PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

ELECTRICAL

1 ARJ/PJ237/EL/MS-01 PVC CONDUITS & FITTINGS CLIPSAL AL SHAMALI TRDG 10-Jul-17

ARJ 1 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

2 ARJ/PJ237/EL/MS-02 GI BACK BOX DELTA POWERMAX TRADING 10-Jul-17

COSMOPLAST COSMOPLAST
3 ARJ/PJ237/EL/MS-03 UPVC DUCT 12-Jul-17

ARJ 2 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

3 ARJ/PJ237/EL/MS-03 UPVC DUCT 12-Jul-17


HEPWORTH HEPWORTH

FRANKLIN, 22-Jul-17
4 ARJ/PJ237/EL/MS-04 LIGHTNING PROTECTION SYSTEM CATOBO
FRANCE

ARJ 3 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

5 ARJ/PJ237/EL/MS-05 EARTHING PROTECTION SYSTEM FRANKLIN CATOBO 22-Jul-17

ALFANAR ARJ SWITCHGEAR


6 ARJ/PJ237/EL/MS-06 DB ENCLOSURE 31-Jul-17

ARJ 4 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

6 ARJ/PJ237/EL/MS-06 DB ENCLOSURE 31-Jul-17


ABB ARJ SWITCHGEAR

7 ARJ/PJ237/EL/MS-07 FIRE ALARM CABLES SHIELD NAFFCO 31-Jul-17

ARJ 5 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

8 ARJ/PJ237/EL/MS-08 CABLE GLANDS RUPAM, INDIA MISTERLIGHT 3-Aug-17

9 ARJ/PJ237/EL/MS-09 CABLES & WIRES ALFANAR AL SHAMALI TRDG 22-Aug-17

ARJ 6 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

10 ARJ/PJ237/EL/MS-10 STRUCTURED CABLING SYSTEM OPTERNA LAN & WAN 17-Aug-17

11 ARJ/PJ237/EL/MS-11 ISOLATORS ABB AL ZUBAIR 30-Jul-17

ARJ 7 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

CENTRAL BATTERY SYSTEM


12 ARJ/PJ237/EL/MS-12 NAFFCO NAFFCO 5-Sep-17
( Emergency Lighting System )

13 ARJ/PJ237/EL/MS-13 CABLE TRAYS AND TRUNKING DELTA Advance Tech. Parts 17-Aug-17

ARJ 8 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

FIRE ALARM W/ VOICE EVACUATION 5-Sep-17


14 ARJ/PJ237/EL/MS-14 SImplex- USA SIBCA Electronics LLC.
SYSTEM

ARJ 9 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

15 ARJ/PJ237/EL/MS-15 WIRING ACCESSORIES - OPTION 1 Clipsal Nazwah General Trading 29-Aug-17

16 ARJ/PJ237/EL/MS-16 GENERATOR & ASSEMBLIES PERKINS CASABLANCA 10-Sep-17

ARJ 10 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

LEGRAND AL HATHBOOR 10-Aug-17


17 ARJ/PJ237/EL/MS-17 CEILING ROSE
EATON AL ZUBAIR 25-Sep-17

ARJ 11 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

18 ARJ/PJ237/EL/MS-18 LV SWITCH GEAR Switchgear ARJ SWITCHGEAR 10-Sep-17

ASCO Power 10-Sep-17


19 ARJ/PJ237/EL/MS-19 ATS PANEL ASCO - USA
Technologies

ARJ 12 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

20 ARJ/PJ237/EL/MS-20 WIRING ACCESSORIES - OPTION 2 Clipsal Nazwah General Trading 29-Aug-17

21 ARJ/PJ237/EL/MS-21 PUBLIC ADDRESS SYSTEM BOSCH SIBCA Electronics LLC. 8-Oct-17

ARJ 13 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

22 ARJ/PJ237/EL/MS-22 FIRE RATED CABLES DRAKA AL ZUBAIR 10-Aug-17

23 ARJ/PJ237/EL/MS-23 CCTV SYSTEM HONEY WELL LAN & WAN  24-Aug-17

ARJ 14 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

24 ARJ/PJ237/EL/MS-24 ACCESS CONTROL SYSTEM HONEY WELL LAN & WAN  24-Aug-17

25 ARJ/PJ237/EL/MS-25 CENTRAL CLOCK SYSTEM BODET LAN & WAN  24-Aug-17

ARJ 15 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

Qlite Sabid Tech.
26 ARJ/PJ237/EL/MS-26 LIGHTING CONTROL SYSTEM 22-Aug-17
MIRCOM ZAHRA 
SIEMENS
SECURITY SYSTEM

ARJ 16 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

GI FLEXIBLE CONDUITS and 3-Aug-17


27 ARJ/PJ237/EL/MS-27 DELTA POWERMAX TRADING
Accessories

SUPER 3-Aug-17
28 ARJ/PJ237/EL/MS-28 CABLE LUGS MISTERLIGHT
IMPEX,INDIA

ARJ 17 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

29 ARJ/PJ237/EL/MS-29 FIEXIBLE CABLES ELETRA ALFANAR 3-Aug-17

30 ARJ/PJ237/EL/MS-30 EMERGENCY LIGHT CABLES FIRECEL MISTERLIGHT 4-Aug-17

ARJ 18 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

