No SIGNAL DESCRIPTION DI DO AI
Water Cooled Chillers(Qty.4)
1 Chiller Start/Stop Command 4
2 Chiller On/Off Status 4
3 Chiller Normal/Fault Status 4
4 Chiller Water Flow Switch 4
5 Chiller Water Flow Status 4
6 Chiller Supply Temp. 4
7 Chiller Butterfly Valve Open/Close Command 4
8 Chiller Butterfly Valve Open/Close Status 4
9 Chiller Main Supply & Return Header Temperature 2
10 Chiller Main Supply & Return Header Flow Status 2
11 Main Load Supply & Return Temerature 2
12 Main Load Supply & Return Flow Status 2
13 Main Load Supply GPM 1
14 Load Differential Pressure 2
Primary Chilled Water Pumps(Qty.3)
1 PCHWP Auto/ Manual 3
2 PCHWP Start/Stop Command 3
3 PCHWP On/Off Status 3
4 PCHWP Normal/Fault 3
5 PCHWP Low Pressure 3
Secondary Chilled Water Pumps(Qty.3)
1 SCHWP Auto/ Manual 3
2 SCHWP Start/Stop Command 3
3 SCHWP On/Off Status 3
4 SCHWP General Alarm 3
5 SCHWP Low Pressure 3
6 SCHWP VFD Control
7 SCHWP VFD Feedback 3
I/O Points 40 14 22
20% Spare I/O Points 8 3 4
TOTAL I/O Points 48 17 26
1 DDC Controller
2 DDC Controller
3 DDC Controller
4 DDC Controller
5 DDC Panel /wo Starters
AO Part No. Qty
S6065A1003 4
A/CP-I-4"-GD 4
V4ABFW16-150-012
A/CP-I-4"-GD 2
A/CP-I-4"-GD 2
By others 1
WP-G-107 2
UEC24014M262/U 3
UEC24014M262/U 3
3
3
1
4
VLX-Platinum 1
EXP-10120 2
EXP-1048 1
EXP-2200 3
1
To:- Engr. Syed Mansoor Hussain
Sales Manager
AIMS, Jeddah
Al Ramadi Est appreciates the interest shown by AIMS in seeking its services for the
design, supply and installation of control Panel for Governer Residence at Madina.
As per the supplied data and panel drawings, 4 chillers are to be controlled along
with 4 primary and 2 secondary Chill water pumps. Below is the scope of work and
its nominal cost
Total SR 98256
Note: The above is as per our discussion and the provided BMS interface
drawings of the system . Any additional devices, work and equipments not
mentioned in the above scope will be charged separately
Terms of Payment
1 60% down payment
2 30% upon panel delivery
3 10% Upon Testing and Commissioning
Regards
Al Ramadi Est appreciates the interest shown by AIMS in seeking its services for the design, supply and
installation of BMS control Panel for Governer Residence at Madina. As per the supplied data and panel
drawings, 4 chillers are to be controlled along with 6 Chill water pumps. Below is the scope of work and
its nominal cost
Total
Note: The above is as per our discussion and given scope of work. Any additional devices and equpmen
he design, supply and
upplied data and panel
the scope of work and
4250 4250
1725 1725
2536 2536
13800 13800
12250 12250
41000 41000
6500 39000
`
114561
Al Ramadi Est appreciates the interest shown by AIMS in seeking its services for the design, supply and
installation of BMS control Panel for Governer Residence at Madina. As per the supplied data and panel
drawings, 4 chillers are to be controlled along with 6 Chill water pumps. Below is the scope of work and
its nominal cost
Total
he design, supply and
upplied data and panel
the scope of work and
6120 6120
4250 4250
1725 1725
2536 2536
13800 13800
12250 12250
46285 46285
14000 14000
25630 25630