Sie sind auf Seite 1von 14

HUAWEI BTS3012AE Base Station

Cabinet Installation Manual Contents

Contents

About This Document.....................................................................................................................1


1 Overview of the Hardware Installation.................................................................................1-1
1.1 BTS3012AE Hardware Structure ................................................................................................................1-2
1.1.1 Schematic Drawing of Hardware Structure .......................................................................................1-2
1.1.2 BTS3012AE Cabinet.........................................................................................................................1-3
1.1.3 Base .................................................................................................................................................1-10
1.1.4 Introduction to the Cables ...............................................................................................................1-10
1.2 Installation Process....................................................................................................................................1-13
1.2.1 Hardware Installation Flow Chart ...................................................................................................1-13
1.2.2 Installation Process Description ......................................................................................................1-14

2 Installation Preparations ..........................................................................................................2-1


2.1 Preparing Technical Documents ..................................................................................................................2-2
2.2 Preparing Mounting Tools and Instruments.................................................................................................2-2
2.3 Checking Installation Conditions ................................................................................................................2-3
2.3.1 Load-Bearing Capacity Requirements...............................................................................................2-4
2.3.2 Grounding Status Requirements........................................................................................................2-4
2.4 Unpacking and Inspecting ...........................................................................................................................2-4
2.4.1 Requirements for Unpacking.............................................................................................................2-4
2.4.2 Unpacking the Wooden Case.............................................................................................................2-5
2.4.3 Inspecting Items Inside the Wooden Case .........................................................................................2-7
2.4.4 Unpacking the Carton........................................................................................................................2-8
2.4.5 Inspecting Items Inside the Carton ....................................................................................................2-9

3 Installing the BTS3012AE Cabinet .........................................................................................3-1


3.1 Installing a Cabinet on the Cement Floor with Sufficient Bearing Capacity (ƒ 800 kg/m2)........................3-2
3.1.1 Installation Flowchart........................................................................................................................3-2
3.1.2 Positioning the Cabinet .....................................................................................................................3-3
3.1.3 Casting the Cement Plinth .................................................................................................................3-4
3.1.4 Positioning the Base ..........................................................................................................................3-5
3.1.5 Drilling Holes and Installing Expansion Bolts ..................................................................................3-7
3.1.6 Fastening the Base.............................................................................................................................3-9
3.1.7 Leveling the Base ..............................................................................................................................3-9

Issue 01 (2006-09-06) Huawei Technologies Proprietary i


HUAWEI BTS3012AE Base Station
Contents Cabinet Installation Manual

3.1.8 Placing the Cabinet..........................................................................................................................3-10


3.1.9 Fastening the Cabinet ......................................................................................................................3-12
3.1.10 Leveling the Cabinet .....................................................................................................................3-16
3.1.11 Removing Lifting Lugs .................................................................................................................3-17
3.1.12 Illustration of the Installed Cabinet ...............................................................................................3-18
3.2 Installing a Cabinet on the Cement Floor with Insufficient Bearing Capacity (< 800 kg/m2)...................3-18
3.2.1 Installation Flowchart......................................................................................................................3-18
3.2.2 Installation Process..........................................................................................................................3-20
3.2.3 Positioning the Cabinet ...................................................................................................................3-20
3.2.4 Casting Cement Plinths ...................................................................................................................3-20
3.2.5 Preparing U-Bar Supports ...............................................................................................................3-21
3.2.6 Positioning U-Bar Supports.............................................................................................................3-21
3.2.7 Drilling Holes and Installing Expansion Bolts ................................................................................3-21
3.2.8 Fastening U-Bar Supports ...............................................................................................................3-21
3.2.9 Leveling U-Bar Supports.................................................................................................................3-22
3.2.10 Fastening the Base.........................................................................................................................3-23
3.2.11 Leveling the Base ..........................................................................................................................3-23
3.2.12 Placing the Cabinet........................................................................................................................3-23
3.2.13 Fastening the Cabinet ....................................................................................................................3-25
3.2.14 Leveling the Cabinet .....................................................................................................................3-28
3.2.15 Removing Lifting Lugs .................................................................................................................3-28
3.2.16 Illustration of the Installed Cabinet ...............................................................................................3-29
3.3 Installing Combined Cabinets ...................................................................................................................3-30

4 Installing Boards ........................................................................................................................4-1


