CELLAR DECK
No. Description Jumlah Berat (Kip) Ukuran
psf 1 Gas Cooler 1 17.50 OD 38'' x 20'-0''
psf 2 Emergency generator 1 20.16 16'-3'' x 8'-3'' x 10'-0''
psf 3 Battery box 2 1.79 3'-3'' x 3'-3'' x 1'-0''
4 Vertical separators 2 42.00 OD 60'' x 9'-4''
5 Maintenance building 1 55.00 15'-3'' x 8'-4'' x 8'-0''
6 Switch gear 1 7.84 5'-0'' x 2'-2'' x 8'-10''
7 Switch gear building 1 5.04 26'-0'' x 24'-0'' x 14'-0''
8 Switch gear building 1 6.72 7'-0'' x 18'-0'' x 13'-6''
9 Diesel fuel tank 1 58.24 10'-0'' x 10'-0'' x 10'-0''
10 Toilet 1 2.24 4'-0'' x 6'-0'' x 8'-0''
11 Transformer-1 1 12.00 9'-0'' x 5'-0'' x 6'-9''
12 Transformer-2 1 10.50 3'-9'' x 3'-0'' x 5'-7''
13 Vertical air receiver 1 1.20 OD 38'' x 6'-4''
MAIN DECK
No. Description Jumlah Berat (Kip) Ukuran
psf 1 Battery box 2 2.25 8'-8'' x 2'-8'' x 5'-0''
psf 2 Air compressor package 1 4.21 5'-8'' x 3'-6'' x 6'-0''
psf 3 Load break switch 1 1.49 4'-6'' x 2'-5'' x 6'-5''
4 Container room-1 1 27.50 40'-0'' x 10'-0'' x 20'-0'
5 Container room-2 1 27.50 40'-0'' x 10'-0'' x 20'-0'
6 Process control room 1 11.59 16'-0'' x 14'-0'' x 12'-0''
7 Transformer 3 24.12 10'-4'' x 9'-4'' x 8'-0''
8 Instrument storage 1 7.02 8'-0'' x 6'-8'' x 6'-6''
9 Fresh water tank 1 8.90 11'-6'' x 8'-0'' x 10'-0''
10 Air receiver 1 1.51 OD 36'' x 75''
11 Ansul drum chemical skid 1 3.10 9'-3'' x 5'-2'' x 4'-5''
12 Mechanical storage 1 9.83 8'-2'' x 8'-1'' x 8'-9''
13 Life capsule 1 3.37 …
14 Communication microwave 1 6.75 10'-4'' x 10'-0'' x 9'-10''
15 Communication tower 1 22.48 10'-5'' x 10'-5'' x 100'-0''
16 Fuel tank 1 16.86 5'-7'' x 4'-5'' x 4'-7''
17 Power instrument storage 1 5.57 8'-2'' x 8'-2'' x 9'-0''
18 Toilet 1 2.24 5'-0'' x 4'-0'' x 8'-0''
19 Crane (Operation) 1 25.00 12'-5.74" x 12'-7.49"
20 Flare bridge 1 … …
0.8333333
1.5
EQUIPMENTS SIZE
SUB CELLAR
CELLAR DECK
MAIN DECK
SUB CELLAR
SIZE
LENGTH WIDTH HEIGHT No.
inch feet inch feet inch feet
3 3 3 3 1 1
60 60 4 9 2
3 15 4 8 8 3
16 14 12 4
10 10 10 5
4 6 8 6
9 5 9 6 7
9 3 3 7 5 8
38 38 4 6 9
CELLAR DECK
SIZE
LENGTH WIDTH HEIGHT No.
inch feet inch feet inch feet
38 38 20 1
3 16 3 8 10 2
3 3 3 3 1 3
60 60 4 9 4
3 15 4 8 8 5
5 2 2 10 8 6
26 24 14 7
7 18 6 13 8
10 10 10 9
4 6 8 10
4 6 8 11
9 5 9 6 12
38 38 4 6 13
MAIN DECK
SIZE
LENGTH WIDTH HEIGHT No.