31 ARJ/PJ237/EL/MS-31 HEAT RESISTANCE CABLES TEKAB TEKAB CO. LTD 15-Nov-17

Al Haji abdulla awazi - 29-Aug-17


31 ARJ/PJ237/EL/MS-32 WIRING ACCESSORIES - OPTION 3 BG Electrical Ltd
Gargash llc

ARJ 19 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

Notes:
A - APPROVED
B - APPROVED WITH COMMENTS
C - REVISE & RESUBMIT
D - REJECTED
UR - UNDER REVIEW

ARJ 20 of 147 04/09/2018


PROJECT CLIENT MEP CO

M/S AL MUTATAWERA GULF


G+2 ARBOR SCHOOL BUILDING M/S NATIONAL EN
GENERAL TRADING L.L.C

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION
DATE

ARJ 21 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

enclosed 10.07.17 18.07.17 C 27.07.17 10.08.17 B

ARJ 22 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

enclosed 16.07.17 06.08.17 C 13.08.17 21.08.17 C 24.09.17 01.10.17 B

10.07.17 18.07.17
enclosed B
ARJ 23 of 147 04/09/2018
MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE
enclosed B
29.07.17 09.08.17

enclosed 24.07.17 08.08.17 B

ARJ 24 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

enclosed 23.07.17 03.08.17 B


submitted
24.7.17
24.07.17 11.09.17 B 29.08.17 11.09.17 B
ARJ 25 of 147 04/09/2018
MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE
24.07.17 11.09.17 B 29.08.17 11.09.17 B
submitted
29.8.17

enclosed 05.08.17 20.08.17 C 09.09.17 20.09.17 C 26.09.17 05.10.17 B

ARJ 26 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

enclosed 05.08.17 15.08.17 C 30.09.17 16.10.17 D

28.09.17 09.10.17 B

ARJ 27 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

22.08.17 06.09.17 C 19.09.17 05.10.17 C 19.10.17 22.10.17 B

enclosed 24.07.17 27.08.17 C 16.09.17 25.09.17 C 15.10.17 28.10.17 B

ARJ 28 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

09.09.17 18.09.17 C 10.10.17 24.10.17 C 07.11.17 19.11.17 B


submitted
14.8.17 12.08.17 21.08.17 C 29.08.17 14.09.317 B

ARJ 29 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

10.10.17 17.10.17 C 30.10.17 09.11.17 B

ARJ 30 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

submitted
28.10.17
28.10.17 30.10.17 C

17.08.17 22.08.17 C 12.09.17 25.09.17 C 10.10.17 29.10.17 B

ARJ 31 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

enclosed
31.07.17 16.08.17 C 23.08.17 28.08.17 C 25.09.17 01.10.17 B
submitted
25.9.17

ARJ 32 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

02.10.17 05.10.17 C 15.10.17 24.10.17 C 29.10.17 05.11.17 C 07.11.17

29.08.17 11.09.17 B

ARJ 33 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

submitted
28.10.17
28.10.17 30.10.17 C

10.10.17 19.10.017 C 01.11.17 08.11.17 C 12.11.17 22.11.17 C 13.12.17

ARJ 34 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

enclosed 08.08.17 15.08.17 C 09.09.17 12.09.17 C 19.09.17 04.10.17 B

05.11.17 07.11.17 C 12.11.17 22.11.17 C 04.12.17 16.12.17 C

ARJ 35 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

22.08.17 07.09.17 C 19.09.17 04.10.17 C 15.10.17 28.10.17 C 01.11.17

22.08.17 07.09.17 C 19.09.17 05.10.17 C 10.10.17 18.10.17 B

ARJ 36 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

17.08.17 26.08.17 C 09.09.17 20.09.17 C 02.10.17 12.10.17 C


01.11.17

ARJ 37 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

enclosed 05.08.17 27.08.17 C 27.09.17 05.10.17 B

enclosed 03.08.17 15.08.17 C 30.09.17 12.09.17 C

ARJ 38 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

submitted
07.9.17
07.09.17 13.09.17 C 28.09.17 09.10.17 B

11.10.17 22.10.17 B

ARJ 39 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

submitted
14.11.17
14.11.17 19.11.17 B
submitted
27.12.17 27.12.17 UR

ARJ 40 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
ELECTRICAL
QD/010

MEP CONSULTANT MAIN CONTRACTOR M

ATIONAL ENGINEERING BUREAU CRC DUBAI ARJ

3rd SUBMISSION (rev. 2)


