MAIN DATA

GRUP KERJA @ 3 orang 22


Software SACS
Kriteria Umum:
1 Recommended Practice API RP 2A-LRFD, AISC 9th
2 Material Struktur ASTM
3 Tipe Platform Wellhead
4 Jumlah kaki jacket 6
5 Kedalaman perairan (LWL) feet 65
6 Orientasi Platform (+)15,00

Kriteria Desain Deck:


1 Jumlah deck: 3
2 Luasan Deck:
Luasan Sub cellar deck 1200 ft2
Luasan Cellar deck 1800 ft2
Luasan Main deck 1800 ft2
3 a. Beban Hidup Area Deck Kondisi Operasi
Sub cellar deck psf 100
Cellar deck psf 100
Main deckpsf 100
b. Beban Hidup Area Deck Kondisi Badai
Sub cellar deck 75 psf
Cellar deck 75 psf
Main deck 90 psf
4 Jumlah crane 1
5 a. Beban Crane Kondisi Operasi
Beban vertikal 135,0 kips
Beban momen 19500,0 kips-in
b. Beban Crane Kondisi Badai
Beban vertikal 65,5 kips
Beban momen 0,0 kips-in
6 Beban Angin
Kondisi Operasi 45 mph
Kondisi Badai 75 mph
7 Beban Perpipaan
Main Deck 60
Cellar Deck 50
Sub cellar deck 60
8 Helideck 1
Type Sikorsky
Rules API RP 2L
9 Work over rig (WOR)
Dead load Normal cond. 325 kips
Dead load Extreem cond. 325 kips
Operating Load Normal 275 kips
Operating Extreem Normal 0 kips
Kriteria Desain Jacket
1 a. Beban Gelombang & Arus Kondisi Operasi
Tinggi gelombang significant 18 ft
Periode gelombang 10 det
Total pasang surut 5.5 ft
Kecepatan arus (permukaan) 4 knot
Kecepatan arus (dasar laut) 0.5 knot
b. Beban Gelombang & Arus Kondisi Badai
Tinggi gelombang maksimum 32 ft
Periode gelombang 12 det
Total pasang surut 5.5 ft
Kecepatan arus (permukaan) 5 knot
Kecepatan arus (dasar laut) 0.7 knot
Storm surge 0.5 ft
2 Marine Growth
Menambah OD tubular member 2inch
3 Corrotion Allowance API RP 2A-LRFD
4 Hydrodynamic Coefficient API RP 2A-LRFD
5 Shielding Effect Coefficient API RP 2A-LRFD
6 Blockage Factor API RP 2A-LRFD
7 Scouring Effect Tollerance 3 ft
8 Riser
Jumlah 9
Diameter luar 10"
Ketebalan 0,25"
8 Conductor
Jumlah 8
Diameter luar 18"
Ketebalan 5/8"
9 Data Tanah A
10 Bater 1 : 8 XYZ
11 Barge bumper 1
EQUIPMENT LIST
SUB CELLAR
No. Description Jumlah Berat (Kip) Ukuran
1 Battery box 1 1.79 3'-3'' x 3'-3'' x 1'-0''
2 Vertical separators 1 42.00 OD 60'' x 9'-4''
3 Maintenance building 1 45.00 15'-3'' x 8'-4'' x 8'-0''
4 Controll Room 1 8.50 16'-0'' x 14'-0'' x 12'-0''
5 Power instrument storage 1 6.50 10'-0'' x 10'-0'' x 10'-0''
6 Mechanical storage 1 2.24 4'-0'' x 6'-0'' x 8'-0''
7 Transformer-1 1 12.00 9'-0'' x 5'-0'' x 6'-9''
8 Fresh water tank 1 10.50 3'-9'' x 3'-0'' x 5'-7''
9 Vertical air receiver 1 1.20 OD 38'' x 6'-4''

CELLAR DECK
No. Description Jumlah Berat (Kip) Ukuran
psf 1 Gas Cooler 1 17.50 OD 38'' x 20'-0''
psf 2 Emergency generator 1 20.16 16'-3'' x 8'-3'' x 10'-0''
psf 3 Battery box 2 1.79 3'-3'' x 3'-3'' x 1'-0''
4 Vertical separators 2 42.00 OD 60'' x 9'-4''
5 Maintenance building 1 55.00 15'-3'' x 8'-4'' x 8'-0''
6 Switch gear 1 7.84 5'-0'' x 2'-2'' x 8'-10''
7 Switch gear building 1 5.04 26'-0'' x 24'-0'' x 14'-0''
8 Switch gear building 1 6.72 7'-0'' x 18'-0'' x 13'-6''
9 Diesel fuel tank 1 58.24 10'-0'' x 10'-0'' x 10'-0''
10 Toilet 1 2.24 4'-0'' x 6'-0'' x 8'-0''
11 Transformer-1 1 12.00 9'-0'' x 5'-0'' x 6'-9''
12 Transformer-2 1 10.50 3'-9'' x 3'-0'' x 5'-7''
13 Vertical air receiver 1 1.20 OD 38'' x 6'-4''

MAIN DECK
No. Description Jumlah Berat (Kip) Ukuran
psf 1 Battery box 2 2.25 8'-8'' x 2'-8'' x 5'-0''
psf 2 Air compressor package 1 4.21 5'-8'' x 3'-6'' x 6'-0''
psf 3 Load break switch 1 1.49 4'-6'' x 2'-5'' x 6'-5''
4 Container room-1 1 27.50 40'-0'' x 10'-0'' x 20'-0'
5 Container room-2 1 27.50 40'-0'' x 10'-0'' x 20'-0'
6 Process control room 1 11.59 16'-0'' x 14'-0'' x 12'-0''
7 Transformer 3 24.12 10'-4'' x 9'-4'' x 8'-0''
8 Instrument storage 1 7.02 8'-0'' x 6'-8'' x 6'-6''
9 Fresh water tank 1 8.90 11'-6'' x 8'-0'' x 10'-0''
10 Air receiver 1 1.51 OD 36'' x 75''
11 Ansul drum chemical skid 1 3.10 9'-3'' x 5'-2'' x 4'-5''
12 Mechanical storage 1 9.83 8'-2'' x 8'-1'' x 8'-9''
13 Life capsule 1 3.37 …
14 Communication microwave 1 6.75 10'-4'' x 10'-0'' x 9'-10''
15 Communication tower 1 22.48 10'-5'' x 10'-5'' x 100'-0''
16 Fuel tank 1 16.86 5'-7'' x 4'-5'' x 4'-7''
17 Power instrument storage 1 5.57 8'-2'' x 8'-2'' x 9'-0''
18 Toilet 1 2.24 5'-0'' x 4'-0'' x 8'-0''
19 Crane (Operation) 1 25.00 12'-5.74" x 12'-7.49"
20 Flare bridge 1 … …

0.8333333

1.5
EQUIPMENTS SIZE

SUB CELLAR

No. Description Jumlah Berat (Kip) Ukuran

1 Battery box 1 1.79 3'-3'' x 3'-3'' x 1'-0''


2 Vertical separators 1 42.00 OD 60'' x 9'-4''
3 Maintenance building 1 45.00 15'-3'' x 8'-4'' x 8'-0''
4 Controll Room 1 8.50 16'-0'' x 14'-0'' x 12'-0''
5 Power instrument storage 1 6.50 10'-0'' x 10'-0'' x 10'-0''
6 Mechanical storage 1 2.24 4'-0'' x 6'-0'' x 8'-0''
7 Transformer-1 1 12.00 9'-0'' x 5'-0'' x 6'-9''
8 Fresh water tank 1 10.50 3'-9'' x 3'-0'' x 5'-7''
9 Vertical air receiver 1 1.20 OD 38'' x 6'-4''