inch feet inch feet inch feet
8 8 8 2 5 1
8 5 6 3 6 2
6 4 5 2 5 6 3
40 10 20 4
40 10 20 5
16 14 12 6
4 10 4 9 8 7
8 8 6 6 6 8
6 11 8 10 9
36 36 75 10
3 9 2 5 5 4 11
2 8 1 8 9 8 12
13
4 10 10 10 9 14
5 10 5 10 100 15
7 5 5 4 7 4 16
2 8 2 8 9 17
5 4 8 18
5.74 12 7.49 12 19
20
EQUIPMENTS SIZE (cont)
SUB CELLAR
SIZE
Description Jumlah Berat (Kip) Ukuran LENGTH WIDTH (ft)
(ft)
Battery box 1 1.79 3'-3'' x 3'-3'' x 1'-0'' 3.25 3.25
Vertical separators 1 42.00 OD 60'' x 9'-4'' 5.00 5.00
Maintenance building 1 45.00 15'-3'' x 8'-4'' x 8'-0'' 15.25 8.33
Controll Room 1 8.50 16'-0'' x 14'-0'' x 12'-0'' 16.00 14.00
Power instrument storage 1 6.50 10'-0'' x 10'-0'' x 10'-0'' 10.00 10.00
Mechanical storage 1 2.24 4'-0'' x 6'-0'' x 8'-0'' 4.00 6.00
Transformer-1 1 12.00 9'-0'' x 5'-0'' x 6'-9'' 9.00 5.00
Fresh water tank 1 10.50 3'-9'' x 3'-0'' x 5'-7'' 3.75 3.00
Vertical air receiver 1 1.20 OD 38'' x 6'-4'' 3.17 3.17
CELLAR DECK
SIZE
Description Jumlah Berat (Kip) Ukuran LENGTH WIDTH (ft)
(ft)
Gas Cooler 1 17.50 OD 38'' x 20'-0'' 3.17 3.17
Emergency generator 1 20.16 16'-3'' x 8'-3'' x 10'-0'' 16.25 8.25
Battery box 2 1.79 3'-3'' x 3'-3'' x 1'-0'' 3.25 3.25
Vertical separators 2 42.00 OD 60'' x 9'-4'' 5.00 5.00
Maintenance building 1 55.00 15'-3'' x 8'-4'' x 8'-0'' 15.25 8.33
Switch gear 1 7.84 5'-0'' x 2'-2'' x 8'-10'' 5.00 2.17
Switch gear building 1 5.04 26'-0'' x 24'-0'' x 14'-0'' 26.00 24.00
Switch gear building 1 6.72 7'-0'' x 18'-0'' x 13'-6'' 7.00 18.00
Diesel fuel tank 1 58.24 10'-0'' x 10'-0'' x 10'-0'' 10.00 10.00
Toilet 1 2.24 4'-0'' x 6'-0'' x 8'-0'' 4.00 6.00
Transformer-1 1 12.00 9'-0'' x 5'-0'' x 6'-9'' 4.00 6.00
Transformer-2 1 10.50 3'-9'' x 3'-0'' x 5'-7'' 9.00 5.00
Vertical air receiver 1 1.20 OD 38'' x 6'-4'' 3.17 3.17
MAIN DECK
SIZE
Description Jumlah Berat (Kip) Ukuran LENGTH WIDTH (ft)
(ft)
Battery box 2 2.25 8'-8'' x 2'-8'' x 5'-0'' 8.67 2.67
Air compressor package 1 4.21 5'-8'' x 3'-6'' x 6'-0'' 5.67 3.50
Load break switch 1 1.49 4'-6'' x 2'-5'' x 6'-5'' 4.50 2.42
Container room-1 1 27.50 40'-0'' x 10'-0'' x 20'-0' 40.00 10.00
Container room-2 1 27.50 40'-0'' x 10'-0'' x 20'-0' 40.00 10.00
Process control room 1 11.59 16'-0'' x 14'-0'' x 12'-0'' 16.00 14.00
Transformer 3 24.12 10'-4'' x 9'-4'' x 8'-0'' 10.33 9.33
Instrument storage 1 7.02 8'-0'' x 6'-8'' x 6'-6'' 8.00 6.67
Fresh water tank 1 8.90 11'-6'' x 8'-0'' x 10'-0'' 11.50 8.00
Air receiver 1 1.51 OD 36'' x 75'' 3.00 3.00
Ansul drum chemical skid 1 3.10 9'-3'' x 5'-2'' x 4'-5'' 9.25 5.17
Mechanical storage 1 9.83 8'-2'' x 8'-1'' x 8'-9'' 8.17 8.08
Life capsule 1 3.37 … 0.00 0.00
Communication microwave 1 6.75 10'-4'' x 10'-0'' x 9'-10'' 10.33 10.00
Communication tower 1 22.48 10'-5'' x 10'-5'' x 100'-0'' 10.42 10.42
Fuel tank 1 16.86 5'-7'' x 4'-5'' x 4'-7'' 5.58 4.42
Power instrument storage 1 5.57 8'-2'' x 8'-2'' x 9'-0'' 8.17 8.17
Toilet 1 2.24 5'-0'' x 4'-0'' x 8'-0'' 5.00 4.00
