Fase Descripción (WBS - Actividad)

1 GLOBAL
101 CONST. PABELLON DE NICHOS DE 4 LADOS - 2 LADOS DE 6 NIVELES X 6 NICHOS Y 2 LADOS DE 6 NIVELES X 21
10101 CEMENTERIO GENERAL
1010101 OBRAS PROVISIONALES
1010101 CARTEL DE OBRA
1010101 GUARDIANÍA Y ALMACÉN
1010102 TRABAJOS PRELIMINARES
1010102 LIMPIEZA DE TERRENO MANUAL
1010102 TRAZO Y REPLANTEO
1010103 MOVIMIENTO DE TIERRAS
1010103 EXCAVACION PARA ZAPATAS HASTA 1.00 M DE PROFUNDIDAD
1010103 EXCAVACION PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL
1010103 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO C/EQUIPO LIVIANO
1010103 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30.00 M (A MANO USANDO CARRETILLA)
1010104 CONCRETO SIMPLE
1010104 SOLADO PARA ZAPATA E= 3"
1010104 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PG
1010104 CONCRETO f'c=175 kg/cm2 EN PISO INTERIOR Y VEREDAS
1010104 ENCOFRADO Y DESENCOFRADO NORMAL
1010105 CONCRETO ARMADO
101010501 SOBRECIMIENTO ARMADO
101010501 SOBRECIMIENTO ARMADO f 'c=210 kg/cm2
101010501 ENCOFRADO Y DESENCOFRADO NORMAL, SOBRECIMIENTOS
101010501 ACERO fy=4200 kg/cm2
101010502 ZAPATAS
101010502 CONCRETO f'c=175 kg/cm2
101010502 ACERO fy=4200 kg/cm2
101010503 COLUMNAS
101010503 CONCRETO f 'c=210 kg/cm2
101010503 ENCOFRADO Y DESENCOFRADO NORMAL
101010503 ACERO fy=4200 kg/cm2
101010504 VIGAS
101010504 ACERO fy=4200 kg/cm2
101010505 TECHO
101010505 CONCRETO f 'c=210 kg/cm2
101010505 ENCOFRADO Y DESENCOFRADO NORMAL
101010505 ACERO fy=4200 kg/cm2
1010106 MUROS Y TABIQUES
1010106 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO-CAL-ARENA
1010107 REVOQUES ENLUCIDOS Y MOLDURAS
1010107 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
1010107 TARRAJEO EN INTERIORES CON CEMENTO-ARENA
1010108 ESTRUCTURAS DE MADERA
1010108 LISTONES DE 2" X 3" X 10
1010108 LISTONES DE 3" X 3" X 10
1010108 TABLAS DE 1" X 8" X 10
1010108 COBERTURA DE TEJA DE ARCILLA
1010108 FRIZO DE 1" X 8"
1010109 CIELORRASOS
1010109 CIELORRASOS CON TRIPLEY
1010110 PINTURA
1010110 PINTADO DE MURO EXTERIOR CON LATEX ACRILICO (SUPERLATEX O SIMILAR)
1010111 DESAGUE PLUVIAL
1010111 CANALETAS DE DESAGUE PLUVIAL
1010111 CODO DE PVC SAP SP DE 3"
1010111 TUBERIA PVC - SAP SP 3"
1010112 VARIOS
1010112 GANCHO DE BRONCE
1010112 DESEÑO DE MEZCLA DE CONCRETO
1010112 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
1010112 LIMPIEZA FINAL DE OBRA
Año 2017 Año 2017 Año 2018
Metrado Noviembre Diciembre Enero
Metrado Ppto. Metrado Total P.U. Costo
Deductivo 2017_x000D_01/11/ 2017_x000D_01/12/ 2018_x000D_01/01/
17-30/11/17 17-31/12/17 18-31/01/18