CELLAR DECK

No. Description Jumlah Berat (Kip) Ukuran

1 Gas Cooler 1 17.50 OD 38'' x 20'-0''


2 Emergency generator 1 20.16 16'-3'' x 8'-3'' x 10'-0''
3 Battery box 2 1.79 3'-3'' x 3'-3'' x 1'-0''
4 Vertical separators 2 42.00 OD 60'' x 9'-4''
5 Maintenance building 1 55.00 15'-3'' x 8'-4'' x 8'-0''
6 Switch gear 1 7.84 5'-0'' x 2'-2'' x 8'-10''
7 Switch gear building 1 5.04 26'-0'' x 24'-0'' x 14'-0''
8 Switch gear building 1 6.72 7'-0'' x 18'-0'' x 13'-6''
9 Diesel fuel tank 1 58.24 10'-0'' x 10'-0'' x 10'-0''
10 Toilet 1 2.24 4'-0'' x 6'-0'' x 8'-0''
11 Transformer-1 1 12.00 9'-0'' x 5'-0'' x 6'-9''
12 Transformer-2 1 10.50 3'-9'' x 3'-0'' x 5'-7''
13 Vertical air receiver 1 1.20 OD 38'' x 6'-4''

MAIN DECK

No. Description Jumlah Berat (Kip) Ukuran

1 Battery box 2 2.25 8'-8'' x 2'-8'' x 5'-0''


2 Air compressor package 1 4.21 5'-8'' x 3'-6'' x 6'-0''
3 Load break switch 1 1.49 4'-6'' x 2'-5'' x 6'-5''
4 Container room-1 1 27.50 40'-0'' x 10'-0'' x 20'-0'
5 Container room-2 1 27.50 40'-0'' x 10'-0'' x 20'-0'
6 Process control room 1 11.59 16'-0'' x 14'-0'' x 12'-0''
7 Transformer 3 24.12 10'-4'' x 9'-4'' x 8'-0''
8 Instrument storage 1 7.02 8'-0'' x 6'-8'' x 6'-6''
9 Fresh water tank 1 8.90 11'-6'' x 8'-0'' x 10'-0''
10 Air receiver 1 1.51 OD 36'' x 75''
11 Ansul drum chemical skid 1 3.10 9'-3'' x 5'-2'' x 4'-5''
12 Mechanical storage 1 9.83 8'-2'' x 8'-1'' x 8'-9''
13 Life capsule 1 3.37 …
14 Communication microwave 1 6.75 10'-4'' x 10'-0'' x 9'-10''
15 Communication tower 1 22.48 10'-5'' x 10'-5'' x 100'-0''
16 Fuel tank 1 16.86 5'-7'' x 4'-5'' x 4'-7''
17 Power instrument storage 1 5.57 8'-2'' x 8'-2'' x 9'-0''
18 Toilet 1 2.24 5'-0'' x 4'-0'' x 8'-0''
19 Crane (Operation) 1 25.00 12'-5.74" x 12'-7.49"
20 Flare bridge 1 … …
NTS SIZE EQ

SUB CELLAR
SIZE
LENGTH WIDTH HEIGHT No.
inch feet inch feet inch feet
3 3 3 3 1 1
60 60 4 9 2
3 15 4 8 8 3
16 14 12 4
10 10 10 5
4 6 8 6
9 5 9 6 7
9 3 3 7 5 8
38 38 4 6 9

CELLAR DECK
SIZE
LENGTH WIDTH HEIGHT No.
inch feet inch feet inch feet
38 38 20 1
3 16 3 8 10 2
3 3 3 3 1 3
60 60 4 9 4
3 15 4 8 8 5
5 2 2 10 8 6
26 24 14 7
7 18 6 13 8
10 10 10 9
4 6 8 10
4 6 8 11
9 5 9 6 12
38 38 4 6 13

MAIN DECK
SIZE
LENGTH WIDTH HEIGHT No.
inch feet inch feet inch feet
8 8 8 2 5 1
8 5 6 3 6 2
6 4 5 2 5 6 3
40 10 20 4
40 10 20 5
16 14 12 6
4 10 4 9 8 7
8 8 6 6 6 8
6 11 8 10 9
36 36 75 10
3 9 2 5 5 4 11
2 8 1 8 9 8 12
13
4 10 10 10 9 14
5 10 5 10 100 15
7 5 5 4 7 4 16
2 8 2 8 9 17
5 4 8 18
5.74 12 7.49 12 19
20
EQUIPMENTS SIZE (cont)

SUB CELLAR
SIZE
Description Jumlah Berat (Kip) Ukuran LENGTH WIDTH (ft)
(ft)
Battery box 1 1.79 3'-3'' x 3'-3'' x 1'-0'' 3.25 3.25
Vertical separators 1 42.00 OD 60'' x 9'-4'' 5.00 5.00
Maintenance building 1 45.00 15'-3'' x 8'-4'' x 8'-0'' 15.25 8.33
Controll Room 1 8.50 16'-0'' x 14'-0'' x 12'-0'' 16.00 14.00
Power instrument storage 1 6.50 10'-0'' x 10'-0'' x 10'-0'' 10.00 10.00
Mechanical storage 1 2.24 4'-0'' x 6'-0'' x 8'-0'' 4.00 6.00
Transformer-1 1 12.00 9'-0'' x 5'-0'' x 6'-9'' 9.00 5.00
Fresh water tank 1 10.50 3'-9'' x 3'-0'' x 5'-7'' 3.75 3.00
Vertical air receiver 1 1.20 OD 38'' x 6'-4'' 3.17 3.17

CELLAR DECK
SIZE
Description Jumlah Berat (Kip) Ukuran LENGTH WIDTH (ft)
(ft)
Gas Cooler 1 17.50 OD 38'' x 20'-0'' 3.17 3.17
Emergency generator 1 20.16 16'-3'' x 8'-3'' x 10'-0'' 16.25 8.25
Battery box 2 1.79 3'-3'' x 3'-3'' x 1'-0'' 3.25 3.25
Vertical separators 2 42.00 OD 60'' x 9'-4'' 5.00 5.00
Maintenance building 1 55.00 15'-3'' x 8'-4'' x 8'-0'' 15.25 8.33
Switch gear 1 7.84 5'-0'' x 2'-2'' x 8'-10'' 5.00 2.17
Switch gear building 1 5.04 26'-0'' x 24'-0'' x 14'-0'' 26.00 24.00
Switch gear building 1 6.72 7'-0'' x 18'-0'' x 13'-6'' 7.00 18.00
Diesel fuel tank 1 58.24 10'-0'' x 10'-0'' x 10'-0'' 10.00 10.00
Toilet 1 2.24 4'-0'' x 6'-0'' x 8'-0'' 4.00 6.00
Transformer-1 1 12.00 9'-0'' x 5'-0'' x 6'-9'' 4.00 6.00
Transformer-2 1 10.50 3'-9'' x 3'-0'' x 5'-7'' 9.00 5.00
Vertical air receiver 1 1.20 OD 38'' x 6'-4'' 3.17 3.17

