ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)

3.1 A GENERAL ITEM

A500 CONTRACTOR'S REQUIREMENT


Temporary Work
3.1.1 A520 Allow for provision of all labours, plants, materials etc. for the river sum
improvement works for all culvert crossing and structures along river
corridor as approved by S.O. including handling, disposal of excavated
spoils and debris, cofferdam, dewatering, shoring, pumping, leveling,
driving, allowing for access way platform, staging and all other
necessary works for the purpose of river improvement works and
removal of all temporary works upon completion.

3.2 H PILING WORK

H100 PLANT AND EQUIPMENT


Piling Equipment
3.2.1 H110 Allow for the provision of all necessary piling equipment, plant, tools sum
and ancillary equipment (for the execution of all piling works in this
contract) including their transportation to the site, handling, lifting,
assembling, dismantling and removal on completion of the work and for
any idle standing time.

Moving and Handling


3.2.2 H120 Allow for moving and handling erected piling equipment about the site sum
as often and whenever necessary for the execution of whole piling
operations including temporary platform for movement of piling
equipment/plant and removing all temporary works off site on
completion.

Temporary Protection
3.2.3 H130 Allow for the provision of all necessary piling equipment, plant, tools sum
and ancillary equipment for temporary work including installation,
eracting after completion of work, transportation to the site, handling,
lifting, assembling, dismantling and removal on completion of the work
and for any idle standing time.

TWIN BOX CULVERT

3.3 H PILING WORK

H200 PILES
RC Pile 350mm x 350mm
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
Supply, deliver and unloading Precast Reinforced Concrete Square Pile
with all necessery reinforcement joint, plates and shoes, etc. according
to approved manufacturer specification :-
3.3.1 H251 350mm x 350mm Initial piles 9.00m length. m 540 60.00

Page Total Carried To Collection Page

BQ3-1/15

Drive only for precast reinforced concrete square pile to set as


3.3.2 H252
specified:
350mm x 350mm Precast reinforced concrete pile. m 540 20.00

3.3.3 H256 Cut off 350mm x 350mm pile at required cut off levels including nr 60 45.00
trimming, stripping, dressing for key and straightening and bending
rods for connections in slab and remove all debris off the site.

3.3.4 H259 30mm Fillet weld connection 1400mm girth, between edges of mild nr 60 35.00
steel extension cap with and including base plates with 4 Nos drilled
holes to receive 4Y20 1000mm long anchorage bars from mild steel
plates, including 30mm diameter x 100mm long mild steel tube for
receiving 25mm centering bar 130mm long.

H500 PILE TEST


Static Load Test
3.3.5 H510 Provide all necessary pile testing equipment, hydraulic jack, kentldege nr 1 900000
and labour, etc. for first load test on a single 350mm x 350mm precast
reinforced concrete pile to twice the working load (1600 KN) as
required by the Engineer including all other cost before the
commencement of the main or on completion of the piling works.

Pile Dynamic Analyzer (PDA)


3.3.6 H520 To conduct PDA load test to a maximum load including mobilisation and
demobilisation of testing equipment required including attendance of
supervisory staffs during test period, all in accordance with
specifications.
Preliminary load test nr 1 6,500.00
Subsequent load test nr 4 5,000.00

3.4 I CONCRETE WORK

I100 IN SITU CONCRETE DESIGNED MIX


Grade : C15
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
3.4.1 I110 Supply, lay, level and vibrate concrete grade 15 (1:3:6) as a m2 330.00 15.00
lean concrete

Grade : C35
3.4.2 I130 To supply, lay, level and vibrate concrete grade 35
i) Cover m3 165.00 290.00
ii) Wall m3 189.00 290.00
iii) Base m3 165.00 290.00

Page Total Carried To Collection Page

BQ3-2/15
I400 FORMWORK

3.4.3 Class F1 finish at buried surfaces.


i) Cover m2 - 25.00
ii) Wall m2 255.00 25.00
iii) Base m2 330.00 25.00

3.4.4 Class F3 finish at exposed surfaces.


i) Cover m2 330.00 48.00
ii) Wall m2 510.00 48.00
iii) Base m2 - 48.00

I500 REINFORCEMENT

3.4.5 To supply, fabricate and lay high strength reinforcement bar as


per drawing
i) Cover tonne 17.60 3,000.00
ii) Wall tonne 20.50 3,000.00
iii) Base tonne 17.60 3,000.00

3.5 P DRAINAGE WORK

Q900 EXISTING DRAINAGE


3.5.1 To reinstate concrete drainage as directed by S.O m 100.00 2,000.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)

3.6 Q ROADS AND PAVINGS

Q200 SUB-BASE
Granular Material - 200mm thick
3.6.1 Q220 Subbase material (CBR > 30%) complaying with type C or type m2 1,920.00 25.00
D grading limits of standard specification

Q300 ROADBASE
Crushed Aggregate - 300mm
3.6.2 Q330 Spread, grade and compact roadbase material complying with m2 1,920.00 30.00
Type I or Type II grading limits of the standard spec.

Q500 SURFACING
3.6.3 a) Bitominous Prime Coat m2 1,920.00 3.00
b) Bituminous Tack Coat m2 1,920.00 3.00
c) Asphaltic Concrete
Asphaltic concrete material complaying with the standard specification
i) Asphaltic concrete binder course (AC 28) - 70mm m2 1,920.00 40.00
ii) Asphaltic concrete wearing course (AC 14) - 50mm m2 1,920.00 26.00

Page Total Carried To Collection Page

BQ3-3/15
Q800 ROAD FURNITURE
3.6.4 Hot-applied all weather superimposed reflectorised
thermoplastic road markings with 20% glassbead as specified in
a) 150mm width edge line m 300 7.50
BS 3262
b) 200mm width centre line m 150 7.50

Directional Arrow for road in Urban Area


a) Single straight nr 10 65.00
b) Single turning nr 4 65.00
c) Single straight and turning nr 4 80.00

SINGLE BOX CULVERT CHAINAGE 825

3.7 H PILING WORK

H200 PILES
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
RC Pile 350mm x 350mm
Supply, deliver and unloading Precast Reinforced Concrete Square Pile
with all necessery reinforcement joint, plates and shoes, etc. according
to approved manufacturer specification :-
3.7.1 H251 350mm x 350mm Initial piles 9.00m length. m 684 60.00

Drive only for precast reinforced concrete square pile to set as


3.7.2 H252
specified:
350mm x 350mm Precast reinforced concrete pile. nr 684 20.00

3.7.3 H256 Cut off 350mm x 350mm pile at required cut off levels including nr 76 45.00
trimming, stripping, dressing for key and straightening and bending
rods for connections in slab and remove all debris off the site.

3.7.4 H259 30mm Fillet weld connection 1400mm girth, between edges of mild nr 76 35.00
steel extension cap with and including base plates with 4 Nos drilled
holes to receive 4Y20 1000mm long anchorage bars from mild steel
plates, including 30mm diameter x 100mm long mild steel tube for
receiving 25mm centering bar 130mm long.

H500 PILE TEST


Static Load Test
3.7.5 H510 Provide all necessary pile testing equipment, hydraulic jack, kentldege nr 1 60,000.00
and labour, etc. for first load test on a single 350mm x 350mm precast
reinforced concrete pile to twice the working load (800 KN) as required
by the Engineer including all other cost before the commencement of
the main or on completion of the piling works.