4.1 Introduction to Installation Positions...........................................................................................................4-2
4.2 Preparations .................................................................................................................................................4-2
4.3 Installing the DTMU ...................................................................................................................................4-4
4.3.1 Setting DIP Switches on the DTMU .................................................................................................4-4
4.3.2 Installation Procedure........................................................................................................................4-6
4.4 Installing the DATU ....................................................................................................................................4-7
4.5 Installing the PSU and DPMU.....................................................................................................................4-8
4.5.1 PSU and DPMU Installation Procedure ............................................................................................4-8
4.6 Installing the DELU ..................................................................................................................................4-11
4.6.1 Installation Overview ......................................................................................................................4-11
4.6.2 Installation Procedure......................................................................................................................4-11
4.7 Installing the DMLU .................................................................................................................................4-11
4.7.1 Installation Overview ......................................................................................................................4-11
4.7.2 Installation Procedure......................................................................................................................4-11
4.8 Installing the DTRU ..................................................................................................................................4-11
4.9 Installing the DDPU and DCOM...............................................................................................................4-13

5 Installing Auxiliary Equipment ..............................................................................................5-1

ii Huawei Technologies Proprietary Issue 01 (2006-09-06)


HUAWEI BTS3012AE Base Station
Cabinet Installation Manual Contents

5.1 Installing Transmission Unit........................................................................................................................5-2


5.1.1 Introduction to Installation Positions.................................................................................................5-2
5.1.2 Installation Procedure........................................................................................................................5-1
5.2 Installing Outdoor Interface Boxes..............................................................................................................5-3
5.2.1 Introduction to the Outdoor Transmission Interface Box ..................................................................5-3
5.2.2 Introduction to the Outdoor Power Interface Box .............................................................................5-5
5.2.3 Installing the Outdoor Interface Box on a Wall.................................................................................5-7
5.2.4 Installing the Outdoor Interface Box on a Pole .................................................................................5-8

6 Installing Cables ........................................................................................................................6-1


6.1 Introduction to the Cables to be Installed On Site .......................................................................................6-3
6.1.1 Introduction to Cabling Holes ...........................................................................................................6-3
6.1.2 Cable Layout at the Cabinet Front.....................................................................................................6-4
6.1.3 Wiring on the Back of the Cabinet ....................................................................................................6-7
6.2 Installing the Power Cables .........................................................................................................................6-2
6.2.1 Introduction to the Power Cables ......................................................................................................6-2
6.2.2 Installation Principles ........................................................................................................................6-1
6.2.3 Leading the 3-Phase 220 VAC Power into the BTS3012AE Cabinet................................................6-1
6.2.4 Leading the Single-Phase 220 VAC Power into the BTS3012AE Cabinet .......................................6-3
6.2.5 Leading the 110 VAC Dual-Live Power into the BTS3012AE Cabinet ............................................6-4
6.2.6 Connecting the Power Cables to the Power Interface Box................................................................6-5
6.3 Installing PGND Cables ..............................................................................................................................6-9
6.3.1 Introduction to PGND Cables ...........................................................................................................6-9
6.3.2 Installation Principles ........................................................................................................................6-9
6.3.3 Installation Procedure......................................................................................................................6-10
6.3.4 Connecting the PGND Cable to the Transmission Interface Box....................................................6-11
6.3.5 Connecting the PGND Cable to the Power Interface Box...............................................................6-11
6.4 Installing the E1 Cables.............................................................................................................................6-12
6.4.1 Introduction to the E1 Cables ..........................................................................................................6-12
6.4.2 Installation Principles ......................................................................................................................6-14
6.4.3 Installation Procedure......................................................................................................................6-14
6.4.4 Connecting the 75-ohm E1 Cable to the Transmission Interface Box.............................................6-15
6.4.5 Connecting the 120-ohm E1 Cable to the Transmission Interface Box...........................................6-15
6.5 Installing Optical Fibers ............................................................................................................................6-18
6.5.1 Introduction to the Optical Fibers....................................................................................................6-18
6.5.2 Installation Principles ......................................................................................................................6-19
6.5.3 Installation Procedure......................................................................................................................6-19
6.5.4 Connecting the Fibers to the Transmission Interface Box...............................................................6-20
6.6 Installing the RF Signal Cables .................................................................................................................6-21
6.6.1 Introduction to the RF Signal Cables ..............................................................................................6-21
6.6.2 Installation Principles ......................................................................................................................6-22
6.6.3 Installation Procedure......................................................................................................................6-22

