Sie sind auf Seite 1von 15

To

The Executive Engineer,


GNSS Division,
Proddatur.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. K. Ramesh – Assistant Executive
Engineer, GNSS Sub Division No.4, Yerraguntla - Submission of Income
Tax Statement for the Financial year 2017-2018 – Regarding.

*****

I here with submit my Income Tax Statement for the financial year 2017-
2018 in duplicate duly enclosing the relevant attested documents for taking
further necessary action.

Thanking You Sir,

Yours faithfully,

(K. RAMESH)
Assistant Executive Engineer,
GNSS Sub Division No.4,
Yerraguntla.
To
The Superintending Engineer,
Designs & Quality Control Circle,
Water Resources Dept.,
Kadapa.

(Through proper channel)

Madam,

I, K. Ramesh working as Assistant Executive Engineer in the Designs


wing of this office submit the following few lines.
I am looking after designs of the GNSS Phase I Package I, GNSS Phase I
Package II, CBR Right Canal, Gandikota Tunnel Package No. 31, SH -31 Package,
Li – 06 Package, Nandyal Flood Protection Works, KCC Canal Lift Scheme, TBP
LLC Package, SRBC Package No.26 and Owk Reservoir in addition to the Non
EPC works under control of the Chief Engineer (Projects), Kurnool. The number
of files under my control is nearly 280. There is no sufficient place to keep all the
files at one place.
Hence I request that I may please be permitted to handover the closed
files to the Record Assistant and keep the running files with me.

Thanking You Madam,

Yours faithfully,

(K. RAMESH)
Assistant Executive Engineer,
Sub Division No. 1
Designs wing
O/o CE(P)/WRD/KADAPA.
To
The Chief Engineer (Projects),
Water Resources Dept.,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. S.Habeebullah – Assistant Executive
Engineer (Designs), O/o the Chief Engineer (Projects), Water
Resources Dept., Kadapa – Submission of Income Tax Statement for the
Financial year 2016-2017 – Regarding.

*****

I here with submit my Income Tax Statement for the financial year 2016-
2017 in duplicate duly enclosing the relevant attested documents for taking
further necessary action.

Thanking You Sir,

Yours faithfully,

(S. HABEEBULLAH)
Assistant Executive Engineer (Designs),
O/o Chief Engineer (Projects),
Water Resources Department,
Kadapa
To
The Chief Engineer (Projects),
Water Resources Department,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. K. Ramesh – Assistant Executive
Engineer (Designs), O/o the Chief Engineer (Projects), Water Resources
Department, Kadapa - Recovery of Income Tax from the month of
December 2016 -Requested – Regarding .

*****

I request that an amount of Rs 6,000/- per month from December 2016 is


proposed to recovery towards Income Tax for the financial year 2016-2017 from
my salary.

Thanking You Sir,

Yours faithfully,

(K. RAMESH)
Assistant Executive Engineer (Designs),
O/o Chief Engineer (Projects),
Water Resources Department,
Kadapa
To
The Research Officer,
Water Quality Level-II Lab,
Tirupati.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. A.V.JAWAHAR REDDY - Deputy
Executive Engineer, Gauging Sub-Division, Water Resources Dept.,
Tirupati – Submission of Income Tax Statement for the financial
year 2017-2018 – Regarding.

*****

I here with submit my Income Tax Statement for the financial year 2017-
2018 in triplicate duly enclosing the relevant attested documents for taking
further necessary action.

Thanking You Sir,

Yours faithfully,

(A.V.JAWAHAR REDDY)
Deputy Executive Engineer,
Gauging Sub-Division,
Water Resources Dept.,,
Tirupati
To
The Chief Engineer (Projects ),
Irrigation,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. K. Ramesh – Assistant Executive
Engineer (Designs), O/o the Chief Engineer (Projects ), Irrigation,
Kadapa - Recovery of Income Tax from the month of
December 2015 -Requested – Regarding .

*****

I request that an amount of Rs 6,000/- per month from December 2015 is


proposed to recovery towards Income Tax for the financial year 2015-2016 from
my salary.

Thanking You Sir,

Yours faithfully,

(K. RAMESH)
Assistant Executive Engineer (Designs),
O/o Chief Engineer (Projects),
Irrigation, Kadapa
To
The Chief Engineer(Projects ),
Irrigation,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. S. VENKATA RAMANA - Deputy
Executive Engineer (Designs), O/o the Chief Engineer(Projects ),
Irrigation , Kadapa-recovery of Income Tax – for the month of
January 2017 - Requested – Regarding .

*****

I request that an amount of Rs 60,000/- for the month of January 2017 is


proposed to recovery towards Income Tax for the financial year 2016-2017 from
my salary.

Thanking You Sir,


Yours faithfully,

(S. VENKATA RAMANA)


Deputy Executive Engineer(Designs),
O/o Chief Engineer (Projects),
Irrigation, Kadapa.

To
The Chief Engineer(Projects ),
Irrigation,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. A.V.JAWAHAR REDDY-Deputy


Executive Engineer (Designs), O/o the Chief Engineer(Projects ),
Irrigation , Kadapa-recovery of Income Tax – from the month of
AUGUST 2013 to January 2014-Requested – Regarding .