Page Total Carried To Collection Page

BQ3-4/15
Pile Dynamic Analyzer (PDA)
3.7.6 H520 To conduct PDA load test to a maximum load including mobilisation and
demobilisation of testing equipment required including attendance of
supervisory staffs during test period, all in accordance with
specifications.
Preliminary load test nr 1 6,500.00
Subsequent load test nr 4 5,000.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)

3.8 I CONCRETE WORK

I100 IN SITU CONCRETE DESIGNED MIX


Grade : C15
3.8.1 I110 Supply, lay, level and vibrate concrete grade 15 (1:3:6) as a m2 365.00 15.00
lean concrete

Grade : C35
3.8.2 I130 To supply, lay, level and vibrate concrete grade 35
i) Cover m3 200.00 290.00
ii) Wall m3 230.00 290.00
iii) Base m3 200.00 290.00

I400 FORMWORK

3.8.3 Class F1 finish at buried surfaces.


i) Cover m2 - 25.00
ii) Wall m2 415.00 25.00
iii) Base m2 365.00 25.00

3.8.4 Class F3 finish at exposed surfaces.


i) Cover m2 365.00 48.00
ii) Wall m2 415.00 48.00
iii) Base m2 - 48.00

I500 REINFORCEMENT

3.8.5 To supply, fabricate and lay high strength reinforcement bar as


per drawing
i) Cover tonne 19.60 3,000.00
ii) Wall tonne 11.10 3,000.00
iii) Base tonne 19.60 3,000.00

3.9 Q ROADS AND PAVINGS

Q200 SUB-BASE
Granular Material - 200mm thick
3.9.1 Q220 Subbase material (CBR > 30%) complaying with type C or type m2 2,640.00 25.00
D grading limits of standard specification

Page Total Carried To Collection Page


ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
Page Total Carried To Collection Page

BQ3-5/15
Q300 ROADBASE
Crushed Aggregate - 300mm
3.9.2 Q330 Spread, grade and compact roadbase material complying with m2 2,640.00 30.00
Type I or Type II grading limits of the standard spec.

Q500 SURFACING

3.9.3 a) Bitominous Prime Coat m2 2,640.00 40.00


b) Bituminous Tack Coat m2 2,640.00 26.00
c) Asphaltic Concrete
Asphaltic concrete material complaying with the standard specification
i) Asphaltic concrete binder course (AC 28) - 70mm m2 2,640.00 40.00
ii) Asphaltic concrete wearing course (AC 14) - 50mm m2 2,640.00 26.00

Q800 ROAD FURNITURE

3.9.4 Hot-applied all weather superimposed reflectorised


thermoplastic road markings with 20% glassbead as specified in
a) 150mm width edge line m 300 7.50
BS 3262
b) 200mm width centre line m 150 7.50

3.9.5 Directional Arrow for road in Urban Area


a) Single straight nr 10 65.00
b) Single turning nr - 65.00
c) Single straight and turning nr - 80.00

SINGLE BOX CULVERT CHAINAGE 925

3.10 H PILING WORK

H200 PILES
RC Pile 350mm x 350mm
Supply, deliver and unloading Precast Reinforced Concrete Square Pile
with all necessery reinforcement joint, plates and shoes, etc. according
to approved manufacturer specification :-
3.10.1 H251 350mm x 350mm Initial piles 9.00m length. m 288 60.00

Drive only for precast reinforced concrete square pile to set as


3.10.2 H252
specified:
350mm x 350mm Precast reinforced concrete pile. nr 288 20.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
3.10.3 H256 Cut off 350mm x 350mm pile at required cut off levels including nr 32 45.00
trimming, stripping, dressing for key and straightening and bending
rods for connections in slab and remove all debris off the site.

Page Total Carried To Collection Page

BQ3-6/15
3.10.4 H259 30mm Fillet weld connection 1400mm girth, between edges of mild nr 32 35.00
steel extension cap with and including base plates with 4 Nos drilled
holes to receive 4Y20 1000mm long anchorage bars from mild steel
plates, including 30mm diameter x 100mm long mild steel tube for
receiving 25mm centering bar 130mm long.

H500 PILE TEST


Static Load Test
3.10.5 H510 Provide all necessary pile testing equipment, hydraulic jack, kentldege nr 1 45,000.00
and labour, etc. for first load test on a single 350mm x 350mm precast
reinforced concrete pile to twice the working load (400 KN) as required
by the Engineer including all other cost before the commencement of
the main or on completion of the piling works.

Pile Dynamic Analyzer (PDA)


3.10.6 H520 To conduct PDA load test to a maximum load including mobilisation and
demobilisation of testing equipment required including attendance of
supervisory staffs during test period, all in accordance with
specifications.
Preliminary load test nr 1 6,500.00
Subsequent load test nr 4 5,000.00

3.11 I CONCRETE WORK

I100 IN SITU CONCRETE DESIGNED MIX


Grade : C15
3.11.1 I110 Supply, lay, level and vibrate concrete grade 15 (1:3:6) as a m2 135.00 15.00
lean concrete

Grade : C35
3.11.2 I130 To supply, lay, level and vibrate concrete grade 35
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
i) Cover m3 70.00 290.00
ii) Wall m3 87.00 290.00
iii) Base m3 70.00 290.00

I400 FORMWORK

3.11.3 Class F1 finish at buried surfaces.


i) Cover m2 - 25.00
ii) Wall m2 175.00 25.00
iii) Base m2 135.00 25.00

3.11.4 Class F3 finish at exposed surfaces.


i) Cover m2 135.00 48.00
ii) Wall m2 175.00 48.00
iii) Base m2 - 48.00

Page Total Carried To Collection Page

BQ3-7/15
I500 REINFORCEMENT

3.11.5 To supply, fabricate and lay high strength reinforcement bar as


per drawing
i) Cover tonne 7.30 3,000.00
ii) Wall tonne 9.00 3,000.00
iii) Base tonne 7.30 3,000.00

3.12 Q ROADS AND PAVINGS

Q200 SUB-BASE
Granular Material - 200mm thick
3.12.1 Q220 Subbase material (CBR > 30%) complaying with type C or type m2 800.00 25.00
D grading limits of standard specification

Q300 ROADBASE
Crushed Aggregate - 300mm
3.12.2 Q330 Spread, grade and compact roadbase material complying with m2 800.00 30.00
Type I or Type II grading limits of the standard spec.

Q500 SURFACING
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)

3.12.3 a) Bitominous Prime Coat m2 800.00 3.00


b) Bituminous Tack Coat m2 800.00 3.00
c) Asphaltic Concrete
Asphaltic concrete material complaying with the standard specification
i) Asphaltic concrete binder course (AC 28) - 70mm m2 800.00 40.00
ii) Asphaltic concrete wearing course (AC 14) - 50mm m2 800.00 26.00

Q800 ROAD FURNITURE

3.12.4 Hot-applied all weather superimposed reflectorised


thermoplastic road markings with 20% glassbead as specified in
a) 150mm width edge line m 80 7.50
BS 3262
b) 200mm width centre line m 40 7.50

3.12.5 Directional Arrow for road in Urban Area


a) Single straight nr - 65.00
b) Single turning nr - 65.00
c) Single straight and turning nr 6 80.00

Page Total Carried To Collection Page

BQ3-8/15
SINGLE BOX CULVERT CHAINAGE 1150

3.13 H PILING WORK

H200 PILES
RC Pile 350mm x 350mm
Supply, deliver and unloading Precast Reinforced Concrete Square Pile
with all necessery reinforcement joint, plates and shoes, etc. according
to approved manufacturer specification :-
3.13.1 H251 350mm x 350mm Initial piles 9.00m length. m 234 60.00

Drive only for precast reinforced concrete square pile to set as


3.13.2 H252
specified:
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
350mm x 350mm Precast reinforced concrete pile. nr 234 20.00

3.13.3 H256 Cut off 350mm x 350mm pile at required cut off levels including nr 26 45.00
trimming, stripping, dressing for key and straightening and bending
rods for connections in slab and remove all debris off the site.

