GE 2022-TQM IV/VII MECHANICAL ENGINEERING
TABLE OF CONTENT
m
1.2.2. Evolution of quality 2
1.2.3. Defining quality 3
1.3 Dimensions of quality 3
.co
1.3.1 Dimensions of service quality 4
1.3.2 Definition of TQM 4
1.4 Characteristics Of TQM 4
1.4.1 Basic Concepts of TQM 4
1.5 TQM Frame work or (ELEMENTS OF TQM) 5
1.6
1.7
1.8
1.9
Principles of tqm
Benefits of tqm
Contributions of Deming
tas
Obstacles (barriers) in implementing tqm
6
7
7
7
lda
1.10 The juran trilogy 8
1.11 Contributions of Crosby 9
1.11.1 Crosby’s fourteen points 9
UNIT II TQM PRINCIPLES
vi
2.1 Leadership 10
2.2 Characteristics for leadership 10
2.3 Leadership roles 10
Ci
2.4 Leaders 11
2.5 Characteristics of quality leaders 11
2.6 Leadership concepts 11
2.7 The 7 habits of highly effective people 11
w.
2.21 Empowerment 28
2.22 Job enrichment vs job empowerment 28
2.23 Teams 29
2.24 Types of teams 30
2.25 Characteristics of successful teams 30
2.26 Recognition and reward 34
2.27 Effects of recognition and reward system 37
2.28 Performance appraisal 37
m
2.29 Benefits of employee involvement 37
2.30 Continuous process improvement 38
2.31 The pdca cycle 41
.co
2.32 5-s: housekeeping 45
2.33 Implementing 5-s 48
2.34 Kaizen 49
2.35 Kaizen cycle 49
2.36 Supplier partnership 50
2.37
2.38
2.39
2.40
Partnering
Sourcing
Supplier selection
Supplier rating
UNIT III
tas
TQM TOOLS & TECHNIQUES - I
52
52
52
53
lda
3.1 Seven tools of quality 55
3.1.1 Prerequisite discussion 55
3.1.2 Concept 55
Flow charts
vi
3.2 55
3.3 Applications 56
3.4 Histogram 56
3.5 Cause and Effect Diagram 57
Ci
3. Concept 62
4. Affinity diagram 62
5. Procedure 62
6. Applications 65
7. Relations diagram 66
8. Tree diagram 66
9 Matrix diagram 68
10 Matrix data analysis diagram 69
11 Process decision programme chart 72
iv E.R.SIVAKUMAR,ASSO.PROF 2015-16
Visit : www.Civildatas.com Visit : www.Civildatas.com
Visit : www.Civildatas.com
GE 2022-TQM IV/VII MECHANICAL ENGINEERING
12 Arrow diagram 73
13 Six sigma 75
14 Prerequisite discussion 75
15 Concept 76
16 Dmaic 76
17 Dmadv 77
18 Significance 77
19 Application 77
m
20 Companies which have adopted six sigma 77
21 Glossary 78
22 References 78
.co
23 Benchmarking 78
24 Benchmarking concept 78
25 Reasons to benchmark 79
26 Process of benchmarking 79
26.1 Decide what to benchmark 79
26.2
26.3
26.4
26.5
26.6
Understand current performance
Plan
Types of benchmarking
Study others
Learn from the data
tas 79
79
79
79
79
lda
26.7 Using the findings 80
27 Pitfalls and criticisms of benchmarking 80
27.1 Significance 80
27.2 Application 80
vi
28.7 Glossary 88
28.8 References
Unit IV TQM Tools and Techniques - II
4.1 Prerequesite discussion 90
ww
4.2 Concept 90
4.3 Improve customer satisfaction 90
4.4 Applications 91
4.5 Quality function deployment 91
4.6 Qfd team 91
4.7 House of quality 94
4.8 The steps in building a house of quality are 94
4.9 The qfd process 95
4.10 Application 96
v E.R.SIVAKUMAR,ASSO.PROF 2015-16
Visit : www.Civildatas.com Visit : www.Civildatas.com
Visit : www.Civildatas.com
GE 2022-TQM IV/VII MECHANICAL ENGINEERING
m
4.17.2 Preventive maintenance (1951) 100
4.17.3 Periodic (routine) maintenance (Time based maintenance - TBM) 101
4.17.4 Predictive maintenance 101
.co
4.18 What is Total Productive Maintenance (TPM)? 101
4.19 Why TPM / The objective of TPM 102
4.20 Six core principles of TPM 102
4.21 Direct Benefits of TPM 103
4.22 Indirect benefits of TPM 103
4.23
4.23.1
4.23.2
4.23.3
4.23.4
Preparatory stage
tas
Steps in introduction of TPM in a organization
vi E.R.SIVAKUMAR,ASSO.PROF 2015-16
Visit : www.Civildatas.com Visit : www.Civildatas.com
Visit : www.Civildatas.com
GE 2022-TQM IV/VII MECHANICAL ENGINEERING
m
5.3 CLAUSES (ELEMENTS) OF ISO 9000 (During the year 1987) 118
5.4 CLAUSES (ELEMENTS) OF ISO 9000 (During the year 2000) 119
5.5 Implementation of quality management system 120
.co
5.6 Pitfalls of successful implementation 120
5.7 Documentation 120
5.8 Quality auditing 121
5.9 Purpose of quality audit 121
5.10 Types of quality audit 121
5.11
5.12
5.13
5.13.1
5.13.2
General requirements
Environmental policy
tas
Iso 14000 – environmental management system
Environmental management system (ems)
Requirement of iso 14001
122
122
123
123
123
lda
5.13.3 Planning 123
5.13.4 Implementation & operation 123
5.13.5 Checking & corrective action 123
5.13.6 Managenment review 123
vi
1.1 INTRODUCTION
m
AN INTRODUCTION:
A name itself is sufficient to describe everything but a bit more clarification will add to a base for the
.co
description. Total quality management is a management’s approach towards the quality, it can be in
regard to products, customer satisfaction and employees satisfaction. The concept of TQM was
developed by an American W. Edwards Deming and i.e. why it is called as Deming’s concept of
tas
TQM .He introduced this concept for improving the quality of various products and services. Earlier
it was just related with the quality of products which a organization is producing but now other
concepts like marketing, finance design, customer service has also joined the area. Which means that
lda
now good numbers of things are there to manage. TQM works on one belief that mistakes can be
avoided and defects can be prevented. And management should believe in watching each and every
step.
TQM is now a day’s called as TPM (total productivity management) and an organization
vi
needs to consider ABCD for the effective application of TQM where A stands for accident cure , B
stands for breakdown , C stands for cost reduction and D stands for damage. This policy of ABCD is
Ci
in relation to product and if TQM needs to be introduced a positive attitude from the side of
management and employees is required and then a collective effort will come up. TQM should give
w.
chance for unleashing employee’s creativity and potential. The aim of TQM is to reduce variations in
quality of the products as well as in the working of whole organization. For the successful
implementation of TQM, an organization must consider the commitment from all the level of
ww
organization. A concept of Six sigma is a part of TQM. It is a strategy developed by Motorola and it
helps to detect the defects and to remove them.
TQM talks about the satisfaction of customer, supplier, employees etc. and it requires
continuous improvement. If the workers of an organization are efficiently working then their morale
will go up. TQM works effectively if the organization works in a family manner. Here management is
like a father, employees are the children and manager is like mother and as father and mother takes
m
implementation. So the concept of TQM talks about adopting the new policy, creating quality
products, eliminate defects, estimate for breakdown, accidents etc . Hence TQM should be purpose
.co
driven so first the whole organization should be willing to accept the change then only TQM can
actually affect the organization in a positive way.
1.2. CONCEPT
PDCA Cycle
DEMING - Statistical Process Control
JURAN - Concepts of SHEWHART
w.
- Management involvement
- Employee involvement
- Company wide quality control
ISHIKAWA - Cause and Effect Diagram
- Quality Circle concept
CROSBY - “Quality is Free”
m
Quality is the totality of features and characteristics of a product or service that bear on its ability to
satisfy stated and implied needs of customer.
.co
Quality can be quantified as follows
Q=P/E
where,
Q
P
E
=
=
=
Quality
Performance
Expectation
tas
vi lda
Ci
w.
ww
-------------------------------------------------------------------------------------------------
Dimension Meaning and Example
-------------------------------------------------------------------------------------------------
Performance Primary product characteristics, such as the brightness of the picture
Features Secondary characteristics, added features, such as remote control
m
Reliability Refers to the dependability of the service providers and their ability to keep
their promises.