1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1)
RCVD RCVD
Sample DATE STATUS DATE STATUS
DATE DATE RCVD
DATE STATUS DATE
DATE

ARJ 41 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 42 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 43 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 44 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 45 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 46 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 47 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 48 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 49 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 50 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 51 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 52 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

14.11.17 B

ARJ 53 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

28.04.17 C

ARJ 54 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 55 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

14.11.17 B

ARJ 56 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

08.11.17 C 06.12.17 13.12.17 B

ARJ 57 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 58 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 59 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 60 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 61 of 147 04/09/2018


QD/01001

MEP CONTRACTOR

ARJ ENGINEERING LLC

4 SUBMISSION (rev. 3)

REMARKS
RCVD
STATUS
DATE

ARJ 62 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

AC

DAIKIN
DAIKIN
AIRCONDITIONING
1 ARJ/PJ237/AC/MS-01 CHILLERS 20-Aug-17
TRANE TRANEBvba

ARJ 63 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

2 ARJ/PJ237/AC/MS-02 FAHU / AHU VTS CLIMA VTS Clima Gulf Fzco 20-Aug-17

3 ARJ/PJ237/AC/MS-03 CHW PUMPS EBARA AL AWTAAN Trading 14-Sep-17

4 ARJ/PJ237/AC/MS-04 FAN COIL UNITS ( FCU ) VTS CLIMA VTS Clima Gulf Fzco 7-Sep-17

ARJ 64 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

5 ARJ/PJ237/AC/MS-05 VENTILATION FANS S&P LEMINAR 27-Aug-17

6 ARJ/PJ237/AC/MS-06 CHILLED WATER PIPES ( MS ) SHIELD TECHNOPRO 7-Sep-17

7 ARJ/PJ237/AC/MS-07 CHILLED WATER PIPE FITTINGS ( MS ) Benkan,Thailand IMS 7-Sep-17

ARJ 65 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

8 ARJ/PJ237/AC/MS-08 CHILLED WATER PIPE INSULATION KIMMCO, KUWAIT LEMINAR 20-Aug-17

FIRE DAMPERS / VOLUME CONTROL PRIME AIR


9 ARJ/PJ237/AC/MS-09 DAMPERS / MOTORIZED VOLUM CONTROL CONDITIONING AEROVAC 22-Aug-17
DAMPERS /SMOKE DAMPERS INDUSTRIES

ARJ 66 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

10 ARJ/PJ237/AC/MS-10 PRESSURE GAUGE & THERMOMETER WINTERS LEMINAR 22-Aug-17

11 ARJ/PJ237/AC/MS-11 GRILLES, DIFFUSERS & LOUVERS 5-Oct-17

12 ARJ/PJ237/AC/MS-12 VIBRATION ISOLATORS 5-Sep-17

ARJ 67 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

13 ARJ/PJ237/AC/MS-13 ACOUSTIC DUCT LINER KIMMCO, KUWAIT LEMINAR 6-Aug-17

14 ARJ/PJ237/AC/MS-14 SOUND ATTENUATORS 5-Sep-17

15 ARJ/PJ237/AC/MS-15 SUPPORTS & HANGERS -CHW APPLICATION WEICCO LEMINAR 24-Jul-17

ARJ 68 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

16 ARJ/PJ237/AC/MS-16 FIBER GLASS DUCT INSULATION KIMMCO LEMINAR 20-Aug-17

17 ARJ/PJ237/AC/MS-17 GI DUCT JINDAL HVEM 28-Sep-17

EASY UNIGULF
18 ARJ/PJ237/AC/MS-18 PRE INSULATED DUCTS 13-Jul-17
ARJ 69 of 147 04/09/2018
PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

18 ARJ/PJ237/AC/MS-18 PRE INSULATED DUCTS 13-Jul-17


Kingspan Pal Duct Pal Middle East Pir
Pre , LLC

ARJ 70 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

GALLOWAY, 22-Aug-17
19 ARJ/PJ237/AC/MS-19 FIRE RATED DUCTS FINLAND
LEMINAR

Emirates
20 ARJ/PJ237/AC/MS-20 CHILLED WATER PREINSULATED PIPING SY EPPI Preinsulated Pipes 30-Jul-17
industries UAE

