 10.72 10.50
25 13.622 13.315 12.845 12.235 11.46 10.67 10.52
36 13.605 13.29 12.801 12.18 11.41 10.61 10.54
49 13.585 13.27 12.765 12.14 11.36 10.56 10.56
24 hour 13.475 13.11 12.51 11.83 11.05 10.28 10.675

Stress H ∆H ∆e = e= (Hr) t₉₀


V t₉₀ (menit) Cv = 0,848 (Hr/2)²/t₉₀
kg/cm2 cm cm ∆H / Ht eo - ∆e (cm) (detik)

ᵟq H ᵟH mv Cv k= mv.Cv.gw
ᵟH/H
kg/cm2 CM cm cm2/kg cm2/dt cm/dt

1 2 3 4 5=4/1 6 7=5x6x10¯³
after

Q 0.825 1.65 3.300 6.600 13.200


τ 0.25 0.50 1.00 2.00 4.00
H0 14.00 13.475 13.11 12.51 11.83
H1 13.475 13.11 12.51 11.83 11.05
ΔH=S 0.525 0.365 0.600 0.680 0.780

0.825 0.825 1.65 3.300 6.600 13.200


0.25 t akar t 0.25 0.50 1.00 2.00 4.00
10.675 0.00 0.000 0.00 0.00 0.00
10.765 0.16 0.4 0.25 0.045 0.05 0.03 0.09
10.77 0.36 0.60 0.26 0.055 0.06 0.04 0.11
10.78 0.64 0.8 0.27 0.060 0.08 0.05 0.12
10.785 1 1 0.27 0.065 0.09 0.07 0.13
10.805 2 1.5 0.29 0.080 0.11 0.09 0.16
10.825 4 2 0.30 0.085 0.13 0.12 0.19
10.86 9 3 0.33 0.115 0.18 0.17 0.25
10.90 16 4 0.35 0.135 0.23 0.22 0.31
10.94 25 5 0.38 0.160 0.26 0.28 0.37
10.98 36 6 0.40 0.185 0.31 0.33 0.42
11.02 49 7 0.42 0.205 0.34 0.37 0.47
11.51 1440 37.95 0.53 0.365 0.60 0.68 0.78

Cv = 0,848 (Hr/2)²/t₉₀ 1
2
3
4
5
6
7
8
9
10
11
12
10
11
12
26.400 6.600 0.825
8.00 2.00 0.25
11.05 10.28 10.675
10.28 10.675 11.51
0.770 -0.395 -0.835

26.400 6.600 0.825


8.00 2.00 0.25
0.00 0.00 0.000
0.12 -0.14 -0.090
0.13 -0.14 -0.095
0.14 -0.14 -0.105
0.15 -0.15 -0.110
0.19 -0.16 -0.130
0.21 -0.16 -0.150
0.27 -0.19 -0.185
0.33 -0.22 -0.225
0.38 -0.24 -0.265
0.44 -0.26 -0.305
0.49 -0.28 -0.345
0.77 -0.40 -0.835
PENYELIDIKAN NILAI CBR DENGAN DCP
(DYNAMIC CONE PENETROMETER)

Sampel : Limestone Titik : 01


Lokasi : Jimbaran
Tempat pengujian : Politeknik Negeri Bali
Tanggal : 04 Januari 2018
Diuji Oleh : Kelompok 1

Tumbukan Bacaan Mistar Penetrasi DCP log CBR = CBR


1.28*log
mm/ DCP 2.632-1.28 CBR ( % )

n cm mm mm tumb log DCP

0 4 40
1 11.2 112 72 72 2.38 0.25 1.8
2 16.3 163 123 62 2.29 0.34 2.2
3 20.4 204 164 55 2.22 0.41 2.6
4 25 250 210 53 2.20 0.43 2.7
5 29.3 293 253 51 2.18 0.45 2.8

KEDALAMAN ( CM )
6 34.7 347 307 51 2.19 0.44 2.8
7 39.5 395 355 51 2.18 0.45 2.8
8 45.8 458 418 52 2.20 0.43 2.7
9 49.9 499 459 51 2.19 0.45 2.8
10 53.6 536 496 50 2.17 0.46 2.9
11 56.5 565 525 48 2.15 0.48 3.0
12 59.6 596 556 46 2.13 0.50 3.2
13 62.1 621 581 45 2.11 0.52 3.3
14 65 650 610 44 2.10 0.53 3.4
15 68.6 686 646 43 2.09 0.54 3.5
16 72.3 723 683 43 2.09 0.55 3.5
17 7.53 75.3 35.3 2 0.41 2.23 168.2
18 79.2 792 752 42 2.07 0.56 3.6
19 82.5 825 785 41 2.07 0.56 3.7
20 85.8 858 818 41 2.06 0.57 3.7
21 89 890 850 40 2.06 0.57 3.8
22 92 920 880 40 2.05 0.58 3.8
23 95.1 951 911 40 2.05 0.59 3.9
24 97.8 978 938 39 2.04 0.59 3.9
25 100 1000 960 38 2.03 0.60 4.0
PENYELIDIKAN NILAI CBR DENGAN DCP
(DYNAMIC CONE PENETROMETER)

Proyek : Jalan Pratama Titik : 02


Lokasi : Nusa Dua, Mangupura
Diuji oleh : Bagia Astawa
Tanggal : 6 Desember 2011

Tumbukan Bacaan Mistar Penetrasi DCP log CBR = CBR


1.28*log
DCP 2.632-1.28 CBR ( % )
n cm mm mm mm/tumb log DCP

0 3.7 37
1 9.5 95 55 55 2.23 0.40 2.5
2 12.9 129 89 45 2.11 0.52 3.3
3 17.1 171 131 44 2.10 0.53 3.4
KEDALAMAN ( CM )

4 21.4 214 174 44 2.10 0.53 3.4


5 26.3 263 223 45 2.11 0.52 3.3
6 32.2 322 282 47 2.14 0.49 3.1
7 39.6 396 356 51 2.18 0.45 2.8
8 45.4 454 414 52 2.19 0.44 2.7
9 50.2 502 462 51 2.19 0.44 2.8
10 54.6 546 506 51 2.18 0.45 2.8
11 59.3 593 553 50 2.18 0.45 2.8
12 62.2 622 582 49 2.16 0.47 3.0
13 68.9 689 649 50 2.17 0.46 2.9
14 73 730 690 49 2.17 0.47 2.9
15 77 770 730 49 2.16 0.47 3.0
16 80.9 809 769 48 2.15 0.48 3.0
17 84.4 844 804 47 2.14 0.49 3.1
18 88 880 840 47 2.14 0.50 3.1
19 91.4 914 874 46 2.13 0.50 3.2
20 95 950 910 46 2.12 0.51 3.2
21 984 9840 9800 467 3.42 -0.78 0.2
22 100 1000 960 44 2.10 0.53 3.4
CBR ( % )
CBR ( % )

Das könnte Ihnen auch gefallen