Issue 01 (2006-09-06) Huawei Technologies Proprietary iii


HUAWEI BTS3012AE Base Station
Contents Cabinet Installation Manual

6.7 Installing the Cable for the Combiner on the DTRU.................................................................................6-22


6.7.1 Introduction to the Cable for the Combiner on the DTRU ..............................................................6-22
6.7.2 Connecting the Cable for Combiner on the DTRU .........................................................................6-23
6.8 Installing the 1/4-Inch RF Jumper .............................................................................................................6-23
6.8.1 Introduction to the RF Jumper.........................................................................................................6-23
6.8.2 Installation Principles ......................................................................................................................6-24
6.8.3 Installation Procedure......................................................................................................................6-24
6.9 Installing the 1/2-Inch RF Jumper .............................................................................................................6-25
6.9.1 Introduction to the RF Jumper.........................................................................................................6-25
6.9.2 Installation Procedure......................................................................................................................6-25
6.10 Installing the Boolean Value Input Signal Cable .....................................................................................6-25
6.10.1 Introduction to the Boolean Value Input Signal Cable ..................................................................6-25
6.10.2 Installation Positions .....................................................................................................................6-26
6.11 Installing the Built-In Storage Battery and Its Cables .............................................................................6-26
6.11.1 Introduction to the Storage Battery Cabin .....................................................................................6-26
6.11.2 Introduction to the Cables for the Built-in Storage Battery ...........................................................6-29
6.11.3 Installation Procedure....................................................................................................................6-29
6.12 Installing Cables for the Combined Cabinet............................................................................................6-38
6.12.1 Introduction to Cables for the Combined Cabinet .........................................................................6-38
6.12.2 Installation Procedure....................................................................................................................6-38
6.13 Installing Cables for the Cabinet Group ..................................................................................................6-39
6.13.1 Introduction to Cables for the Cabinet Group ...............................................................................6-39
6.13.2 Installation Procedure....................................................................................................................6-39
6.14 Installing the RET Control Signal Cable .................................................................................................6-39
6.14.1 Introduction to the RET Control Signal Cable ..............................................................................6-39
6.14.2 Connecting the RET Control Signal Cable....................................................................................6-40

7 Checking Hardware Installation.............................................................................................7-1


7.1 Equipment Installation Check .....................................................................................................................7-2
7.2 Cable Installation Check..............................................................................................................................7-2
7.2.1 Transmission Cable Installation Check .............................................................................................7-2
7.2.2 Power Cable and Protection Grounding Cable Installation Check....................................................7-3
7.3 Power-On Check .........................................................................................................................................7-3
7.3.1 Cabinet Power-On Check ..................................................................................................................7-4
7.3.2 Board Power-On Check.....................................................................................................................7-5
7.3.3 Power-On Check of the Heat Exchanger...........................................................................................7-6
7.3.4 Power-on Check of the Batteries .......................................................................................................7-6
7.4 Sanitation Check..........................................................................................................................................7-7

A Making OT Terminals of Power Cables............................................................................. A-1


A.1 Work Flow .................................................................................................................................................A-2
A.2 Procedure...................................................................................................................................................A-2
A.2.1 Cutting Cables .................................................................................................................................A-2

iv Huawei Technologies Proprietary Issue 01 (2006-09-06)


HUAWEI BTS3012AE Base Station
Cabinet Installation Manual Contents

A.2.2 Mounting Heat-Shrinkable Tube .....................................................................................................A-3


A.2.3 Stripping ..........................................................................................................................................A-3
A.2.4 Crimping..........................................................................................................................................A-4
A.2.5 Blowing Heat-shrinkable Tube........................................................................................................A-6
A.2.6 Checking..........................................................................................................................................A-6
A.2.7 Labeling...........................................................................................................................................A-6

B Making Connectors of Communication Cables .................................................................B-1