MAIN DECK
SIZE
Description Jumlah Berat (Kip) Ukuran LENGTH WIDTH (ft)
(ft)
Battery box 2 2.25 8'-8'' x 2'-8'' x 5'-0'' 8.67 2.67
Air compressor package 1 4.21 5'-8'' x 3'-6'' x 6'-0'' 5.67 3.50
Load break switch 1 1.49 4'-6'' x 2'-5'' x 6'-5'' 4.50 2.42
Container room-1 1 27.50 40'-0'' x 10'-0'' x 20'-0' 40.00 10.00
Container room-2 1 27.50 40'-0'' x 10'-0'' x 20'-0' 40.00 10.00
Process control room 1 11.59 16'-0'' x 14'-0'' x 12'-0'' 16.00 14.00
Transformer 3 24.12 10'-4'' x 9'-4'' x 8'-0'' 10.33 9.33
Instrument storage 1 7.02 8'-0'' x 6'-8'' x 6'-6'' 8.00 6.67
Fresh water tank 1 8.90 11'-6'' x 8'-0'' x 10'-0'' 11.50 8.00
Air receiver 1 1.51 OD 36'' x 75'' 3.00 3.00
Ansul drum chemical skid 1 3.10 9'-3'' x 5'-2'' x 4'-5'' 9.25 5.17
Mechanical storage 1 9.83 8'-2'' x 8'-1'' x 8'-9'' 8.17 8.08
Life capsule 1 3.37 … 0.00 0.00
Communication microwave 1 6.75 10'-4'' x 10'-0'' x 9'-10'' 10.33 10.00
Communication tower 1 22.48 10'-5'' x 10'-5'' x 100'-0'' 10.42 10.42
Fuel tank 1 16.86 5'-7'' x 4'-5'' x 4'-7'' 5.58 4.42
Power instrument storage 1 5.57 8'-2'' x 8'-2'' x 9'-0'' 8.17 8.17
Toilet 1 2.24 5'-0'' x 4'-0'' x 8'-0'' 5.00 4.00
Crane (Operation) 1 25.00 12'-5.74" x 12'-7.49" 12.48 12.62
Flare bridge 1 … … 0.00 0.00
EQUIPMENTS AREAS
SIZE
HEIGHT SUB CELLAR
(ft) No. Description Amount
1.00 1 Battery box 1
9.33 2 Vertical separators 1
8.00 3 Maintenance building 1
12.00 4 Controll Room 1
10.00 5 Power instrument storage 1
8.00 6 Mechanical storage 1
6.75 7 Transformer-1 1
5.58 8 Fresh water tank 1
6.33 9 Vertical air receiver 1

SIZE
HEIGHT CELLAR DECK
(ft) No. Description Amount
20.00 1 Gas Cooler 1
10.00 2 Emergency generator 1
1.00 3 Battery box 2
9.33 4 Vertical separators 2
8.00 5 Maintenance building 1
8.83 6 Switch gear 1
14.00 7 Switch gear building 1
13.50 8 Switch gear building 1
10.00 9 Diesel fuel tank 1
8.00 10 Toilet 1
8.00 11 Transformer-1 1
6.75 12 Transformer-2 1
6.33 13 Vertical air receiver 1

SIZE
HEIGHT MAIN DECK
(ft) No. Description Amount
5.00 1 Battery box 2
6.00 2 Air compressor package 1
6.42 3 Load break switch 1
20.00 4 Container room-1 1
20.00 5 Container room-2 1
12.00 6 Process control room 1
8.00 7 Transformer 3
6.50 8 Instrument storage 1
10.00 9 Fresh water tank 1
6.25 10 Air receiver 1
4.42 11 Ansul drum chemical skid 1
8.75 12 Mechanical storage 1
0.00 13 Life capsule 1
9.83 14 Communication microwave 1
100.00 15 Communication tower 1
4.58 16 Fuel tank 1
9.00 17 Power instrument storage 1
8.00 18 Toilet 1
0.00 19 Crane (Operation) 1
0.00 20 Flare bridge 1
ENTS AREAS

Weigth (kips) Area (ft 2) Luas Yang Digunakan Area (ft2)


1.79 10.56 Subcellar Deck 569.41
42 19.63 Cellar Deck 1260.91
45 127.08 Main Deck 1921.19
8.5 224.00
6.5 100.00
2.24 24.00
12 45.00
10.5 11.25
1.2 7.88
129.73

Weigth (kips) Area (ft 2)


17.5 7.88
20.16 134.06
1.79 10.56
42 19.63
55 127.08
7.84 10.83
5.039 624.00
6.72 126.00
58.24 100.00
2.24 24.00
12 24.00
10.5 45.00
1.2 7.87
240.229

Weigth (kips) Area (ft 2)


2.25 23.11
4.21 19.83
1.49 10.88
27.50 400.00
27.50 400.00
11.59 224.00
24.12 96.44
7.02 53.33
8.90 92.00
1.51 7.07
3.10 47.79
9.83 66.01
3.37 0.00
6.75 103.33
22.48 108.51
16.86 24.66
5.57 66.69
2.24 20.00
25 157.53
0 0
211.30
DECK SIZE
Deck Area (ft2)
Cellar Deck 1800 ft2
Main Deck 1800 ft2
Sub Cellar Deck 1200 ft2

Possible Size for Cellar Deck (1800 ft2) Ukuran Deck Length Width
Length Width Area (ft2) Subcellar 30 40
45 40 1800 Cellar Deck 45 40
Main Deck 45 40
Possible Size for Main Deck (1800 ft2) 9
Length Width Area (ft2)
45 40 1800

Possible Size for Subcellar (1200 ft2)


Length Width Area (ft2)
40 30 1200
Area (ft2) Selisih
1200 0
1800 0
1800 0
COG

SUB CELLAR
SIZE
No. Description Jumlah Berat (Kip) LENGTH WIDTH (ft)
(ft)
1 Battery box 1 1.79 3.25 3.25
2 Vertical separators (Tubular) 1 42.00 5.00 5.00
3 Maintenance building 1 45.00 15.25 8.33
4 Controll Room 1 8.50 16.00 14.00
5 Power instrument storage 1 6.50 10.00 10.00
6 Mechanical storage 1 2.24 4.00 6.00
7 Transformer-1 1 12.00 9.00 5.00
8 Fresh water tank 1 10.50 3.75 3.00
9 Vertical air receiver (Tubular) 1 1.20 3.17 3.17
TOTAL 129.73

COG
CELLAR DECK
SIZE
No. Description Jumlah Berat (Kip) LENGTH WIDTH (ft)
(ft)
1 Gas Cooler (Tubular) 1 17.50 3.17 3.17
2 Emergency generator 1 20.16 16.25 8.25
3 Battery box-1 1 1.79 3.25 3.25
3 Battery box-2 1 1.79 3.25 3.25
4 Vertical separators-1 (Tubular) 1 42.00 5.00 5.00
4 Vertical separators-2 (Tubular) 1 42.00 5.00 5.00
5 Maintenance building 1 55.00 15.25 8.33
6 Switch gear 1 7.84 5.00 2.17
7 Switch gear building 1 5.04 26.00 24.00
8 Switch gear building 1 6.72 7.00 18.00
9 Diesel fuel tank 1 58.24 10.00 10.00
10 Toilet 1 2.24 4.00 6.00
11 Transformer-1 1 12.00 4.00 6.00
12 Transformer-2 1 10.50 9.00 5.00
13 Vertical air receiver (Tubular) 1 1.20 3.17 3.17
TOTAL 158.78

