S1 S3 S4
400
S2
S5 S6 S7 S8
S12 300
S9 S10 S11 400
S13 S14
500 400 400 500
Depth determination
D=450mm
b=250mm
fcd=11.33Mpa
fyd=260.87Mpa
1
Concrete Cover=25mm Reinf. Bar = Φ14mm
Stirrup=Φ8mm
Exterior Span,
f ykLe
d= (0.4+0.6 )
400 a
Le 5000
= 0.85 0.85 151.78mm assume, 155mm
a 28
Interior Span,
f ykLe
d= (0.4+0.6 )
400 a
Le 4000
d = 0.85 0.85 141.667 assume, 145mm
a 24
Overall depth, D = 145+25+7+8 = 185mm < D used = 450mm
0.6 0.6
ρmin= f 300 0.002 [EBCS 2,1995 Part 2 Section 7.2.1.1]
yk
M sd 107.97 * 1000
μus = 2
0.01416
f cd * b * d 11.33 * 10 6 * 0.25 * 0.412
2
M sd 107.9749 * 1000
As = 1030.122mm 2
Z * f yd 0.4018 * 260.87 *10 6
1030.122
No. of bars 6.69 assume 7 bars
153.938
Member F-66 L,
( 4 * 40) (3 * 79)
y' = 56.71m
7
d = 450-56.71 = 393.28mm.
107.974 *1000
μus = 0.2464
11 .333 *10 6 * 0.25 * .39322
3
Right 89.734 0.1884 0.87 0.3419 1066.05 7 1077.568
Φ14
T-11 Left 41.458 0.0870 0.95 0.3895 408.01 3 461.814
Φ14
Right 52.613 0.1104 0.93 0.3813 528.934 4 615.752
Φ14
T-12 Left 51.017 0.1071 0.94 0.3854 507.44 4 615.752
Φ14
Right 42.985 0.0902 0.94 0.3854 427.549 3 461.814
Φ14
T-13 Left 86.143 0.1964 0.89 0.3649 904.952 6 923.628
Φ14
Right 111.488 0.2547 0.85 0.3342 1238.15 8 1231.49
Φ14
Member T-10
Le
a) be = bw + b) be = C/C spacing between
5
beams
5000
= 250 + =5000mm
5
= 1250mm
f yd 260.87 *10 6
M= 28.77
0.8 f cd 0.8 * 11 .333 * 10 6
2.5 2.5
C1 = 0.08688
m 28.77
Moment = 59.2017KN-m
4
1 2 4M
ρ= (C1 C1 )
2 be * d 2 * C 2
1 4(59.2017 * 10 6 )
= (0.08688 0.007549 )
2 1050 * 410 2 * 3002
= 0.0013
1025mm 2
No. of bar = 6.65 7bars
153.938mm 2
Re-calculate As and check the new effective depth will change the
reinforcement.
955.35mm 2
No.of bars Re-calculate = 6.2, assume 7 bars.
153.938mm 2
5
Use 7Φ14 A s provided =1077.567mm2.
0.4 0.4
ρmin = f 300 0.001333 [EBCS 2, 1995 Sec.7.2.12]
yk
ρ= As/bd
6
Design of Shear Reinforcement
Av * d * f yd
Vs = (EBCS 2, 1995 Sec 4.5.4.4)
S
Span T-10
As 8 * 153.938
ρ= 0.0125
bd 250 * 393.17
k1 = (1+50ρ) <2.0
= (1+50*0.0125) <2.0
= 1.626 <2.0
Vc = 0.25*fctd*k1*k2*bw*d
= 0.25*(1.03*106)*1.626*1.19*0.25*0.41
= 47.918 KN.
7
2.57493 (0.39317 0.20)
Vsd right = * 131.1787 100.959 KN
2.57493
T-10 Left 0.0105 1.525 47.88 290.41 104.2 Φ8c/c50mm 26.88 74.76
Right 0.0105 1.525 47.88 290.41 100.1 Φ8c/c50mm 26.88 74.76
T-11 Left 0.0045 1.225 38.48 290.41 50.26 Φ8c/c100mm 26.88 65.36
Right 0.006 1.300 40.83 290.41 56.46 Φ8c/c90mm 26.88 67.71
T-12 Left 0.006 1.300 40.83 290.41 55.59 Φ8c/c90mm 26.88 67.71
Right 0.0045 1.225 38.48 290.41 51.34 Φ8c/c100mm 26.88 65.36
T-13 Left 0.0090 1.451 45.558 290.41 96.57 Φ8c/c50mm 26.88 72.44
Right 0.012 1.600 50.253 290.41 107.8 Φ8c/c50mm 26.88 77.13
Development Length
Every reinforcement at each end must be anchored in order to avoid any bond
failure.
8
Type of reinforced bar deformed rough bar.
aLb * Ascal .
Lbnet = 0.3Lb 200mm
As .eff
14 * 260.87
= 443.225mm
4 * 2 * 1.03 * 10 6
Ascal = 1238.15mm2.
As.eff. = 1231.15mm2.
1 * 443.225 *1238.15
Lbnet = 443.225mm
1231.49
9
Length of bar
Support T-10 Left = 1.09+.44+0.2 = 1.74m.
Support T-11 Left = 0.94+0.79+(2*.39) = 2.51m.
Support T-11 Right & T-12 Left = 0.95+0.93+(2*.38) = 2.6m.
Support T-12 Right & T-13 Left = 0.81+0.91+(2*0.43) = 2.59m.
Support T-13 Right = 1.12+0.39+0.2 = 1.71mts.
10