B.1 Making RJ45 Connectors........................................................................................................................... B-2
B.1.1 Parts Required.................................................................................................................................. B-2
B.1.2 Stripping and Cutting....................................................................................................................... B-2
B.1.3 Wire Insertion and Assembly........................................................................................................... B-3
B.1.4 Crimping.......................................................................................................................................... B-4
B.1.5 Checking.......................................................................................................................................... B-5
B.2 Making SMB-Type Connectors ................................................................................................................. B-6
B.2.1 Mounting the Heat-shrinkable Tube and Crimping Sleeve.............................................................. B-6
B.2.2 Stripping .......................................................................................................................................... B-6
B.2.3 Soldering Pins.................................................................................................................................. B-7
B.2.4 Crimping External Conductor.......................................................................................................... B-7
B.2.5 Blowing Heat-Shrinkable Tube ....................................................................................................... B-8
B.2.6 Checking.......................................................................................................................................... B-9

C Engineering Labels for Cables...............................................................................................C-1


C.1 Introduction to Labels................................................................................................................................ C-2
C.1.1 About Engineering Labels ............................................................................................................... C-2
C.1.2 Material............................................................................................................................................ C-2
C.1.3 Type and Shape................................................................................................................................ C-2
C.1.4 Writing Labels ................................................................................................................................. C-5
C.1.5 Affixing Labels ................................................................................................................................ C-6
C.1.6 Information Carried on Labels......................................................................................................... C-7
C.1.7 Points for Attention.......................................................................................................................... C-8
C.2 Engineering Labels for Optical Fibers ....................................................................................................... C-8
C.2.1 Labels for the Fiber that Connects Two Devices ............................................................................. C-8
C.2.2 Labels for the Fiber that Connects the Device and the ODF ......................................................... C-10
C.3 Engineering Labels for Trunk Cables ...................................................................................................... C-11
C.3.1 Labels for the Trunk Cable that Connects Two Devices................................................................ C-11
C.3.2 Labels for the Trunk Cable that Connects the Device and the DDF .............................................. C-12
C.4 Engineering Labels for Power Cables...................................................................................................... C-13
C.4.1 Labels for DC Power Cables ......................................................................................................... C-13

D Acronyms and Abbreviations............................................................................................... D-1


Index ................................................................................................................................................ i-1

Issue 01 (2006-09-06) Huawei Technologies Proprietary v


HUAWEI BTS3012AE Base Station
Cabinet Installation Manual Figures

Figures

Figure 1-1 BTS3012AE hardware structure .....................................................................................................1-2


Figure 1-2 BTS3012AE cabinet .......................................................................................................................1-4

Figure 1-3 BTS3012AE cabinet without a base (in mm)..................................................................................1-5

Figure 1-4 BTS3012AE 机柜底面尺寸图(单位:mm) .............................................................................1-6

Figure 1-5 BTS3012AE cabinet with a base (in mm).......................................................................................1-7

Figure 1-6 Front view of the BTS3012AE cabinet under full configuration ....................................................1-8
Figure 1-7 Installation space for a BTS3012AE cabinet (in mm) ....................................................................1-9

Figure 1-8 Base dimensions (in mm)..............................................................................................................1-10

Figure 1-9 Hardware installation of the BTS3012AE ....................................................................................1-14


Figure 2-1 Straightening tongues......................................................................................................................2-6

Figure 2-2 Removing the cover ........................................................................................................................2-6

Figure 2-3 Removing all wooden boards..........................................................................................................2-7


Figure 2-4 Unpacking a carton .........................................................................................................................2-8

Figure 3-1 Process for installing a cabinet on the cement floor........................................................................3-3

Figure 3-2 Installation position of the BTS3012AE cabinet.............................................................................3-4


Figure 3-3 Dimensions of the cement plinth.....................................................................................................3-5

Figure 3-4 Installation holes of the expansion bolts for a single cabinet..........................................................3-6

Figure 3-5 M12 expansion bolt assembly.........................................................................................................3-7


Figure 3-6 Installing the expansion bolt (1)......................................................................................................3-8

Figure 3-7 Installing the expansion bolt (2)......................................................................................................3-8

Figure 3-8 Installing the base ...........................................................................................................................3-9


Figure 3-9 Leveling the base (1).....................................................................................................................3-10

Figure 3-10 Leveling the base (2)...................................................................................................................3-10

Figure 3-11 Lifting the cabinet .......................................................................................................................3-11


Figure 3-12 Placing the cabinet on the base ...................................................................................................3-12

Figure 3-13 Fastening the cabinet on the base (Rear view) ............................................................................3-13