Responsiveness Refers to the reaction time of the service.
.co
Assurance Refers the level of certainty a customer has regarding the quality of the
service provided.
Empathy Being able to understand the needs of the customer as an individual.
Tangibles Similar to the physical characteristics of quality of products.
Other Dimensions Time, Courtesy, Timeliness, consistency, accuracy, credibility and security.
tas
Total Quality Management (TQM) is an enhancement to the traditional way of doing business.
TQM is the application of quantitative methods and human resources to improve all the processes
within an organization and exceed CUSTOMER NEEDS now and in the future.
Ci
1. The philosophical elements of TQM stress the operation of the company using quality as the
m
integrating element.
2. The generic tools consist of various statistical process control (SPC) methods that are used for
.co
problem solving and continuous improvement by quality teams. Quality function deployment is
typically used by managers to drive the voice of the customer into the organization.
3. Tools of the QC department consists of statistical quality control (SQC) methods such as
sampling
tas
plans, process capability and Taguchi methods.
QUALITY GURUS
Ci
1. Benchmarking 1. Leadership
2. Six sigma 2. Quality statements
ww
m
Measures:
.co
Performance Measures
tas
A
S
P
D
lda Interpersonal Skills
Problem Solving
Improvement
Team Work
Discipline
vi
Process
Quality
Ci
Discipline, Consistency.
m
.co
1.7. OBSTACLES (BARRIERS) IN IMPLEMENTING TQM :
Lack of Management Commitment
Improved quality
Ci
Employee participation
Team work
Working relationships
Customer satisfaction
w.
Employee satisfaction
Productivity
Communication
Profitability
ww
Market share
m
11a. Eliminate numerical quotas for the work force.
11b. Eliminate Management by objectives.
.co
12. Remove Barriers that rob people of pride of workmanship.
13. Encourage Education and Self-improvement for everyone.
14. Take action to accomplish the transformation.
2. QUALITY CONTROL
Control is used by operating forces to help meet the product, process and service requirements.
w.
3. QUALITY IMPROVEMENT
Aims to attain levels of performance that are higher than current levels.
m
1. Quality is defined as conformance to requirements.
2. The system for causing Quality is prevention.
3. The performance standard must be zero defects.
.co
4. The measurement of Quality is the Price of Nonconformance
1. Management Commitment
2. Quality Improvement Team
3. Quality Measurement
4. Cost of Quality Evaluation
5. Quality Awareness
6. Corrective Action
tas
lda
7. Establish an Ad Hoc Committee for the Zero Defects Program
8. Supervisor Training
9. Zero Defects Day
10. Goal Setting
11. Error Cause Removal
vi
12. Recognition
13. Quality Councils
14. Do It Over Again
Ci
w.
ww
2.1. LEADERSHIP
“Leadership is lifting of man’s visions to higher sights, the raising of man’s performance to a
higher standard, the building of man’s personality beyond its normal limitations”.
Introduction:
The success of quality management is to a greater extent is influenced by the quality of the
m
leadership. Peter Drucker, the eminent management thinker and writer quotes: “Leadership is lifting
of man’s visions to higher sights, the raising of man’s performance to a higher standard, the building
of man’s personality beyond its normal limitations”.
.co
Leadership is the process of influencing others towards the accomplishment of goals. Leader
triggers the will to do, show the direction and guide the group members towards the accomplishment
of the company’s goal.
Benchmark continuously.
Establish system.
Encourage collaboration.
w.
1. Producer role.
2. Director role.
ww
2.4 LEADERS
m
2.5 CHARACTERISTICS OF QUALITY LEADERS
1. They give priority attention to external and internal customers and their needs.
.co
2. They empower, rather than control, subordinates.
3. They emphasis improvement rather than maintenance.
4. They emphasis prevention.
5. They emphasis collaboration rather than competition.
6. They train and coach, rather than direct and supervise.
7. They learn from the problems.
tas
8. They continually try to improve communications.
9. They continually demonstrate their commitment to quality.
10. They choose suppliers on the basis of quality, not price.
11. They establish organizational systems to support the quality effort.
lda
12. They encourage and recognize team effort.
3. People like to hear a kind word of praise. Catch people doing something right, so you can
pat them on the back.
4. People can process only a few facts at a time; thus, a leader needs to keep things simple.
5. People trust their gut reaction more than statistical data.
w.
6. People distrust a leader’s rhetoric if the words are inconsistent with the leader’s actions.
1. Be Proactive
2. Begin with the End in mind
3. Put First Things First
4. Think Win – Win
5. Seek First to Understand, then to Be Understood
6. Synergy
7. Sharpen the Saw (Renewal)
m
3. Strong information base.
4. Recognition and Reward system.
5. Spending most of the time on Quality.
.co
6. Communication.
7. Identify and encourage potential employee.
8. Accept the responsibility.
9. To play a role model.
10. Remove road blocks.
tas
11. Study TQM and investigate how TQM is implemented elsewhere.
12. Establish policies related to TQM.
13. Establish ‘priority of quality’ and ‘customer satisfaction’ as the basic policy.
14. Assume leadership in bringing about a cultural change.
15. Check whether the quality improvement programmes are conducted as planned.
lda
16. Become coaches and cheer leaders to implement TQM.
17. Generate enthusiasm for TQM activities.
18. Visit other companies to observe TQM functioning.
19. Attend TQM training programme.
20. Teach others for the betterment of society and the surroundings.
vi
Develop the core values, vision statement, mission statement and quality policy statement
Develop the strategic long term plan with goals and Annual Quality Improvement Program
with objectives
Create the total education and training plan
Determine and monitor the cost of poor quality
m
New project teams
Benchmarking report
.co
Within three to five years, the quality council activities will become ingrained in the culture of the
organization.
Goals
Objectives
–
–
Long term planning
Short term planning tas
(Eg : Win the war)
(Eg : Capture the bridge)
lda
PRESENT STRATEGIC PLAN VISION OF
FUTURE
vi
Ci
Goals should
Be measurable
Have a plan or method for its achievement
Have a time frame for achieving the goal
Finally, it should be challenging yet achievable
ww
In order to integrate quality with the strategic planning process, a systematic and sequential procedure
has to be adopted. There are seven basic steps to strategic process planning. They are
The second step requires the planners to determine its positioning with regards to its
customers. Various alternatives such as whether the organization should give up, maintain or expand
market position should be considered. In order to become successful, the organization should
m
concentrate and consolidate its position in its areas of excellence.
Customer needs
.co
Customer Positioning
tas
Gap Analysis (Comparison of
various alternatives)
lda
Closing the gap (selection of
best alternative)
vi
Alignment
Implementation
Ci
Next, the planners must predict future conditions that will affect their product or service: To
ww
help predicting the future, the tools such as demographics, economic forecasts, and technical
assessments or projections may be used.
In this step, the planners must identify the gaps between the current state and the future state
of the organization. This concept is also known as value stream mapping. For identifying the gaps,
an analysis of the core values and concepts and other techniques may be used.
Now the planners should develop a specific plan to close the gaps. This process is also termed
as Process improvement. By assessing the relative importance and relative difficulty of each gap,
planners can close the gaps.
Step 6. Alignment
Now the revised plan should be aligned with the mission, vision, and core values and concepts
of the organization. Organization should embrace quality as an essential ingredient in their vision,
m
mission, and objectives.
.co
Step 7. Implementation
tas
In order to implement the action plan, resources must be allocated to collecting data,
designing changes, and overcoming resistance to change. Also the planners should monitor and assess
the result of the strategic plan.
Since quality is a continuous improvement process, one has to reassess and renew the
lda
strategic plans periodically. So it is a cyclic process. Figure summarizes the strategic planning cycle.
QUALITY STATEMENTS
a. Vision statement,
b. Mission statement, and
m
4. An example of a simple vision statement is :
“To continuously enrich knowledge base of practitioners in mobility industry and institutions
in the service of humanity”. – Society of Automotive Engineers (SAE)
.co
What is Mission Statement?
1. The mission statement, describes the function of the organization. It provides a clear statement
of purpose for employees, customers, and suppliers.
tas
2. The mission statement answers the following questions : who we are?; who are our
customers? ; what we do?; and how we do it?
3. An example of a simple mission statement is :
“Concern for the ultimate customers – millions of customers
lda
Concern for the intermediate customers – the trade
Concern for the suppliers – the sources of raw materials and ancillaries
Concern for the competitors – wishing them well as healthy competition ultimately benefits
the customers.
