Sie sind auf Seite 1von 2

HUAWEI BTS3012AE Base Station

Cabinet Installation Manual Index

Index

A
O
AC power cable
structure, 6-2 OT terminal of power cable
procedure, A-2
work flow, A-2
B outdoor interface box
battery power-on check, 7-6 pole, install, 5-8
wall, install, 5-7
C
P
cable for cabinet group installing, 6-39
cable for combined cabinet installing, 6-38 power cable
installing, checklist, 7-3
D power interface box
110V-type, component, 5-7
DATU installing, 4-7 220V-type, component, 5-6
DCSU weight, 5-6
DIP switch, 3-31 power-on check
DPMU installing, 4-8 board power-on, 7-5
DTMU installing, 4-4 cabinet power-on, 7-4
protection grounding cable
H installing, checklist, 7-3
heat exchanger, power-on check, 7-6
R
I RJ45 connector, B-2
installing checklist, 7-2
installing combined cabinet, 3-30 S
internal wiring of the cabinet sanitation checklist, 7-7
cables on the back of the cabinet, 6-1 SMB-type connector, B-6
wring on cabinet back, 6-7
T
L
transmission cable
label installing checklist, 7-2
optical fiber, C-8 transmission interface box
power cable, C-3, C-13 120-ohm-type, component, 5-5
signal cable, C-2 75Ω-type, component, 5-3
trunk cable, C-11 dimension, 5-3
weight, 5-3

Issue 01 (2006-09-06) Huawei Technologies Proprietary i-1


HUAWEI BTS3012AE Base Station
Index Cabinet Installation Manual

i.

i-2 Huawei Technologies Proprietary Issue 01(2006-09-06)

Das könnte Ihnen auch gefallen