21 ARJ/PJ237/AC/MS-21 ELECTROSTATIC PERCIPITATOR 29-Aug-17

ARJ 71 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

22 ARJ/PJ237/AC/MS-22 PRESSURIZATION UNIT EBARA AL AWTAAN Trading 21-Sep-17

Water Bird WATER


23 ARJ/PJ237/AC/MS-23 CHEMICAL DOSING POTS Treatment Water Bird 12-Sep-17
Chemicals .L.L.C

ARJ 72 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

24 ARJ/PJ237/AC/MS-24 CHW VALVES Kids-ltaly Dynaflow Trading llc 7-Sep-17

25 ARJ/PJ237/AC/MS-25 DX SPLIT UNITS Carrier Carrier 29-Aug-17

ARJ 73 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

PRESSURE INDEPENDENT CONTROL LEMINAR AIR


26 ARJ/PJ237/AC/MS-26 VALVES ( PICV ) & FCU VALVE KIT WITH Frese CONDTIONINGCO.L 7-Sep-17
PICV LC

27 ARJ/PJ237/AC/MS-27 BTU METER 27-Aug-17

ARJ 74 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

28 ARJ/PJ237/AC/MS-28 CHILLED WATER PIPE FITTINGS ( MI ) SHIELD TECHNOPRO 7-Sep-17

AERODUCT RAMESH HIRA


29 ARJ/PJ237/AC/MS-29 FLEXIBLE DUCTS 7-Sep-17
Focus AIR
Crayflex Conditioning
Industries LLC

ARJ 75 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

FLEXIBLE DUCTS CONNECTORS & 7-Sep-17


30 ARJ/PJ237/AC/MS-30 AERODUCT RAMESH HIRA
ACCESSORIES

31 ARJ/PJ237/AC/MS-31 VAPOUR BARRIER & ADHESIVE COATING NAPCO LEMINAR 8-Sep-17

32 ARJ/PJ237/AC/MS-32 COPPER PIPES & FITTINGS Mueller Brass LEMINAR 8-Sep-17

ARJ 76 of 147 04/09/2018


PROJECT CLIENT MEP CON
M/S MUTATAWERA GULF M/S NATIONAL
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUR

PLANNED
S/N REF. NO. DESCRIPTION SUBMISSION
Proposed Make SUPPLIER DATE

Notes:
A - APPROVED
B - APPROVED WITH COMMENTS
C - REVISE & RESUBMIT
D - REJECTED
UR - UNDER REVIEW

ARJ 77 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

23.07.17 19.08.17 C 29.08.17 10.09.17 C 16.09.17 25.09.17 C 24.09.17 26.09.17 C

ARJ 78 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

29.08.17 24.09.17 C 12.10.17 16.10.17 D 21.10.17 26.10.17 C 13.11.17 14.11.17 B

14.10.17 24.10.17 C 02.11.17 12.11.17 C 05.12.17 10.12.17 B

29.08.17 13.09.17 C 20.09.17 01.10.17 C 11.10.17 22.10.17 C 09.11.17 12.11.17 B


ARJ 79 of 147 04/09/2018
MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

17.08.17 22.08.17 C 04.10.17 12.10.17 B


Submitted
09.08.17 09.08.17 17.09.17 B
Submitted
08.08.17 05.08.17 17.09.17 C 21.10.17 05.11.17 B
ARJ 80 of 147 04/09/2018
MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

enclosed 09.08.17 25.09.17 B

Submitted
04.10.17 04.10.17 16.10.17 D 11.11.17 22.11.17 B

ARJ 81 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

05.12.17 10.12.17 C 23.12.17 25.12.17 B


Submitted
11.10.17 11.10.17 22.10.17 C 05.12.17 13.12.17 C

ARJ 82 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

Submitted
12.08.17 23.08.17 13.09.17 C 30.09.17 04.10.17 D 11.10.17 26.10.17 B

enclosed 23.07.17 20.08.17 C 30.09.17 05.10.17 C 11.10.17 15.10.17 B


ARJ 83 of 147 04/09/2018
MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

Submitted
30.07.17 30.07.17 25.09.14 B

enclosed 12.07.17 24.07.17 C 30.07.17 26.09.17 C 11.10.17 16.10.17 B

enclosed
11.07.17 10.08.17 C 30.09.17 04.10.17 B
ARJ 84 of 147 04/09/2018
MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE
11.07.17 10.08.17 C 30.09.17 04.10.17 B
Submitted
30.09.17

ARJ 85 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

enclosed 1.08.17 13.09.17 B


Submitted
16.11.17 16.11.17 26.11.17 B

ARJ 86 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

14.10.17 22.10.17 C 09.11.17 16.11.17 C 11.12.17 14.12.17 C

26.08.17 30.08.17 C 26.09.17 03.10.17 C 25.10.17 05.11.17 C 21.11.17 03.12.17 B

ARJ 87 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

Submitted
18.10.17 18.10.17 22.10.17 C 24.10.17 24.10.17 B

26.11.17 03.12.17 C 18.12.17 23.12.17 C

ARJ 88 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

Submitted
24.09.17 24.09.17 05.10.17 B

ARJ 89 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

Submitted
028.08.17 28.08.17 30.08.17 C 14.09.17 18.09.17 B
Submitted
05.09.17 C C
05.09.17 16.09.17 04.10.1412.010.17 25.10.17 26.10.17 B
Submitted
25.10.17