Issue 01 (2006-09-06) Huawei Technologies Proprietary vii


HUAWEI BTS3012AE Base Station
Figures Cabinet Installation Manual

Figure 3-14 Unlocking the cabinet .................................................................................................................3-14

Figure 3-15 Fixing the front door ...................................................................................................................3-15


Figure 3-16 Fastening the cabinet on the base (Front view) ...........................................................................3-15

Figure 3-17 Leveling the cabinet (1) ..............................................................................................................3-16

Figure 3-18 Leveling the cabinet (2) ..............................................................................................................3-17


Figure 3-19 Removing lifting lugs .................................................................................................................3-17

Figure 3-20 Installed BTS3012AE cabinet.....................................................................................................3-18

Figure 3-21 Process for installing a cabinet on the cement floor with insufficient bearing capacity .............3-19
Figure 3-22 Installation position of the BTS3012AE cabinet.........................................................................3-20

Figure 3-23 Dimensions of U-bar supports (unit: mm) ..................................................................................3-21

Figure 3-24 Fastening the U-bar supports on the cement plinths ...................................................................3-22

Figure 3-25 Leveling the U-bar support (1)....................................................................................................3-22

Figure 3-26 Leveling the U-bar support (2)....................................................................................................3-23

Figure 3-27 Lifting the cabinet .......................................................................................................................3-24

Figure 3-28 Placing the cabinet on the U-bar supports...................................................................................3-25

Figure 3-29 Fastening the cabinet on the base (Rear view) ............................................................................3-26

Figure 3-30 Unlocking the front door.............................................................................................................3-27


Figure 3-31 Fastening the cabinet on the base (Front view) ...........................................................................3-28

Figure 3-32 Removing lifting lugs .................................................................................................................3-29

Figure 3-33 Installed cabinet ..........................................................................................................................3-30


Figure 3-34 DIP switches on the DCSU .........................................................................................................3-31

Figure 4-1 Boards in the BTS3012AE subrack ................................................................................................4-2

Figure 4-2 Wearing an ESD wrist strap ............................................................................................................4-3


Figure 4-3 DIP switches on the DTMU............................................................................................................4-4

Figure 4-4 Installing the DTMU.......................................................................................................................4-6

Figure 4-5 Hooking spanners on to the square holes of the subrack ................................................................4-7

Figure 4-6 DIP switches on the DATU .............................................................................................................4-8

Figure 4-7 DIP switch of the DPMU ................................................................................................................4-9

Figure 4-8 Installing the PSU and DPMU (1) ................................................................................................4-10


Figure 4-9 Installing the PSU and DPMU (2) ................................................................................................4-10

Figure 4-10 Front panel of a DTRU ...............................................................................................................4-12

Figure 4-11 Front panel of a DDPU................................................................................................................4-14


Figure 5-1 Installation position of the transmission unit ..................................................................................5-2

viii Huawei Technologies Proprietary Issue 01 (2006-09-06)


HUAWEI BTS3012AE Base Station
Cabinet Installation Manual Figures

Figure 5-2 Positions of the dummy panel and air deflector plate .....................................................................5-2

Figure 5-3 Installing transmission unit .............................................................................................................5-2


Figure 5-4 Internal structure of the 75-ohm outdoor transmission interface box .............................................5-4

Figure 5-5 Structure of the 12-core fusion parts ...............................................................................................5-4

Figure 5-6 Internal structure of the 120-ohm transmission interface box.........................................................5-5


Figure 5-7 Internal structure of the 220 VAC power interface box...................................................................5-6

Figure 5-8 Positions of the expansion bolts......................................................................................................5-7

Figure 5-9 Installing the outdoor interface box on a wall.................................................................................5-8


Figure 5-10 Fixing the pole fixture to the interface box ...................................................................................5-9

Figure 5-11 Fixing the interface box to the pole...............................................................................................5-9

Figure 6-1 BTS3012AE cabling holes..............................................................................................................6-3

Figure 6-2 Silkscreens of the cabling holes ......................................................................................................6-4

Figure 6-3 Cable layout at the cabinet front .....................................................................................................6-5

Figure 6-4 NPMI cable layout on the top of the cabinet...................................................................................6-6

Figure 6-5 Wring on the back of the BTS3012AE cabinet ...............................................................................6-8

Figure 6-6 Installing L1, L2, L3, and N............................................................................................................6-2