Crane (Operation) 1 25.00 12'-5.74" x 12'-7.49" 12.48 12.62
Flare bridge 1 … … 0.00 0.00
EQUIPMENTS AREAS
SIZE
HEIGHT SUB CELLAR
(ft) No. Description Amount
1.00 1 Battery box 1
9.33 2 Vertical separators 1
8.00 3 Maintenance building 1
12.00 4 Controll Room 1
10.00 5 Power instrument storage 1
8.00 6 Mechanical storage 1
6.75 7 Transformer-1 1
5.58 8 Fresh water tank 1
6.33 9 Vertical air receiver 1
SIZE
HEIGHT CELLAR DECK
(ft) No. Description Amount
20.00 1 Gas Cooler 1
10.00 2 Emergency generator 1
1.00 3 Battery box 2
9.33 4 Vertical separators 2
8.00 5 Maintenance building 1
8.83 6 Switch gear 1
14.00 7 Switch gear building 1
13.50 8 Switch gear building 1
10.00 9 Diesel fuel tank 1
8.00 10 Toilet 1
8.00 11 Transformer-1 1
6.75 12 Transformer-2 1
6.33 13 Vertical air receiver 1
SIZE
HEIGHT MAIN DECK
(ft) No. Description Amount
5.00 1 Battery box 2
6.00 2 Air compressor package 1
6.42 3 Load break switch 1
20.00 4 Container room-1 1
20.00 5 Container room-2 1
12.00 6 Process control room 1
8.00 7 Transformer 3
6.50 8 Instrument storage 1
10.00 9 Fresh water tank 1
6.25 10 Air receiver 1
4.42 11 Ansul drum chemical skid 1
8.75 12 Mechanical storage 1
0.00 13 Life capsule 1
9.83 14 Communication microwave 1
100.00 15 Communication tower 1
4.58 16 Fuel tank 1
9.00 17 Power instrument storage 1
8.00 18 Toilet 1
0.00 19 Crane (Operation) 1
0.00 20 Flare bridge 1
ENTS AREAS
Possible Size for Cellar Deck (1800 ft2) Ukuran Deck Length Width
Length Width Area (ft2) Subcellar 30 40
45 40 1800 Cellar Deck 45 40
Main Deck 45 40
Possible Size for Main Deck (1800 ft2) 9
Length Width Area (ft2)
45 40 1800
SUB CELLAR
SIZE
No. Description Jumlah Berat (Kip) LENGTH WIDTH (ft)
(ft)
1 Battery box 1 1.79 3.25 3.25
2 Vertical separators (Tubular) 1 42.00 5.00 5.00
3 Maintenance building 1 45.00 15.25 8.33
4 Controll Room 1 8.50 16.00 14.00
5 Power instrument storage 1 6.50 10.00 10.00
6 Mechanical storage 1 2.24 4.00 6.00
7 Transformer-1 1 12.00 9.00 5.00
8 Fresh water tank 1 10.50 3.75 3.00
9 Vertical air receiver (Tubular) 1 1.20 3.17 3.17
TOTAL 129.73
COG
CELLAR DECK
SIZE
No. Description Jumlah Berat (Kip) LENGTH WIDTH (ft)
(ft)
1 Gas Cooler (Tubular) 1 17.50 3.17 3.17
2 Emergency generator 1 20.16 16.25 8.25
3 Battery box-1 1 1.79 3.25 3.25
3 Battery box-2 1 1.79 3.25 3.25
4 Vertical separators-1 (Tubular) 1 42.00 5.00 5.00
4 Vertical separators-2 (Tubular) 1 42.00 5.00 5.00
5 Maintenance building 1 55.00 15.25 8.33
6 Switch gear 1 7.84 5.00 2.17
7 Switch gear building 1 5.04 26.00 24.00
8 Switch gear building 1 6.72 7.00 18.00
9 Diesel fuel tank 1 58.24 10.00 10.00
10 Toilet 1 2.24 4.00 6.00
11 Transformer-1 1 12.00 4.00 6.00
12 Transformer-2 1 10.50 9.00 5.00
13 Vertical air receiver (Tubular) 1 1.20 3.17 3.17
TOTAL 158.78
COG
MAIN DECK
SIZE
No. Description Jumlah Berat (Kip) LENGTH WIDTH (ft)
(ft)
1 Battery box-1 1 2.25 8.67 2.67
1 Battery box-2 1 2.25 8.67 2.67
2 Air compressor package 1 4.21 5.67 3.50