*****

I request that an amount of Rs 8000/- per month from AUGUST 2013 to


January 2014 is proposed to recovery towards Income Tax for the financial year
2013-2014 from my salary.

Thanking You Sir,


Yours faithfully,

(A.V.JAWAHAR REDDY)
Deputy Executive Engineer(Designs),
O/o Chief Engineer (Projects),
Irrigation, Kadapa.
To
The Chief Engineer(Projects ),
Irrigation,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. S. Ravi Chandran – Deputy
Executive Engineer (Designs), O/o the Chief Engineer(Projects ),
Irrigation , Kadapa-recovery of Income Tax – from the month of
July 2013 to December 2013-Requested – Regarding.

**********

I request that an amount of Rs 3000/- per month from July 2013 salary to
December 2013 is proposed to recovery towards Income Tax for the financial year
2013-2014 from my salary.

Thanking You Sir,


Yours faithfully,

(S. Ravi Chandran)


Deputy Executive Engineer(Designs),
O/o Chief Engineer (Projects),
Irrigation, Kadapa.
To
The Chief Engineer (Projects ),
Irrigation,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. A.V.JAWAHAR REDDY-Deputy


Executive Engineer (Designs), O/o the Chief Engineer(Projects ),
Irrigation , Kadapa-recovery of Income Tax – from the month of
AUGUST 2014 to January 2015-Requested – Regarding .

*****

I request that an amount of Rs 10,000/- per month from AUGUST 2014 to


January 2015 is proposed to recovery towards Income Tax for the financial year
2014-2015 from my salary.

Thanking You Sir,


Yours faithfully,

(A.V.JAWAHAR REDDY)
Deputy Executive Engineer(Designs),
O/o Chief Engineer (Projects),
Irrigation, Kadapa.
To
The Chief Engineer (Projects ),
Irrigation,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. A.V.JAWAHAR REDDY-Deputy


Executive Engineer (Designs), O/o the Chief Engineer(Projects ),
Irrigation , Kadapa-recovery of Income Tax – from the month of
AUGUST 2015 to January 2016-Requested – Regarding .

*****

I request that an amount of Rs 8,000/- per month from AUGUST 2014 to


January 2015 is proposed to recovery towards Income Tax for the financial year
2015-2016 from my salary.

Thanking You Sir,


Yours faithfully,

(A.V.JAWAHAR REDDY)
Deputy Executive Engineer(Designs),
O/o Chief Engineer (Projects),
Irrigation, Kadapa
To
The Chief Engineer(Projects ),
Water Resources Department,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. A.V. Jawahar Reddy - Deputy
Executive Engineer (Designs), O/o the Chief Engineer(Projects ),
Irrigation , Kadapa-enhancement of GPF subscription – from the
month of September 2015 - Requested – Regarding .

*****
I am proposing to enhance my GPF subscription from Rs 4,000 to Rs
6,000/P.M i.e an amount of Rs 2,000/- per month from September 2015 salary.

Thanking You Sir,


Yours faithfully,

(A. V. JAWAHAR REDDY)


Deputy Executive Engineer(Designs),
O/o Chief Engineer (Projects),
Irrigation, Kadapa.
To
The Chief Engineer(Projects ),
Water Resources Department,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. S.Ravichandran - Deputy


Executive Engineer (Designs), O/o the Chief Engineer(Projects ),
Irrigation , Kadapa-enhancement of GPF subscription – from the
month of September 2015 - Requested – Regarding .

*****
I am proposing to enhance my GPF subscription from Rs 2,500 to Rs
6,000/P.M i.e an amount of Rs 3,500/- per month from September 2015 salary.

Thanking You Sir,


Yours faithfully,

(S.RAVICHANDRAN)
Deputy Executive Engineer(Designs),
O/o Chief Engineer (Projects),
Irrigation, Kadapa.

To
The Chief Engineer(Projects),
Water Resource Department,
Kadapa.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. S. VENKATA RAMANA - Deputy
Executive Engineer (Designs), O/o the Chief Engineer(Projects ),
Irrigation , Kadapa-recovery of Income Tax – from the month of
September 2016 to December 2016 - Requested – Regarding .

*****

I request that an amount of Rs 20,000/- per month from September 2016


to December 2016 is proposed to recovery towards Income Tax for the financial
year 2016-2017 from my salary.

Thanking You Sir,


Yours faithfully,

(S. VENKATA RAMANA)


Deputy Executive Engineer(Designs),
O/o Chief Engineer (Projects),
Irrigation, Kadapa.
To
The Research Officer,
Water Quality Level-II Lab,
Tirupati.

Sir,

Sub: Estt.- APES- I & CAD Dept. – Sri. A.V.JAWAHAR REDDY - Deputy
Executive Engineer, Gauging Sub-Division, Water Resources Dept.,
Tirupati – Earned leave from 15/03/2018 to 30/03/2018 – requested
Regarding.

*****

I submit that I have to attend to medical treatment of my old aged mother.


Hence I request that I may kindly be permitted to proceed on earned leave from
15-03-2018 to 30-03-2018 (including suffix holiday on 30-03-2018 Good Friday)
on personal affairs.

Thanking You Sir,

Yours faithfully,

(A.V.JAWAHAR REDDY)
Deputy Executive Engineer,
Gauging Sub-Division,
Water Resources Dept.,,
Tirupati

Das könnte Ihnen auch gefallen