DESIGN BASIS, TREATMENT SCHEME & PROCESS

 Flow rate: 900 m3/day

 Nature of wastewater: Sewage

 Characteristics of inlet/outlet of STP: As per the enquiry

 Plant Room Location: Not provided

 Characteristics of inlet /outlet of STP (After tertiary treatment):

Parameters Unit Inlet Outlet of Filters


pH ---- 7.0 – 8.5 6.5 – 7.5
COD mg/l 600 – 800 < 50
BOD mg/l 250 – 400 < 10
Suspended Solids mg/l 200 – 450 < 10
O&G mg/l 50 <5
Detergent mg/l 50-100 < 10
Hardness mg/l 250 (Assumed) <5

Treatment Scheme:

 Followed by Screening, the water from Collection / Equalization tank is transferred to


SBR reactor.

 Biological treatment of wastewater is done in Sequential Batch Reactor.

 Treated water from SBR Tank is decanted in Chlorine contact tank by Decanter. .

 After chlorine dosing through metering Pump, the water is pumped to Dual Media filter
and Carbon Filter by Filter Feed Pumps.

 Part of Filtered water is then passed through softener to remove hardness which will
make it soft suitable for cooling tower makeup. Strong acid cation exchange resin in
Na form is used as media for softening.

 The water from filters may be stored in a Treated water Tank and may be used for
Flushing, Irrigation & basement car washing.

 Sludge from the SBR tank is to be transferred to Filter Press through Sludge transfer
pumps. The water from Filter press shall be sent back to Equalization/Collection Tank
for recycling.

EXCLUSIONS/OWNERS SCOPE

These Exclusions shall remain valid unless specifically withdrawn in written

 Approach to site and storage of equipment.


 Treated water Tank & Pump.

 All civil & structural works including tanks construction, foundation of equipment, water
proofing, plaster structure duly tested for leak proofing, plant room, flooring or
shedding for equipment.

 Lighting, Ventilation of plant room and STP Area.

 Raw water incoming pipeline up to the STP.

 Treated water disposal pipeline beyond STP area. We shall provide the flanges end
connection at the outlet of STP.

 Sludge disposal pipeline beyond STP area.

 Electricity during the Installation / commissioning work.

 Sulabh / Water Charges, Labor welfare cess etc.

 Electric incoming power supply with earthing to STP panel on continuous basis.

 Fresh water connection in STP.

 Drain arrangement in STP area.

 Official fee for Consent / statutory clearance from PCB / any other relevant authorities

 Plant room/ covering of STP equipment.

 Any other work, which is not specifically mentioned

TECHNICAL NOTES

 Equalization or Collection Tank: We have proposed collection cum equalization tank


in RCC above the ground level. Coarse air grid is used for aeration in Collection Tank.
The mixed raw water is pumped to SBR tank by Raw water Transfer Pumps.

 SBR Reactors: SBR Reactor has five steps of operation:

 Fill
 Aeration
 Settling
 Decanting
 Idle

 Air is used in SBR tank and will also be used in collection cum equalization tank to
avoid the anaerobic conditions, smell problem and sedimentation of solids in to the
tank.

 Media Filtration & Carbon Filtration System: The clarified & chlorinated water is
pumped to Media Filter followed by Carbon Filter to further polish the treated effluent.
The Carbon Filter removes color & odor.

 Our offer is exclusive of civil work, which includes tanks construction, foundation of
equipments, drains & trenches, shedding/plant room for the equipment and related MS
work
 All electro-mechanical equipments are proposed with standby units.