3.13.4 H259 30mm Fillet weld connection 1400mm girth, between edges of mild nr 26 35.00
steel extension cap with and including base plates with 4 Nos drilled
holes to receive 4Y20 1000mm long anchorage bars from mild steel
plates, including 30mm diameter x 100mm long mild steel tube for
receiving 25mm centering bar 130mm long.

H500 PILE TEST


Static Load Test
3.13.5 H510 Provide all necessary pile testing equipment, hydraulic jack, kentldege nr 1 45,000.00
and labour, etc. for first load test on a single 350mm x 350mm precast
reinforced concrete pile to twice the working load (400 KN) as required
by the Engineer including all other cost before the commencement of
the main or on completion of the piling works.

Pile Dynamic Analyzer (PDA)


3.13.6 H520 To conduct PDA load test to a maximum load including mobilisation and
demobilisation of testing equipment required including attendance of
supervisory staffs during test period, all in accordance with
specifications.
Preliminary load test nr 1 6,500.00
Subsequent load test nr 4 5,000.00

3.14 I CONCRETE WORK

I100 IN SITU CONCRETE DESIGNED MIX


Grade : C15
3.14.1 I110 Supply, lay, level and vibrate concrete grade 15 (1:3:6) as a m2 170.00 15.00
lean concrete

Page Total Carried To Collection Page

BQ3-9/15
Grade : C35
3.14.2 I130 To supply, lay, level and vibrate concrete grade 35
i) Cover m3 85.00 290.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
ii) Wall m3 76.00 290.00
iii) Base m3 85.00 290.00

I400 FORMWORK

3.14.3 Class F1 finish at buried surfaces.


i) Cover m2 - 25.00
ii) Wall m2 155.00 25.00
iii) Base m2 170.00 25.00

3.14.4 Class F3 finish at exposed surfaces.


i) Cover m2 170.00 48.00
ii) Wall m2 155.00 48.00
iii) Base m2 - 48.00

I500 REINFORCEMENT

3.14.5 To supply, fabricate and lay high strength reinforcement bar as


per drawing
i) Cover tonne 9.00 3,000.00
ii) Wall tonne 8.00 3,000.00
iii) Base tonne 9.00 3,000.00

3.15 Q ROADS AND PAVINGS

Q200 SUB-BASE
Granular Material - 200mm thick
3.15.1 Q220 Subbase material (CBR > 30%) complaying with type C or type m2 500.00 25.00
D grading limits of standard specification

Q300 ROADBASE
Crushed Aggregate - 300mm
3.15.2 Q330 Spread, grade and compact roadbase material complying with m2 500.00 30.00
Type I or Type II grading limits of the standard spec.

Q500 SURFACING

3.15.3 a) Bitominous Prime Coat m2 500.00 3.00


b) Bituminous Tack Coat m2 500.00 3.00
c) Asphaltic Concrete
Asphaltic concrete material complaying with the standard
specification
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
i) Asphaltic concrete binder course (AC 28) - 70mm m2 500.00 40.00
ii) Asphaltic concrete wearing course (AC 14) - 50mm m2 500.00 26.00

Page Total Carried To Collection Page

BQ3-10/15
Q800 ROAD FURNITURE

3.15.4 Hot-applied all weather superimposed reflectorised


thermoplastic road markings with 20% glassbead as specified in
a) 150mm width edge line m 80 7.50
BS 3262
b) 200mm width centre line m 40 7.50

3.15.5 Directional Arrow for road in Urban Area


a) Single straight nr - 65.00
b) Single turning nr - 65.00
c) Single straight and turning nr 6 80.00

U DRAIN CHAINAGE 800

3.16 I CONCRETE WORK

I100 IN SITU CONCRETE DESIGNED MIX


Grade : C15
3.16.1 I110 Supply, lay, level and vibrate concrete grade 15 (1:3:6) as a m2 50.00 15.00
lean concrete

Grade : C35
3.16.2 I130 To supply, lay, level and vibrate concrete grade 35
i) Cover m3 - 290.00
ii) Wall m3 14.00 290.00
iii) Base m3 18.50 290.00

I400 FORMWORK

3.16.3 Class F1 finish at buried surfaces.


i) Cover m2 - 25.00
ii) Wall m2 60.00 25.00
iii) Base m2 50.00 25.00

3.16.4 Class F3 finish at exposed surfaces.


i) Cover m2 - 48.00
ii) Wall m2 60.00 48.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
iii) Base m2 - 48.00

I500 REINFORCEMENT

3.16.5 To supply, fabricate and lay high strength reinforcement bar as


per drawing
i) Cover tonne - 3,000.00
ii) Wall tonne 1.25 3,000.00
iii) Base tonne 1.65 3,000.00

Page Total Carried To Collection Page

BQ3-11/15
U DRAIN CHAINAGE 850

3.17 I CONCRETE WORK

I100 IN SITU CONCRETE DESIGNED MIX


Grade : C15
3.17.1 I110 Supply, lay, level and vibrate concrete grade 15 (1:3:6) as a m2 50.00 15.00
lean concrete

Grade : C35
3.17.2 I130 To supply, lay, level and vibrate concrete grade 35
i) Cover m3 - 290.00
ii) Wall m3 14.00 290.00
iii) Base m3 18.50 290.00

I400 FORMWORK

3.17.3 Class F1 finish at buried surfaces.


i) Cover m2 - 25.00
ii) Wall m2 60.00 25.00
iii) Base m2 50.00 25.00

3.17.4 Class F3 finish at exposed surfaces.


i) Cover m2 - 48.00
ii) Wall m2 60.00 48.00
iii) Base m2 - 48.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
I500 REINFORCEMENT

3.17.5 To supply, fabricate and lay high strength reinforcement bar as


per drawing
i) Cover tonne - 3,000.00
ii) Wall tonne 1.25 3,000.00
iii) Base tonne 1.65 3,000.00

U DRAIN CHAINAGE 1050

3.18 I CONCRETE WORK

I100 IN SITU CONCRETE DESIGNED MIX


Grade : C15
3.18.1 I110 Supply, lay, level and vibrate concrete grade 15 (1:3:6) as a m2 50.00 15.00
lean concrete

Page Total Carried To Collection Page

BQ3-12/15
Grade : C35
3.18.2 I130 To supply, lay, level and vibrate concrete grade 35
i) Cover m3 - 290.00
ii) Wall m3 14.00 290.00
iii) Base m3 18.50 290.00

I400 FORMWORK

3.18.3 Class F1 finish at buried surfaces.


i) Cover m2 - 25.00
ii) Wall m2 60.00 25.00
iii) Base m2 50.00 25.00

3.18.4 Class F3 finish at exposed surfaces.


i) Cover m2 - 48.00
ii) Wall m2 60.00 48.00
iii) Base m2 - 48.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
I500 REINFORCEMENT

3.18.5 To supply, fabricate and lay high strength reinforcement bar as


per drawing
i) Cover tonne - 3,000.00
ii) Wall tonne 1.25 3,000.00
iii) Base tonne 1.65 3,000.00

SUMP

3.19 I CONCRETE WORK

I100 IN SITU CONCRETE DESIGNED MIX


Grade : C15
3.19.1 I110 Supply, lay, level and vibrate concrete grade 15 (1:3:6) as a m2 234.00 15.00
lean concrete

Grade : C35
3.19.2 I130 To supply, lay, level and vibrate concrete grade 35
i) Cover m3 - 290.00
ii) Wall m3 87.00 290.00
iii) Base m3 94.00 290.00

Page Total Carried To Collection Page

BQ3-13/15
I400 FORMWORK

3.19.3 Class F1 finish at buried surfaces.


i) Cover m2 - 25.00
ii) Wall m2 220.00 25.00
iii) Base m2 234.00 25.00

3.19.4 Class F3 finish at exposed surfaces.


i) Cover m2 - 48.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)
ii) Wall m2 220.00 48.00
iii) Base m2 - 48.00

I500 REINFORCEMENT

3.19.5 To supply, fabricate and lay high strength reinforcement bar as


per drawing
i) Cover tonne - 3,000.00
ii) Wall tonne 7.20 3,000.00
iii) Base tonne 7.60 3,000.00

3.20 T MISCELLANEOUS WORK

T900 M.S GRATING


3..20.1 To fabricate, supply and install on site a M.S Grating with size 15m x sum
13m including all necessery item to make it applicable.