Ci
- ITC Limited
The quality policy is a guide for everyone in the organization as to how they provide products
ww
Example :
Disney Theme Park - Happiest place on earth
Polaroid - Instant photography
m
MISSION STATEMENT
.co
Who we are?
Who are the customers?
What we do?
How we do it?
It is guide for everyone in the organization as to how they should provide products and services to the
customers.
Ci
Ex: Xerox is a quality company. Quality is the basic business principle for Xerox. Quality means
providing our external and internal customers with innovative products and services that fully satisfy
their requirements.
m
5. A part of business, not outsiders.
6. Life blood of the business.
7. People who come with their needs and jobs.
.co
8. Deserve the most courteous and attentive treatment.
Types of Customers
tas
1. Internal customers, and 2. External customers.
lda
1. Internal Customers
2. As there is a flow of work, product and service in the organization, each department is
dependent on the other. In this, each department or each quality management unit is
considered as a customer by the previous department and as a supplier for the next
Ci
In order to achieve the total customer orientation, TQM requires the better customer – supplier
relationship. Figure shows the model of customer – supplier chain.
Customer satisfaction, a business term, is a measure of how products and services supplied by a
company meet or surpass customer expectation. It is seen as a key performance indicator within
business and is part of the four of a Balanced Scorecard.
m
.co
tas
vi lda
Ci
w.
Satisfied
Dissatisfied customer
Totally satisfied customer contributes to monitored.
FEEDBACK (INFORMATION COLLECTING TOOLS)
Listening to the voice of the customer can be accomplished by numerous information collecting tools.
1. Comment Card
2. Customer Questionnaire
m
Satisfied Dissatisfied
1. Trash removal 5 4 3 2 1
.co
2. Personal hygiene 5 4 3 2 1
3. Romance 5 4 3 2 1
4. Thoughtfulness 5 4 3 2 1
5. Listening skills 5 4 3 2 1
6. Faithfulness 5 4 3 2 1
7.
8.
Respect for
Mother – in - law
Overall,how satisfied
are you with your
marriage?
5
5
4
4
tas 3
3
2
2
1
1
lda
To make surveys more useful, it is best to remember eight points
Before the data are collected, you should know how you want to analyse and use the data
3. Focus Groups
ww
These groups are very effective for gathering information on customer expectations and
requirements.
5. Customer Visits
6. Report Card
8. Employee Feedback
9. Mass Customization
m
.co
tas
vi lda
Investigate customers experiences by actively getting feed back, both positive and negative,
and then acting on it promptly
w.
Develop procedures for complaint resolution that include empowering front – line
personnel.
Analyze complaints, but understand that complaints do not always fit into neat categories.
ww
Work to identify process and material variations and then eliminate the root cause. “More
inspection” is not corrective action.
When a survey response is received, a senior manager should contact the customer and
strive to resolve the concern.
Provide a monthly complaint report to the quality council for their evaluation and, if needed,
the assignment of process improvement teams.
SERVICE QUALITY
m
Customer service is the set of activities an organization uses to win and retain customer’s
satisfaction. It can be provided before, during, or after the sale of the product or exist on its own.
.co
Elements of customer service are
Organization
1. Identify each market segment.
2.
3.
4.
5.
Write down the requirements.
Communicate the requirements.
Organize processes.
Organize physical spaces.
Customer Care
tas
lda
6. Meet the customer’s expectations.
7. Get the customer’s point of view.
8. Deliver what is promised.
9. Make the customer feel valued.
10. Respond to all complaints.
vi
Communication
13. Optimize the trade – off between time and personal attention.
14. Minimize the number of contact points.
w.
Front-Line people
ww
It means “retaining the customer” to support the business. It is more powerful and effective than
customer satisfaction.
For Customer Retention, we need to have both “Customer satisfaction & Customer loyalty”.
m
The following steps are important for customer retention.
.co
2. Identify and understand the customers what they like and dislike about the organization.
8. Customer Retention moves customer satisfaction to the next level by determining what is truly
important to the customers.
vi
9. Customer satisfaction is the connection between customer satisfaction and bottom line.
Ci
It is a means to better meet the organization’s goals for quality and productivity.
2.18 MOTIVATION
ww
CONCEPT OF MOTIVATION
m
THEORIES OF MOTIVATION
Though there are many theories of motivation, the Maslow’s hierarchy of needs theory and
Herzberg’s two factor theory are more important from our subject of view.
.co
2.19 MASLOW’S HIERARCHY OF NEEDS
Self - Actualization
tas
Esteem
lda
Social
Security
vi
Survival
Ci
EMPLOYEE WANTS
w.
-------------------------------------------------------------------------------------------------
Factor Employee Rating Manager Rating
Interesting work 1 5
Appreciation 2 8
ww
Involvement 3 10
Job security 4 2
Good Pay 5 1
Promotion/ growth 6 3
Good working conditions 7 4
Loyalty to employees 8 7
Help with personal problems 9 9
Tactful discipline 10 6
(OR) Self
Actualization
Needs
Esteem Needs
Social Needs
m
.co
Safety Needs (or) Security Needs
Achievement Supervisors
Ci
their absence will dissatisfy them. Therefore these factors are called dissatisfiers.
On the other hand, motivational factors creates satisfaction to the workers at the time of
presence but their absence does not cause dissatisfaction. It can be noted that Herzberg’s dissatisfiers
are roughly equivalent to Maslow’s lower levels, and the motivators are similar to the Maslow’s
upper levels.
The building of a motivated work force if for the most part an indirect process. Concepts to
achieve a motivated work force are as follows:
1. Know thyself.
m
2. Know your employees.
.co
4. Share the goals.
5. Monitor progress.
6.
Develop interesting work.
Job rotation
Job enlargement
Job enrichment
tas
lda
7. Communicate effectively
8. Celebrate success.
vi
EMPLOYEE SURVEYS
Employee surveys help managers assess the current state of employee relations, identify trends,
measure the effectiveness of program implementation, identify needed improvements, and increase
Ci
communication effectiveness.
STEP 1 The Quality Council to create a multifunctional team
Consult: the supervisor invites input into a decision while retaining authority to make the
final decision herself.
Join: the supervisor invites employees to make the decision with the supervisor. The
supervisor considers her voice equal in the decision process.
m
To round out the model, I add the following.
.co
Delegate: the supervisor turns the decision over to another party.
#1 Set a major goal, but follow a path. The path has mini goals that go in many
tas
directions. When you learn to succeed at mini goals, you will be motivated to
challenge grand goals.
lda
#2 Finish what you start. A half finished project is of no use to anyone. Quitting is
a habit. Develop the habit of finishing self-motivated projects.
develop the attitudes of our five best friends. If they are losers, we will be a loser. If
they are winners, we will be a winner. To be a cowboy we must associate with
cowboys.
Ci
#4 Learn how to learn. Dependency on others for knowledge supports the habit of
procrastination. Man has the ability to learn without instructors. In fact, when we
w.
learn the art of self-education we will find, if not create, opportunity to find success
beyond our wildest dreams.
ww
#5 Harmonize natural talent with interest that motivates. Natural talent creates
motivation, motivation creates persistence and persistence gets the job done.
#7 Take risk. Failure and bouncing back are elements of motivation. Failure is
alearning tool. No one has ever succeeded at anything worthwhile without a string of
failures.
m
2.21 EMPOWERMENT
CONCEPT OF EMPOWERMENT
.co
Empowerment is the opposite of helplessness or dependency. An empowered person does not
feel incapable of doing the things that he considers important for the well-being of his organization.
There are no constraints that he perceives to be externally imposed. In other words, being empowered
implies that the person acts from a state of autonomy, doing what he knows is the right thing to do
under a given set of circumstances.
tas
It is understood that empowerment is dependent upon two factors:
lda
(i) An individual’s personal choices; and
(ii) The organization climate, that can either encourage dependency or foster autonomy.
EMPOWERMENT DEFINED
vi
1. According to Webster’s Dictionary, the verb empower means ‘to give the means, ability or
authority’. Therefore empowerment in work setting involves giving people the means, ability
and authority to do something they have not done before.
Ci
Job enrichment is aimed at expanding the content of an individual’s job. But job
empowerment focuses on expanding on the context of the job such as its interactions and
ww
Empowerment is investing people with authority. It’s purpose is to tap the enormous reservoir
of potential contribution that lies within every worker.
m
6. Trust them.
7. Allow them to commit mistakes.
8. Treat them with dignity and respect.
.co
Three dimensions of empowerment are
Capability
Alignment and
Trust
Therefore, it is important to empower individuals and teams at all levels of the organization to
w.