COG
MAIN DECK
SIZE
No. Description Jumlah Berat (Kip) LENGTH WIDTH (ft)
(ft)
1 Battery box-1 1 2.25 8.67 2.67
1 Battery box-2 1 2.25 8.67 2.67
2 Air compressor package 1 4.21 5.67 3.50
3 Load break switch 1 1.49 4.50 2.42
4 Container room-1 1 27.50 40.00 10.00
5 Container room-2 1 27.50 40.00 10.00
6 Process control room 1 11.59 16.00 14.00
7 Transformer-1 1 24.12 10.33 9.33
7 Transformer-2 1 24.12 10.33 9.33
7 Transformer-3 1 24.12 10.33 9.33
8 Instrument storage 1 7.02 8.00 6.67
9 Fresh water tank 1 8.90 11.50 8.00
10 Air receiver (Tubular) 1 1.51 3.00 3.00
11 Ansul drum chemical skid 1 3.10 9.25 5.17
12 Mechanical storage 1 9.83 8.17 8.08
13 Life capsule 1 3.37 0.00 0.00
14 Communication microwave 1 6.75 10.33 10.00
15 Communication tower 1 22.48 10.42 10.42
16 Fuel tank 1 16.86 5.58 4.42
17 Power instrument storage 1 5.57 8.17 8.17
18 Toilet 1 2.24 5.00 4.00
19 Crane (Operation) 1 25.00 12.48 12.62
20 Flare bridge 1 … 0.00 0.00
21 Heliport S-5TT 1 7.20 37.50 37.50
TOTAL 92.11

COG
Ukuran Deck Length Width Area (ft2) Selisih
Subcellar 30 40 1200 0
Cellar Deck 45 40 1800 0
Main Deck 45 40 1800 0

SIZE Moment to Deck CG


Coordinate COG (kips.ft)
HEIGHT (ft)
X Y Wx Wy
1.00 -3 1.625 -5.37 2.90875
9.33 -4.5 2.5 -189 105
8.00 7.375 -5.16 331.875 -232.2
12.00 7 8 59.5 68
10.00 -6 10 -39 65
8.00 -5 -2.5 -11.2 -5.6
6.75 -5 -7 -60 -84
5.58 -9.5 3.5 -99.75 36.75
6.33 10.5 -12 12.6 -14.4
-0.345 -58.54125
Xo Yo
0.00 -0.45

SIZE Moment to Deck CG


Coordinate COG (kips.ft)
HEIGHT (ft)
X Y Wx Wy
20.00 -7.5 -15.21 -131.25 -266.175
10.00 17.6 0.875 354.816 17.64
1.00 17.5 -8.875 31.325 -15.88625
1.00 17.5 -12.125 31.325 -21.70375
9.33 -3.4495 -16.5 -144.879 -693
9.33 3.4495 -16.5 144.879 -693
8.00 -18.335 7.375 -1008.425 405.625
8.83 -10 -10.2841 -78.4 -80.627344
14.00 -0.8 2.8 -4.0312 14.1092
13.50 -18 -10.25 -120.96 -68.88
10.00 17.5 15 1019.2 873.6
8.00 5 18 11.2 40.32
8.00 -5 18 -60 216
6.75 -17 17.5 -178.5 183.75
6.33 7.5 -15.21 9 -18.252
-124.7002 -106.48014
Xo Yo
-0.79 -0.67
SIZE Moment to Deck CG
Coordinate COG (kips.ft)
HEIGHT (ft)
X Y Wx Wy
5.00 17.5 -15.58 39.29408 -34.982958
5.00 17.5 -18.25 39.29408 -40.978112
6.00 17.5 17.7482 73.75872 74.8048294
6.42 9.98 10.9 14.8975053 16.2708224
20.00 -17.5 0 -481.25 0
20.00 17.5 0 481.25 0
12.00 5.19 1 60.1555046 11.590656
8.00 17.5 -2.41 422.13696 -58.13429
8.00 -17.5 -4.1016 -422.13696 -98.939255
8.00 -17.5 -14.4316 -422.13696 -348.12067
6.50 17.5 -10.91 122.9312 -76.638822
10.00 -8 -8 -71.179674 -71.179674
6.25 10 -16 15.0528 -24.08448
4.42 17.5 5.335 54.265344 16.5431777
8.75 17.5 11.96 172.10368 117.620572
0.00 0 0 0 0
9.83 -17.5 14.4 -118.10176 97.1808768 53
100.00 -7 3.79 -157.35194 85.1948339 2809
4.58 10 -11 168.59136 -185.4505 1404.5
9.00 -17.5 5.15 -97.532736 28.7024909 37.4766594029
8.00 5 -16.5 11.2 -36.96
0.00 0 16 0 400
0.00 0 0 0 0
0.00 0 -16 0 -115.2
-94.758792 -242.7605
Xo Yo
-1.03 -2.64
ENVELOPE (MAIN DECK)

Secondary Girder
Eq 1 1 2 3 4 5 6 7 7 7
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
TABLE OF AREA AND LOADS (KIPS)

ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
SG1 13.75 24.121 12.053
SG2
SG3
SG4
SG5 5.7953
SG6 2.9308
SG7
SG8 2.249 1.1245 4.2148 13.75 24.122
Total 2.249 1.1245 4.2148 0 13.75 13.75 8.7261 24.122 24.121 12.053
0.3554
Main Girder
Eq 1 1 2 3 4 5 6 7 7 7
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
MG1
MG2 1.4948 2.8785
MG3 1.1245 6.875 6.875 12.07
MG4 6.875 6.875
Total 0 1.1245 0 1.4948 13.75 13.75 2.8785 0 0 12.07

Secondary Girder
Eq 1 1 2 3 4 5 6 7 7 7
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
SG1 480 123.96 123.96
TABLE OF LENGTH (INCH)

SG2
SG3
SG4
SG5 192
SG6 192
SG7
SG8 32.04 32.04 42 480 123.96

Main Girder
Eq 1 1 2 3 4 5 6 7 7 7
TABLE OF L
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
MG1
MG2 29.04 192
MG3 104.04 120 120 144.84
MG4 120 120

Secondary Girder
Eq 1 1 2 3 4 5 6 7 7 7
TABLE OF DISTRIBUTED LOADS (KIPS/INCH)

kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
SG1 0.0286 0.1946 0.0972
SG2
SG3
SG4
SG5 0.0302
SG6 0.0153
SG7
SG8 0.0702 0.0351 0.1004 0.0286 0.1946
Total 0.0702 0.0351 0.1004 0.0000 0.0286 0.0286 0.0454 0.1946 0.1946 0.0972

Main Girder
Eq 1 1 2 3 4 5 6 7 7 7
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
MG1
MG2 0.0515 0.015
MG3 0.01081 0.0573 0.0573 0.0833
MG4 0.0573 0.0573
Total 0 0.01081 0 0.0515 0.1146 0.1146 0.015 0 0 0.0833
PE (MAIN DECK)

