UNIT WEIGHT TEST

Project : Perbaikan jalan


Ruas : Tohpati - Pantai Siut
STA :
Tanggal :
Kedalaman : m
Depth (Df) m 2.00
Sample description Lempung
No. of ring 1 2 3
Weight of ring gr 82.00 79.80 85.00
Weight of ring + sample gr 184.86 187.44 198.50
Volume of Ring cm 3 56.52 56.52 56.52
Unit weight gr/cm 3 1.820 1.904 2.008
Average unit weight gr/cm 3 1.911
KUAT GESER
( DIRECT SHEAR )

Project : Perbaikan jalan Kalibrasi proving Rin


Ruas : Tohpati - Pantai Siut Luas A ( cm2 )
STA : 0
Tanggal : 0
Kedalaman ( Df ) : 0m

Gaya/ P1 = 8 kg P2 = 16 kg P3 = 24 kg
Tegangan s1 = 0,252 kg/cm2 s2 = 0,505kg/cm2 s 3 = 0,758kg/cm
normal
division Dial Gaya Teg. Dial Gaya Teg. Dial Gaya
0.01 mm Reading Geser Geser Reading Geser Geser Reading Geser
(kg ) (kg/cm2) (kg ) (kg/cm2) (kg )

25 3.0 t.1 4.0 t.2 6.0


50 5.0 8.0 10.0
75 6.0 12.0 14.0
100 8.0 15.0 19.0
125 9.0 18.0 23.0
150 10.0 19.0 26.0
175 11.0 22.0 29.0
200 12.0 23.0 32.0
225 12.0 7.2 0.23 24.0 33.0
250 12.0 7.2 0.23 24.0 33.0
275 12.0 7.2 0.23 24.0 33.0
300 24.0 14.4 0.46 33.0
325 24.0 14.4 0.46 33.0 19.8
350 24.0 14.4 0.46 33.0 19.8
375 33.0 19.8
400
425
450
475

1
t(kg/cm2)

0.9

0.8

0.7

0.6
f(x) = 0.7874810019x + 0.0387365655
0.5

0.4
0.6
f(x) = 0.7874810019x + 0.0387365655
0.5

0.4

0.3

0.2

f
0.1
C
0
0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1

s(kg/cm2)
Kohesi ( C ) = 0.039 (kg/cm2)
Sudut Gesek ( F) = 38.22 0
= 0.6
= 31.621

Sampel No
B17

P3 = 24 kg
s 3 = 0,758kg/cm2

Teg.
Geser
(kg/cm2)
t.3

0.63
0.63
0.63

655
655

0.252 0.23
0.505 0.46
0.758 0.63

0.8 0.9 1
MOISTURE CONTENT TEST

Depth (Df) m 1.00


Sample description Lempung
No. of can 1 2
Weight of can gr 10.35 9.93
Weight of can + wet sample gr 38.00 43.87
Weight of can + dry sample gr 30.35 34.90
Water content w % 38.25 35.92
Average water content w % 37.09
PEMERIKSAAN PERMEABILITAS
(Falling Head Permeameter Test )

Project : Perbaikan jalan


Ruas : Tohpati - Pantai Siut
STA : 0
Tanggal : 0
Kedalaman : m

No. Keterangan Lempung Kerobokan 1


1 2
1 Diameter dalam pipa d cm 0.70 0.70
2 Diameter Sampel D cm 10.20 10.20
3 Panjang sampel L cm 11.62 11.62
4 Waktu Pembacaan t detik 1,260.00 900.00
5 Tinggi muka air pada pip H1 cm 98.00 96.00
6 Tinggi muka air pada pipaH2 cm 96.50 94.00

Koefisien Permeabilitas
k = (d2/D2) . (L/t) x 2.3 Logk(H1/H2) cm/dt 6.696E-07 1.279E-06
PEMERIKSAAN BERAT JENIS
Project : Perbaikan jalan
Ruas : Tohpati - Pantai Siut
STA : 0
Tanggal : 0
Kedalaman : m