ARJ 90 of 147 04/09/2018


MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

Submitted
05.09.17 05.09.17 16.09.17 C 04.10.14 12.10.17 B

07.12.17 10.12.17 C 23.12.17 25.12.17 B

31.12.17 UR
ARJ 91 of 147 04/09/2018
MATERIAL SUBMITTAL SCHEDULE   
HVAC
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


/S NATIONAL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
BUREAU

1st SUBMISSION (rev. 0) 2nd SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4rd SUBMISSION (rev. 3)

RCVD STATU RCVD RCVD STATU RCVD


Sample DATE DATE STATUS DATE DATE STATUS
DATE S DATE DATE S DATE

ARJ 92 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

05.10.17 09.10.17 C 14.10.17 18.10.17 B

ARJ 93 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 94 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 95 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 96 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 97 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 98 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 99 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 100 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 101 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 102 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 103 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 104 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 105 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 106 of 147 04/09/2018


QD/01001

J ENGINEERING LLC

5 SUBMISSION (rev. 4) 6 SUBMISSION (rev. 5)


REMARKS
RCVD RCVD
DATE STATUS DATE STATUS
DATE DATE

ARJ 107 of 147 04/09/2018


MATERIAL

PROJECT CLIENT MEP CONSULT


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEE
TRADING L.L.C

PLANNED
Proposed
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION sample
Make
DATE

DRAINAGE

UPVC DRAINAGE PIPES & FITTINGS 10-Jul-17


1 ARJ/PJ237/PL/MS-01 HEPWORTH HEPWORTH enclosed
(U/G GROUND )

DRAINAGE PIPES & FITTINGS ( ABOVE 12-Jul-17


2 ARJ/PJ237/PL/MS-02 HEPWORTH HEPWORTH enclosed
GROUND)
MATERIAL

PROJECT CLIENT MEP CONSULT


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEE
TRADING L.L.C

PLANNED
Proposed
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION sample
Make
DATE

General Pumps 7-Sep-17


3 ARJ/PJ237/PL/MS-03 SUMP PUMP LEMINAR
Spain

4 ARJ/PJ237/PL/MS-04 MANHOLE COVERS / GRATINGS RBA Al Semsam 10-Aug-17

5 ARJ/PJ237/PL/MS-05 FLOOR DRAIN COVER 10-Aug-17


MATERIAL

PROJECT CLIENT MEP CONSULT


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEE
TRADING L.L.C

PLANNED
Proposed
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION sample
Make
DATE

AL MAMLEEK
6 ARJ/PJ237/PL/MS-06 ROOF DRAIN (RAINWATER OUTLET) WADE BUILDING 10-Aug-17
MATERIALS LLC
Rapid Cool
Trading CO LLC
7 ARJ/PJ237/PL/MS-07 ACOUSTIC LAGGING Hodgson&Hodh 3-Aug-17
son Acoustic Kinetics Middle
Technologies.uk East LLC

POLYFAB POLYFAB
24-Jul-17 Submitted
8 ARJ/PJ237/PL/MS-09 HDPE PIPES 19.10.17
MATERIAL

PROJECT CLIENT MEP CONSULT


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEE
TRADING L.L.C

PLANNED
Proposed
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION sample
Make
DATE

24-Jul-17 Submitted
8 ARJ/PJ237/PL/MS-09 HDPE PIPES 19.10.17
HEPWORTH HEPWORTH

AL MAMLEEK
9 ARJ/PJ237/PL/MS-10 GREASE TRAP WADE BUILDING 10-Aug-17
MATERIALS LLC

MODERN 24-Jul-17
10 ARJ/PJ237/PL/MS-12 FCU Drain Pipes MPI ATLAS enclosed
PLASTIC

11 ARJ/PJ237/PL/MS-13 HANGERS & SUPPORTS WEICCO LEMINAR 19-Jul-17 enclosed


MATERIAL

PROJECT CLIENT MEP CONSULT


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEE
TRADING L.L.C

PLANNED
Proposed
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION sample
Make
DATE

WATER SUPPLY

12 ARJ/PJ237/PL/MS-14 PPR PIPES & FITTINGS BORPLUS AQUAGAS 20-Jul-17 enclosed

13 ARJ/PJ237/PL/MS-15 PEX PIPES & FITTINGS UNIDELTA AQUAGAS 27-Jul-17 enclosed


MATERIAL

PROJECT CLIENT MEP CONSULT


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEE
TRADING L.L.C

PLANNED
Proposed
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION sample
Make
DATE