3 Load break switch 1 1.49 4.50 2.42
4 Container room-1 1 27.50 40.00 10.00
5 Container room-2 1 27.50 40.00 10.00
6 Process control room 1 11.59 16.00 14.00
7 Transformer-1 1 24.12 10.33 9.33
7 Transformer-2 1 24.12 10.33 9.33
7 Transformer-3 1 24.12 10.33 9.33
8 Instrument storage 1 7.02 8.00 6.67
9 Fresh water tank 1 8.90 11.50 8.00
10 Air receiver (Tubular) 1 1.51 3.00 3.00
11 Ansul drum chemical skid 1 3.10 9.25 5.17
12 Mechanical storage 1 9.83 8.17 8.08
13 Life capsule 1 3.37 0.00 0.00
14 Communication microwave 1 6.75 10.33 10.00
15 Communication tower 1 22.48 10.42 10.42
16 Fuel tank 1 16.86 5.58 4.42
17 Power instrument storage 1 5.57 8.17 8.17
18 Toilet 1 2.24 5.00 4.00
19 Crane (Operation) 1 25.00 12.48 12.62
20 Flare bridge 1 … 0.00 0.00
21 Heliport S-5TT 1 7.20 37.50 37.50
TOTAL 92.11
COG
Ukuran Deck Length Width Area (ft2) Selisih
Subcellar 30 40 1200 0
Cellar Deck 45 40 1800 0
Main Deck 45 40 1800 0
Secondary Girder
Eq 1 1 2 3 4 5 6 7 7 7
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
TABLE OF AREA AND LOADS (KIPS)
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
SG1 13.75 24.121 12.053
SG2
SG3
SG4
SG5 5.7953
SG6 2.9308
SG7
SG8 2.249 1.1245 4.2148 13.75 24.122
Total 2.249 1.1245 4.2148 0 13.75 13.75 8.7261 24.122 24.121 12.053
0.3554
Main Girder
Eq 1 1 2 3 4 5 6 7 7 7
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
MG1
MG2 1.4948 2.8785
MG3 1.1245 6.875 6.875 12.07
MG4 6.875 6.875
Total 0 1.1245 0 1.4948 13.75 13.75 2.8785 0 0 12.07
Secondary Girder
Eq 1 1 2 3 4 5 6 7 7 7
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
SG1 480 123.96 123.96
TABLE OF LENGTH (INCH)
SG2
SG3
SG4
SG5 192
SG6 192
SG7
SG8 32.04 32.04 42 480 123.96
Main Girder
Eq 1 1 2 3 4 5 6 7 7 7
TABLE OF L
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
MG1
MG2 29.04 192
MG3 104.04 120 120 144.84
MG4 120 120
Secondary Girder
Eq 1 1 2 3 4 5 6 7 7 7
TABLE OF DISTRIBUTED LOADS (KIPS/INCH)
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
SG1 0.0286 0.1946 0.0972
SG2
SG3
SG4
SG5 0.0302
SG6 0.0153
SG7
SG8 0.0702 0.0351 0.1004 0.0286 0.1946
Total 0.0702 0.0351 0.1004 0.0000 0.0286 0.0286 0.0454 0.1946 0.1946 0.0972
Main Girder
Eq 1 1 2 3 4 5 6 7 7 7
kips 2.2454 2.24538 4.2148 1.4927 27.5 27.5 11.591 24.122 24.122 24.122
ft2 23.111 23.1111 19.833 10.875 400 400 224 96.444 96.444 96.444
MG1
MG2 0.0515 0.015
MG3 0.01081 0.0573 0.0573 0.0833
MG4 0.0573 0.0573
Total 0 0.01081 0 0.0515 0.1146 0.1146 0.015 0 0 0.0833
PE (MAIN DECK)
8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
3.3754 5.5733
3.6146 8.095
6.9156 6.2489
6.2489
8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
5.2829 7.4683
0.7532 16.862
0.7532 1.671
3.3732 12.502
0 5.2829 1.5063 0 0 0 3.3732 7.4683 16.862 0 1.671 12.502 0
8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
123.96 98.004
138 125
125 151.44
151.44
8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
138 125