No. Uraian Air Suling


I II
1 Berat Piknometer gr 39.2 39.8
2 Berat Piknometer + sampel gr 55.0 55.9
3 Piknometer + Sampel +W1 gr 148.3 148.5
4 Berat Piknometer + Air W2 gr 139.1 139.2
7 Berat sampel kering Ws gr 15.8 16.1
8 Berat Jenis Gs = {Ws/(W2.k-W1+Ws)}k 2.502 2.474
5 Suhu oC 28 28
6 Koreksi suhu k 0.998 0.998
9 Berat Jenis rata-rata Gs 2.488
PENGUJIAN BATAS-BATAS ATTERBERG
Project : Perbaikan jalan
Ruas : Tohpati - Pantai Siut
STA : 0
Tanggal : 0

Hard Base
Batas Cair ( LL ) Batas Plastis ( PL )
Jumlah Pukulan 10 25 41 48
Nomor Cawan a b c d e
Berat Cawan (gr) 6.30 6.20 6.60 6.60 6.3
Berat Cawan + Tanah basah (gr) 24.00 20.10 21.90 22.10 10.2
Berat Cawan + Tanah kering (gr) 14.80 13.60 15.20 15.50 9.2
Berat Air (gr) 9.20 6.50 6.70 6.60 1.00
Berat Tanah kering (gr) 8.50 7.40 8.60 8.90 2.90
Kadar Air % 108.19 87.84 77.91 74.16 34.48
JUMLAH PUKULAN

100

45
36

25

25

10 10 LL = 193%
150 160 170 180 190 200 210 220 230 240 250
KADAR AIR ( % )

Batas Susut ( SL ) Rangkuman Pengujian

Nomor Cawan 1 2 Batas Susut SL %


Berat Cawan gr 10.22 10.22 Batas Plastis PL %
Berat Cawan + Tanah basah gr 33.20 33.30 Batas Cair LL %
Berat Cawan + Tanah kering gr 23.20 23.20 Indek Plastisitas PI %
Berat Air gr 10.00 10.10
Berat Tanah Basah W gr 22.98 23.08
Berat Tanah Kering Wo gr 12.98 12.98
Volume Tanah basah V cm3 13.12 13.12
Volume tanah Kering Vo cm3 6.90 6.80
KadarAir w % 77.04 77.81
SL=w -(V-Vo)/Wo x 100% % 29.12 29.12
SL = 29.12
Klasifikasi:
as Plastis ( PL )

f
6.40
9.80
8.90
0.90
2.50
36.00

240 250

29.12
35.24
90.00
54.76
Analiasa Ukuran Butir
Project : Perbaikan jalan
Ruas : Tohpati - Pantai Siut
STA : 0
Tanggal : 0
Kedalaman :
Berat sampel : 500

A . ANALISA AYAKAN

Nomor Ukuran Berat Berat tanah Berat tanah Berat tanah Lolos
Saringan lubang ayakan ayakan tertahan tertahan lolos
+ tanah kumulatif kumulatif
(mm) (gr) (gr) (gr) (gr) % %
2" 50.8
11/2" 37.5
1" 25
3/4" 19.1
1/2" 12.5 0 500 100.00
3/8" 9.38 0 500 100.00
4 4.750 440.2 450 9.8 10 490 98.04
10 2.000 426.6 550 123.4 133 367 73.36
20 0.841 418.7 450 31.3 165 336 67.10
40 0.420 408.4 475 66.6 231 269 53.78
60 0.250 406.7 450 43.3 274 226 45.12
140 0.150 398.1 489.4 91.3 366 134 26.86
200 0.074 391.6 500 108.4 474 26 5.18
pan 474.1 500 25.9 500 0 0.00000
500
B . ANALISA HIDROMETER ( Type Hydrometer : ASTM (E100) 151H - 713 )