Page Total Carried To Collection Page

BQ3-14/15
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)

COLLECTION PAGE

Total brought forward from Page BQ3-1/15

Total brought forward from Page BQ3-2/15

Total brought forward from Page BQ3-3/15

Total brought forward from Page BQ3-4/15

Total brought forward from Page BQ3-5/15

Total brought forward from Page BQ3-6/15

Total brought forward from Page BQ3-7/15

Total brought forward from Page BQ3-8/15

Total brought forward from Page BQ3-9/15

Total brought forward from Page BQ3-10/15

Total brought forward from Page BQ3-11/15

Total brought forward from Page BQ3-12/15

Total brought forward from Page BQ3-13/15

Total brought forward from Page BQ3-14/15


ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

RANCANGAN TEBATAN BANJIR SG KUANG FASA 1, RAWANG DAERAH GOMBAK


PROJEK MENAIKTARAF ANAK SG KUANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

BILL NO.3 - RIVER STRUCTURE (ALL QUANTITIES ARE PROVISIONAL)

Item Code Rate


Description Unit Qty
No. No. (RM)

Total Bill No.2 Carried To Grand Summary

BQ3-15/15
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

40,000.00

45,000.00

20,000.00

20,000.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

32,400.00

157,400.00

BQ3-1/15

10,800.00

2,700.00

2,100.00

900,000.00

6,500.00
20,000.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)
4,950.00

47,850.00
54,810.00
47,850.00

1,097,560.00

BQ3-2/15

6,375.00
8,250.00

15,840.00
24,480.00

52,800.00
61,500.00
52,800.00

200,000.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

48,000.00

57,600.00

5,760.00
5,760.00

76,800.00
49,920.00

665,885.00

BQ3-3/15

2,250.00
1,125.00

650.00
260.00
320.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

41,040.00

13,680.00

3,420.00

2,660.00

60,000.00

125,405.00

BQ3-4/15

6,500.00
20,000.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

5,475.00

58,000.00
66,700.00
58,000.00

10,375.00
9,125.00

17,520.00
19,920.00

58,800.00
33,300.00
58,800.00

66,000.00

488,515.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)
488,515.00

BQ3-5/15

79,200.00

105,600.00
68,640.00

105,600.00
68,640.00

2,250.00
1,125.00

650.00

17,280.00

5,760.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)
2,700.00

457,445.00

BQ3-6/15
2,100.00

90,000.00

6,500.00
20,000.00

2,025.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)
20,300.00
25,230.00
20,300.00

4,375.00
3,375.00

6,480.00
8,400.00

209,085.00

BQ3-7/15

21,900.00
27,000.00
21,900.00

20,000.00

24,000.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

2,400.00

32,000.00
20,800.00

600.00
300.00

480.00

171,380.00

BQ3-8/15

14,040.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)
4,680.00

1,170.00

910.00

45,000.00

6,500.00
20,000.00

2,550.00

94,850.00

BQ3-9/15

24,650.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)
22,040.00
24,650.00

3,875.00
4,250.00

8,160.00
7,440.00

27,000.00
24,000.00
27,000.00

12,500.00

15,000.00

1,500.00
1,500.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)
20,000.00
13,000.00

236,565.00

BQ3-10/15

600.00
300.00

480.00

750.00

4,060.00
5,365.00

1,500.00
1,250.00

2,880.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

3,750.00
4,950.00

25,885.00

BQ3-11/15

750.00

4,060.00
5,365.00

1,500.00
1,250.00

2,880.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

3,750.00
4,950.00

750.00

25,255.00

BQ3-12/15

4,060.00
5,365.00

1,500.00
1,250.00

2,880.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

3,750.00
4,950.00

3,510.00

25,230.00
27,260.00

79,755.00

BQ3-13/15

5,500.00
5,850.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)
10,560.00

21,600.00
22,800.00

35,000.00

101,310.00

BQ3-14/15
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

157,400.00

1,097,560.00

665,885.00

125,405.00

488,515.00

457,445.00

209,085.00

171,380.00

94,850.00

236,565.00

25,885.00

25,255.00

79,755.00

101,310.00
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

1, RAWANG DAERAH GOMBAK


ANG DI BANDAR BARU KUNDANG DAN KERJA - KERJA BERKAITAN
BILL OF QUANTITIES

UCTURE (ALL QUANTITIES ARE PROVISIONAL)

Amount
(RM)

3,936,295.00

BQ3-15/15
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBDXX

Item Code Rate


Description Unit Qty
No. No. (RM)

7.1.4 IRRIGATION END CONTROL, I.E.C


a-600mmx600mm I.E.C (1nos)
b-750mmx600mm I.E.C (1nos)
c-750mmx750mm I.E.C (1nos)
d-900mmx750mm I.E.C (1nos)
e-900mmx900mm I.E.C (1nos)
f-1200mmx900mm I.E.C (1nos)

7.1.4.1 A520 TEMPORARY WORKS

A A523.1 Construct cofferdams and remove upon completion; fixed charge


a-600mmx600mm I.E.C Tertiary Canal T1 sum
b-750mmx600mm I.E.C Tertiary Canal T2 sum
c-750mmx750mm I.E.C Tertiary Canal T3 sum
d-900mmx750mm I.E.C Tertiary Canal T4 sum
e-900mmx900mm I.E.C Tertiary Canal T5 sum
f-1200mmx900mm I.E.C Tertiary Canal T6 sum

B A523.2 Maintain cofferdams for duration of construction; time-related charge

a-600mmx600mm I.E.C Tertiary Canal T1 sum


b-750mmx600mm I.E.C Tertiary Canal T2 sum
c-750mmx750mm I.E.C Tertiary Canal T3 sum
d-900mmx750mm I.E.C Tertiary Canal T4 sum
e-900mmx900mm I.E.C Tertiary Canal T5 sum
f-1200mmx900mm I.E.C Tertiary Canal T6 sum
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBDXX

Item Code Rate


Description Unit Qty
No. No. (RM)

Total Carried To Collection Page F2/91

F2/56
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBDXX

Item Code Rate


Description Unit Qty
No. No. (RM)

7.1.4.1 J100 BRICKWORK

Item for brickwork shall be deemed to include joint


reinforcement, movement joints, fixing ties, bonds to existing
work and fixing clamps.

a-600mmx600mm I.E.C Tertiary Canal T1 m²


b-750mmx600mm I.E.C Tertiary Canal T2 m²
c-750mmx750mm I.E.C Tertiary Canal T3 m²
d-900mmx750mm I.E.C Tertiary Canal T4 m²
e-900mmx900mm I.E.C Tertiary Canal T5 m²
f-1200mmx900mm I.E.C Tertiary Canal T6 m²

7.1.4.2
J400 MISCELLANEOUS WORK

Surface Features

J416 Common brickwork pilasters as shown in the drawing.