36 66.996
36 60
120 149.76
8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
0.0272 0.0569
0.0262 0.0648
0.0553 0.0413
0.0413
8 9 10 11 12 13 14 15 16 17 18 19 20
7.0246 8.8975 1.5053 3.1009 9.8345 3.3743 6.7487 22.479 16.859 5.5733 2.24 25 0
53.333 92 7.065 47.792 66.014 0 103.33 108.51 24.66 66.694 20 157.53 0
0.0383 0.0597
0.0209 0.2517
0.0209 0.0279
0.0281 0.0835
0 0.0383 0.0418 0 0 0 0.0281 0.0597 0.2517 0 0.0279 0.0835 0
1 Battery Box 6 Process Control Room 9
MAX Girder Area (ft2) Girder Area (ft2)
SG8 23.1485 SG5 112
58.87257 TOTAL 23.1485 SG6 56.64
0 MG2 55.63
11.70957 1 Battery Box TOTAL 224.27
13.16444 Girder Area (ft2) 10
12.04419 SG8 11.57425 7 Transformer
2.93078 MG3 11.57425 Girder Area (ft2)
0 TOTAL 23.1485 SG8 96.44
65.41973 TOTAL 96.44
65.41973 2 Air Compressor
Girder Area (ft2) 7 Transformer-1 11
SG8 19.833 Girder Area (ft2)
TOTAL 19.833333 SG1 96.44
MAX TOTAL 96.44
3 Load Break Switch
12.75117 Girder Area (ft2) 7 Transformer-2 12
21.98827 MG2 10.89 Girder Area (ft2)
29.36868 TOTAL 10.89 SG1 48.1894
29.62551 MG3 48.2550
29.62551 4 Container-1 TOTAL 96.4444
Girder Area (ft2) 14
SG1 200 8 Instrument Storage
MG3 100 Girder Area (ft2)
MG4 100 SG8 53.333
TOTAL 400 TOTAL 53.333
5 Container-2
Girder Area (ft2)
SG8 200
MG3 100
MG4 100
TOTAL 400 IN FEET
SECONDARY GIRDER
L W Eq 1 1 2
1 Battery box 8.6666667 2.6667 SG1
2 Air compressor package 5.6666667 3.5 SG2
3 Load break switch 4.5 2.4167 SG3
4 Container room-1 40 10 SG4
5 Container room-2 40 10 SG5
6 Process control room 16 14 SG6
7 Transformer 10.333333 9.3333 SG7
8 Instrument storage 8 6.6667 SG8 2.67 2.67 3.5
9 Fresh water tank 11.5 8
10 Air receiver 3 3 MAIN GIRDER
11 Ansul drum chemical skid 9.25 5.1667 Eq 1 1 2
MAX 12 Mechanical storage 8.1666667 8.0833 MG1
13 Life capsule 0 0 MG2
0.404563 14 Communication microwave 10.333333 10 MG3 8.67
0 15 Communication tower 10.416667 10.417 MG4
0.090952 16 Fuel tank 5.5833333 4.4167
0.096587 17 Power instrument storage 8.1666667 8.1667
0.071447 18 Toilet 5 4
0.015264 19 Crane (Operation) 12.478333 12.624
0 20 Flare bridge 0 0
0.66808
0.66808
MAX
0.098028
0.339071
0.257497
0.226176
0.339071
Fresh Water Tank 15 Communication Tower
Girder Area (ft2) Girder Area (ft2)
SG3 37.375 SG3 39.075
MG1 54.625 SG4 33.38
TOTAL 92 MG1 36.05
TOTAL 108.51
Air Receiver
Girder Area (ft2) 16 Fuel Tank
MG2 3.535 Girder Area (ft2)
MG3 3.535 MG2 24.6636
TOTAL 7.07 TOTAL 24.6636
3 4 5 6 7 7 7 8 9 10
40 10.33 10.33
11.5
16
16
40 10.33 6.67
3 4 5 6 7 7 7 8 9 10
11.5
2.42 16 3
10 10 12.07 3
10 10
11 12 13 14 15 16 17 18 19 20
10.33 8.167
10.4167
10.4167
12.62
12.62
5.167 8.08
11 12 13 14 15 16 17 18 19 20
10.4167
5.583
5
10 12.48
MAIN DECK SCANTLINGS (Gratings)
a. Deck Flooring
Length a = 32 ft
Width b = 4 ft
a/b = 8
q = -0.0011 ksi
t2 = -0.089 in
t = 0.298 in
From the AISC Manual 13th Ed. table I-18 (page 117/2181), the available nominal
thicnkess is,
t = 3/ 8 in
CHECK 15.05 ksi O.K. !