Volume larutan V 1000 cm3


Berat sampel kering untuk hydrometer Ws1 50 gr
Berat sampel kering untuk ayakan Ws 500 gr
Berat tanah lolos ayakan no.200 W1 25.9 gr
Berat jenis tanah Gs 2.622 gr/cm3
Berat volume butir tanah gs 2.622 gr/cm3
Temperatur percobaan T 29 oC
Berat volume air pd.T gw 0.9986 gr.dt/cm2
Viskositas air pada T m 8.34E-06

Waktu (t) Bacaan hydrometer (R-Rw) N Zr D N'


(menit) rw r R Rw (%) (cm) (micron) (%)
0.25 0.9986 1.031 31 (1.40) 29.60000 95.56 8555.33 1.78 4.95
0.5 0.9986 1.031 31 (1.40) 29.60000 95.56 8555.33 1.26 4.95
1 0.9986 1.031 31 (1.40) 29.60000 95.56 8555.33 0.89 4.95
2 0.9986 1.030 30 (1.40) 28.60000 92.34 8288.67 0.62 4.78
5 0.9986 1.029 29 (1.40) 27.60000 89.11 8022.00 0.39 4.62
15 0.9986 1.029 29 (1.40) 27.10000 87.49 7888.67 0.22 4.53
30 0.9986 1.028 28 (1.40) 26.60000 85.88 7755.33 0.15 4.45
60 0.9986 1.027 27 (1.40) 25.60000 82.65 7488.67 0.11 4.28
240 0.9986 1.023 23 (1.40) 21.60000 69.74 6422.00 0.05 3.61
1440 0.9986 1.010 10 (1.40) 8.60000 27.77 2955.33 0.01 1.44

18m Zr Gs V W1
D  N g w ( R  Rw ) N' N
g s  g w t G s  1 Ws1 Ws
Grafik Gradasi

100

90

Lolos (%) 80

70

60

50

40

30

20

10

0
0.000 0.000 0.001 0.010 0.100 1.000 10.000
Ukuran Saringan (mm)

No Deskripsi Ukuran butir % Diameter Lolos


1 Clay < 0.002 mm 1.44 butir (%)
2 Silt 0.002 < d < 0.075 mm 5.18(mm)
3 Fine Sand 0.075 < d < 0.42 mm 48.60 4.75000 98.0
4 Medium Sand 0.42 < d < 2 mm 19.58 2.00000 73.4
5 Coarse Sand 2 < d < 4.75 26.64 0.84100 67.1
6 Fine Gravel 4.75 < d < 19.1 1.96 0.42000 53.8
7 Coarse Gravel 19.1 < d < 76.20 0 0.25000 45.1
103.40 0.14900 26.9
No. Deskripsi Formula % 0.07500 5.2
1 D10 0.00178 5.0
2 D30 0.00126 5.0
3 D60 0.00089 5.0
4 Cu ( D60 / D10 ) 0.00062 4.8
5 Cc ( D302/( D10 * D60- ) 0.00039 4.6
0.00022 4.5
* Klasifikasi menurut USCS : 0.00015 4.4
0.00011 4.3
0.00005 3.6
0.00001 1.4
1.000 10.000
KONSILIDASI
Project : Perbaikan jalan
Ruas : Tohpati - Pantai Siut
STA : 0
Tanggal : 0
Kedalaman : m
Tinggi cinc H cm 2.0 Berat tanah kering Ws gr
Dia.cincin D cm 6.4 Berat jenis Gs gr/cm3
Luas cinci A cm2 32.17 H
Tinggi bagian padats = W s
/AGsgw cm
Vol. cincin V cm3 64.34 Tinggi benda uji akhir Ht cm
Berat tanah + cincin gr 154.8 Kadar air w %
Berat cincin gr 46.2 Angka pori awal eo
Berat tanah gr 108.6 Derajat kejenuhan aw SR %
Berat isi gs gr/cm3 1.688 Derajat kejenuhan akh SR %
Kadar air w % 88.0
Pembacaan arloji regangan (division)
Beban (kg) 0.825 1.65 3.3 6.6 13.2 26.4 6.6 0.825
(kg/cm2) 0.25 0.5 1 2 4 8 2 0.25
Tegangan
t/m2 2.5 5 10 20 40 80 20 2.5
Waktu Pembacaan (mt)
0 0.0 26.0 70.0 140.0 289.0 430.0 335.0
0.16 3.5 33.0 75.5 161.0 302.0 407.0 286.0
0.36 5.2 37.0 80.0 178.0 312.0 400.0 276.5
0.64 7.7 40.0 84.5 188.3 320.0 391.0 271.4
1 9.8 42.5 88.3 196.0 336.0 382.0 267.0
2.25 13.0 46.0 93.2 204.6 350.5 375.0 245.2
4 15.0 47.5 100.3 213.6 365.0 370.0 239.2
9 17.5 49.0 107.0 223.0 381.3 365.0 225.5
16 19.0 50.0 111.6 230.0 395.0 360.4 212.3
25 19.9 51.0 116.0 235.3 400.0 355.3 209.0
36 20.2 52.2 119.0 240.5 404.0 340.4 207.0
49 20.5 52.7 121.0 243.0 408.0 335.1 206.5
1440 26.0 70.0 140.0 289.0 430.0 335.0 206.5
1 div = 0.01 mm
Perhitungan e, cv
Tegangan bacaan Perubahan Tinggi Tinggi Angka Tinggi Waktu untuk cv berdasarkan
(kg/cm2) arloji ketinggian benda uji pori pori akhir rata-rata
regangan akhir selama t90 t50 t90
akhir konsolidasi
DH Ht Hv e Ht(av)
(mm) (mm) (mm) (mm) (mm) (detik) (cm2/dt)
1 2 3 4 5 6 7 8 9 10

