Daily Drilling Fluids Report

EGYPTIAN MUD ENGINEERING & CHEMICALS COMPANY


Oil Base

Operator General Petroleum Company"GPC" Rig Name ADM#3 Report No. 37


Operator (Rep's) Mahmoud Abdel-Razk, Boghdady Country Egypt Date 4/1/2018
Well Name & Number HH 83 - 1D Field / Location G.O.S / G.O.S Measure Depth / TVD, m 1960 / 1755.21
Contractor Ades Water Depth / RKB, m 23.00 / 36.00 Progress 0
Contractor (Rep's) Mohamed ELshiekh Spud Date 24.02.2018 Present Activity Logging

STRING DATA CASING DATA HOLE VOLUMES MUD PIT VOLUME


OD ID Type Length OD ID Set @ MD bbl min stks Pit
Fluid Type Volume, bbl
13.375 12.415 775.00 Surface Equipments 1.62 0 14 ID Status
Drill String Capacity 0.00 0 0 SAND TRAP Active OBM 110.52
Drill String Displacement 0.00 0 0 TANK#1 Active OBM 214.96
Annular Section 0.00 0 0 SLUG Reserve DIESEL 0.00
Total Hole With String 947.45 62 8100 TANK#2 Reserve OBM 100.00
Total Hole Without String 947.45 62 8100 TANK#3 Reserve HI VIS 0.00
Active Pits Volume 325.48 21 2783 TANK#4 Reserve OBM 7.9 170.00
Total Circulation Volume 1,274.55 84 10897 TANK#5 Reserve 9.2PPG REC. OBM 260.00
Circulation Volume at Bit 327.10 22 2797

MUD SPECS BIT DATA SOLIDS CONTROL EQUIPMENT CIRCULATION & PUMPS DATA
Fluid Type OIL BASE MUD Hole Size in 12.25 Device Make Size Hrs Pump Make NATIONAL NATIONAL
Parameters min max Bit Size in 12.25 SHAKER#1 SWACO 4*80 0 Pump Model NAT.P-150 NAT.P-150
Mud weight, lb/gal 9.50 11.20 Bit No. 3 SHAKER#2 SWACO 2*100/ 0 Liner, in 6.50 6.50
Funnel Viscosity, sec/Qrt 60 80 Bit Type Rock Bit SHAKER#3 SWACO 4*80 0 Stroke Length, in 12.00 12.00
PV, cP TFA in2 0.902 DESANDER SWACO 2 0 Efficiency, % 95.00 95.00
YP, lb/100ft2 25 35 Depth in m 775.00 DESILITER SWACO 16 0 Pump Rate, stk/min 65 65
LSYP, lb/100ft2 12 16 W.O.B lbf 0 MUDCLEANER SWACO 4*170 0 Pump Output, bbl 0.117 0.117
HTHP, ml/30min 6.0 8.0 R.P.M 0 Centrifuge DERRICK 2400 0 Pump Flow Rate, bbl/min 7.6 7.6
Water Ratio 15 20 R.O.P m/h 0.0 Flow Rate, gal/min 638.7
Oil Ratio 80 85 Pump Pressure, psi 2,700.0
Lime Content, ppb 5.00 6.00
Emulsion Stability, V 1,200 1,500

MUD PROPERTIES MUD VOLUME ACCOUNTING MUD PRODUCTS CONSUMPTION


Sample Source Active Pit Additions, bbl Daily Cumm. Products Unit Size Used
Time 14:00:54 Initial Volume 1829.55 0
Flow Line Temp., F 165 Mud Mixed 0 1153.13
Depth MD / TVD, m 1,960.00/1,755.21 Water (dilution) 0 0
Mud Weight, lb/gal 9.70 Diesel Added 0 0
Mud Gradient, psi/ft 0.50 Chemicals 0 256.42
Funnel Viscosity, sec/Qrt 78 Mud Recieved 0 1785
600 / 300 / 200 RPM 80/53/43 Gain 0 0
100 / 6 / 3 RPM 31/18/16 Total Addition 0 3194.55
Rheology Temp., F 150
PV / YP / LSYP, cP/lb/100ft2 27/26/14
Gel Str. 10s/10m/30m, lb/100ft2 17 / 29 /
API Fluid Loss, ml/30min (N/C)
HTHP, ml/30min/HTHP Temp., F 6.0/300
Cake API / HTHP, 1/32nd in /1.00 Losses, bbl Daily Cumm.
Sand Content, Vol % Shakers 0 0
Report Oil, Vol % 69.00 S.C.Eq. 0 0
Retort Water, Vol % 10.00 Formation 0 320
Retort Solids, Vol % 21.00 Dumped 0 0
Alkalinity Mud (Pom), 4 Trip 25 200
Excess Lime, ppb 5.18 Left in Hole 0 0
Emulsion Stability, V 1495 Mud Returned 0 0 DAILY ADDITIONAL COST
Oil / Water Ratio, 87 / 13 Oil in Cuttings 0 640
Other 0 230
Total Losses 25 1390
Final Volume 1804.55 1804.55

ADDITIONAL PARAMETERS
incl. (degree) 6.9
azimuth (degree) 299.9
Current Dilution Factor 0.90
SOLIDS ANALYSIS BIT HYDRAULICS MUD COST ANALYSIS
Brine, Vol % 11.23 Rheology Model Power Law 17.50 Original Water Base Spud Mud 3,620.00
CaCl2, % wt 31.3 AV / DP, ft/min 17.50 Original Water Base POLY GEL 6,225.00
CL-, mg/l 259528 AV / DC, ft/min 17.50 Original Water Base kcl salt sat mud 50,635.00
Avg.Sp.Gr. Solids, 2.18 AV / Riser, ft/min 12.25 Original Oil Base OBM 117,071.75
Corrected Solids, Vol % 19.77 Bit HHSI, hp/in2 1.3
Avg.Sp.Gr. Salt Water, 1.3 Bit Press. Loss, psi 404
LGS, Vol % 5.14 Nozzels Vel., ft/sec 227.2
LGS, ppb 48.67 ECD @ Bit, lb/gal 9.7
HGS (EMEC CARB (EF)), Vol % 14.63 ECD @ Casing Shoe, lb/gal
HGS (EMEC CARB (EF)), ppb 133.28 Leak-Off Test
CaCl2 (Water Phase), ppb 142.15 n 0.59
CaCl2 (Water Phase), mg/l 405559 k (lbf.sec^-n/100ft^2) 1.393
CaCl2 (Whole Mud), ppb 15.94
CaCl2 (Whole Mud), mg/l 45464
Aw 0.6134 Total Cost 177,551.75
RIG OPERATIONS TIME DISTRIBUTION MUD TREATMENT
Cont'd well logging when MDT tool get stuck, Cut wier, RIH with fishing to get the tool. Tripping 12:00
Logging 12:00

Total 1.00:00:00
LITHOLOGY DATA
Age
Formation Drilled Nubia
Lithology Sand
DEVIATION DATA
Inclination / Azimuth, de
MD / TVD, m
Horisontal Displ., m
Ayman Rashad District Egypt District Representative Mahmoud Fawzy Daily Cost, $ Cummulative Cost, $
EMEC ENGINEER
Mohammed Maged Warehouse ALEX. Free Zone Field Representative 0 177551.75

General Petroleum Company"GPC", Egypt Page 1 of 1 April, 2018