2.23 TEAMS
ww
Teamwork is the cumulative actions of the team during which each member of the team
subordinates his individual interests and opinions to fulfill the objectives or goals of the group.
m
2. The whole is greater than the sum of its members.
3. Team members develop a rapport which each other.
4. Teams provide the vehicle for improved communication.
.co
2.24 TYPES OF TEAMS
tas
Self – Directed / Self – Managed work teams.
1. Sponsor : In order to have effective liason with the quality council, there should be a sponsor. The
w.
sponsor is a person from the quality council, he is to provide support to the organization.
2. Team Charter : A team charter is a document that defines the team’s mission, boundaries, the
background of the problem, the team’s authority and duties, and resources. It also identifies the
ww
members and their assigned roles – leader, recorder, time keeper and facilitator.
3. Team Composition : The size of the team should not exceed ten members except in the case of
natural work teams or self-directed teams. Teams should be diversed by having members with
different skills, perspective and potential. Wherever needed, the internal and external customers and
suppliers should be included as a team member.
5. Ground Rules : The team should have separate rules of operation and conduct. Ground rules
should be discussed with the members, whenever needed it should be reviewed and revised.
6. Clear Objectives: The objective of the team should be stated clearly. Without the clear objective,
the team functions is not to be effective.
7. Accountability: The team performance is accountable. Periodic status report of the team should be
m
given to the quality council. The team should review its performance to determine possible team
process weaknesses and make improvements.
.co
8. Well-defined Decision Procedures: The decision should be made clearly at the right time by the
team.
9. Resources: The adequate information should be given to the team wherever needed. The team
cannot be expected to perform successfully without the necessary tools.
tas
10. Trust : Management must trust the team to perform the task effectively. There must also be trust
among the members and a belief in each other.
lda
11. Effective Problem-Solving : Problem-solving methods are used to make the effective decision.
12. Open Communication : Open communication should be encouraged i.e., everyone feels free to
speak in the team whatever they are thinking, without any interruptions.
vi
13. Appropriate Leadership: Leadership is important in all the team. Leader is a person who leads
the team, motivates the team and guides the team in a proper direction.
14. Balanced Participation : Everyone in a team should be involved in the team’s activities by
Ci
voicing their opinions, lending their knowledge and encouraging other members to take part.
15. Cohesiveness: Members should be comfortable working with each other and act as a single unit,
not as individuals or subgroups.
w.
1. Purpose
3. Activities
4. Effectiveness
6. Results, and
7. Recognition.
m
.co
tas
lda
Figure depicts the seven main elements of effective teamwork.
Each term takes sometime to start functioning effectively towards problem solving. Each team
vi
goes through six distinct stages in its development. These are farming, storming, norming,
performing maintenance and evaluating.
Ci
1. Farming stage : When a team is created, it consist of group of individuals and team work does not
exist at this stage. Team’s purpose, members’ roles, acceptance of roles, authority and process of
functioning are learnt in the formation process.
w.
2. Storming stage : Initial agreements and role allocations are challenged and re-established at this
stage of team development. At this stage, hostilities and personal needs often emerge which may be
resolved.
ww
3. Norming stage : During norming stage of team development, formal and informal relationships get
established among team members. Openness and cooperation have been observed as signs of team’s
behaviour.
4. Performing stage : At this stage, the team starts operating in successful manner. Trust, openness,
healthy conflict and decisiveness of a group’s performance can be reached at this stage.
6.Evaluating stage : At this stage, team’s performance is to be evaluated in view of the set targets.
Both self-evaluation and management-based evaluation form this stage of team development.
m
TEAM MEMBER ROLES
.co
TEAM LEADER
tas
lda
Ensures the smooth and effective operation of the team.
Facilitates the team process.
Serves as a Contact Point.
Organizes the implementation of changes.
Prepares the meeting agenda.
vi
FACILITATOR
Supports the leader.
Ci
Documents the main ideas of the team’s discussion, the issues raise, decisions made, action
items etc.
Presents the documents and distributes the MOM.
Participates as a team member.
ww
TIMEKEEPER
Ensures that the team maintains the schedule.
Participates as a team member.
TEAM MEMBER
Contributes best, without reservation.
Respects other people’s contributions.
Listens carefully and asks questions.
m
3. Handclasp decision.
4. Minority-rule decision.
5. Majority-rule decision.
.co
6. Consensus.
Insufficient training.
Incompatible rewards and compensation.
First-line supervisor resistance.
Lack of planning.
Lack of management support.
Access to information systems.
tas
lda
Lack of Union support.
Project scope too large.
Project objectives are not significant.
No clear measures of success.
No time to do improvement work.
vi
MEANING:
Send letters to improve team members when they establish a team thanking them for their
involvement.
1. Develop a behind the scenes awards specifically for those whose actions are not usually in
m
the lime light, make sure such awards are in the lime light.
2. Create best ideas of the year booklet and include everyone’s picture name and description of
their best ideas.
.co
3. Feature the quality team of the month and put their picture in a prominent place.
4. Honor peers who have helped you by recognizing them at your staff meetings.
5. Let people attend meetings, committees etc; in your place when you are not available.
6. Involve teams with external customers and suppliers, sending them on appropriate visits to
solve problems and look for opportunities.
tas
7. Invite a team for coffee or lunch at any time, not necessarily when you need them for
something.
8. Create a visibility wall to display information, posters, and pictures, thanking individual
employees and their teams, and describing their contributions.
9. When you are discussing an individual or group ideas with other people, peers, or higher
lda
management make sure that you give them credit.
REWARD
MEANING:
ww
Reward is a tangible one, such as increased salaries, commissions, cash bonus, gain sharing,
etc; to promote desirable behavior.
TYPES OF REWARDS:
1. Intrinsic rewards
2. Extrinsic rewards
Intrinsic rewards are related to feelings of accomplishment of self-worth.
INTRINSIC REWARDS
m
4. 360 degree performance appraisals feedback from co-workers subordinates to customers is
incorporated into performance appraisals.
.co
EXTRINSIC REWARDS:
1.
2.
Profit sharing
gain sharing
tas
lda
3. employment security
4. compensation time
5. individual based performance systems
6. quality based performance appraisals
vi
3. Reward is normally in the form of cinema tickets, dinner for family etc.
4. The financial compensation (for recognition) can be paid in terms of increased salaries,
commissions, gain sharing etc.
5. The efforts of employees can be recognized by promotions, special job assignments etc.
ww
6. A letter of appreciation from the CEO or the Top Management will increase the employee’s
involvement.
7. Reward may be delayed but recognition should be in a timely basis.
8. Rewards should be appropriate to the improvement level.
9. People like to be recognized than any reward.
10. Special forms of recognition include pictures on the bulletin board, articles in news letters, letter
to families etc.
11. Supervisors can give on-the-spot praise for a job which is done well.
1. Recognition and reward go together for letting people know that they are valuable members for
the organization.
2. Employee involvement can be achieved by recognition and reward system.
3. Recognition and reward system reveals that the organization considers quality and productivity
as important.
4. It provides the organization an opportunity to thank high achievers.
5. It provides employees a specific goal to achieve.
m
6. It motivates employees to improve the process.
7. It increases the morale of the workers.
.co
2.28 PERFORMANCE APPRAISAL
The performance appraisal is used to let employees know how they are performing. The performance
appraisal becomes a basis for promotions, increase in salaries, counseling and other purposes related
to an employee’s future.
Employees make better decisions using their expert knowledge of the process
ww
Employees are better able to spot and pin-point areas for improvement.
Employees are better able to take immediate corrective action.
Employee involvement reduces labour / management friction.
Employee involvement increases morale.
Employees have an increased commitment to goals because they are involved.
m
.co
2.30 CONTINUOUS PROCESS IMPROVEMENT
Continuous process improvement is designed to utilize the resources of the organization to
achieve a quality-driven culture.
tas
vi lda
Ci
w.
ww
m
.co
tas
vi lda
Improvement is made by
PROCESS
m
INPUT PROCESS OUTPUT
.co
People,
OUTCOMES
Materials, Equipment, Information,
Information,
Data, etc.
tas
Procedures,
Environment,
Product,
Service, etc.
lda
Materials
CONDITIONS
vi
Reduce resources.