Figure 6-7 Installing the short-circuiting copper bar ........................................................................................6-3


Figure 6-8 Installing L1, L2, and N ..................................................................................................................6-5

Figure 6-9 Power cable layout of the single-phase mains input .......................................................................6-6

Figure 6-10 Connection of power cables in single-phase mains and single-phase generator input modes ......6-7
Figure 6-11 Connection of power cables in three-phase mains input mode .....................................................6-8

Figure 6-12 Connection of power cables in three-phase mains and three-phase generator input mode ...........6-9

Figure 6-13 Installing the PGND cable for the power interface box ..............................................................6-12
Figure 6-14 75-ohm E1 coaxial cable.............................................................................................................6-13

Figure 6-15 Connecting the 75-ohm E1 cable ................................................................................................6-15

Figure 6-16 Connecting the 120-ohm E1 cable ..............................................................................................6-16

Figure 6-17 Clamping the 120-ohm E1 cable to the 120-ohm digital unit .....................................................6-17

Figure 6-18 Connecting the E1 wire of the client...........................................................................................6-18

Figure 6-19 LC connector...............................................................................................................................6-18


Figure 6-20 Connection between a fiber and a 12-core fiber splice tray ........................................................6-20

Figure 6-21 12-route Fiber Indicator Table.....................................................................................................6-21

Figure 6-22 Structure of the RF RX signal cable and that of the TX signal cable..........................................6-22
Figure 6-23 Cable for the combiner on the DTRU .........................................................................................6-23

Issue 01 (2006-09-06) Huawei Technologies Proprietary ix


HUAWEI BTS3012AE Base Station
Figures Cabinet Installation Manual

Figure 6-24 Structure of the RF jumper..........................................................................................................6-24

Figure 6-25 Removing the cover plate of the RF cable ..................................................................................6-24


Figure 6-26 Structure of the RF jumper..........................................................................................................6-25

Figure 6-27 Boolean value input signal cable.................................................................................................6-26

Figure 6-28 Full configuration of the BTS3012AE ........................................................................................6-27


Figure 6-29 Cabling of the –48 V 50-AH storage battery cabin.....................................................................6-28

Figure 6-30 Cabling of the –48 V 150-AH storage battery cabin...................................................................6-28

Figure 6-31 Cabling for the 100-AH configuration mode (1) ........................................................................6-30
Figure 6-32 Cabling for the 100-AH configuration mode (2) ........................................................................6-31

Figure 6-33 Cabling for the 150-AH configuration mode (1) ........................................................................6-33

Figure 6-34 Cabling for the 150-AH configuration mode (2) ........................................................................6-34

Figure 6-35 Cabling for the 150-AH configuration mode (3) ........................................................................6-35

Figure 6-36 Cabling for the 200-AH configuration mode ..............................................................................6-37

Figure 6-37 Cable for the combined cabinet...................................................................................................6-38

Figure 6-38 Cable for the cabinet group .........................................................................................................6-39

Figure 6-39 Structure of the RET control signal cable ...................................................................................6-40

Figure A-1 Work flow of making OT terminals of power cables ....................................................................A-2


Figure A-2 Cable cutting .................................................................................................................................A-3

Figure A-3 Cable stripping ..............................................................................................................................A-4

Figure A-4 Connecting the cable core wires to the terminal crimping sleeve .................................................A-5
Figure A-5 Crimping molds for various power cables.....................................................................................A-5

Figure A-6 Crimping method...........................................................................................................................A-5

Figure A-7 Usage of a heat-shrinkable tube ....................................................................................................A-6


Figure B-1 Outline of a round communication cable ...................................................................................... B-2

Figure B-2 Outline of a flat telephone cable.................................................................................................... B-2

Figure B-3 Outline of a shielded cable ............................................................................................................ B-3

Figure B-4 Outline of neatly-cut core wires .................................................................................................... B-3

Figure B-5 Outline of a RJ45 connector .......................................................................................................... B-4

Figure B-6 A crimped RJ45 connector ............................................................................................................ B-5


Figure B-7 Mounting the heat-shrinkable tube and crimping sleeve ............................................................... B-6

Figure B-8 Stripping a cable (unit: mm).......................................................................................................... B-6

Figure B-9 Soldering Pins ............................................................................................................................... B-7


