3143

BAR SCHEDULE
RCD ISSUE 1

No. of Length of Total


Bar Type No. of Total Shape A* B* C* D* E/R * Rev
Member bars in each bar Mass
Mark & Size mbrs no. code letter
each (mm)+ kg

141 H20 1 68 68 2900 00 486.3

69 H20 1 68 68 3500 00 586.9

142 H32 1 10 10 6850 00 432.5

143 H32 1 9 9 6250 00 355.1

TOP
01 H20 1 136 136 9500 00 3186.3
REBAR

144 H32 1 19 19 8025 00 962.6

99 H25 1 119 119 5450 00 2499.1

76 H20 1 19 19 3225 00 151.1

77 H20 1 19 19 2625 00 123.0

TOP
70 H20 1 9 9 3000 00 66.6
REBAR

75 H20 1 8 8 2400 00 47.4

109 H20 1 17 17 1575 11 260 (1350) B 66.0

108 H20 1 201 201 1375 11 260 (1150) B 681.6

101 H25 1 2 2 8775 00 67.6

102 H25 1 2 2 8175 00 63.0

144 H32 1 10 10 8025 00 506.6

153 H32 1 9 9 7400 00 420.5

71 H20 1 14 14 5900 00 B 203.7

72 H20 1 13 13 5300 00 B 169.9

73 H20 1 27 27 5650 00 376.2

159 H32 1 19 19 9950 00 1193.5

103 H25 1 4 4 5550 00 B 85.5

125 H20 1 2 2 7675 00 B 37.9

108 H20 1 38 38 1375 11 260 (1150) B 128.9

108 H20 1 107 107 1375 11 260 (1150) B 362.8

138 H20 1 14 14 8525 00 294.3

10 H20 1 14 14 7925 00 273.6

TOTAL

13828.7

PROJECT: DUBLIN LANDINGS Date:


20/02/2018
BLOCK
DL5 Drawn: VK

Location: THIRD FLOOR SLAB


Chkd: RH

TOP REBAR Drg No: O574 3143


GRID 01-03/A-E7 ,DL5
Sh: 1 OF 1 B