Reduce errors.
Meet or exceed expectations of downstream customers.
w.
m
.co
PROBLEM SOLVING METHOD
Identify the Problem
Pareto analysis of external alarm signals.
Pareto analysis of internal alarm signals.
Proposals from key insiders.
tas
lda
Proposals from suggestion schemes.
Field study of user’s needs.
Comments of key people outside the organization.
Customer surveys.
Employee surveys.
vi
This phase has the objective of establishing potential and feasible solutions and recommending the
m
best solution to improve the process.
Creativity plays the major role, and brainstorming is the principal technique.
There are three types of creativity:
.co
Create new processes
Combine different processes
Modify the existing process
4. IMPLEMENT CHANGES
This phase has the objective of monitoring and evaluating the change by tracking and studying the
effectiveness of the improvement efforts.
Ci
m
.co
tas
lda
PDSA CYCLE (OR DEMING WHEEL)
The basic Plan – Do – Study – Act cycle was originally developed by Walter A. Shewart. But
it was popularized by Edward Deming and that’s why it is often called the Deming Cycle or Deming
vi
PDSA stands for Plan, Do, Study, and Act. It is a model for testing ideas that you think may
m
The four phases of PDSA cycle and their descriptions are presented in Table.
.co
Phases of PDSA Cycle
Phases Description
1. Plan
Define the problem
Define the performance indicators.
tas
Analyze the causes and draft an action plan for solving the problem.
Determine the quality objectives and the critical factors.
Collect and analyze the necessary process data.
Generate possible solutions
lda
Select the most feasible solution; and work it out.
2. Do
First, implement the plan on a limited scale or conduct an experiment to test the proposed
improvement. Collection data is hereby essential.
Train all involved employees in the use of quality improvement methods and techniques.
Describe the process which is considered for improvement and form project teams to lead
vi
the process.
3. Check Evaluate the trial project with the performance indicators.
Verify whether the improvement has been successful or not.
Ci
4. Act Act to implement proven improvements. The choices are: introduce the plan, adjust or
reject it.
The improvements are documented in standard procedures so all employees are well-
w.
The relationship between the PDSA cycle and eleven steps to continuous process
improvement are illustrated in figure.
Each phase of the PDCA cycle must undergo its own PDCA cycle for further improvements,
as shown in figure.
m
.co
Applying PDCA to its phases
SEIRI CLEARING
ww
SEITON ARRANGING
SEISO SWEEPING
SEIKETSU CLEANLINESS
SHITSUKE DISCIPLINE
m
scrapped pens
Rejected material Useless paper Old clothes
Expired goods Old diaries Broken suitcases
.co
Broken tools, Broken furniture’s
pallets, bins,
trolleys.
Old notices
Flow Chart :
No use Repair
Ci
The unwanted clutters up the place and the wanted are hard to find.
Every place can only hold so much.
Clutter sometimes causes misidentification.
ww
m
location system. Not arranged well
Things on the floor File heaps and papers
.co
Consequences of not practicing SEITON
window, grills,
parts, R.Mtls. bookshelves.
Dirty jigs, fixtures Dirty office equipments
Dirty walls, roofs Littered floor
Littered floor Dirty windows
ww
Most machines are affected by dust & dirt and hence their performance may go down.
Dust and dirt on products, materials, packing boxes etc. will affect either their performance
quality or their aesthetic look.
Unpleasant to work in.
m
Factory Floor Office Home
.co
Handling hazardous Free of pests Pest control
chemicals Personal hygiene Personal hygiene
Control of fumes,
hazardous dust.
Disinfecting, Personal hygiene
tas
lda
Good health and safety require the practice of Seiketsu.
Hazardous chemicals, dusty chemicals, fumes etc. can make it a dangerous place to work in.
Washing thoroughly and cleaning a place makes the workplace pleasant.
Personal hygiene is essential for healthy workforce.
vi
and punctuality.
w.
2.34 KAIZEN
m
Kaizen is a Japanese word for the philosophy that defines management’s roles in continuously
encouraging and implementing small improvements involving everyone.
.co
It focuses on simplification by breaking down complex progress into their sub – processes and then
improving them.
tas
vi lda
m
.co
What is Supplier Partnering?
tas
supplier should be based upon trust, dedication to common goals and objectives, and an
understanding of each party’s expectations and values.
Benefits of Partnering
lda
The benefits of partnering include:
The three important elements to achieve the customer / supplier partnering relationship are :
1. Long-term commitment: Long-term commitment provides both customer and supplier the much
needed environment to achieve the planned objectives. Because to set up and solve the problem of
continuous improvement, both parties may require the sufficient time.
3. Shared vision : Both the customers and suppliers have the common goal i.e., to satisfy the end
user. In order to ensure this goal, both particles should share and understand their goals and
objectives.
m
o Sole sourcing;
o Multiple sourcing, and
o Single sourcing.
.co
1. Sole Sourcing
Sole sourcing is the use of only one supplier for the organization. The organization does not
have any choice. It is forced to use only one supplier.
tas
This forced situation is because of the following factors : patents, technical specifications, raw
material location, only one organization producing the item, etc.
2. Multiple Sourcing
lda
Multiple sourcing is the use of two or more suppliers for an item.
The basic concept of multiple sourcing is that competition will result in better quality,
lower costs, and better service. (The selection of suppliers from various alternatives is based on their
performance in terms of prices, quality and delivery.
vi
3. Single Sourcing
Ci
Single sourcing is the use of one supplier for an item when several sources are available. It
leads to long-term partnering relationship.
w.
The suppliers should be treated as partners to achieve the same quality level as attained within the
organization.
The following forces need Supplier Partnership to improve quality, reduce costs and increase market
ww
share.
Dr. Kaoru Ishikawa has given ten principles of customer-supplier relations. They are
1. Both the customer and supplier are fully responsible for the control of quality.
2. Both the customer and supplier should be independent of each other.
3. The customer is responsible for providing the supplier with clear and sufficient requirements so
that the customer can know precisely what to produce.
4. Both the customer and supplier should enter into a non-adversarial contract.
5. The supplier is responsible for providing the quality that will satisfy the customer.
6. Both the customer and supplier should decide the method to evaluate the quality of the product
m
or services.
7. Both the customer and supplier should establish in the contract the method by which they can
reach an amicable settlement in case of any dispute.
.co
8. Both the customers and supplier should continually exchange information.
9. Both the customer and supplier should perform business activities.
10. Both the customer and supplier should have the best interest of the end user in mind.
2.37 PARTNERING
Shared Vision
2.38 SOURCING
w.
1. The supplier should understand clearly the management philosophy of the organization.
2. The supplier should have stable management system.
3. The supplier should maintain high technical standards.
m
SUPPLIER CERTIFICATION
A certified supplier is one which, after extensive investigation, is found to supply material of such
.co
quality that is not necessary to perform routine testing.
tas
2. No non-product related rejections for atleast 6 months.
3. No production related negative incidents for atleast 6 months.
4. Should have passed a recent on-site quality system evaluation.
5. Having a fully agreed specifications.
6. Fully documented process and quality system.
lda
7. Timely copies of inspection and test data.
8. Process that is stable and in control
.
2.40 SUPPLIER RATING
vi
To provide each supplier with a detailed and true record of problems for corrective action.
To enhance the relationship between the buyer and the supplier.
RELATIONSHIP DEVELOPMENT
w.
(a) Partnering
ww
m
.co
tas
vi lda
Ci
w.
ww
m
Every organization needs to establish a set of well-defined process for manufacturing of
product (or) design or service.
The objective of process control is to control the quality of the processes and ensure that the
.co
deliverables are produced as planned.
Aim of the statistical based process control is to produce products and services with quality
consistently.
Seven quality control tools are very important for continuous improvement in the TQM
journey.
tas
It is a prerequisite for ISO 9000 certification process flow charts are insisted and the
organizations are asked to document the processes.
3.1.2 Concept
lda
There are many proposed tools and techniques to achieve the TQM promises. Generally, a technique
can be considered as a number of activities performed in a certain order to reach the values .
On the other hand, tools sometimes have statistical basis to support decision making or facilitate
analysis of data.
vi
The best tools for this purpose is check sheet, Pareto chart, histogram, scatter diagram, run chart and
statistical process control (SPC).
Ci
The data collected by these tools can be used to measure the process. The correct selection and use of
tools and techniques is a vital component of any successful TQM implementation plan.
w.
The TQM tools and techniques can be divided into simple tools for solving a special problem and
complex one that cover all functions within the company.