8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
3.3754 5.5733

3.6146 8.095
6.9156 6.2489
6.2489

7.0246 3.1008 9.8339


7.0246 3.6146 0 3.1008 9.8339 0 3.3754 15.011 0 5.5733 0 12.498 0

8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
5.2829 7.4683
0.7532 16.862
0.7532 1.671
3.3732 12.502
0 5.2829 1.5063 0 0 0 3.3732 7.4683 16.862 0 1.671 12.502 0

8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
123.96 98.004

138 125
125 151.44
151.44

80.04 62.004 96.96

8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
138 125
36 66.996
36 60
120 149.76

8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
0.0272 0.0569

0.0262 0.0648
0.0553 0.0413
0.0413

0.0878 0.0500 0.1014


0.0878 0.0262 0.0000 0.0500 0.1014 0.0000 0.0272 0.1201 0.0000 0.0569 0.0000 0.0825 0.0000

8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
0.0383 0.0597
0.0209 0.2517
0.0209 0.0279
0.0281 0.0835
0 0.0383 0.0418 0 0 0 0.0281 0.0597 0.2517 0 0.0279 0.0835 0
1 Battery Box 6 Process Control Room 9
MAX Girder Area (ft2) Girder Area (ft2)
SG8 23.1485 SG5 112
58.87257 TOTAL 23.1485 SG6 56.64
0 MG2 55.63
11.70957 1 Battery Box TOTAL 224.27
13.16444 Girder Area (ft2) 10
12.04419 SG8 11.57425 7 Transformer
2.93078 MG3 11.57425 Girder Area (ft2)
0 TOTAL 23.1485 SG8 96.44
65.41973 TOTAL 96.44
65.41973 2 Air Compressor
Girder Area (ft2) 7 Transformer-1 11
SG8 19.833 Girder Area (ft2)
TOTAL 19.833333 SG1 96.44
MAX TOTAL 96.44
3 Load Break Switch
12.75117 Girder Area (ft2) 7 Transformer-2 12
21.98827 MG2 10.89 Girder Area (ft2)
29.36868 TOTAL 10.89 SG1 48.1894
29.62551 MG3 48.2550
29.62551 4 Container-1 TOTAL 96.4444
Girder Area (ft2) 14
SG1 200 8 Instrument Storage
MG3 100 Girder Area (ft2)
MG4 100 SG8 53.333
TOTAL 400 TOTAL 53.333

5 Container-2
Girder Area (ft2)
SG8 200
MG3 100
MG4 100
TOTAL 400 IN FEET
SECONDARY GIRDER
L W Eq 1 1 2
1 Battery box 8.6666667 2.6667 SG1
2 Air compressor package 5.6666667 3.5 SG2
3 Load break switch 4.5 2.4167 SG3
4 Container room-1 40 10 SG4
5 Container room-2 40 10 SG5
6 Process control room 16 14 SG6
7 Transformer 10.333333 9.3333 SG7
8 Instrument storage 8 6.6667 SG8 2.67 2.67 3.5
9 Fresh water tank 11.5 8
10 Air receiver 3 3 MAIN GIRDER
11 Ansul drum chemical skid 9.25 5.1667 Eq 1 1 2
MAX 12 Mechanical storage 8.1666667 8.0833 MG1
13 Life capsule 0 0 MG2
0.404563 14 Communication microwave 10.333333 10 MG3 8.67
0 15 Communication tower 10.416667 10.417 MG4
0.090952 16 Fuel tank 5.5833333 4.4167
0.096587 17 Power instrument storage 8.1666667 8.1667
0.071447 18 Toilet 5 4
0.015264 19 Crane (Operation) 12.478333 12.624
0 20 Flare bridge 0 0
0.66808
0.66808

MAX

0.098028
0.339071
0.257497
0.226176
0.339071
Fresh Water Tank 15 Communication Tower
Girder Area (ft2) Girder Area (ft2)
SG3 37.375 SG3 39.075
MG1 54.625 SG4 33.38
TOTAL 92 MG1 36.05
TOTAL 108.51
Air Receiver
Girder Area (ft2) 16 Fuel Tank
MG2 3.535 Girder Area (ft2)
MG3 3.535 MG2 24.6636
TOTAL 7.07 TOTAL 24.6636

Ansul Drum 17 Power Inst


Girder Area (ft2) Girder Area (ft2)
SG8 47.79 SG1 66.694
TOTAL 47.79 TOTAL 66.694

Mech Storage 18 Toilet


Girder Area (ft2) Girder Area (ft2)
SG8 66.01 MG3 20
TOTAL 66.01 TOTAL 20

Communication Mic 19 Crane


Girder Area (ft2) Girder Area (ft2)
SG1 51.68 SG4 39.375
MG4 51.65 SG5 39.375
TOTAL 103.33 MG4 78.77855972
TOTAL 157.53

3 4 5 6 7 7 7 8 9 10
40 10.33 10.33
11.5

16
16

40 10.33 6.67

3 4 5 6 7 7 7 8 9 10
11.5
2.42 16 3
10 10 12.07 3
10 10
11 12 13 14 15 16 17 18 19 20
10.33 8.167
10.4167
10.4167
12.62
12.62

5.167 8.08

11 12 13 14 15 16 17 18 19 20
10.4167
5.583
5
10 12.48
MAIN DECK SCANTLINGS (Gratings)
a. Deck Flooring

Spacing between secondary girder is 4 ft


Using A36 Steel with Yield Stress 36 ksi

Live Load (Operat.)= -100 psf = -0.000694 ksi


Piping Load = -60 psf = -0.000417 ksi +
= -160 psf = -0.001111 ksi
TOTAL
= -288000 pounds = -288 kips

Main Deck Area = 1800 ft2


Panel Size = 128 ft2

Length a = 32 ft
Width b = 4 ft
a/b = 8
q = -0.0011 ksi

Allowable Stress = 0.6 x Yield Stress (AISC ASD)


(σmax) = 21.6 ksi

Formulas for Stress and Strain (Roark, 2002)


From interpolation we get,
β1 = 0.750

t2 = -0.089 in
t = 0.298 in

From the AISC Manual 13th Ed. table I-18 (page 117/2181), the available nominal
thicnkess is,
t = 3/ 8 in
CHECK 15.05 ksi O.K. !
= 16.37 psf
Wplate
= 29.466 kips The stress should be less than 21.6 ksi

So the linear weight for the respective plate (per inch) is,

qplate = -0.0001 ksi


MAIN DECK SCANTLINGS (Secondary Girder)
b. Secondary Girder (Flushed Beam)

Using force equation derived from statically indeterminate problem (using method of
superposition) we can determine the maximum moment occurred along the beam. First
we need to choose one of the most "intense" secondary girder span which supports many
equipment (heaviest yet smallest equipment). Later we calculate maximum moment
happened because of each equipment, Plate, Live Load, Pipe Load, and then sum them
up. This total moment will be used as our criteria. (Dimas M., 2016)

MOST "INTENSE" GIRDER

SECONDARY
GIRDER 8

EQUIPMENT LOADS
(1) Battery Box = 0.070194 kips/in
(1) Battery Box = 0.070194 kips/in
(3) Load Break S = 0.051474 kips/in
(7) Transformer = 0.194596 kips/in
(11) Ansul Drum = 0.050009 kips/in
(12) Mech Storage = 0.101422 kips/in
Span L = 384 in (5) Container R-2 = 0.029 kips/in