0 20.000 13.541 2.096


0.000 20.000 0.0 #DIV/0!
0.25 0.000 20.000 13.541 2.096
0.260 19.870 2343.8 0.036
0.5 0.260 19.740 13.281 2.056
0.440 19.520 1622.4 0.050
1 0.700 19.300 12.841 1.988
0.700 18.950 2733.8 0.028
2 1.400 18.600 12.141 1.880
1.490 17.855 1353.8 0.050
4 2.890 17.110 10.651 1.649
1.410 16.405 1983.8 0.029
8 4.300 15.700 9.241 1.431
-0.950 16.175
2 3.350 16.650 10.191 1.578
-1.285 17.293
0.25 2.065 17.935 11.476 1.777

Untuk Grafik Penurunan Vs waktu


Waktu Akar Pembacaan arloji regangan (mm)
Pembe waktu Beban (kg) 0.825 1.65 3.3 6.6 13.2 26.4 6.6
banan pembeba Tegangan
(menit) n an (kg/cm2) 0.25 0.5 1 2 4 8 2
(menit)

0.00 0.00 0.000 0.000 0.260 0.700 1.400 2.890 4.300


0.16 0.40 0.000 0.035 0.330 0.755 1.610 3.020 4.070
0.36 0.60 0.000 0.052 0.370 0.800 1.780 3.120 4.000
0.64 0.80 0.000 0.077 0.400 0.845 1.883 3.200 3.910
1.00 1.00 0.000 0.098 0.425 0.883 1.960 3.360 3.820
2.25 1.50 0.000 0.130 0.460 0.932 2.046 3.505 3.750
4.00 2.00 0.000 0.150 0.475 1.003 2.136 3.650 3.700
9.00 3.00 0.000 0.175 0.490 1.070 2.230 3.813 3.650
16.00 4.00 0.000 0.190 0.500 1.116 2.300 3.950 3.604
25.00 5.00 0.000 0.199 0.510 1.160 2.353 4.000 3.553
36.00 6.00 0.000 0.202 0.522 1.190 2.405 4.040 3.404
49.00 7.00 0.000 0.205 0.527 1.210 2.430 4.080 3.351
1440.00 37.95 0.000 0.260 0.700 1.400 2.890 4.300 3.350
Grafik Penurunan VS Akar waktu
Tegangan 0.5 Kg/cm2
Penurunan (mm)