SOLAHART - ECOVAL 12-Sep-17


14 ARJ/PJ237/PL/MS-16 SOLAR WATER HEATER & CALORIFIER
AUSTRALIA TRADING LLC

DOMESTIC PUMPS ARJ WATER 27-Aug-17


15 ARJ/PJ237/PL/MS-17 LOWARA
(CIRCULATION/BOOSTER/TRANSFER PUMPS) TECHNOLOGY

Culligan Culligan 29-Aug-17


16 ARJ/PJ237/PL/MS-18 SILVER COOPER IONIZATION UNIT
International International
MATERIAL

PROJECT CLIENT MEP CONSULT


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEE
TRADING L.L.C

PLANNED
Proposed
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION sample
Make
DATE

Dynaflow Trading 27-Aug-17 Submitted


17 ARJ/PJ237/PL/MS-19 PLUMBING VALVES Kids-ltaly
llc 21.10.17

18 ARJ/PJ237/PL/MS-20 WATER HAMMER ARRESTORS ZURN- USA BEEKAY 28-Jul-17

19 ARJ/PJ237/PL/MS-21 GRP WATER TANK Solico Solico 20-Aug-17


MATERIAL

PROJECT CLIENT MEP CONSULT


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEE
TRADING L.L.C

PLANNED
Proposed
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION sample
Make
DATE

20-Aug-17 Submitted
20 ARJ/PJ237/PL/MS-22 WATER SUPPLY PIPE INSULATION KIMMCO LEMINAR 19.09.17

MAJID 20-Aug-17
21 ARJ/PJ237/PL/MS-23 ACID NEUTRALIZER TANK ZURN- USA
BUKATARA

Notes:
A - APPROVED
B - APPROVED WITH COMMENTS
C - REVISE & RESUBMIT
D - REJECTED
MATERIAL

PROJECT CLIENT MEP CONSULT


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEE
TRADING L.L.C

PLANNED
Proposed
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION sample
Make
DATE

UR - UNDER REVIEW
AL SUBMITTAL SCHEDULE
PLUMBING
QD/01001

ULTANT MAIN CONTRACTOR MEP CONTRACTOR

NEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4th SUBMISSION (rev. 3)
RCVD RCVD RCVD
DATE STATUS DATE STATUS DATE RCVD DATE STATUS DATE STATUS
DATE DATE DATE

11.07.17 18.07.17 C 30.07.17 02.08.17 B

30.07.17 2.08.17 B
AL SUBMITTAL SCHEDULE
PLUMBING
QD/01001

ULTANT MAIN CONTRACTOR MEP CONTRACTOR

NEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4th SUBMISSION (rev. 3)
RCVD RCVD RCVD
DATE STATUS DATE STATUS DATE RCVD DATE STATUS DATE STATUS
DATE DATE DATE

14.10.17 22.10.17 C 31.10.17 08.11.17 C 11.11.17 12.11.17 B

12.10.17 06.11.17 B
AL SUBMITTAL SCHEDULE
PLUMBING
QD/01001

ULTANT MAIN CONTRACTOR MEP CONTRACTOR

NEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4th SUBMISSION (rev. 3)
RCVD RCVD RCVD
DATE STATUS DATE STATUS DATE RCVD DATE STATUS DATE STATUS
DATE DATE DATE

12.10.17 16.10.17 C 26.10.17 31.10.17 B

28.10.17 30.10.17 C
C 11.11.17 12.11.17 B
02.11.17 07.11.17

20.07.17 15.08.17 C 19.10.17 22.10.17 B


AL SUBMITTAL SCHEDULE
PLUMBING
QD/01001

ULTANT MAIN CONTRACTOR MEP CONTRACTOR

NEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4th SUBMISSION (rev. 3)
RCVD RCVD RCVD
DATE STATUS DATE STATUS DATE RCVD DATE STATUS DATE STATUS
DATE DATE DATE

20.07.17 15.08.17 C 19.10.17 22.10.17 B

31.10.17 09.11.17 C 28.12.17 UR

23.07.17 10.08.17 B

19.07.17 19.08.17 C 11.10.17 15.10.17 B


AL SUBMITTAL SCHEDULE
PLUMBING
QD/01001

ULTANT MAIN CONTRACTOR MEP CONTRACTOR

NEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4th SUBMISSION (rev. 3)
RCVD RCVD RCVD
DATE STATUS DATE STATUS DATE RCVD DATE STATUS DATE STATUS
DATE DATE DATE

18.07.17 23.07.17 B

17.07.17 23.07.17 B
AL SUBMITTAL SCHEDULE
PLUMBING
QD/01001

ULTANT MAIN CONTRACTOR MEP CONTRACTOR

NEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4th SUBMISSION (rev. 3)
RCVD RCVD RCVD
DATE STATUS DATE STATUS DATE RCVD DATE STATUS DATE STATUS
DATE DATE DATE