This is one of the basic quality tool that can be used for analyzing a sequence of events.
The tool maps out a sequence of events that take place sequentially or in parallel. The flow chart can
be used to understand a complex process in order to find the relationships and dependencies between
events.
You can also get a brief idea about the critical path of the process and the events involved in the
critical path.
Flow charts can be used for any field and to illustrate events involving processes of any complexity.
There are specific software tools developed for drawing flow charts, such as MS Vision.
m
.co
tas
lda
3.3 Applications:
In a product assembly how sub assemblies made and then build into final product.
vi
The time taken for before improvement is greater than after improvement by using flow diagrams.
3.4. Histogram
Ci
Histogram is used for illustrating the frequency and the extent in the context of two variables.
Histogram is a chart with columns. This represents the distribution by mean. If the histogram is
normal, the graph takes the shape of a bell curve.
If it is not normal, it may take different shapes based on the condition of the distribution. Histogram
w.
can be used to measure something against another thing. Always, it should be two variables.
Consider the following example: The following histogram shows morning attendance of a class. The
X-axis is the number of students and the Y-axis the time of the day.
ww
m
.co
3. 5 Cause and Effect Diagram
Organizations face problems everyday and it is required to understand the causes of these problems in
order to solve them effectively. Cause and effect diagrams exercise is usually a teamwork.
lda
A brainstorming session is required in order to come up with an effective cause and effect diagram.
All the main components of a problem area are listed and possible causes from each area is listed.
Then, most likely causes of the problems are identified to carry out further analysis.
vi
Ci
w.
ww
m
FUNCTION SUGAR
OF ID FAN CONTENT
VARIATION IN
.co
STEAM
GENERATION
VARIATION IN VARIATION
WATER LEVEL IN BOILER
IN DRUM WATER pH
VARIATION IN
WATER
tas
VARIATION
IN BOILER
WATER TDS
BOILER
WATER
FEED WATER
TEMPERATURE
lda
QUALITY
When this is done with the help of software packages such as Microsoft Excel, you can derive further
analysis graphs and automate through macros available.
Therefore, it is always a good idea to use a software check sheet for information gathering and
Ci
organizing needs.
One can always use a paper-based check sheet when the information gathered is only used for backup
or storing purposes other than further processing.
Types of check sheet
w.
m
.co
3.7. Scatter Diagram
When it comes to the values of two variables, scatter diagrams are the best way to present. Scatter
diagrams present the relationship between two variables and illustrate the results on a Cartesian plane.
tas
Then, further analysis, such as trend analysis can be performed on the values.
In these diagrams, one variable denotes one axis and another variable denotes the other axis.
vi lda
Ci
w.
ww
m
.co
3.9. Pareto Charts
tas
Pareto charts are used for identifying a set of priorities. You can chart any number of issues/variables
lda
related to a specific concern and record the number of occurrences.
This way you can figure out the parameters that have the highest impact on the specific concern.
This helps you to work on the propriety issues in order to get the condition under control.
vi
Ci
w.
ww
m
can be applied to any condition.
There are seven basic quality tools used in organizations. These tools can provide much information
about problems in the organization assisting to derive solutions for the same.
.co
A number of these quality tools come with a price tag. A brief training, mostly a self-training, is
sufficient for someone to start using the tools.
Let's have a look at the seven basic quality tools in brief.
GLOSSARY:
tas
Variables – The measurement data will vary continuously Ex: Voltage, Current, Length, Efficiency.
Attributes – Any counting can occur in whole numbers Ex: No. of defects in a software, No. of
parts rejected.
lda
1.REFERENCES:
management/#
Why?
It is a simple and effective tool. This approach focuses on the process (to reveal the causes),
rather than the people.
ww
This technique provides for ideas input from every one in the team and for effective decision
making.
m
A team wants to decide upon a current complaint to attend. Every one in the team writes the
.co
problem on a paper, what they think is most important. They are listed in a chart and then the team
members are asked to rank, from most important to least important. The ranking are given a
numerical value starting from, say, on a 10 to 1 scale. Points for each problem is totaled and the ones
with highest number of points, is considered o be the most important.
tas
The seven advanced tools of quality management or the ‘New Seven’ is a collection of tools put
together by a set of Japanese quality professionals. , Arrow Diagram, was known to engineers and
project managers by names like PERT (Programme Evaluation and Review Technique) or CMP
(Critical Mean Path). Another tool in this set PDPC (Process Decision Programme Chart) has been
lda
used in operations research.
3. CONCEPT
These tools, unlike SPC tools are qualitative tools. Most of these tools do not involve the use of
numerical data.
vi
2. Relations diagram
3. Tree diagram
4. Matrix diagram
5. Matrix data analysis diagram .
ww
3. Affinity Diagram
The purpose of an affinity diagram is to provide a visual representation of grouping of a large number
of ideas or factors or requirements into logical sets of related items to help one organise action plans
in a systematic manner.
Procedure
m
simplicity makes it easy to combine it with other tools and put it to a wide variety of applications. For
instance, it can be combined with a cause-and-effect diagram or a relations diagram to identify and
regroup causes for a problem or it can be combined with a tree diagram to categorise
.co
possible solutions. Thus it can assist in problem solving. It can be used to group customer
requirements in a complex product and can help one to design a product with characteristics and
features that would satisfy and delight customers. It can be used to categorise actions in an
implementation plan leading to a rationalised distribution of responsibility. In fact the tool can
be used to break up any complex problem or task into smaller more easily manageable bits. Someone
tas
has asked a question - “How do you eat a whale ?” which has an obvious answer -”A mouthful at a
time”. Another similar set of a question and an answer is - “How to eat an elephant - slice by slice”.
Well affinity diagram is a tool that helps to break up a whale into convenient mouthfuls or an
elephant into manageable slices. Its simplicity makes it a very widely applicable tool.
vi lda
Ci
w.
ww
m
.co
tas
vi lda
Ci
2.Relations Diagram
Purpose
The purpose of relations diagram is to generate a visual representation of the relations between an
w.
effect and its causes as well as the interrelationship between the causes in complex problems.
Structure
As mentioned in the opening paragraph of the chapter, the structure of relations diagram is not very
rigid; it is quite flexible. Only thing fixed about the diagram is a bold bordered rectangle in which the
ww
‘effect’ is written. The causes are entered in light rectangles and lines are drawn to show relation
between the rectangles. The lines have arrows at one end showing which is the cause and which is the
effect - the arrow always leading from the cause to the effect. The most common shape the diagram
takes has the ‘effect’ at the centre, with immediate causes surrounding it and secondary and tertiary
causes as outer layers.
5. Procedure
To prepare a relations diagram, there is a need for a large number of causes.
No single individual can generate an exhaustive list of causes.
1. Decide the ‘effect’ or the problem for which causes are to be found.
Write is in the centre of the flip chart or a board and enclose it in a dark bordered rectangle.
Discuss the subject and confirm the ‘effect’.
m
Take care to place causes likely to be related to one another in adjacent positions.
It is quite possible that the locations of the causes may have to be changed as one progresses.
Hence a white board is preferable to a flip chart for this exercise. If a flip chart is used, the causes
.co
may be written on post-it pads and stuck on the chart so that their location can be changed easily.
3. Connect these immediate causes to the effect by connecting the rectangles of the causes to that of
the effect with a line with an arrow pointing towards the effect. Explore the cause and effect
relationship among the immediate causes and connect them, keeping in mind that
the arrow always points to an effect.
tas
4. Taking each of these immediate causes as an effect, brainstorm to find causes for them one by one.
The key question for identifying causes is “why ?”. Keep asking the question till the root causes are
identified for the immediate, secondary and tertiary causes.
lda
5. Explore the relationship between all the causes and connect the rectangles as in step-3. Show as
many relations among different causes as possible. A large number of routes leading to the same root
causes provides an indication that the root cause may be an important contributor to the problem.
vi
6. Brainstorm to find the more important root causes and more prominent links leading to the effect.
Mark these by making the rectangles and the connecting lines darker.
Ci
7. If necessary, rearrange the rectangles in such a way that the connecting lines are short and the
diagram compact.