Figure B-10 Crimping an SMB connector onto a coaxial cable ...................................................................... B-8

x Huawei Technologies Proprietary Issue 01 (2006-09-06)


HUAWEI BTS3012AE Base Station
Cabinet Installation Manual Figures

Figure B-11 Blowing the heat-shrinkable tube to shrink It.............................................................................. B-8

Figure C-1 The label for the signal cable ........................................................................................................ C-2
Figure C-2 Label for power cables .................................................................................................................. C-3

Figure C-3 Warning prompt before printing.................................................................................................... C-4

Figure C-4 Writing direction of the label ........................................................................................................ C-6


Figure C-5 Affixing a label to a signal cable ................................................................................................... C-6

Figure C-6 Appearance of affixed labels on power cables .............................................................................. C-7

Figure C-7 Printed parts on the label for signal cables.................................................................................... C-8
Figure C-8 Example of the label on the optical fiber between two devices .................................................... C-9

Figure C-9 Example of the label on the optical fiber between the device and the ODF................................ C-10

Figure C-10 Example of the label on the trunk cable between two devices .................................................. C-12

Figure C-11 Example of the label on the trunk cable between the device and the DDF ............................... C-13

Figure C-12 Example of the labels on the DC power cable .......................................................................... C-14

Issue 01 (2006-09-06) Huawei Technologies Proprietary xi


HUAWEI BTS3012AE Base Station
Cabinet Installation Manual Tables

Tables

Table 1-1 Description of the BTS3012AE hardware ........................................................................................1-2


Table 1-2 Weight of the BTS3012AE cabinet under different configurations ..................................................1-7

Table 1-3 Boards in the BTS3012AE cabinet ...................................................................................................1-8


Table 1-4 Base specifications..........................................................................................................................1-10

Table 1-5 Types and installation positions of the cables .................................................................................1-11

Table 1-6 Installation process .........................................................................................................................1-15

Table 2-1 Technical documents for reference ...................................................................................................2-2

Table 2-2 List of tools and instruments.............................................................................................................2-3

Table 3-1 Settings for SW1.............................................................................................................................3-31

Table 3-2 Settings for SW11 ...........................................................................................................................3-31

Table 3-3 Settings for SW2−SW5...................................................................................................................3-32

Table 3-4 Settings for SW6 and SW7 .............................................................................................................3-32

Table 3-5 Settings for SW8.............................................................................................................................3-33

Table 3-6 Settings for SW9 and SW10 ...........................................................................................................3-33

Table 4-1 S4/S5/S6/S7 setting descriptions ......................................................................................................4-4


Table 4-2 Default setting of the DIP switches on the DATU ............................................................................4-7

Table 6-1 Cables laid out at the cabinet front....................................................................................................6-6

Table 6-2 Cables on the back of the BTS3012AE cabinet ................................................................................6-1


Table 6-3 Specifications of the AC power cables for the BTS3012AE ............................................................6-2

Table 6-4 AC power distribution mode.............................................................................................................6-1

Table 6-5 Figure for reference in different power supply modes ......................................................................6-5
Table 6-6 Pins of the coaxial cable .................................................................................................................6-13

Table 6-7 Installation positions of the Boolean value input signal cable ........................................................6-26

Table 7-1 Equipment installation checklist .......................................................................................................7-2

Table 7-2 Transmission cable installation checklist ..........................................................................................7-2

Table 7-3 Power cable and grounding cable installation checklist....................................................................7-3

Issue 01 (2006-09-06) Huawei Technologies Proprietary xiii


HUAWEI BTS3012AE Base Station
Tables Cabinet Installation Manual

Table 7-4 Instructions to handling different values...........................................................................................7-6

Table 7-5 Sanitation checklist ...........................................................................................................................7-7


Table C-1 Standard typeface for handwriting .................................................................................................. C-5

Table C-2 Information on labels affixed to the fiber between two devices...................................................... C-8

Table C-3 Information on labels affixed to the fiber between the device and the ODF................................. C-10
Table C-4 Information on labels affixed to the trunk cable between two devices ......................................... C-11

Table C-5 Information on labels affixed to the trunk cable between the device and the DDF ...................... C-12

Table C-6 Information on labels affixed to the DC power cables.................................................................. C-13

xiv Huawei Technologies Proprietary Issue 01 (2006-09-06)

Das könnte Ihnen auch gefallen