a-600mmx600mm I.E.C Tertiary Canal T1 m
b-750mmx600mm I.E.C Tertiary Canal T2 m
c-750mmx750mm I.E.C Tertiary Canal T3 m
d-900mmx750mm I.E.C Tertiary Canal T4 m
e-900mmx900mm I.E.C Tertiary Canal T5 m
f-1200mmx900mm I.E.C Tertiary Canal T6 m
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBDXX

Item Code Rate


Description Unit Qty
No. No. (RM)

Total Carried To Collection Page F2/91

F2/57
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/56
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/57
MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
UNTUK BLOK XX, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.7 BOX CULVERT CROSSING B.C.C.


a-600mmx600mm B.C.C (1 nos)
b-900mmx750mm B.C.C (1 nos)
c-900mmx900mm B.C.C (1 nos)
d-1200mmx900mm B.C.C (1 nos)

7.1.7.1 A520 TEMPORARY WORKS

A A523.1 Construct cofferdams and remove upon completion; fixed charge


a-600mmx600mm B.C.C Tertiary Canal T1 sum
b-900mmx750mm B.C.C Tertiary Canal T2 sum
c-900mmx900mm B.C.C Tertiary Canal T3 sum
d-1200mmx900mm B.C.C Tertiary Canal T4 sum

B A523.2 Maintain cofferdams for duration of construction; time-related charge


a-600mmx600mm B.C.C Tertiary Canal T1 sum
b-900mmx750mm B.C.C Tertiary Canal T2 sum
c-900mmx900mm B.C.C Tertiary Canal T3 sum
d-1200mmx900mm B.C.C Tertiary Canal T4 sum

C A524.1 Install pump for pumping/dewatering and remove upon completion;fixed


charge

a-600mmx600mm B.C.C Tertiary Canal T1 sum


b-900mmx750mm B.C.C Tertiary Canal T2 sum
c-900mmx900mm B.C.C Tertiary Canal T3 sum
d-1200mmx900mm B.C.C Tertiary Canal T4 sum

D A524.2 Operation and maintenance of pump


a-600mmx600mm B.C.C Tertiary Canal T1 sum
b-900mmx750mm B.C.C Tertiary Canal T2 sum
c-900mmx900mm B.C.C Tertiary Canal T3 sum
d-1200mmx900mm B.C.C Tertiary Canal T4 sum
MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
UNTUK BLOK XX, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total Carried To Collection Page F2/91

F2/67
MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
UNTUK BLOK XX, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.7.2 F100 EXCAVATION

Foundation

Excavation for foundation shall include upholding sides of


excavation, preparation of excavated surface, additional
excavation to provide working space, backfilling and removal of
dead services.

A F141 Excavate in earth material irrespective of depth commencing from level


as specified in the drawings
a-600mmx600mm B.C.C Tertiary Canal T1 m³
b-900mmx750mm B.C.C Tertiary Canal T2 m³
c-900mmx900mm B.C.C Tertiary Canal T3 m³
d-1200mmx900mm B.C.C Tertiary Canal T4 m³

7.1.7.3 H100 PILING WORKS

H100 PLANT AND EQUIPMENT


A H110 Provision of all necessary piling plant and equipment, transportation to
site, handling, assembling and removal from site after completion

a-600mmx600mm B.C.C Tertiary Canal T1 sum


b-900mmx750mm B.C.C Tertiary Canal T2 sum
c-900mmx900mm B.C.C Tertiary Canal T3 sum
d-1200mmx900mm B.C.C Tertiary Canal T4 sum

B H120 Moving and handling of piling plant and equipment within site and from
location to location as often as is and when necessary

a-600mmx600mm B.C.C Tertiary Canal T1 sum


b-900mmx750mm B.C.C Tertiary Canal T2 sum
c-900mmx900mm B.C.C Tertiary Canal T3 sum
d-1200mmx900mm B.C.C Tertiary Canal T4 sum
MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
UNTUK BLOK XX, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total Carried To Collection Page F2/91

F2/68
MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
UNTUK BLOK XX, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

H100 PILING WORKS(cont.)

H200 PILES

H300 Items for piling work shall be deemed to include piling records
and disposal of excavated and surplus materials.

C H391 Supply in 90mm dia(min), 4200mm to 4800 mm long Bakau Piles


a-600mmx600mm B.C.C Tertiary Canal T1 nr
b-900mmx750mm B.C.C Tertiary Canal T2 nr
c-900mmx900mm B.C.C Tertiary Canal T3 nr
d-1200mmx900mm B.C.C Tertiary Canal T4 nr

D H392 Depth driven


Drive 90mm dia(min), 4200mm to 4800 mm long Bakau Piles m
a-600mmx600mm B.C.C Tertiary Canal T1 m
b-900mmx750mm B.C.C Tertiary Canal T2 m
c-900mmx900mm B.C.C Tertiary Canal T3 m
d-1200mmx900mm B.C.C Tertiary Canal T4

Total Carried To Collection Page F2/91

F2/69
MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
UNTUK BLOK XX, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.7.4 CONCRETE WORK

I100 IN SITU CONCCRETE DESIGN MIX

Rate for in situ concrete designed mix shall be deemed to


include placing and compaction of concrete

Grade : C 15

A I111 Concrete blinding, 50 mm thick to structure base


a-600mmx600mm B.C.C Tertiary Canal T1 m²
b-900mmx750mm B.C.C Tertiary Canal T2 m²
c-900mmx900mm B.C.C Tertiary Canal T3 m²
d-1200mmx900mm B.C.C Tertiary Canal T4 m²

Grade : C 30

B I149 Reinforced concrete in the structures as per drawing and specification


a-600mmx600mm B.C.C Tertiary Canal T1 m³
b-900mmx750mm B.C.C Tertiary Canal T2 m³
c-900mmx900mm B.C.C Tertiary Canal T3 m³
d-1200mmx900mm B.C.C Tertiary Canal T4 m³

7.1.7.5 I400 FORMWORK

Rate for formwork shall be deemed to include the projections


and instrusions and amt temporary staging required.

A I419 F2: Fair finish to all structural component


a-600mmx600mm B.C.C Tertiary Canal T1 m²
b-900mmx750mm B.C.C Tertiary Canal T2 m²
c-900mmx900mm B.C.C Tertiary Canal T3 m²
d-1200mmx900mm B.C.C Tertiary Canal T4 m²
MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
UNTUK BLOK XX, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total Carried To Collection Page F2/91

F2/70
MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
UNTUK BLOK XX, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.7.6 I500 REINFORCEMENT

Rate for reinforcement shall be deemed to include labour for


cutting, bending and placing

A I550.5 High Tensile steel fabric - mesh A10 for the following B.C.C.

a-600mmx600mm B.C.C Tertiary Canal T1 m²


b-900mmx750mm B.C.C Tertiary Canal T2 m²
c-900mmx900mm B.C.C Tertiary Canal T3 m²
d-1200mmx900mm B.C.C Tertiary Canal T4 m²

7.1.7.7 P600 CULVERTS

Item for culverts shall be deemed to include all joints, water


stop, concrete base, and concrete surround unless otherwise
stated.

