Sie sind auf Seite 1von 1

Proposed Ground Surface

Varies from 31’-7" to 55’-3"


Type "A" gutter to ~ Coaltown Road

GENERAL NOTES 1’-2’’


1
:3
Reinforcement bars designated (E) shall be epoxy coated. (
V: 1’-0’’ 2" Existing ground
H)
TOTAL BILL OF MATERIAL


2’
surface

The contractor is responsible for the design and performance of the lagging using no less than a ITEM UNIT TOTAL


-0’
3 in. nominal rough-sawn thickness and timber with a minimum allowable bending stress of 1000 psi.


Structure Excavation Cu. Yd. 114

-6’

1’
Concrete Structures Cu. Yd. 324.8

1’
Ashlar stone form liner shall be used on all locations labeled with Form Liner Textured Surface. Form Liner Textured Surface Sq. Ft. 5,795
Protective Coat Sq. Yd. 644
Stud Shear Connectors Each 2,008 Front face
Reinforcement Bars, Epoxy Coated Pound 33,610 of wall
Soldier pile

ve Coat
Name Plates Each 1
Form Liner

al
Geocomposite Wall Drain

ts of
Sq. Yd. 433

"
Textured

ed Low Strength Materi


Concrete Gutter, Type A Foot 850 Untreated
Surface

Protecti
-10
timber lagging

mi
Drilling and Setting Soldier Piles (In Soil) Cu. Ft. 11,954

Li
6’
Drilling and Setting Soldier Piles (In Rock) Cu. Ft. 3,633 " } x 6"

"
max.
Untreated Timber Lagging Sq. Ft. 5,958 Shear studs

-0
Furnishing Soldier Piles (W Section) Foot 3,176

9’
Pipe Underdrains for Structures 6" Foot
Concrete
850
Geocomposite Facing
Temporary Soil Retention System Sq. Ft. 1,374
wall drain
CURVE DATA
Finish Grade
(Proposed Curve Coaltown Road)
STATION 18+89.06

l
Control
PI Sta. = 28+35.98 Limits of CLSM and
BUILT BY 1:50
! = 711’ 46" (Rt.) soil removal for


-0’
STATE OF ILLINOIS D = 100’ 00" lagging installation


R = 5,729.58’

1’
LOADING HL-93

-0’
STRUCTURE NO. 081-P002 T = 360.27’

2’
L = 719.60’
E = 11.32’
P.C. Sta. = 24+75.71
NAME PLATE
P.T. Sta. = 31+95.31
See Std. 515001

Encasement
Concrete
Pipe underdrain
for structures

SECTION THRU
SOLDIER PILE WALL

*Included in the cost of Pipe Underdrains for Structures, 6".

Finished grade Finished grade


Untreated timber
al

Untreated timber at front face

87
at front face
ed Low Strength Materi

lagging

. 592.
lagging

00
24
PVI Sta. 18+50.

53
on 598.
Geocomposite

. 587.
00 El
wall drain

00 El
PVC 19+85.
evati
-0"

n.
-0"

n.

mi

El
Place " gap

PVT 23+15.
mi

Place " gap

2’
330.00’ V.C.
2’

to allow for to allow for


+08
.6% -3.
9
drainage, typ. 7%
drainage, typ.

21
l

Concrete
Control

Concrete

. 597.
facing Soldier facing

47
. 593.
Pile
240.00’ V.C. -3.

00 El
97%
+07
.3%

00
00 El

PVI Sta. 21+50.


32
Concrete Encasement

PVC 17+30.

on 586.
*Geotechnical filter *Geotechnical filter

-0"
-0"

fabric for french drains

PVT 19+70.
fabric for french drains

1’
1’

evati
*Drainage *Drainage

aggregate aggregate

El
*6" Perforated *6" Perforated
1’-0" drain pipe
drain pipe PROFILE GRADE LINE
(along Coaltown Road)
BETWEEN SOLDIER PILES

AT SOLDIER PILES

UNDERDRAIN DETAIL FOR


SOLDIER PILE WALLS

F.A.P. TOTAL SHEET


USER NAME = DESIGNED - TBP REVISED ADDENDUM 1 8/15/2013 SECTION COUNTY
LIN ENGINEERING,LTD. GENERAL DATA RTE. SHEETS NO.
FILE NAME = CHECKED - VPT REVISED STATE OF ILLINOIS 595 (142-1)R & 142-1HB ROCK ISLAND 507 363F
Consulting Engineers
-
RETAINING WALL - STA. 18+89.06 TO STA. 27+37.02
Springfield, Illinois
PLOT SCALE = DRAWN AJF REVISED DEPARTMENT OF TRANSPORTATION CONTRACT NO. 64B84
PLOT DATE = CHECKED - MTH REVISED SD-2 OF SD-18 ILLINOIS FED. AID PROJECT

Das könnte Ihnen auch gefallen