6. Applications
Relations diagram can be applied to explore cause and effect relationships, especially in complex
situations where the causes are likely to be mutually related. The most common use is in problem
ww
solving to identify multiple interrelated causes. The output of the tool is a list of root causes for the
problem with some indication of their relative importance. The output has to be considered as only an
indication of the relative importance of the causes. Data has to be collected to confirm or reject the
conclusions arrived at the end of the session. Priority of corrective actions to eliminate the causes
should be based on the data collected, not on output of relations diagram. The output of
relations diagram is based on the perception of the members of the group brainstorming the issue; it
needs to be supported by facts. While the output is important as it points a direction to data collection
efforts, it is no substitute for facts and data.
7. Relations diagram
m
.co
tas
vi lda
8. Tree Diagram
Ci
Purpose
The purpose of the tree diagram is to explore ways and means to achieve an objective, develop a list
w.
of alternate means to reach the desired situation in a sequential order and to present them in a visual
form.
Procedure
ww
This tool like other tools in the ‘new seven’ is a group tool. A brainstorming session is necessary to
collect a large number of ideas for the means to achieve the objective. The rules of brainstorming
should be observed to get the best results from the tool.
m
6. Continue the process till the group feels that the end of the line has been reached.
7. If a lower level means is required to attain two higher level means, it may be connected to both.
Rearrange the boxes if necessary to make this possible. Use of POST-IT pads can make such a
.co
rearrangement simple.
8. Brainstorm to reach a consensus on the relative importance of the last level means to priorities
action.
9. Give a suitable title to the diagram. Application The most important application of the tree diagram
is for devising solutions for problems. It helps one to develop a systematic step by step strategy to
tas
achieve an objective. It is also useful in monitoring the implementation of solutions by taking care of
accomplishment of means at different levels.
vi lda
Ci
w.
ww
9. Matrix Diagram
Purpose
The purpose of a matrix diagram is to explore the existence and the extent of relations between
individual items in two sets of factors or features or characteristics and express them in a symbolic
form that is easy to understand. The purpose for which the tool is most frequently used is to
understand the relation between customer expectations as expressed by the customers and product
characteristics as designed, manufactured and tested by the manufacturer.
m
Procedure
The steps in the procedure to prepare a matrix diagram are :
1. Decide the two sets of factors for which relations are required to be clarified. Call the set of the
.co
main factors ‘features’ and the set of factors dependent on it counterpart ‘characteristics’ or
characteristics.
2. Divide the features into primary, secondary and tertiary features.
3. Divide the characteristics into primary, secondary and tertiary characteristics.
4. Place the features vertically on the left hand side of the matrix and characteristics horizontally on
top of the matrix.
tas
5. Enter the importance of the features on the column after that for the tertiary features.
6. In the main body of the matrix, place symbols at the squares denoting the relationship between
thefeature and the characteristic meeting at the intersection. The symbols to be used are :
- Strong relationship
lda
- Medium relationship
- Weak relationship
In case there is no relation between the concerned feature and characteristic, leave the square blank to
indicate ‘no relation’. The relationship should be based on data available with the team or on the
results of a brainstorming session which must be confirmed by collecting necessary data.
vi
7. Title the diagram suitably. ApplicationsMatrix diagram, being a very simple table showing
relations between individual items in two sets of factors, can be put to a wide variety of uses.
The symbolic representation of the relationship makes the diagram so much easier to understand as
Ci
compared to a table with a lot of figures. Let us see some of the possible applications of a matrix
diagram.
Matrix diagram can be used to solve problems by arranging data in such a way that the relations
between relevant factors are brought into sharp focus. It can be used to understand relations between
w.
customer satisfaction and product characteristics, between complaints and product groups, between
complaints and geographical regions, between a product’s performance in the market and
promotional inputs on it and so on. Once the relations between individual items in sets of factors are
clearly understood and agreed upon, it becomes easy to solve problems and to plan and implement
ww
solutions systematically.
There is no limit to the use of the tool. The unlimited possibility of the application of the tool is
proved by a couple of unusual examples. A book on
QC tools written by Japanese authors gives an example where the tool was used to describe the
relations between male and female members of the staff in an office. A recent article in a magazine
brought out by an NBFC (Non Banking Finance Company) for the benefit of investors used the
matrix diagram to depict the vulnerability of different industries. The diagram provides relation
between 24 industries from Aluminium and Automobiles to tyres and yarn with half a dozen
m
can be used to develop specification requirements for inputs to a process by studying their relation to
the output requirements.
.co
tas
vi lda
Ci
w.
characteristics. The purpose then is to analyse the data on several characteristics for a number of
products and use the information to arrive at optimum values for the characteristics for a new product
or to decide the strong points of a product and use the information for designing a strategy for the
promotion of the product.
Procedure
The procedure for creating a matrix data analysis diagram consists of the following steps:
1. Decide the two factors whose relations are to be analyses.
2. Check the number of individual items in the two factors.
m
related products and placing them in a matrix data analysis diagram, one can decide the desired
characteristics of the proposed product depending on target group of customers for the new product.
Analysis of the data can also be used to identify the strongest characteristics of an existing product to
.co
decide its promotional inputs. The tool can also be used to study the causes of customer complaints. It
can also be used to determine process parameters to achieve desired product characteristics.
The tool can be very useful in compiling data obtained on the analysis of competitive products with a
view to develop a product better than the competition or to devise a marketing strategy for the
product based on its strengths.
tas
vi lda
Ci
w.
ww
m
.co
tas
vi lda
Ci
w.
ww
Procedure
The steps in the preparation of a process decision programme chart are :
1. Prepare a ‘normal’ flowchart of the process with all expected events as steps in the chart.
m
2. Consider the possibility of the process not going as per the plan due to any abnormal, though less
probable, occurrences.
3. Show these occurrences on the flowchart through branching at appropriate locations.
.co
4. Consider how the abnormal occurrence will affect the process and search for ways and means to
counter the effect.
5. Show these countermeasures in rectangles connecting the corresponding abnormal occurrence on
one side and the process objective or the goal on the other.
6. Give a suitable title to the diagram.
tas
Steps 2 and 4 require totally different type of thinking and hence the team must be prepared to think
on appropriate lines. One needs to put on different ‘thinking hats’ while brainstorming steps 2 and 4
and the facilitator must inform all members about it. As suggested by Dr. Edward De Bono in his
book ‘Six Thinking Hats’ the correct thinking hats for steps 2 and 4 are black and yellow which
lda
respectively encourage ‘negative logical’ and ‘positive logical’ thinking.
Applications
The tool has the widest range of applications as it can be used for a range of activities from simple
ones like a game of bridge or reaching railway station or airport in time to catch a train or a plane to
vi
complex processes or projects. In fact if can be applied to all processes to ensure their success by
systematically minimising the untoward effect of unexpected adverse occurrences. Through the
process of brainstorming for possible adverse occurrences and for measures to counter them, one
Ci
assures the success of the process even if such events do occur. The tool can be used to prevent
problems by identifying opportunities for error and devising measures to avoid failure. It can be used
during the implementation of solutions for predicting resistance and for planning measures to
overcome the resistance.
w.
ww
m
.co
tas
vi lda
Ci
w.
12.Arrow Diagram
ww
Purpose
The purpose of an arrow diagram is to create a visual presentation of the steps of a process or tasks
necessary to complete a project with special emphasis on the time taken for these activities. The
diagram provides a clear understanding of the schedule of various steps in the process which helps
one to monitor the process for ensuring its completion on time.
Procedure
The steps for preparing an arrow diagram are :
m
streams are combining, the maximum time taken by a stream is taken into consideration. This time is
entered on the top half of the rectangle. This time is related to the starting time of the process which is
taken as zero.
.co
7. After the time for all event nodes including the completion of the process or the project is
available, one calculates the latest time by which an event node must be reached. This is done by
starting at the time of completion and going back step by step. The time is entered on the bottom half
of the rectangle. The time indication at all event nodes will appear as :
X Y where X is the earliest time by which the event can be completed and
tas
Y is the latest time by which the event should be completed.
8. Give a title to the diagram. As the calculation of the time indications is extremely important in the
construction of an arrow diagram it is necessary that we understand the procedure well. Let us
understand the concept through diagram.
vi lda
Ci
w.
ww
Let us calculate the time the events can be reached earliest by adding time for the step to the time of
the earlier event starting with zero time at the start i.e. event-1. Where there are two streams one has
to take the time for the longer or the critical path. The time to be put on the top half of the rectangle
for the 15 event nodes are given in table 3.