Precast Box Culvert

A P621.1 1200 mm x 1200 mm single precast box culvert in standard length of


1m for the following box culvert.

a-600mmx600mm B.C.C Tertiary Canal T1 m


b-900mmx750mm B.C.C Tertiary Canal T2 m
c-900mmx900mm B.C.C Tertiary Canal T3 m
d-1200mmx900mm B.C.C Tertiary Canal T4 m

Total Carried To Collection Page F2/91

F2/71
TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
X, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
X, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/67
TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
X, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
X, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/68
TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
X, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/69
TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
X, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
X, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/70
TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN
X, DI WILAYAH xx, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/71
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.5 IRRIGATION ROAD CROSSING (I.R.C.)


a-I.R.C at T1 (1 nos)
b-I.R.C at T2 (1 nos)

7.1.5.1 A520 TEMPORARY WORKS

A A523.1 Construct cofferdams and remove upon completion; fixed charge


a-I.R.C at T1 sum
b-I.R.C at T2 sum

B A523.2 Maintain cofferdams for duration of construction; time-related charge

a-I.R.C at T1 sum
b-I.R.C at T2 sum

C A524.1 Install pump for pumping/dewatering and remove upon completion;fixed


charge
a-I.R.C at T1 sum
b-I.R.C at T2 sum

D A524.2 Operation and maintenance of pump


a-I.R.C at T1 sum
b-I.R.C at T2 sum

7.1.5.2 F100 EXCAVATION

Foundation

Excavation for foundation shall include upholding sides of


excavation, preparation of excavated surface, additional
excavation to provide working space, backfilling and removal of
dead services.
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)
A F141.1 Excavate in earth material irrespective of depth commencing from level
as specified in the drawings
a-I.R.C at T1 m3
b-I.R.C at T2 m3

Total Carried To Collection Page F2/91

F2/58
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.5.3 H100 PILING WORKS

PILING PLANT AND EQUIPMENT


A H110 Provision of all necessary piling plant and equipment, transportation to
site, handling, assembling and removal from site after completion
a-I.R.C at T1 sum
b-I.R.C at T2 sum

B H120 Moving and handling of piling plant and equipment within site and from
location to location as often as is and when necessary
a-I.R.C at T1 sum
b-I.R.C at T2 sum

H200 PILES

Precast Reinforced Concrete Piles.

Items for piling work shall be deemed to include piling records


and disposal of excavated and surplus materials.
150 mm square precast reinforced concrete piles

C 252.1 Supply initial piles with rock shoes of 6m length


a-I.R.C at T1 nr
b-I.R.C at T2 nr

D 252.2 Depth driven


a-I.R.C at T1 nr
b-I.R.C at T2 nr

E H245 Jointing with butt weld all round as shown in Drawing.


a-I.R.C at T1 nr
b-I.R.C at T2 nr

F H256 Cut-off piles. Rate to include preparing heads with exposed steel bars
from pile to be bended into foundation
a-I.R.C at T1 nr
b-I.R.C at T2 nr
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

H500 PILE TESTS

G H520 PDA test on 150 mm square precast R.C. pile


a-I.R.C at T1 nr
b-I.R.C at T2 nr

Total Carried To Collection Page F2/91

F2/59
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.5.4 CONCRETE WORK

I100 IN SITU CONCRETE DESIGN MIX

Rate for in situ concrete designed mix shall be deemed to


include placing and compaction of concrete.

Grade : C 15

A I111 Blinding layer 50 mm thick


a-I.R.C at T1 m²
b-I.R.C at T2 m²

Grade : C 30

B I149 Reinforced concrete in the structures as per drawing


a-I.R.C at T1 m3
b-I.R.C at T2 m3

7.1.5.5 I400 FORMWORK

Rate for formwork shall be deemed to include the projections


and intrusions and any temporary staging required.

A I419 F2: Fair finish all structural component


a-I.R.C at T1 m²
b-I.R.C at T2 m²

7.1.5.6 I500 REINFORCEMENT

Rate for reinforcement shall be deemed to include labour for


cutting, bending, and placing.

High Tensile Bars


A I512.1 Nominal diameter: 12mm
a-I.R.C at T1 t
b-I.R.C at T2 t
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

B I550.6 High Tensile steel fabric - mesh A10


a-I.R.C at T1 m²
b-I.R.C at T2 m²

Total Carried To Collection Page F2/91

F2/60
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

I500 REINFORCEMENT(cont.)

Mild Steel Bars


C I512.1 Nominal diameter: 10mm
a-I.R.C at T1 t
b-I.R.C at T2 t

7.1.5.7 P600 CULVERT

Intem for culvert shall be deemed to include all joints, water


stop, concrete base, and concrete surround unless otherwise
stated

A P611.1 Supply and laying or install 900mm x 1500 mm pre-cast box culvert
with concrete lid in standard length of 1m including 50mm thk imported
sand to form bedding

a-I.R.C at T1 m
b-I.R.C at T2 m

7.1.5.8 Q100 ROADS AND PAVINGS

A Q110 Earth material to receive road pavement. Rate to include


scarifying, levelling, and compaction of the top 300 mm of the
subgrade.

a-I.R.C at T1 m²
b-I.R.C at T2 m²

F300 FILLING

The following items for filling shall include compaction and


additional filling necessitated by settlement or penetration into
underlying materials as applicable.

B F311 Imported laterite from contractor's own source with grading limits as per
specification.
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)
a-I.R.C at T1 m³
b-I.R.C at T2 m³

Total Carried To Collection Page F2/91

F2/61
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Q200 SUB-BASE

Sub-base shall be deemed to include chamfer.

C Q220.1 Granular (sand) material with a CBR value of more than 30 in 150 mm
thick.
a-I.R.C at T1 m²
b-I.R.C at T2 m²

Q300 ROAD-BASE

Road-base shall be deemed to include chamfer.

D Q330.1 Crushed aggregates with a CBR value of more than 80, in 300 mm
thick.
a-I.R.C at T1 m2
b-I.R.C at T2 m2

Q500 SURFACING

Asphaltic Concrete

E Q530 Tack coat to be applied at a rate of 0.5 litre per square metre as per
Specification.
a-I.R.C at T1 m2
b-I.R.C at T2 m2

F Q540 Prime coat to be applied at a rate of 0.35 litres per square metre as per
Specification.
a-I.R.C at T1 m2
b-I.R.C at T2 m2

G Q561 Binder course (ACB 28), 60mm thick as per Specification.


a-I.R.C at T1 m2
b-I.R.C at T2 m2

H Q562 Wearing course (ACW 14) 40 mm thick as per Specification.


ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)
a-I.R.C at T1 m2
b-I.R.C at T2 m2

Total Carried To Collection Page F2/91

F2/62
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.5.9 L200 MISCELLANEOUS

Item for miscellaneous metalwork shall be deemed to include


fixing to other work, supply of fixing components, and drilling or
cutting of other work.

L390 galvanised M.S. grating cover(size..x..) come with angle seating and
A fitting as per drawings
a-I.R.C at T1 nr
b-I.R.C at T2 nr

B L230 Galvanised mild steel cat ladders, with 20 mm diameter steel rungs at
300 mm centres. Rate to include full assemblies
a-I.R.C at T1 nr
b-I.R.C at T2 nr

Total Carried To Collection Page F2/91


ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

F2/63
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)

F2/58
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)

F2/59
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)

F2/60
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)

F2/61
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)

F2/62
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS

BILL OF QUANTITIES

Amount
(RM)

F2/63
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK ALBD XX, DI WILAYAH I, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.6 FARM IRRIGATION TURNOUT


Construct 194 nos of Farm Irrigation Turnout (F.I.T) in
accordance with drawing

7.1.6.1 F100 EXCAVATION

Foundation

Excavation for foundation shall include upholding sides of


excavation, preparation of excavated surface, additional
excavation to provide working space, backfilling and removal of
dead services.

A F141 Excavate in earth material irrespective of depth commencing from level m3


as specified in the drawings

7.1.6.2 I100 CONCRETE DESIGN MIX

Rate for in situ concrete designed mix shall be deemed to


include placing and compaction of concrete.

