Sie sind auf Seite 1von 2

SUMMARY FORM FOR PEC ZERO VISIT REPORT

University/Institution

1.
2. Name of Degree Awarding University
3. Name of the Program
4. Date of Visit
5. PEC Team Composition Convener & Expert
(with organization/HEIs) PEC Rep.
6. Legal Status
(Charter/DAI/Affiliated/Constituent; Please clarify)
7. Scheme of Study/Curriculum
(comparison with approved scheme of NCRC-HEC
8. Total Covered Area of Institution
(minimum required area 300 ft2 per student)
9. No of Labs with size
Note: Well equipped labs min for first two years should
be in place.
10. Engineers
Labs Staff
Non Engineers
11. No of sections/No of students per section (max 40
students per section)
12. Recommended No of students
13. Classrooms with size
(minimum required area 12-15 ft2 per student per class
room)
14. Other Allied Facilities
(Library, internet, auditorium, seminar hall, sports,
hostel etc.)
15. Allocation & utilization of Allocation &
Endowment Fund Operational/Recurring Budget utilization of
(min Rs. 50 M) Developmental
Budget details:
Budget (projected
plan for two years)

16. Faculty Summary (Core Engineering)


Total Ph.D M.S / M.E
Dedicated
(min 1 PhD and 3 MS/ME for section of 40)
In case of new disciplines the matter will be decided by the
EA&QEC/EAB on merit.
Shared

Countable Faculty:
Note: The intake is restricted to one section of 40 students. Any increase upto max of two sections (80 students) is subject to
Change of Scope assessment visit after successful Interim Visit in 2nd year.

17. Observations as per PEC Criteria:


a. Strong Areas
Note; PEC Rep is advised to send complete summary report to Addl. Registrar (Accr.) by E-mail:
kmnasir@pec.org.pk, CC to osaf@pec.org.pk
SUMMARY FORM FOR PEC ZERO VISIT REPORT

b. Deficiencies
c. Weak Areas
d. Concerns
18. Recommendations of PEC Visiting Team (check consistency with report as per PEC Policies/Regulations and Practices
in adherence to accreditation criteria):

a. Green signal to launch the program in Spring or Fall .


i. The intake must be restricted to 40 students per year.
ii. Observations of the visiting team must be addressed before next interim visit in 2nd year.
OR
b. Due to serious deficiencies/Weak Areas, program is not recommended to be launched at this stage
(convincing reasons/referring to engineering regulations & guidelines/criteria of PEC for launching an engineering program must
be given).

Signature of PEC Rep. Signature of Team Leader/Expert

Note; PEC Rep is advised to send complete summary report to Addl. Registrar (Accr.) by E-mail:
kmnasir@pec.org.pk, CC to osaf@pec.org.pk

Das könnte Ihnen auch gefallen