Sie sind auf Seite 1von 1

Project : PROPOSED TWO STOREY RESIDENTIAL BUILDING

Location :
Owner :
Item Description Qty Unit Price Total
9.1 SEAWAGE (PVC ORANGE)
100mm dia. wye 9 pcs 150.00 1,350.00
100mm dia. clean out 7 pcs 45.00 315.00
100mm dia. 90 ° elbow 11 pcs 45.00 495.00
100mm dia. X 10ft PVC pipe 14 pcs 600.00 8,400.00
100mm dia. X 50mm dia. wye 8 pcs 150.00 1,200.00
50mm dia. 45 ° elbow 10 pcs 45.00 450.00
50mm dia. p-trap 10 sets 85.00 850.00
50mm dia. 90 ° elbow 12 pcs 45.00 540.00
50mm dia. x 10ft pvc pipe 7 pcs 240.00 1,680.00
50mm dia. long sweep 90° elbow 2 pcs 85.00 170.00
100mm dia. tee 3 pcs 150.00 450.00
9.2 CLEAN WATER (PPR PIPES)
25mm dia. check valve 1 set 250.00 250.00
water meter 1 set -
25mm dia. gate valve 7 sets 250.00 1,750.00
25mm dia. coupling/female adapter (w/ thread)22 pcs 112.25 2,469.50
25mm dia. tee (no thread) 16 pcs 21.00 336.00
25mm dia. 90° elbow (no thread) 52 pcs 35.00 1,820.00
25mm dia. x 10ft PPR pipe PN20 18 pcs 342.25 6,160.50
9.3 FIXTURES
stainless steel kitchen sink (complete set) 1 set 15,250.00 15,250.00
hose bibb 2 pcs 415.00 830.00
lavatory (complete set) 4 sets 5,000.00 20,000.00
water closet (complete set) 5 sets 18,000.00 90,000.00
floor drain 5 sets 280.00 1,400.00
roof drain 2 sets 280.00 560.00
shower head (complete set) 5 sets 3,600.00 18,000.00
9.4 SEPTIC TANK
150mm CHB 250 pcs 15.00 3,750.00
Cement 46 bags 265.00 12,190.00
Sand 3 cu.m. 1,200.00 3,600.00
crushed gravel 1.5 cu.m. 1,200.00 1,800.00
10mm RSB 20 pcs 120.00 2,400.00
tie wire 1.5 kg 80.00 120.00
9.5 miscellaneous
solvent cement 2 lits 350.00 700.00
teflon tape 10 rolls 35.00 350.00
Total Direct Cost 199,636.00

Total Direct Cost 397,112.00


Labor Cost 40% 158,844.80
Contractor's Profit 10% 39,711.20
Total Cost 595,668.00