147249.98 32,356.1000 28,208.3700 31,193.3800


2 LADOS DE 6 NIVELES X 21 NICHOS DEL CEMETERIO GRAL. DE JA 147249.98 32,356.1000 28,208.3700 31,193.3800
147249.98 32,356.1000 28,208.3700 31,193.3800
900 900.0000
1 1 500 500 500.0000
4 4 100 400 400.0000
494.03 494.0500
178.35 178.35 1.45 258.61 258.6200
178.35 178.35 1.32 235.42 235.4300
3538.1 3,538.1000
19.46 19.46 18.9 367.79 367.8000
23.78 23.78 18.72 445.16 445.1600
23.64 23.64 61.41 1451.73 1,451.7300
54.05 54.05 23.56 1273.42 1,273.4100
10912.61 5,334.7700 1,517.7900 1,678.4000
18.02 18.02 48.73 878.11 878.1100
23.78 23.78 161.78 3847.13 3,847.1400
17.77 17.77 310.07 5509.94 527.3000 1,355.9200 1,499.4000
24.76 24.76 27.36 677.43 82.2200 161.8700 179.0000
63608.32 17,113.7200 15,646.0900 17,301.7600
3775.17 3,775.1800
3.61 3.61 322.58 1164.51 1,164.5200
60.12 60.12 27.36 1644.88 1,644.8800
224.6 224.6 4.3 965.78 965.7800
4106.95 4,106.9400
10.81 10.81 290.58 3141.17 3,141.1600
224.6 224.6 4.3 965.78 965.7800
4871.85 2,756.2000 721.0700 797.3800
3.64 3.64 322.58 1174.19 150.2000 346.1800 382.8200
46.86 46.86 27.36 1282.09 190.4200 374.8900 414.5600
561.76 561.76 4.3 2415.57 2,415.5800
3194.51 408.6500 941.8900 1,041.5600
742.91 742.91 4.3 3194.51 408.6500 941.8900 1,041.5600
47659.84 6,066.7500 13,983.1300 15,462.8200
84.01 84.01 322.58 27099.95 3,466.7700 7,990.4900 8,836.0400
537.5 537.5 27.36 14706 1,841.0500 4,243.4100 4,692.4400
1361.37 1361.37 4.3 5853.89 758.9300 1,749.2300 1,934.3400
24870.75 3,645.1800 7,176.4500 7,935.8600
663.22 663.22 37.5 24870.75 3,645.1800 7,176.4500 7,935.8600
17234.2 1,330.2800 3,868.0400 4,277.3600
153.61 153.61 18.53 2846.39
843.86 843.86 17.05 14387.81 1,330.2800 3,868.0400 4,277.3600
13780.28
168.5 168.5 18.12 3053.22
99.86 99.86 24.12 2408.62
220 220 18.05 3971
159.52 159.52 20.49 3268.56
61.3 61.3 17.6 1078.88
2554.29
50.55 50.55 50.53 2554.29
3696.57
416.75 416.75 8.87 3696.57
2470.22
61.6 61.6 26.31 1620.7
12 12 26.27 315.24
29.6 29.6 18.05 534.28
3190.61
324 324 5.5 1782
2 2 350 700
18 18 25 450
178.35 178.35 1.45 258.61
Año 2018 Año 2018
Febrero Marzo
2018_x000D_01/02/ 2018_x000D_01/03/
18-28/02/18 18-31/03/18

25,131.5400 30,359.9000 147,249.2900


25,131.5400 30,359.9000
25,131.5400 30,359.9000

1,541.8800 839.2000

1,377.4400 749.7000
164.4400 89.5000
13,546.9500

597.3900
294.9000
302.4900

802.3500
802.3500
12,147.2100
6,806.7100
3,929.0800
1,411.4200
6,113.2700
6,113.2700
3,929.4400 3,828.7500
2846.39
3,929.4400 982.3600
13780.27
3053.21
2408.62
3970.99
3268.56
1078.89
2554.29
2554.29
3696.56
3696.56
2470.22
1620.7
315.24
534.28
3190.61
1782.01
700
450
258.6