= 16.37 psf
Wplate
= 29.466 kips The stress should be less than 21.6 ksi
So the linear weight for the respective plate (per inch) is,
Using force equation derived from statically indeterminate problem (using method of
superposition) we can determine the maximum moment occurred along the beam. First
we need to choose one of the most "intense" secondary girder span which supports many
equipment (heaviest yet smallest equipment). Later we calculate maximum moment
happened because of each equipment, Plate, Live Load, Pipe Load, and then sum them
up. This total moment will be used as our criteria. (Dimas M., 2016)
SECONDARY
GIRDER 8
EQUIPMENT LOADS
(1) Battery Box = 0.070194 kips/in
(1) Battery Box = 0.070194 kips/in
(3) Load Break S = 0.051474 kips/in
(7) Transformer = 0.194596 kips/in
(11) Ansul Drum = 0.050009 kips/in
(12) Mech Storage = 0.101422 kips/in
Span L = 384 in (5) Container R-2 = 0.029 kips/in
Bending and Reactions Equations for a Beam Fixed at Both Ends with Partial
Uniform Loading
Description:
Then, we sum up the moment because of the equipments (superposition). The maximum
of MA and MB will be used as our criteria.
Total maximum flexure stress occurred along the beam (including beam self weight)
should be less than the allowable stress of A36 ASD steel.
CHECK O.K. !
MAIN DECK SCANTLINGS (Main Girder)
e. Main Girder (Flushed Beam)
Main girder should have the capacity to support both equipment and secondary girder (including
gratings). By determining the moment cause by equipment on the most "intense" girder, added
with secondary girder's highest reactions (R) along the main girder, including its self weight.*
There are 3 main loads in this case, (1) Reactions from each of Secondary Girder, (2)
Reactions from Self-Weight of Secondary Girder, (3) Equipments.*
This symetrically loaded and statically indeterminate problem can be solved using the
displacement method, by determining the moment at one end for each of reactions that occurred
along the span, and then by superposition, we sum them up. This total moment will be used as ou
criteria.*
A B
Longest Main Girder Span (L) = 60 ft
P M_B=(Pba^2)
a b /L^2
A B M_A=−
(Pab^2)/L^2
MOMENT CALCULATION
No. P (kips) a (ft) b (ft) L (ft) MA(kips.ft) MB (kips.ft)
SG3 -37.13 2.5 17.5 20 71.06 -10.15
SG4 -37.13 7.5 12.5 20 108.77 -65.26
SG5 -37.13 12.5 7.5 20 65.26 -108.77
SG6 -37.13 17.5 2.5 20 10.15 -71.06
TOTAL 108.77 -108.77
CCW (+) MPmax 1305.2 -1305
MPAmax MPBmax
MAIN GIRDER 4
EQUIPMENT LOADS
(15) Comm Tow =
Span L = 240 in (19) Crane =
Bending and Reactions Equations for a Beam Fixed at Both Ends with Partial Uniform
Loading
Description:
W =
w or q =
a,b,c,d,L =
M =
R =
MA = 0 kips-in
CCW(+)
MB = 0 kips-in
MA = 68.1936 kips-in
CCW(+)
MB = -447.83 kips-in
Then, we sum up the moment because of the equipments (superposition) AND because of multiple
Reactions (P). The maximum of MA and MB will be used as our criteria.
CHECK O.K. !