Bending and Reactions Equations for a Beam Fixed at Both Ends with Partial
Uniform Loading

Description:

W = load total (kips)


w or q = unit load (kips/in)
a,b,c,d,L = distances (inches)
M = Moments (kips-in)
R = Reaction (kips)

Note: This Eq. is from http://www.engineersedge.com/beam_bending/beam_bending52.htm where it is a simplification of


equations from Chap. 8 - Roark's Formulas for Stress & Strain. [Jamhari, 2017]

NON EQUIPMENT LOAD (ne)


Live Load qL = -0.033 kips/in
Piping Load qp = -0.020 kips/in
Plate Self Weight wp = -0.005 kips/in +
T O TAL qne = -0.059 kips/in

i. Distributed Load of Control Room-2 (5)


a = 0 in
b = 384 in
c = 384 in
d = 192 in
q = -0.029 kips/in

MA = 352 kips-in RA = 5.5 kips


CCW(+)
MB = -352 kips-in RB = 5.5 kips

ii. Distributed Load of Battery Box (1)


a = 7.92 in
b = 39.96 in
c = 32.04 in
d = 360.06 in
q = -0.070 kips/in

MA = 46.4288 kips-in RA = 2.220448 kips


CCW(+)
MB = -3.55472 kips-in RB = 0.02856 kips

iii. Distributed Load of Battery Box (1)


a = 39.96 in
b = 72 in
c = 32.04 in
d = 328.02 in
q = -0.070 kips/in

MA = 91.0846 kips-in RA = 2.116782 kips


CCW(+)
MB = -15.9601 kips-in RB = 0.132226 kips

iv. Distributed Load of Load Breaks Storage (3)


a = 72 in
b = 101.04 in
c = 29.04 in
d = 297.48 in
q = -0.051 kips/in

MA = 77.2538 kips-in RA = 1.300163 kips


CCW(+)
MB = -22.6627 kips-in RB = 0.194632 kips

v. Distributed Load of Transformer (7)


a = 101.04 in
b = 225 in
c = 123.96 in
d = 220.98 in
q = -0.195 kips/in

MA = 1243.83 kips-in RA = 14.67616 kips


CCW(+)
MB = -938.692 kips-in RB = 9.445948 kips

vi. Distributed Load of Ansul Drum (11)


a = 225 in
b = 287.04 in
c = 62.04 in
d = 127.98 in
q = -0.050 kips/in

MA = 88.2306 kips-in RA = 0.810905 kips


CCW(+)
MB = -173.91 kips-in RB = 2.291664 kips

vii. Distributed Load of Mechanical Storage (12)


a = 287.04 in
b = 384 in
c = 96.96 in
d = 48.48 in
q = -0.101 kips/in
MA = 65.0548 kips-in RA = 0.547818 kips
CCW(+)
MB = -331.441 kips-in RB = 9.286098 kips

viii. Distributed Load I (qne)


a = 0 in
b = 384 in
c = 384 in
d = 192 in
qne = -0.059 kips/in

MA = 65.0548 kips-in RA = 0.547818 kips


CCW(+)
MB = -331.441 kips-in RB = 9.286098 kips

Then, we sum up the moment because of the equipments (superposition). The maximum
of MA and MB will be used as our criteria.

MA total = 2028.9 kips-in Max. M = 2028.9 kips-in


MB total = -2169.7 kips-in Moment This is our criteria (absolute)

VA total = 27.7 kips


VB total = 36.2 kips

BEAM PROFILE SELECTION

Maximum Bending Moment


M = 2028.9 kips-in CCW (+)

Allowable Stress Criteria (σmax) = 0.6 x Yield Stress


(AISC ASD) (σmax) = 21.6 ksi

Minimum Modulus of Smin = Mmax/σa


Sectional Area (Smin) Smin = 93.93251 in3

AISC Manual 13th


Selected Beam Profile W18X60 Edition. Table 1-1 W 1
Modulus of Sectional Area S = 108 in3
2
Linear Weight of Beam WS = -60 lb/f 3
Self-Weight (SW) of SG WS = -0.005 kips/in 4
Reaction b'cuz of the SW RS = -0.960 kips 5
Simplification into Distributed qRs = -0.020 kips/in
Load
Simplification into Distributed qRs = -0.020 kips/in
Load

CHECK THE STRENGTH OF SELECTED PROFILE

Total maximum flexure stress occurred along the beam (including beam self weight)
should be less than the allowable stress of A36 ASD steel.

Maximum moment because of


= 216 kips-in
self-weight

Max. Flexure Stress σ = M/S


= 20.79 ksi < 21.6 ksi

CHECK O.K. !
MAIN DECK SCANTLINGS (Main Girder)
e. Main Girder (Flushed Beam)

Main girder should have the capacity to support both equipment and secondary girder (including
gratings). By determining the moment cause by equipment on the most "intense" girder, added
with secondary girder's highest reactions (R) along the main girder, including its self weight.*

There are 3 main loads in this case, (1) Reactions from each of Secondary Girder, (2)
Reactions from Self-Weight of Secondary Girder, (3) Equipments.*

This symetrically loaded and statically indeterminate problem can be solved using the
displacement method, by determining the moment at one end for each of reactions that occurred
along the span, and then by superposition, we sum them up. This total moment will be used as ou
criteria.*

Multiple Reactions (Point Loads) from Each of Secondary Girder:


LOAD CASE CONFIGURATION
P P P
5 ft

A B
Longest Main Girder Span (L) = 60 ft

LOAD CASE SIMPLIFICATION PER REACTION Moment at A

P M_B=(Pba^2)
a b /L^2
A B M_A=−
(Pab^2)/L^2

Reaction from Secondary Girder Rw = -36.2 kips


Reaction from Secondary Self-Weight Rs = -0.960 kips +
T O TAL P = -37.1 kips

Number of Secondary Between Main Girder = 4


Secondary Girder Span = 5 ft
Main Girder Span = 20 ft

MOMENT CALCULATION
No. P (kips) a (ft) b (ft) L (ft) MA(kips.ft) MB (kips.ft)
SG3 -37.13 2.5 17.5 20 71.06 -10.15
SG4 -37.13 7.5 12.5 20 108.77 -65.26
SG5 -37.13 12.5 7.5 20 65.26 -108.77
SG6 -37.13 17.5 2.5 20 10.15 -71.06
TOTAL 108.77 -108.77
CCW (+) MPmax 1305.2 -1305
MPAmax MPBmax

MOST "INTENSE" GIRDER

MAIN GIRDER 4

EQUIPMENT LOADS
(15) Comm Tow =
Span L = 240 in (19) Crane =

Bending and Reactions Equations for a Beam Fixed at Both Ends with Partial Uniform
Loading

Description:

W =
w or q =
a,b,c,d,L =
M =
R =

i. Distributed Load of Communiaction Tower (15)


a = 0 in
b = 109.92 in
c = 109.92 in
d = 185.04 in
q = 0.000 kips/in

MA = 0 kips-in
CCW(+)
MB = 0 kips-in

ii. Distributed Load of Crane (19)


a = 114.24 in
b = 240 in
c = 125.76 in
d = 62.88 in
q = -0.083 kips/in

MA = 68.1936 kips-in
CCW(+)
MB = -447.83 kips-in

Then, we sum up the moment because of the equipments (superposition) AND because of multiple
Reactions (P). The maximum of MA and MB will be used as our criteria.

