Sie sind auf Seite 1von 3

2.

0 Project Management
2.1 Project Planning
2.1.1 Project Development Approach and Justification
2.1.2 Milestones and Deliverables
2.1.3 Roles and Responsibilities
2.1.4 Group Dependencies
2.2 Project Scheduling
2.3 Risk Management
2.4 Estimation
2.4.1 Effort Estimation
2.4.2 Cost Analysis
3.0 System Requirements Stud
3.1 User Characteristics
3.2 Hardware and Software Requirements
3.2.1 Server side Hardware Requirement
3.2.2 Software Requirements
3.2.3 Client side Requirements
3.3 Constraints
3.3.1 Hardware Limitations
3.3.2 Interfaces to Other Applications
3.3.3 Reliability Requirements
3.3.4 Safety and Security Consideration
3.4 Assumption And Dependencies

4.0 System Analysis


4.1 Study of Current System
4.2 Problem and Weaknesses of Current System
4.3 Requirements of New System
4.3.1 User Requirements
4.3.2 System Requirements
4.4 Feasibility Study
4.4.1 Does the system contribute to the overall
objectives of the organization?
4.4.2 Can the system be implemented using the
current technology and within the given
cost and schedule constraints?
4.4.3 Can the system be integrated with other
system which are already in place?
4.5 Requirements Validation
4.6 Features Of New System
4.7 Use Case Diagram
4.8 Class Diagram
4.9 Collaboration Diagram
4.10 ER Diagram
4.11 Selection Of Hardware and Software and Justification

5.0 System Design


5.1 Database Design
5.2 Input/Output Design
5.3 Interface Design
5.3.1 State-Transition Diagram

6.0 Code Implementation


6.1 Implementation Environment
6.2 Program Module/Specification
6.3 Code Standard
6.3.1Variable Standard
6.3.2 Comment Standard

7.0 Testing
7.1Testing Plan
7.1.1Design Testing
7.1.2Implementation Testing
7.1.3 Coding Testing
7.2 Testing Strategy
7.3 Testing Methods
7.3.1 Unit Testing
7.3.2 Integration Testing
7.3.3 Validation Testing
7.3.4 Storage Testing
7.4 Test Cases
7.4.1 Purpose

8.0 Limitation and Future Enhancement


8.1 Limitations
8.2 Future Enhancement
9.0 Conclusion And Discussion
9.1 Self Analysis of Project Viabilities
9.2 Problem Encountered and Possible Solution
9.2.1 Resource Availability
9.2.2 To get the Knowledge of the Company
9.2.3 Requirement Understanding
9.2.4 Problem encountered and Possible Solutions.
9.3 Summary of Project Work.
References
Appendix
A.1 Business Model Canvas
A.2 Canvas Exhibition
A.3Peroidic Progress Report
A.4 BMC Report
A.5 Patent Drafting Excercise
• Login
• Show splash screen
• Show full details of items
• Manage category
• Manage Shop
• Manage User
• Manage static page
• Sharing with social sites
• Manage Discount
• Do the marketing
• Delete Records
• Delete Company Details
• Display Details of Expenses
• Reply Feedback
• Logout

Android technology is so far for today‘s trends, many user


use smart phone devices with android OS. Using internet everybody
want to get any information at sitting in any corner. So , we will
try to develop an android application for every user who want to get
the detail of discount in his/her city.

We will provide some category wise classification like shops


,showrooms, malls etc...and after in we provide all available
shop in particular city and then user can view current
discount with term and conditions.

Das könnte Ihnen auch gefallen