OPSI S W
W24X55 114 -55
W21X55 110 -55
W21X57 111 -57
W18X60 108 -60
W16X67 117 -67
er)
Moment at A
M_B=(Pba^2)
/L^2
M_A=−
(Pab^2)/L^2
MB (kips.ft)
-10.15
-65.26
-108.77
-71.06
-108.77 kips-ft
-1305 kips-in
MPBmax
PMENT LOADS
0 kips/in
0.083 kips/in
Description:
1753.0 kips-in
his is our criteria (absolute)
CCW (+)
OPSI S W
1 W24X55 114 -55
2 W21X55 110 -55
3 W21X57 111 -57
4 W18X60 108 -60
5 W18X65 117 -65
5 W16X67 117 -67
6 W14X74 112 -74
D PROFILE
uding beam self-weight)
21.6 ksi
ENVELOPE (CE
Secondary Girder
Eq 1 2 3 3 4 4 5 6
kips 17.5 20.16 1.79 1.79 42 42 55 7.84
TABLE OF AREA AND LOADS (KIPS)
Main Girder
Eq 1 2 3 3 4 4 5 6
kips 17.5 20.16 1.79 1.79 42 42 55 7.84
ft2 7.875798 134.0625 10.5625 10.5625 19.625 19.625 127.0833 10.83333
MG1 8.288265
MG2
MG3 8.75 21 21
MG4
Total 8.75 0 0 0 21 21 0 8.288265
Secondary Girder
Eq 1 2 3 3 4 4 5 6
kips 17.5 20.16 1.79 1.79 42 42 55 7.84
ft2 7.875798 134.0625 10.5625 10.5625 19.625 19.625 127.0833 10.83333
SG1 183
TABLE OF LENGTH (INCH)
SG2
SG3 38.004
SG4 55.5
SG5 55.5
SG6
SG7
SG8 195 39 39
Main Girder
Eq 1 2 3 3 4 4 5 6
TABLE OF L
kips 17.5 20.16 1.79 1.79 42 42 55 7.84
ft2 7.875798 134.0625 10.5625 10.5625 19.625 19.625 127.0833 10.83333
MG1 26.04
MG2
MG3 32.9784 58.788 58.788
MG4
Secondary Girder
Eq 1 2 3 3 4 4 5 6
TABLE OF DISTRIBUTED LOADS (KIPS/INCH)
Main Girder
Eq 1 2 3 3 4 4 5 6
kips 17.5 20.16 1.79 1.79 42 42 55 7.84
ft2 7.875798 134.0625 10.5625 10.5625 19.625 19.625 127.0833 10.83333
MG1 0.3183
MG2
MG3 0.2653 0.3572 0.3572
MG4
Total 0.265325 0 0 0 0.357216 0.357216 0 0.31829
ENVELOPE (CELLAR DECK)
7 8 9 10 11 12 13 1
5.039 6.72 58.24 2.24 12 10.5 1.2 MAX
624 126 100 24 24 45 7.871806
3.36 5.25 63.61
0.49421 0.49421
0.726779 6 15.47678
0.969038 6 27.96904 2
0.969038 1.12 23.08904
0.726779 1.12 0.6 2.446779
0
29.12 52.86564
3.885844 3.36 29.12 2.24 12 5.25 0.6 63.61 3
7 8 9 10 11 12 13
5.039 6.72 58.24 2.24 12 10.5 1.2 MAX
624 126 100 24 24 45 7.871806 3
0.484519 8.772785
0.668637 0.668637
3.36 0.6 54.71
29.12 5.25 34.37
1.153156 3.36 29.12 0 0 5.25 0.6 54.71 4
7 8 9 10 11 12 13
5.039 6.72 58.24 2.24 12 10.5 1.2
624 126 100 24 24 45 7.871806
216 60 4
288
288 48
288 48
288 48
288 48 38.004
120
7 8 9 10 11 12 13
5.039 6.72 58.24 2.24 12 10.5 1.2
624 126 100 24 24 45 7.871806 1
288 2
288 3
84 32.9784 4
120 108 5
6
7
7 8 9 10 11 12 13 8
5.039 6.72 58.24 2.24 12 10.5 1.2 MAX 9
624 126 100 24 24 45 7.871806 10
0.0156 0.0875 0.403602 11
0.0017 0.001716 12
0.0025 0.1250 0.357762 13
0.0034 0.1250 0.506743
0.0034 0.0233 0.405076
0.0025 0.0233 0.0158 0.041645
0
0.2427 0.437875
0.0135 0.0156 0.2427 0.0467 0.2500 0.0875 0.0158 0.506743
7 8 9 10 11 12 13
5.039 6.72 58.24 2.24 12 10.5 1.2 MAX
624 126 100 24 24 45 7.871806
0.0017 0.319972
0.0023 0.002322
0.0400 0.0182 1.0380
0.2427 0.0486 0.291278
0.004004 0.04 0.242667 0 0 0.048611 0.018194 1.03795
