CHECK LIST FOR EXCAVATION/

PILE DRILLING
ORIENT ENERGY SYSTEMS PVT LTD TP1000/OES/SEC/CW0001

DATE:

Line #

Location No. Type of Tower/Poles

Foundation Design No. (being used)

SR. # Description
1 To check whether excavation/drilling is as per drawing.

2 To check for Soil condition after excavation/drilling for Soil bearing capacity.

3 To check proper compaction in case of over excavation/drilling of filling


with lean concrete.
4 To check if Soil replacement under footing to required depth is done if so required.

5 To check if proper de-watering is done in case of water logged area.

6 To check if lean concrete is placed at pit bottom at wet location.

7 To check if the Piles are broken .

Checked by:
SEC OES Sub-Contractor KE

Legend
Applicable
Not Applicable
CHECK LIST FOR TOWER/POLE SETTING

ORIENT ENERGY SYSTEMS (PVT) LTD TP1000/OES/SEC/CW0002

DATE:
Line #

Location No. Type of Tower/Poles

Foundation Design No. (being used)

SR. # Description
1 To check the that center peg is in proper position.

2 To check that back span is as specified.

3 To check that levels of stub/anchor bolts are the same as specified.

4 To check that back to back is as specified.

5 To check that heel slope is as specified.

6 To check that diagonal is as specified.

7 To check that all cleat have been rigidly fixed with stub.

8 To check that earth resistance is below the specfied value.

9 To check that all templates are properly set and will not disturb during concreting.
To check that the location No. type of Tower/Foundation and angles is the same as in
10
structure list.

Checked by:
SEC OES Subcontractor KE

Legend
Applicable
Not Applicable
CHECK LIST FOR CONCRETING

ORIENT ENERGY SYSTEMS (PVT) LTD TP1000/OES/SEC/0003


DATE:

ne #

Location No. Type of Tower/Poles

Foundation Design No. (being used)

Pile Cap Pilling/ Conv .Fiind.


SR. # Description L.1 L.2 L.3 L.4

1 To check that the approved mix design is available, at start of project


2 To check that the lot from which this steel has been used tested
To check grading before fine and coarse aggregates before concrete
3
mixing
4 To check if water used for concreting is free from salts and has beeen tested
5 To check re-bar placement and size as per drawing
6 To check overlaps if any and mention in pourslips / Bar bending schedule
7 To check clearance of re-bar from ground and formwork
8 To check if forms aere leak proof and rigidly fixed
To check if cement is not set and all bags are intect. Also ensure used of
9
SR cement in areas where sulphate exist
10 To check the concrete mix ration is as per deisgn

11 To check slump of concrete is as per specification


To check T&P is used for concreting for its reliability such as mixer
12
machine , vibrators etc
13 To check cubes are mould in proper size and filled properly

14 To check cubes are cured, transported properly

15 To check proper de-watering is done prior to concreting in water logged area


16 To check the concrete is poured through proper chute / Tremie pipe

17 To check that any defect in concrete is properlt repaired

10 To check the curing is done / completed before backfilling

Checked by:

SEC OES Subcontractor KE

Legend
Applicable
Not Applicable
CHECK LIST FOR BACKFILLING

ORIENT ENERGY SYSTEMS PVT LTD TP1000/OES/SEC/0004


DATE:

Line #

Location No. Type of Tower/Poles

Foundation Design No. (being used)

SR. # Description
1 To check that curing compound is applied to concrete or water cured after stripping formwork

2 To check that soil used is suitable for backfilling

3 To check that soil used is free from big stones, wood and bushes

4 To check that soil has proper moisture contents

5 To check that backfilling and compaction is being done in layer

6 To check that compactor used is in working order

7 To check that soil is properly compacted to required density

8 To check that platform of each leg is correctly extended over excavation line

9 To check that surplus soil if any, has been properly disposed off

10 To check that proper drainage of rain water is possible

11 To check that all surplus material has been shifted from tower location to achieve required site
clearance
Checked by:

SEC OES Subcontractor KE

Legend
Applicable
Not Applicable
EXCAVATION / PILE DRILLING

ORIENT ENERGY SYSTEMS PVT LTD TP1000/OES/SEC/0005

PROJECT :

OWNER :

LINE :

SUBCONTRACTOR :

TOWER / POLE NO. TOWER / POLE TYPE:

FOUNDATION DRAWING NO.(Being used) :

PILE DRILLING METHOD:

BACK TO BACK : DIAGONAL:

EXCAVATION / DRILLING OF :

1. NORMAL SOIL %
2. VERY HARD SOIL %
3. SOFT SOIL %
4. HARD ROCK %
5. WEAK SOIL %
6. WATER LOGGED OR DRY %
Leg NO.1 Leg NO.2 Leg NO.3 Leg NO.4

TOTAL EXCAVATION :

Checked by:

SEC OES SUBCONTRACTOR KE


CONVENTIONAL FOUNDATION

ORIENT ENERGY SYSTEMS PVT LTD TP1000/OES/SEC/0006


DATE:

PROJECT :

OWNER :

LINE :

SUBCONTRACTOR :

TOWER / POLE NO. TOWER / POLE TYPE:

FOUNDATION DRAWING NO.(Being used) :

REINFORCEMENT : CONCRETING :

#9 DATE:

#8 STARTED AT :

#7 COMPLETED AT :
TOTAL VOLUME
#6 OF CONCRETE :

#5 NO OF CUBES:
#4

#3

TOTAL WEIGHT IN KGS :

Checked by:

SEC OES SUBCONTRACTOR KE


PILLING REPORT

ORIENT ENERGY SYSTEMS PVT LTD TP1000/OES/SEC/007


DATE:

PROJECT :

OWNER :

LINE :

SUBCONTRACTOR :

TOWER / POLE NO. TOWER / POLE TYPE:

FOUNDATION DRAWING NO.(Being used) :

DRILLING METHOD :

1 3

LINE DIRECTION
2 4

DRILLING RECORD GROUETING RECORD

DATE STARTED: PILE NO.


DATE COMPLETED: CONCRETE STARTED
DRILL DEPTH: CONCRETE COMPLETED
TOTAL VOLUME
DIA OF PILE: OF CONCRETE :
NO OF CUBES:
REINFORCEMNET :
a) MAIN BARS CASING:
b) MAIN BARS a) DIA / THICKNESS
c) SPIRAL b) LENGTH (METER):
TOTAL WEIGHT IN KGS :

Checked by:

SEC OES SUBCONTRACTOR KE


PILE CAP REPORT

ORIENT ENERGY SYSTEMS PVT LTD TP1000/OES/SEC/008


DATE:

PROJECT :

OWNER :

LINE :

SUBCONTRACTOR :

TOWER / POLE NO. TOWER / POLE TYPE:

FOUNDATION DRAWING NO.(Being used) :

REINFORCEMENT : CONCRETING :

#9 DATE:

#8 STARTED AT :

#7 COMPLETED AT :
TOTAL VOLUME
#6 OF CONCRETE :

#5 NO OF CUBES:
#4 EXCAVATION :

#3 TYPE :

Checked by:

SEC OES SUBCONTRACTOR KE


BAR BENDING SCHEDULE

ORIENT ENERGY SYSTEMS PVT LTD TP1000/OES/SEC/CW0009


Transmission Line Prepared by :

Pole / Tower Type


Date:

S. Bar Total
Description Dia Spacing Total No. Length Bending Shape
No. Mark length
BAR BENDING SCHEDULE

ORIENT ENERGY SYSTEMS PVT LTD TP1000/OES/SEC/CW0009


Transmission Line Prepared by :

Pole / Tower Type


Date:

Dia of Bar 6 10 12 16 20 22 25 32
Weigth per meter
This page Length
This page weight
Previous Page Weight
Total Weight TONS

CHECKED BY :

SEC OES SUBCONTRACTOR KE