Grade : C 15

A I111 Concrete blinding Grade 15, 50 mm thick m²

Grade : C 30

B I149 Reinforced concrete in the structures as per drawing m³

Total Carried To Collection Page F2/91


ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK ALBD XX, DI WILAYAH I, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

F2/64
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK ALBD XX, DI WILAYAH I, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.6.3 I400 FORMWORK

Rate for formwork shall be deemed to include the projections


and instrusions and amt temporary staging required.

A I419 F2: Fair finish to all structural component m²

7.1.6.4 I500 REINFORCEMENT

Rate for reinforcement shall be deemed to include labour for


cutting, bending, and placing.

A I500.1 High tensile steel fabric - mesh A4 m2

7.1.6.5 O300 PIPES

Supply, lay and install. Rate to include all pipe cutting,


wrapping, lining and lagging as required.

Unplasticised polyvinyl chloride (uPVC) pipes to MS 628 (Class D)


200mm diameter, with jointing. Rate to include supply and making joints
complete for the following pipe length:

A O333.3 a- 2.0m to 4m m
B O333.3 b- 4.1m to 6m m
C O333.3 c- 6.1m to10m m

7.1.6.6 F300 FILLING

The following items for filling shall include compaction, and


additional filling necessitated by settlement or penetration into
underlying material as applicable.

A F332.1 Back fill with excavated spoil and disposing surplus spoil or materials m3
not suitable as directed as per drawings.
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK ALBD XX, DI WILAYAH I, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)
B F332.2 Supply and fill in approved imported earth to back fill structures m3
including compacting, trimming to required levels and sction as per
drawings.

Total Carried To Collection Page F2/91

F2/65
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK ALBD XX, DI WILAYAH I, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.6.7 MISCELLANEOUS

A To install Kompastic Gate complete with all necessary components and


fittings as per drawing nr

Total Carried To Collection Page F2/91

F2/66
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


D XX, DI WILAYAH I, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


D XX, DI WILAYAH I, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/64
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


D XX, DI WILAYAH I, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


D XX, DI WILAYAH I, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/65
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


D XX, DI WILAYAH I, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/66
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.9 DRAINAGE CROSSING(D.C)


a-900mm D.C (2nos)
b-1200mm D.C (2nos)
c-1500mm D.C (2nos)
d-1500mm Twin D.C (2nos)

7.1.9.1 A520 TEMPORARY WORKS

A A523.1 Construct cofferdams and remove upon completion; fixed charge


a. 900mm D.C (1) sum
b. 900mm D.C (2) sum
c. 1200mm D.C (3) sum
d. 1200mm D.C (4) sum
e. 1200mm D.C (5) sum
f. 1200mm D.C (7) sum
g. 1500mm Twin D.C (8) sum
h. 1500mm Twin D.C (9) sum

B A523.2 Maintain cofferdams for duration of construction; time-related charge

a. 900mm D.C (1) sum


b. 900mm D.C (2) sum
c. 1200mm D.C (3) sum
d. 1200mm D.C (4) sum
e. 1200mm D.C (5) sum
f. 1200mm D.C (7) sum
g. 1500mm Twin D.C (8) sum
h. 1500mm Twin D.C (9) sum

C A524.1 Install pump for pumping/dewatering and remove upon completion;fixed


charge

a. 900mm D.C (1) sum


b. 900mm D.C (2) sum
c. 1200mm D.C (3) sum
d. 1200mm D.C (4) sum
e. 1200mm D.C (5) sum
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)
f. 1200mm D.C (7) sum
g. 1500mm Twin D.C (8) sum
h. 1500mm Twin D.C (9) sum

Total Carried To Collection Page F2/92

F2/80
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

A520 TEMPORARY WORKS(cont.)

D A524.2 Operation and maintenance of pump


a. 900mm D.C (1) sum
b. 900mm D.C (2) sum
c. 1200mm D.C (3) sum
d. 1200mm D.C (4) sum
e. 1200mm D.C (5) sum
f. 1200mm D.C (7) sum
g. 1500mm Twin D.C (8) sum
h. 1500mm Twin D.C (9) sum

7.1.9.2 F100 EXCAVATION

Foundation

Excavation for foundation shall include upholding sides of


excavation, preparation of excavated surface, additional
excavation to provide working space, backfilling and removal of
dead services.

A F141 Excavate in earth material irrespective of depth as specified in the


drawings
a. 900mm D.C (1) m³
b. 900mm D.C (2) m³
c. 1200mm D.C (3) m³
d. 1200mm D.C (4) m³
e. 1200mm D.C (5) m³
f. 1200mm D.C (7) m³
g. 1500mm Twin D.C (8) m³
h. 1500mm Twin D.C (9) m³
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total Carried To Collection Page F2/92

F2/81
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.9.3 F300 FILLING

The following items for filling shall include compaction and


additional filling necessitated by settlement or penetration into
underlying materials as applicable.

A F311 Imported laterite from contractor's own source with grading limits as per
specification.

a. 900mm D.C (1) m³


b. 900mm D.C (2) m³
c. 1200mm D.C (3) m³
d. 1200mm D.C (4) m³
e. 1200mm D.C (5) m³
f. 1200mm D.C (7) m³
g. 1500mm Twin D.C (8) m³
h. 1500mm Twin D.C (9) m³

7.1.9.3 H100 PILING WORKS

H100 PLANT AND EQUIPMENT


A H110 Provision of all necessary piling plant and equipment, transportation to
the Site, handling, assembling, and removal off the Site after
completion of operation

a. 900mm D.C (1) sum


b. 900mm D.C (2) sum
c. 1200mm D.C (3) sum
d. 1200mm D.C (4) sum
e. 1200mm D.C (5) sum
f. 1200mm D.C (7) sum
g. 1500mm Twin D.C (8) sum
h. 1500mm Twin D.C (9) sum
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total Carried To Collection Page F2/92

F2/82
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

H100 PLANT AND EQUIPMENT(cont.)

B H120 Moving and handling of all piling plant and equipment within the Site
and from location to location as often as is, and whenever necessary
for the execution of the whole piling operation.

a. 900mm D.C (1) sum


b. 900mm D.C (2) sum
c. 1200mm D.C (3) sum
d. 1200mm D.C (4) sum
e. 1200mm D.C (5) sum
f. 1200mm D.C (7) sum
g. 1500mm Twin D.C (8) sum
h. 1500mm Twin D.C (9) sum

H300 PILES

Items for piling work shall be deemed to include piling records


and disposal of excavated and surplus materials.

C H391 Supply in 90mm dia(min), 4200mm to 4800 mm long Bakau Piles

a. 900mm D.C (1) nr


b. 900mm D.C (2) nr
c. 1200mm D.C (3) nr
d. 1200mm D.C (4) nr
e. 1200mm D.C (5) nr
f. 1200mm D.C (7) nr
g. 1500mm Twin D.C (8) nr
h. 1500mm Twin D.C (9) nr

D H392 Depth driven


Drive 90mm dia(min), 4200mm to 4800 mm long Bakau Piles
a. 900mm D.C (1) m
b. 900mm D.C (2) m
c. 1200mm D.C (3) m
d. 1200mm D.C (4) m
e. 1200mm D.C (5) m
f. 1200mm D.C (7) m
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)
g. 1500mm Twin D.C (8) m
h. 1500mm Twin D.C (9) m

Total Carried To Collection Page F2/92

F2/83
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.9.4 CONCRETE DESIGN MIX

Rate for in situ concrete designed mix shall be deemed to


include placing and compaction of concrete.