GAS COOLER 5 MAINTENANCE BUILD 10 TOILET
Girder Area (ft2) Girder Area (ft2) Girder
SG3 3.938 SG1 127.08 SG5
MG3 3.938 TOTAL 127.08 SG6
TOTAL 7.876 TOTAL
6 SWITCH GEAR
EMERGENCY GENERATOR Girder Area (ft2) 11 TRANSFORMER-1
Girder Area (ft2) MG1 10.83 Girder
SG8 134.1 TOTAL 10.83 SG3
TOTAL 134.1 SG4
7 SWITCH GEAR BUILD TOTAL
BATTERY BOX-1 Girder Area (ft2)
Girder Area (ft2) SG2 61.2 12 TRANSFORMER-2
SG8 10.563 SG3 90 Girder
TOTAL 10.5625 SG4 120 SG1
SG5 120 MG4
BATTERY BOX-2 SG6 90 TOTAL
Girder Area (ft2) MG1 60
SG8 10.563 MG2 82.8 13 VERTICAL AIR REC
TOTAL 10.5625 TOTAL 624 Girder
SG6
VERTICAL SEPARATOR-1 8 SWITCH GEAR BUILD MG3
Girder Area (ft2) Girder Area (ft2) TOTAL
SG4 9.8125 SG1 63
MG3 9.8125 MG3 63
TOTAL 19.625 TOTAL 126
IN FEET
SECONDARY GIRDER
L 2 Eq 1 2 3 3
Gas Cooler 3.1666666667 3.1667 SG1
Emergency generator 16.25 8.25 SG2
Battery box 3.25 3.25 SG3 3.167
Vertical separators 5 5 SG4
Maintenance building 15.25 8.3333 SG5
Switch gear 5 2.1667 SG6
Switch gear building 26 24 SG7
Switch gear building 7 18 SG8 16 3.3 3.25
Diesel fuel tank 10 10 MAIN GIRDER
Toilet 4 6 Eq 1 2 3 3
Transformer-1 4 6 MG1
Transformer-2 9 5 MG2
Vertical air receiver 3.1666666667 3.1667 MG3 2.7482
MG4
Area (ft2)
12
12
24
TRANSFORMER-1
Area (ft2)
12
12
24
TRANSFORMER-2
Area (ft2)
22.5
22.5
45
10
4 4 5 6 7 8 9 10 11 12
2.17 24
24
4.899 4.9 7
10 9
13
3.167
13
2.7482
ENVELOPE (SUBCELL
Secondary Girder
Eq 1 2 3 4 5 6 7 8
kips 1.79 42 45 8.5 6.5 2.24 12 10.5
TABLE OF AREA AND LOADS (KIPS)
Main Girder
Eq 1 2 3 4 5 6 7 8
kips 1.79 42 45 8.5 6.5 2.24 12 10.5
ft2 10.5625 19.63495 127.0833 224 100 24 45 11.25
MG1 3.984375 2.275 10.5
MG2 22.14295
MG3
MG4 1.790085
Total 1.790085 0 22.14295 3.984375 2.275 0 0 10.5
Secondary Girder
Eq 1 2 3 4 5 6 7 8
kips 1.79 42 45 8.5 6.5 2.24 12 10.5
ft2 10.5625 19.63495 127.0833 224 100 24 45 11.25
SG1 58.788 99.96 168 120 48 60
TABLE OF LENGTH (INCH)
SG2 99.96
SG3
SG4
SG5
SG6
SG7
SG8
Main Girder
Eq 1 2 3 4 5 6 7 8
TABLE OF L
kips 1.79 42 45 8.5 6.5 2.24 12 10.5
ft2 10.5625 19.63495 127.0833 224 100 24 45 11.25
MG1 168 120 36
MG2 99.96
MG3
MG4 39
Secondary Girder
Eq 1 2 3 4 5 6 7 8
TABLE OF DISTRIBUTED LOADS (KIPS/INCH)
Main Girder
Eq 1 2 3 4 5 6 7 8
kips 1.79 42 45 8.5 6.5 2.24 12 10.5
ft2 10.5625 19.63495 127.0833 224 100 24 45 11.25
MG1 0.0237 0.0190 0.2917
MG2 0.2215
MG3
MG4 0.0459
Total 0.0459 0 0.221518 0.023717 0.018958 0 0 0.291667
ELOPE (SUBCELLAR DECK)
9 IN FEET
1.2 SECONDARY GIRDER
7.88 Eq 1 2 3 4 5 6 7 8 9
SG1 4.899 8.33 14 10 4 5
SG2 8.33
SG3
SG4
SG5
SG6
SG7
SG8
MAIN GIRDER
9 Eq 1 2 3 4 5 6 7 8 9
1.2 MG1 14 10 3
7.88 MG2 8.33 3.17
MG3
38.004 MG4 3.25
9
1.2 MAX
7.88
1.088495
0.221518
0
0
0
0
0
0
0.0000 1.088495
9
1.2 MAX
7.88
0.334342
0.0316 0.253111
0.0000
0.0459
0.031592 0.334342
VERTICAL AIR REC
Girder Area (ft2)
MG2 7.88
TOTAL 7.88