Developments
p in p
para--Xylene
para y
Production
Guangdong Qu
UOP 6044P-2
Polyester chain drivers continue to
be strong
ACT FRCST
~30 M
~30
30 units
20 M
Me
15 M
10 M
5M
M
2014 2016 2018 2020 2022 2024
• PX – naphtha margins
have begun to decline &
expected
t d to
t continue
ti in
i
2014 – 2015
• 2011-2013
0 0 3 sp
spreads
eads have
a e
exceeded most every prior
year average
Naphtha based
complexes hold the
advantage
p-Xylene Cost of Production impacted by
regional utility costs
1,200
$1,065 $1,044 $1,041
$1,000 $988
1,000
Capital Charges
Fixed COP
800 $888 $870 $896 $859 Cat & Chems
$803
T PX
Utilities
$/MT
200
0
Asia Pac USGC China India Middle
East
Basis Assumed:
Energy Values, /mm btu: AP = $5.50 USGC = $3.9 China = $6.00 India = $4.20 ME = $1.25
Location Factors: AP = 1.02 USGC = 1.00 China = 0.80 India = 0.77 ME = 1.08
ED Raffinate
Sulfolane™ Benzene
Unit
CCR
Platforming™ Reformate TA-32
Unit Splitter B T Heavy
Aromatics
Tatoray™
Tatoray Column
NHT Unit
ADS-47 I-500 A10+
p-Xylene
Naphtha
Parex™ Isomar™ Light Ends
Unit Unit
Xylene
Column Deheptanizer
Column
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014+
Base ROI +15% ROI +22% ROI +30% ROI +45% ROI
Net Energy Required Additional 14%+ CAPEX and OPEX
Reduced by 1/3 vs. Energy Reductions vs.
Best 2009 Designs Reduction vs. Best 2012 Design
Best
B t 2010 Design
D i
TA-20HP • Higher
g xylenes
y yield
y
– More than 1% higher xylene selectivity
perature, °C
UOP 5892B-14
Latest products improve yields and
capital investment effectiveness
For new aromatics complex designed with the latest products:
Base Latest COP Reduction
Unit Product Product Excluding Energy
CCR Platforming R-264 R-284 $3+ /MT pX
Isomar I-300/350 I-500 $1-8* / MT pX
Tatoray TA 20HP
TA-20HP TA-32 $3+ / MT pX
Parex ADS-37 ADS-47 $3 / MT pX
Total COP Reduction Over $10 / MT pX
Production Costs
Reduceed
Latest products substantially
reduce production costs
UOP 6044P-15
Integrated process design reduces energy
costs by over 53%
Total Energy Energy Savings
Requirement Energy Savings @ $6 / mm Btu
(MMBtu/hr) (MMBtu/hr) (MM$/year)*
UOP Design
g – 2009 1150 Base Base
1800
1600
1400
KMTA
1200
1000
p-Xylene,
800
600
p
400
200
0
70
75
80
85
90
95
00
05
10
15
20
19
19
19
19
19
19
20
20
20
20
20
Commissioned In Design / Construction
Source: UOP licensed unit data
ROFITABILITY
Y
Track record of innovation
PR
to address diverse challenges
UOP 6044P-18
UOP 6123-19