Grade 15

A I111 Concrete blinding Grade : C 15, 50 mm thick

a. 900mm D.C (1) m²


b. 900mm D.C (2) m²
c. 1200mm D.C (3) m²
d. 1200mm D.C (4) m²
e. 1200mm D.C (5) m²
f. 1200mm D.C (7) m²
g. 1500mm Twin D.C (8) m²
h. 1500mm Twin D.C (9) m²

Grade: 30

B I149 Reinforced concrete in the structures as per drawing and specification

a. 900mm D.C (1) m³


b. 900mm D.C (2) m³
c. 1200mm D.C (3) m³
d. 1200mm D.C (4) m³
e. 1200mm D.C (5) m³
f. 1200mm D.C (7) m³
g. 1500mm Twin D.C (8) m³
h. 1500mm Twin D.C (9) m³
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total Carried To Collection Page F2/92

F2/84
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.9.5 I400 FORMWORK

Rate for formwork shall be deemed to include the projections


and intrusions and any temporary staging required.

A I419 F2: Fair finish all structural component

a. 900mm D.C (1) m²


b. 900mm D.C (2) m²
c. 1200mm D.C (3) m²
d. 1200mm D.C (4) m²
e. 1200mm D.C (5) m²
f. 1200mm D.C (7) m²
g. 1500mm Twin D.C (8) m²
h. 1500mm Twin D.C (9) m²

7.1.9.5 I500 REINFORCEMENT

Rate for reinforcement shall be deemed to include labour for


cutting, bending, and placing.

A I550.5 High tensile steel fabric - mesh A10

a. 900mm D.C (1) m²


b. 900mm D.C (2) m²
c. 1200mm D.C (3) m²
d. 1200mm D.C (4) m²
e. 1200mm D.C (5) m²
f. 1200mm D.C (7) m²
g. 1500mm Twin D.C (8) m²
h. 1500mm Twin D.C (9) m²
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total Carried To Collection Page F2/92

F2/85
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.9.6 P600 CULVERT

P611.1 Item for culvert shall be deemed to include all joints, water
stop, concrete base, and concrete surround unless otherwise
stated

Supply and install 900mm diameter single precast concrete pipe


culvert, Class L in standard length 1.5m of equivalent with standard
collars

a. 900mm D.C (1) m


b. 900mm D.C (2) m
c. 1200mm D.C (3) m
d. 1200mm D.C (4) m
e. 1200mm D.C (5) m
f. 1200mm D.C (7) m
g. 1500mm Twin D.C (8) m
h. 1500mm Twin D.C (9) m
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total Carried To Collection Page F2/92

F2/86
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/80
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/81
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/82
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/83
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/84
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/85
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

EM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/86
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.10 DRAINAGE OUTLET(D.O)


Construct 159 nos of Drainage Outlet (D.O) as per drawing

7.1.10.1 A520 TEMPORARY WORKS

A Allows for temporary works sum

7.1.10.2 EXCAVATION

Foundation

Excavation for foundation shall include upholding sides of


excavation, preparation of excavated surface, additional
excavation to provide working space, backfilling and removal of
dead services.

A F141 Excavate in earth material commencing from level as specified in the m3


drawing

7.1.10.3 CONCRETE DESIGN MIX

Rate for in situ concrete designed mix shall be deemed to


include placing and compaction of concrete.

Grade : C 15

A I111 Concrete blinding Grade : C 15, 50 mm thick m²

Grade: C30

B I149 Reinforced concrete in the structures as per drawing m³

Total Carried To Collection Page F2/92


ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)
F2/87
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.10.4 I400 FORMWORK

Rate for formwork shall be deemed to include the projections


and instrusions and amt temporary staging required.

A I419 F2: Fair finish to all structural component m²

7.1.10.5 I500 REINFORCEMENT

Rate for reinforcement shall be deemed to include labour for


cutting, bending, and placing.

A I500.1 High tensile steel fabric - mesh BMC DA4 m2

7.1.10.6 O300 PIPES

Supply, lay and install. Rate to include all pipe cutting,


wrapping, lining and lagging as required.

High density polyethylene (HDPE) solid wall plain ended pipe to MS


1058 for the following:

A O334.9 300mm OD, PE 80, PN 16 in standard length of 12 m m

7.1.10.7 F300 FILLING

The following items for filling shall include compaction, and


additional filling necessitated by settlement or penetration into
underlying material as applicable.

A F332.1 Back fill with excavated spoil and disposing surplus spoil or materials m3
not suitable as directed as per drawings.
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)
B F332.2 Supply and fill in approved imported earth to back fill structures m3
including compacting, trimming to required levels and section as per
drawings.

Total Carried To Collection Page F2/92

F2/88
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

7.1.10.8 T200 MISCELLANEOUS

A T210 Supply and install Timber Dropboards with all necessary fittings as per
drawing

a-Type A nr

b-Type B nr

c-Type C nr

Total Carried To Collection Page F2/92

F2/89
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

COLLECTION PAGE

Total brought forward from Page F2/35

Total brought forward from Page F2/36

Total brought forward from Page F2/37

Total brought forward from Page F2/38

Total brought forward from Page F2/39

Total brought forward from Page F2/40

Total brought forward from Page F2/41

Total brought forward from Page F2/42

Total brought forward from Page F2/43

Total brought forward from Page F2/44

Total brought forward from Page F2/45

Total brought forward from Page F2/46

Total brought forward from Page F2/47

Total brought forward from Page F2/48

Total brought forward from Page F2/49

Total brought forward from Page F2/50

Total brought forward from Page F2/51

Total brought forward from Page F2/52

Total brought forward from Page F2/53


ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total brought forward from Page F2/54

Total brought forward from Page F2/55

Total Carried To Collection Page F2/92

F2/90
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

COLLECTION PAGE (cont.)

Total brought forward from Page F2/56

Total brought forward from Page F2/57

Total brought forward from Page F2/58

Total brought forward from Page F2/59

Total brought forward from Page F2/60

Total brought forward from Page F2/61

Total brought forward from Page F2/62

Total brought forward from Page F2/63

Total brought forward from Page F2/64

Total brought forward from Page F2/65

Total brought forward from Page F2/66

Total brought forward from Page F2/67

Total brought forward from Page F2/68

Total brought forward from Page F2/69

Total brought forward from Page F2/70

Total brought forward from Page F2/71


ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total Carried To Collection Page F2/92

F2/91
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

COLLECTION PAGE (cont.)

Total brought forward from Page F2/72

Total brought forward from Page F2/73

Total brought forward from Page F2/74

Total brought forward from Page F2/75

Total brought forward from Page F2/76

Total brought forward from Page F2/77

Total brought forward from Page F2/78

Total brought forward from Page F2/79

Total brought forward from Page F2/80

Total brought forward from Page F2/81

Total brought forward from Page F2/82

Total brought forward from Page F2/83

Total brought forward from Page F2/84

Total brought forward from Page F2/85

Total brought forward from Page F2/86

Total brought forward from Page F2/87

Total brought forward from Page F2/88

Total brought forward from Page F2/89

Total brought forward from Page F2/90


ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

MEMBINA DAN MENYIAPKAN SISTEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


UNTUK BLOK XX, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

BILL NO.7 - STRUCTURES


7.1 IRRIGATION BLOCK ALBD XX

Code Rate
Item No. Description Unit Qty
No. (RM)

Total brought forward from Page F2/91

Total Bill No.7 Carried To Grand Summary Page

F2/92
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
F2/87
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/88
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/89
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/90
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/91
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)
ALL QUANTITIES PROVISIONAL UNLESS OTHERWISE STATED

TEM PENGAIRAN TERSIER DAN KERJA-KERJA BERKAITAN


X, DI WILAYAH XX, MADA, KEDAH/PERLIS
BILL OF QUANTITIES

Amount
(RM)

F2/92