MA total = 1373 kips-in Maximum M= 1753.0


MB total = -1753 kips-in Moment This is our criteria (absolute)

BEAM PROFILE SELECTION

Maximum Bending Moment Mmax = 1753 kips-in

Allowable Stress Criteria (σa) = 0.6 x Yield Stress


(AISC ASD) (σa) = 21.6 ksi

Minimum Modulus of Smin = Mmax/σa


Sectional Area (Smin) Smin = 81.15804 in3

AISC Manual 13th Edition.


Selected Beam Profile W24X55 Table 1-1 W
Modulus of Sectional Area S = 114 in3
Linear Weight of Beam WM = -55 lb/f

CHECK THE STRENGTH OF SELECTED PROFILE


Total Maximum flexure stress occurred along the beam (including beam self-weight)
should be less than the allowable stress of A36 ASD steel.

Maximum moment because of self-


= 22 kips-in
weight

Max. Total Flexure Stress σ = M/S


= 15.57 ksi <

CHECK O.K. !

OPSI S W
W24X55 114 -55
W21X55 110 -55
W21X57 111 -57
W18X60 108 -60
W16X67 117 -67
er)

secondary girder (including


st "intense" girder, added
ncluding its self weight.*

ondary Girder, (2)


.*

be solved using the


h of reactions that occurred
l moment will be used as our

Moment at A

M_B=(Pba^2)
/L^2
M_A=−
(Pab^2)/L^2
MB (kips.ft)
-10.15
-65.26
-108.77
-71.06
-108.77 kips-ft
-1305 kips-in
MPBmax

PMENT LOADS
0 kips/in
0.083 kips/in

nds with Partial Uniform

Description:

load total (kips)


unit load (kips/in)
distances (inches)
Moments (kips-in)
Reaction (kips)
ND because of multiple

1753.0 kips-in
his is our criteria (absolute)

CCW (+)

OPSI S W
1 W24X55 114 -55
2 W21X55 110 -55
3 W21X57 111 -57
4 W18X60 108 -60
5 W18X65 117 -65
5 W16X67 117 -67
6 W14X74 112 -74

D PROFILE
uding beam self-weight)

21.6 ksi
ENVELOPE (CE

Secondary Girder
Eq 1 2 3 3 4 4 5 6
kips 17.5 20.16 1.79 1.79 42 42 55 7.84
TABLE OF AREA AND LOADS (KIPS)

ft2 7.875798 134.0625 10.5625 10.5625 19.625 19.625 127.0833 10.83333


SG1 55
SG2
SG3 8.75
SG4 21
SG5 21
SG6
SG7
SG8 20.16564 1.79 1.79
Total 8.75 20.16564 1.79 1.79 21 21 55 0

Main Girder
Eq 1 2 3 3 4 4 5 6
kips 17.5 20.16 1.79 1.79 42 42 55 7.84
ft2 7.875798 134.0625 10.5625 10.5625 19.625 19.625 127.0833 10.83333
MG1 8.288265
MG2
MG3 8.75 21 21
MG4
Total 8.75 0 0 0 21 21 0 8.288265

Secondary Girder
Eq 1 2 3 3 4 4 5 6
kips 17.5 20.16 1.79 1.79 42 42 55 7.84
ft2 7.875798 134.0625 10.5625 10.5625 19.625 19.625 127.0833 10.83333
SG1 183
TABLE OF LENGTH (INCH)

SG2
SG3 38.004
SG4 55.5
SG5 55.5
SG6
SG7
SG8 195 39 39

Main Girder
Eq 1 2 3 3 4 4 5 6
TABLE OF L
kips 17.5 20.16 1.79 1.79 42 42 55 7.84
ft2 7.875798 134.0625 10.5625 10.5625 19.625 19.625 127.0833 10.83333
MG1 26.04
MG2
MG3 32.9784 58.788 58.788
MG4

Secondary Girder
Eq 1 2 3 3 4 4 5 6
TABLE OF DISTRIBUTED LOADS (KIPS/INCH)

kips 17.5 20.16 1.79 1.79 42 42 55 7.84


ft2 7.875798 134.0625 10.5625 10.5625 19.625 19.625 127.0833 10.83333
SG1 0.3005
SG2
SG3 0.2302
SG4 0.3784
SG5 0.3784
SG6
SG7
SG8 0.1034 0.0459 0.0459
Total 0.2302 0.1034 0.0459 0.0459 0.3784 0.3784 0.3005 0.0000

Main Girder
Eq 1 2 3 3 4 4 5 6
kips 17.5 20.16 1.79 1.79 42 42 55 7.84
ft2 7.875798 134.0625 10.5625 10.5625 19.625 19.625 127.0833 10.83333
MG1 0.3183
MG2
MG3 0.2653 0.3572 0.3572
MG4
Total 0.265325 0 0 0 0.357216 0.357216 0 0.31829
ENVELOPE (CELLAR DECK)

7 8 9 10 11 12 13 1
5.039 6.72 58.24 2.24 12 10.5 1.2 MAX
624 126 100 24 24 45 7.871806
3.36 5.25 63.61
0.49421 0.49421
0.726779 6 15.47678
0.969038 6 27.96904 2
0.969038 1.12 23.08904
0.726779 1.12 0.6 2.446779
0
29.12 52.86564
3.885844 3.36 29.12 2.24 12 5.25 0.6 63.61 3

7 8 9 10 11 12 13
5.039 6.72 58.24 2.24 12 10.5 1.2 MAX
624 126 100 24 24 45 7.871806 3
0.484519 8.772785
0.668637 0.668637
3.36 0.6 54.71
29.12 5.25 34.37
1.153156 3.36 29.12 0 0 5.25 0.6 54.71 4

7 8 9 10 11 12 13
5.039 6.72 58.24 2.24 12 10.5 1.2
624 126 100 24 24 45 7.871806
216 60 4
288
288 48
288 48
288 48
288 48 38.004

120

7 8 9 10 11 12 13
5.039 6.72 58.24 2.24 12 10.5 1.2
624 126 100 24 24 45 7.871806 1
288 2
288 3
84 32.9784 4
120 108 5
6
7
7 8 9 10 11 12 13 8
5.039 6.72 58.24 2.24 12 10.5 1.2 MAX 9
624 126 100 24 24 45 7.871806 10
0.0156 0.0875 0.403602 11
0.0017 0.001716 12
0.0025 0.1250 0.357762 13
0.0034 0.1250 0.506743
0.0034 0.0233 0.405076
0.0025 0.0233 0.0158 0.041645
0
0.2427 0.437875
0.0135 0.0156 0.2427 0.0467 0.2500 0.0875 0.0158 0.506743