-0.05

1.2490009027033E-16

0.05

0.1

0.15
0.05

0.1

0.15

0.2

0.25

0.3
0 5 10 15 20 25 30 35 40 45 50

Akar waktu (menit)

Grafik Penurunan VS Akar waktu


Tegangan 1,0 Kg/cm2
Penurunan (mm)

0.22

0.32

0.42

0.52

0.62

0.72

0 5 10 15 20 25 30 35 40 45 50

Akar waktu (menit)


Grafik Penurunan VS Akar waktu
Tegangan 2,0 Kg/cm2
Penurunan (mm)

0.6

0.7

0.8

0.9

1.1

1.2

1.3

1.4

0 5 10 15 20 25 30 35 40 45 50

Akar waktu (menit)

Grafik Penurunan VS Akar waktu


Penurunan (mm)

Tegangan 4,0 Kg/cm2

1.4

1.6

1.8

2.2

2.4

2.6

2.8
2.4

2.6

2.8

3
0 5 10 15 20 25 30 35 40 45 50

Akar waktu (menit)

Grafik Penurunan VS Akar waktu


Penurunan (mm)

Tegangan 8,0 Kg/cm2

2.9

3.1

3.3

3.5

3.7

3.9

4.1

4.3

4.5
0 5 10 15 20 25 30 35 40 45 50

Akar waktu (menit)


Perhitungan mv, k
Perubahan bacaan Perubahan Tinggi Perubahan Koefisien Koefisien Koefisien
tegangan arloji ketinggian benda uji regangan perubahankonsolidasi
permeabilitas
regangan akhir volume
akhir
57.8 Ds' DH Ht De mv = De/Ds cv k = cv.gw.mv
2.78 (kg/cm2) (mm) (mm) (mm)
0.6 1 2 3 4 5 6 7 8
14.750
88.0 0.00 20.000
2.096 0.25 0.000 0.260 19.740 0.013 0.053 0.000 0.0E+00
0.50 0.260 0.440 19.300 0.023 0.046 0.036 1.6E-03
1.00 0.700 0.700 18.600 0.038 0.038 0.050 1.9E-03
2.00 1.400 1.490 17.110 0.087 0.044 0.028 1.2E-03
4.00 2.890 1.410 15.700 0.090 0.022 0.050 1.1E-03
8.00 4.300 0.950 14.750 0.064 0.008 0.029 2.3E-04
3.35 rata-rata 0.035 0.032 0.001

Tebel hubungan tegangan dengan angka pori

Tegangan 0.25 0.5 1 2 4 8 2


(kg/cm2
)
Angka Pori 2.096 2.096 1.988 1.880 1.649 1.431 1.578

Hubungan Tegangan dengan Angka pori


Angka pori e (%)

2.2
Pc
2.1

cv berdasarkan 1.9

1.8
t50
1.7

(cm2/dt) 1.6
11 1.5

1.4
#DIV/0!
1.3
#DIV/0!
1.2
#DIV/0! 1.1
0.1 1 10 100

Tegangan (kg/cm2)

Pemampatan Polynomial (Pemampatan) Pelepasan beban


1.2

1.1
0.1 1 10 100
#DIV/0!
Tegangan (kg/cm2)
#DIV/0!
Pemampatan Polynomial (Pemampatan) Pelepasan beban
#DIV/0!

Resume : Cc = 0.865
Cs = 0.199
Cv = 0.032
Pc = 1.8 kg/cm2

0.825

0.25

3.350
2.860
2.765
2.714
2.670
2.452
2.392
2.255
2.123
2.090
2.070
2.065
2.065
40 45 50

45 50
45 50
45 50

45 50
permeabilitas

k = cv.gw.mv