Sie sind auf Seite 1von 1

IFRCHECKLIST

1.- BEFORE TAXI 6-BEFORE IFR APPROACHES


ATIS Information ...................... OBTAIN* Power .............................................. AS DESIRED
Delivery Authorization .............. OBTAIN* Weather Conditions/OAT ............... VERIFY
*Only if available Engine Instrumen System EIS ........ CHECK
COM1 / COM2 ............................... ON FREQUENCY
2- ATC AUTORIZATION
NAV1 / NAV2 / DME / ADF ........ CHECK and TEST
Clear to Holding Pattern Entering ................ DETERMINE
Route
Approach Briefing ....................... EXECUTE
Altitude
Frequency GPS Approach ............................. LOAD
Transpoder CFIT ............................................ BE CONSIDERATE
QNH ............................................. SET
3.- TAXI - HOLDING PATTERN - 6 T's
Compases .............. VERIFICAR LEFT / RIGHT
Time ..................... CHECK
4.- BEFORE DEPARTURE Turn ...................... IF YOU NEED IT
NAV 1 y NAV 2 ....................... SET, CHECK and TEST Twist ..................... SET INBOUND CRS
ADF ........................................... SET, CHECK and TEST Throttle .................. AS REQUIRED
DME .......................................... SET and CHECK Talk ........................ MAKE
ILS ............................................. SET, CHECK and TEST Think Always ........ WIND DIRECTION
Marker beacons ......................... ON and set LOW
7.- BEFORE DESCENT/LANDING
Clock ......................................... SET and CHECK
Hydraulic .................................... CHECK Breaks
Transponder .............................. SET/GND
Aircraft Checklist ....................... COMPLET
T/O Briefing ............................. NORMAL and EMERGENCY
Wind Direction ........................... CHECK
IFR Briefing ............................. A. READ SID
Runway Condition ...................... CHECK
B. CHECK FREQUENCY
Final Approach Course ............... CHECK
C. CDI, SELECT COURSE/SID
DA-DH / MDA-MDH ................. CHECK

5.- ON RUNWAY Flap Approach ............................. AS REQUIRED


Engine Instrumen System EIS ..... CHECK
LDG Light .............. ON
Pitot Heat .................... AS REQUIRED 8.- AFTER LANDING
Compasses .................. CHECK Flaps ............................................. UP
HDG Bug ................... SET Trim .............................................. SET FOR T/O
T/O Time .................... CHECK XPDR ........................................... SET 2000
LDG Lights .................................. OFF
STROBE Lights ........................... OFF
TIME CONTROL.
TAXI Light ................................... ON
Engine Start Up: ____ : ____
COM .............................................. GDN FREQ SET
Take Off: ____ : ____
Landing: ____ : ____
Engine Cut Off: ____ : ____

OBSERVATIONS OBSERVATIONS
__________________________________________________ __________________________________________________
__________________________________________________ __________________________________________________
__________________________________________________ __________________________________________________
__________________________________________________ __________________________________________________
__________________________________________________ __________________________________________________
__________________________________________________ __________________________________________________

Das könnte Ihnen auch gefallen