10.10.17 19.10.17 C 11.11.17 12.11.17 C 19.11.17 22.11.17 C 06.12.17 13.12.17 C

10.10.17 16.10.17 C 26.10.17 07.11.17 C 16.11.17 29.11.17 C 29.11.17 03.12.17 B

02.11.17 12.11.17 C 20.11.17 03.12.17 C 11.12.17 23.12.17 B


AL SUBMITTAL SCHEDULE
PLUMBING
QD/01001

ULTANT MAIN CONTRACTOR MEP CONTRACTOR

NEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4th SUBMISSION (rev. 3)
RCVD RCVD RCVD
DATE STATUS DATE STATUS DATE RCVD DATE STATUS DATE STATUS
DATE DATE DATE

21.10.17 24.10.17 B

24.09.17 26.09.17 C 05.10.17 09.10.17 B

14.10.17 18.10.17 C 31.10.17 05.11.17 C 07.11.17 22.11.17 C 29.11.17 03.12.17 B


AL SUBMITTAL SCHEDULE
PLUMBING
QD/01001

ULTANT MAIN CONTRACTOR MEP CONTRACTOR

NEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4th SUBMISSION (rev. 3)
RCVD RCVD RCVD
DATE STATUS DATE STATUS DATE RCVD DATE STATUS DATE STATUS
DATE DATE DATE

19.09.17 28.09.17 B

09.09.17 20.09.17 C
AL SUBMITTAL SCHEDULE
PLUMBING
QD/01001

ULTANT MAIN CONTRACTOR MEP CONTRACTOR

NEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2) 4th SUBMISSION (rev. 3)
RCVD RCVD RCVD
DATE STATUS DATE STATUS DATE RCVD DATE STATUS DATE STATUS
DATE DATE DATE
MEP CONTRACTOR

ARJ ENGINEERING LLC

REMARKS
MEP CONTRACTOR

ARJ ENGINEERING LLC

REMARKS
MEP CONTRACTOR

ARJ ENGINEERING LLC

REMARKS
MEP CONTRACTOR

ARJ ENGINEERING LLC

REMARKS
MEP CONTRACTOR

ARJ ENGINEERING LLC

REMARKS
MEP CONTRACTOR

ARJ ENGINEERING LLC

REMARKS
MEP CONTRACTOR

ARJ ENGINEERING LLC

REMARKS
MEP CONTRACTOR

ARJ ENGINEERING LLC

REMARKS
MEP CONTRACTOR

ARJ ENGINEERING LLC

REMARKS
MATERIAL SUBMITTAL SCHED
FIREFIGHTING & LPG

PROJECT CLIENT MEP CONSULTAN


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEERIN
TRADING L.L.C

Proposed PLANNED
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION Sample
Make
DATE

FIRE FIGHTING

FIRE FIGHTING PIPE FITTINGS 27-Aug-17


1 ARJ/PJ237/FF/MS-01 Shield UK Naffco
( HDPE PIPES AND FITTINGS )

2 ARJ/PJ237/FF/MS-02 FIRE FIGHTING SPRINKLER SYSTEMS Shield UK Naffco 27-Aug-17


MATERIAL SUBMITTAL SCHED
FIREFIGHTING & LPG

PROJECT CLIENT MEP CONSULTAN


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEERIN
TRADING L.L.C

Proposed PLANNED
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION Sample
Make
DATE

FIRE FIGHTING PUMP 6-Aug-17


3 ARJ/PJ237/FF/MS-03 Naffco Naffco
( Electric -Diesel - Jockey )

4 ARJ/PJ237/FF/MS-04 FOAM SYSTEM Shield UK Naffco 27-Aug-17

FIRE FIGHTING SYSTEMS ( Fire 7-Sep-17


5 ARJ/PJ237/FF/MS-05 Naffco Naffco
Hosereel Cabinet & Fire Extinguisher )

6 ARJ/PJ237/FF/MS-06 FM200 & CLEANAGENT SYSTEM FIKE Naffco 7-Sep-17


MATERIAL SUBMITTAL SCHED
FIREFIGHTING & LPG

PROJECT CLIENT MEP CONSULTAN


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEERIN
TRADING L.L.C

Proposed PLANNED
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION Sample
Make
DATE

7 ARJ/PJ237/FF/MS-07 HYDRANT SYSTEM Shield UK Naffco 8-Sep-17

LPG

1 ARJ/PJ237/LPG/MS-01 LPG CENTRAL GAS SYSTEM Lootah BC Gas Lootah BC Gas 27-Aug-17

Notes:
MATERIAL SUBMITTAL SCHED
FIREFIGHTING & LPG

PROJECT CLIENT MEP CONSULTAN


M/S MUTATAWERA
G+2 ARBOR SCHOOL BUILDING GULF GENERAL M/S NATIONAL ENGINEERIN
TRADING L.L.C

Proposed PLANNED
S/N REF. NO. DESCRIPTION SUPPLIER SUBMISSION Sample
Make
DATE

A - APPROVED
B - APPROVED WITH COMMENTS
C - REVISE & RESUBMIT
D - REJECTED
UR - UNDER REVIEW
MITTAL SCHEDULE
HTING & LPG
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR

NAL ENGINEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2)


RCVD RCVD STATU RCVD STATU
DATE STATUS DATE DATE REMARKS
DATE DATE S DATE S

28.10.17 31.10.17 B

28.10.17 07.11.17 B
MITTAL SCHEDULE
HTING & LPG
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR

NAL ENGINEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2)


RCVD RCVD STATU RCVD STATU
DATE STATUS DATE DATE REMARKS
DATE DATE S DATE S

28.10.17 05.11.17 B

28.10.17 07.11.17 C 23.11.17 29.11.17 C 21.12.17 23.12.17 B

28.10.17 07.11.17 B

28.10.17 07.11.17 C 21.12.17 23.12.17 B


MITTAL SCHEDULE
HTING & LPG
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR

NAL ENGINEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2)


RCVD RCVD STATU RCVD STATU
DATE STATUS DATE DATE REMARKS
DATE DATE S DATE S

28.10.17 07.11.17 C 23.11.17 04.12.17 B

25.11.17 26.11.17 C 20.12.17 27.12.17 B


MITTAL SCHEDULE
HTING & LPG
QD/01001

MEP CONSULTANT MAIN CONTRACTOR MEP CONTRACTOR

NAL ENGINEERING BUREAU CRC DUBAI ARJ ENGINEERING LLC

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2)


RCVD RCVD STATU RCVD STATU
DATE STATUS DATE DATE REMARKS
DATE DATE S DATE S
MATERIAL SUBMITTAL SCHED
General MEP

PROJECT CLIENT MEP CONSULTANT


M/S MUTATAWERA GULF M/S NATIONAL ENGINEE
G+2 ARBOR SCHOOL BUILDING
GENERAL TRADING L.L.C BUREAU

PLANNED
S/N REF. NO. DESCRIPTION Proposed Make SUPPLIER SUBMISSION Sample
DATE

General MEP

Submitted
1 MS/100068/MEP/01/Rev 0 Anchors,Channels & Fasteners FISCHER GERMANY FISCHER FIXING LLC 10/15/2017
16.10.17

Submitted
2 MS/100068/MEP/02/Rev 0 Lubber Lined - SPLIT CLAMPS FISCHER FISCHER FIXING LLC 10/24/2017
23.10.17

Al Fawaz advertising & Submitted


3 MS/100068/MEP/03/Rev 0 SERVICES IDENTIFICATION Brimar Identification
Publicity
18.12.17
18.10.18
Notes:
A - APPROVED
B - APPROVED WITH COMMENTS
C - REVISE & RESUBMIT
D - REJECTED
UR - UNDER REVIEW
AL SCHEDULE
MEP
QD/01001

ONSULTANT MAIN CONTRACTOR MEP CONTRACTOR


AL ENGINEERING
CRC DUBAI ARJ ENGINEERING LLC
UREAU

1st SUBMISSION (rev. 0) 2ND SUBMISSION (rev. 1) 3rd SUBMISSION (rev. 2)


RCVD RCVD REMARKS
DATE RCVD DATE STATUS DATE STATUS DATE STATUS
DATE DATE

16.10.17 22.10.17 C 24.10.17 04.11.17 B

24.10.17 24.10.17 B

18.12.17 20.12.17 C
PROJECT : G+2 ARBOR SCHOOL
CLIENT : M/S AL MUTATAWERA GULF GEN. TRDG. LLC
CONSULTANT: M/S NEB
M/CONTRACTOR: M/S CRC CONTRACTING LLC
MEP CONTRACTOR: ARJ ENGG. LLC
4/9/2018
SUMMARY OF MATERIAL SUBMITTALS

MATERIAL STATUS

STATUS
TOTAL NUMBER OF
S.NO. DESCRIPTION TO BE
MATERIALS
SUBMITTED SUBMITTED
APPROVED APPROVED AS REJECTED PENDING FOR
NOTED (Code NEW
(Code A) (Code C&D) APPROVAL
B)

1 ELECTRICAL 32 32 0 25 6 1 0

2 HVAC 31 27 0 24 3 0 4

3 Plumbing 21 20 0 17 2 1 1

4 FIRE FIGHTING 7 7 0 7 0 0 0

5 General MEP 3 3 0 2 1 0 0

6 LPG 1 1 0 0 0 1 0

TOTAL NO. 95 90 0 75 12 3 5

100% 94.7% 0% 79% 13% 3% 5%