7 8 9 10 11 12 13
5.039 6.72 58.24 2.24 12 10.5 1.2 MAX
624 126 100 24 24 45 7.871806
0.0017 0.319972
0.0023 0.002322
0.0400 0.0182 1.0380
0.2427 0.0486 0.291278
0.004004 0.04 0.242667 0 0 0.048611 0.018194 1.03795
GAS COOLER 5 MAINTENANCE BUILD 10 TOILET
Girder Area (ft2) Girder Area (ft2) Girder
SG3 3.938 SG1 127.08 SG5
MG3 3.938 TOTAL 127.08 SG6
TOTAL 7.876 TOTAL
6 SWITCH GEAR
EMERGENCY GENERATOR Girder Area (ft2) 11 TRANSFORMER-1
Girder Area (ft2) MG1 10.83 Girder
SG8 134.1 TOTAL 10.83 SG3
TOTAL 134.1 SG4
7 SWITCH GEAR BUILD TOTAL
BATTERY BOX-1 Girder Area (ft2)
Girder Area (ft2) SG2 61.2 12 TRANSFORMER-2
SG8 10.563 SG3 90 Girder
TOTAL 10.5625 SG4 120 SG1
SG5 120 MG4
BATTERY BOX-2 SG6 90 TOTAL
Girder Area (ft2) MG1 60
SG8 10.563 MG2 82.8 13 VERTICAL AIR REC
TOTAL 10.5625 TOTAL 624 Girder
SG6
VERTICAL SEPARATOR-1 8 SWITCH GEAR BUILD MG3
Girder Area (ft2) Girder Area (ft2) TOTAL
SG4 9.8125 SG1 63
MG3 9.8125 MG3 63
TOTAL 19.625 TOTAL 126

VERTICAL SEPARATOR-2 9 DIESEL FUEL TANK


Girder Area (ft2) Girder Area (ft2)
SG5 9.8125 SG8 50
MG3 9.8125 MG4 50
TOTAL 19.625 TOTAL 100

IN FEET
SECONDARY GIRDER
L 2 Eq 1 2 3 3
Gas Cooler 3.1666666667 3.1667 SG1
Emergency generator 16.25 8.25 SG2
Battery box 3.25 3.25 SG3 3.167
Vertical separators 5 5 SG4
Maintenance building 15.25 8.3333 SG5
Switch gear 5 2.1667 SG6
Switch gear building 26 24 SG7
Switch gear building 7 18 SG8 16 3.3 3.25
Diesel fuel tank 10 10 MAIN GIRDER
Toilet 4 6 Eq 1 2 3 3
Transformer-1 4 6 MG1
Transformer-2 9 5 MG2
Vertical air receiver 3.1666666667 3.1667 MG3 2.7482
MG4
Area (ft2)
12
12
24

TRANSFORMER-1
Area (ft2)
12
12
24

TRANSFORMER-2
Area (ft2)
22.5
22.5
45

VERTICAL AIR REC


Area (ft2)
3.94
3.94
7.87
4 4 5 6 7 8 9 10 11 12
15 18 5
24
24
4.625 24 4
4.63 24 4 4
24 4

10

4 4 5 6 7 8 9 10 11 12
2.17 24
24
4.899 4.9 7
10 9
13

3.167

13

2.7482
ENVELOPE (SUBCELL

Secondary Girder
Eq 1 2 3 4 5 6 7 8
kips 1.79 42 45 8.5 6.5 2.24 12 10.5
TABLE OF AREA AND LOADS (KIPS)

ft2 10.5625 19.63495 127.0833 224 100 24 45 11.25


SG1 42 8.108852 1.859375 4.225 2.24 12
SG2 22.14295
SG3
SG4
SG5
SG6
SG7
SG8
Total 0 42 30.2518 1.859375 4.225 2.24 12 0

Main Girder
Eq 1 2 3 4 5 6 7 8
kips 1.79 42 45 8.5 6.5 2.24 12 10.5
ft2 10.5625 19.63495 127.0833 224 100 24 45 11.25
MG1 3.984375 2.275 10.5
MG2 22.14295
MG3
MG4 1.790085
Total 1.790085 0 22.14295 3.984375 2.275 0 0 10.5

Secondary Girder
Eq 1 2 3 4 5 6 7 8
kips 1.79 42 45 8.5 6.5 2.24 12 10.5
ft2 10.5625 19.63495 127.0833 224 100 24 45 11.25
SG1 58.788 99.96 168 120 48 60
TABLE OF LENGTH (INCH)

SG2 99.96
SG3
SG4
SG5
SG6
SG7
SG8

Main Girder
Eq 1 2 3 4 5 6 7 8
TABLE OF L
kips 1.79 42 45 8.5 6.5 2.24 12 10.5
ft2 10.5625 19.63495 127.0833 224 100 24 45 11.25
MG1 168 120 36
MG2 99.96
MG3
MG4 39

Secondary Girder
Eq 1 2 3 4 5 6 7 8
TABLE OF DISTRIBUTED LOADS (KIPS/INCH)

kips 1.79 42 45 8.5 6.5 2.24 12 10.5


ft2 10.5625 19.63495 127.0833 224 100 24 45 11.25
SG1 0.7144 0.0811 0.0111 0.0352 0.0467 0.2000
SG2 0.2215
SG3
SG4
SG5
SG6
SG7
SG8
Total 0.0000 0.7144 0.3026 0.0111 0.0352 0.0467 0.2000 0.0000

Main Girder
Eq 1 2 3 4 5 6 7 8
kips 1.79 42 45 8.5 6.5 2.24 12 10.5
ft2 10.5625 19.63495 127.0833 224 100 24 45 11.25
MG1 0.0237 0.0190 0.2917
MG2 0.2215
MG3
MG4 0.0459
Total 0.0459 0 0.221518 0.023717 0.018958 0 0 0.291667
ELOPE (SUBCELLAR DECK)

9 1 BATTERY BOX 5 POWER INSTRUMENT 9


1.2 MAX Girder Area (ft2) Girder Area (ft2)
7.88 MG4 10.563 SG1 65
70.43323 TOTAL 10.563 MG1 35
22.14295 TOTAL 100
0 2 VERTICAL SEPARATOR
0 Girder Area (ft2) 6 MECHANICAL STORAGE
0 SG1 19.634954 Girder Area (ft2)
0 TOTAL 19.634954 SG1 24.00
0 TOTAL 24.00
0 3 MAINTENANCE BUILD
0 70.43323 Girder Area (ft2) 7 TRANSFORMER-1
SG1 22.900 Girder Area (ft2)
SG2 41.650 SG1 45
9 MG2 62.533 TOTAL 45
1.2 MAX TOTAL 127.083
7.88 8 FRESH WATER TANK
16.75938 4 CONTROL ROOM Girder Area (ft2)
1.20064 23.34359 Girder Area (ft2) MG1 11.25
0 SG1 49.000 TOTAL 11.25
1.790085 SG2 70.000
1.20064 23.34359 MG2 105.000
TOTAL 224.000

9 IN FEET
1.2 SECONDARY GIRDER
7.88 Eq 1 2 3 4 5 6 7 8 9
SG1 4.899 8.33 14 10 4 5
SG2 8.33
SG3
SG4
SG5
SG6
SG7
SG8

MAIN GIRDER
9 Eq 1 2 3 4 5 6 7 8 9
1.2 MG1 14 10 3
7.88 MG2 8.33 3.17
MG3
38.004 MG4 3.25

9
1.2 MAX
7.88
1.088495
0.221518
0
0
0
0
0
0
0.0000 1.088495

9
1.2 MAX
7.88
0.334342
0.0316 0.253111
0.0000
0.0459
0.031592 0.334342
VERTICAL AIR REC
Girder Area (ft2)
MG2 7.88
TOTAL 7.88