For event node 7, we get two values. As the time for node 6 is 5 hours and step from 6 to 7 takes one
hour, the time for 7 would be 6 hours. But time for node 3 is 4 hours and the step from 3 to 7 takes 3
m
1 11completion of the project on time. In this case one has to start with event 15 as 20 hours and
calculate the time for the event by reducing the time taken for the step. Step from event 14 to 15 takes
2 hours. To complete the project at 20 hours, it is essential that one reaches event 14 by 18 hours. In
.co
this way
we get the time by which the events must be accomplished. These are given in table 4.
Applications
The most common application of an arrow diagram is in planning and scheduling projects which
involve a large number of activities. The diagram is also useful in planning and scheduling steps in
tas
complicated processes. Once an arrow diagram is ready with time indications for all stages of the
project or the process, referred as the event nodes in the procedure, one can look for
opportunities to reduce the time taken for the project by concentrating on the steps on the critical
path. It can then be used to monitor the progress of the project throughout its duration.
lda
13. SIX SIGMA
14.Prerequisite Discussion
Six Sigma is a set of techniques and tools for process improvement. It was developed by Motorola in
1986, coinciding with the Japanese asset price bubble which is reflected in its terminology.
vi
Six Sigma seeks to improve the quality of process outputs by identifying and removing the causes of
defects (errors) and minimizing variability in manufacturing and business processes. It uses a set
of quality management methods, including statistical methods, and creates a special infrastructure of
Ci
people within the organization ("Champions", "Black Belts", "Green Belts", "Yellow Belts", etc.)
who are experts in these methods.
WHAT IS SIX SIGMA?
w.
Six sigma stands for six standard deviation from mean (sigma is the Greek letter used to
represent standard deviation in statistics).
ww
m
(Three sigma quality is not enough. Why?)
We know that, the three sigma quality, i.e., the natural variability (x 3) is equal to tolerance
.co
(= upper specification limit – lower specification limit). It means, in normal distribution curve, only
0.27% of the output would be expected to fall outside the specifications limits.
The real meaning of 3 concept: A medium aircraft consists of 10,000 different parts. At
tas
3 quality, 27 of those parts in an assembled aircraft would be defective. So three sigma quality level
cannot be accepted as good enough quality level. So we have to increase the sigma level (i.e.,
reducing the number of defectives). In fact, even four sigma quality also not sufficient for the aircraft
case. That’s why six sigma quality level is preferred than 3 and 4 quality levels.
lda
15. CONCEPT
Six Sigma – A vision of quality which equates with only 3.4 defects per million opportunities for
each product or service transaction. Strives for perfection.
DMAIC methodology provides a structured framework for solving business problems by assuring
correct and effective process execution.
vi
This methodology has 6 phases in which, in the case of Six Sigma, teams take total employee
involvement approaches to complete the cycle of process management and use self-diagnosis skills to
fulfill the goals of each phase.
Ci
16. DMAIC
w.
ww
m
DMAIC – It is used for improving existing processes/products.
.co
DMADV – It is applied to a new processes/products.
Aircraft consist 10000 different parts.
tas
At 3 sigma level27 parts will be defective.
It cannot afford to fail 27 parts in million at 3 sigma level.
Similarly 1). Failure in surgery. 2). Testing of nuclear plant.
lda
Therefore increased to six sigma level. (reduce the number of defects)
18.Significance:
Each Six Sigma project carried out within an organization follows a defined sequence of steps and
w.
has quantified value targets, for example: reduce process cycle time, reduce pollution, reduce costs,
increase customer satisfaction, and increase profits.
19.Application:
ww
Today six sigma can apply to many fields such as services, medical and insurance procedures,
call centers etc.,
Motorola
Sony
IBM
21.Glossary :
m
DMADV – It is applied to a new processes/products.
.co
22.References:
23.BENCHMARKING
lda
CONCEPT:
Benchmarking is a systematic method by which organizations can measure themselves against
the best industry practices.
Benchmarking is a systematic search for the best practices, innovative ideas, and highly
vi
24.BENCHMARKING CONCEPT
Ci
Creative
Adaptation
Breakthrough
Performance
26.PROCESS OF BENCHMARKING
The following six steps contain the core techniques of Benchmarking.
m
26.1Decide what to benchmark
Benchmarking can be applied to any business or production process.
The strategy is usually expressed in terms of mission and vision statements.
.co
Best to begin with the mission and critical factors.
Choosing the scope of the Benchmarking study.
Pareto analysis – what process to investigate.
Cause and Effect diagram – for tracing outputs back.
26.2Understand current performance
tas
Understand and document the current process.
Those working in the process are the most capable of identifying and correcting problems.
While documenting, it is important to quantify.
Care should be taken during accounting information.
26.3Plan
lda
A benchmarking team should be chosen.
Organizations to serve as the benchmark need to be identified.
Time frame should be agreed upon for each of the benchmarking tasks.
26.4Types of benchmarking
vi
Internal
Competitive
Process
Ci
26.5Study Others
Benchmarking studies look for two types of information
How best the processes are practiced
w.
Focus groups
26.6Learn from the data
Answering a series of questions like
Is there a gap between the organization’s performance and the performance of the best-in-
class organizations?
What is the gap? How much is it?
Why is there a gap? What does the best-in-class do differently that is better?
If best-in-class practices were adopted, what would be the resulting improvement?
m
Process owners
Upper management
Steps for the development and execution of action plans are
.co
1. Specify tasks
2. Sequence tasks
3. Determine resources needs
4. Establish task schedule
5. Assign responsibility for each task
6.
7.
Describe expected results
tas
Specify methods for monitoring results
properly. It breaks down (waste money, time and energy and some times morale too) if process
owners and managers feel threatened or do not accept and act on the findings. Finally, benchmarking
is not a substitute for innovation; however, it is a source of ideas from outsidethe organization.
These 4 questions formed the basis on which Boeing, Digital equipments company,
Motorola and Xerox jointly developed a benchmarking template.
m
.co
tas
lda
28.FAILURE MODE AND EFFECTS ANALYSIS
Prerequisite discussion:
vi
Finds and corrects weaknesses before the product gets into the hands of the customer.
If effectively used throughout the product life cycle, it will result in significant improvements to
reliability, safety, quality, delivery, and cost
MEANING:
Failure mode and effect analysis also known as risk analysis is a preventive measure to
systematically display the causes, effects, and possible actions regarding observed failures.
1. The objective of FEMA is to anticipate failures and prevent them from occurring. FEMA
prioritizes failures and attempts to eliminate their causes.
2. FEMA is an engineering technique is used to define, identify and eliminate known and or
potential failures, problems, errors which occur in the system, design, process and service before
they reach the customer.
3. FEMA is a before the event action and is done when existing systems products processes are
changed or redesigned.
4. FEMA is a never ending process improvement tool.
m
28.1Types of FEMA:
.co
1. System FEMA
2. Design FEMA
3. Process FEMA
4. Service FEMA
5. Equipment FEMA
6. Maintenance FEMA
7. Concept FEMA
8. Environmental FEMA
28.2Benefits of FEMA:
tas
lda
1. Improve product/process reliability and quality.
2. Increase customer satisfaction.
3. Early identification and elimination of potential product/process failure modes.
4. Prioritize product or process deficiencies
vi
Meaning of reliability:
Reliability is one of the most important characteristics of any product, no matter what its
application. Reliability is also an important aspect when dealing with customer satisfaction. Whether
ww
the customer is internal or external. Customers want a product that will have a relatively long service
life, with long times between failures. However, as products become more complex in nature,
traditional design methods are not adequate for ensuring low rates of failure. This problem gave rise
to the concept of designing reliability into the product itself.
Reliability requirements:
The acceptance of a certain product or process is subject to meeting certain set of given
requirements for reliability of the product or process. It is however important to realize that although
Failure rate:
A vast majority of products follow a very familiar pattern of failure. When no information is
known about the reliability or conversely, failure of a product, component, system or process, except
m
the failure rate which is a constant, periods of failure can conveniently be modeled by an exponential
distribution. The failures of most products can be classified in to three main categories: debug,
chance, and wear out. The first of these includes a high failure rate at the initial stages because of
.co
inappropriate use or flaws in the design or manufacturing. The next category is the failure of the
product due to accidents, poor maintenance, or limitations on the design. The final category covers
failure after the product or process has performed as expected for at least the amount of time given
by the manufacturer as the product or process life. A successful design or process ideally fails only in
this method.
STAGES OF FEMA.
1. Functions
2. Possible failure modes
3. Root causes
vi
4. Effects
5. Detection/prevention
Ci
1. probability of cause
2. severity of effect
w.
1. prioritizing work
2. detailing action
3. assigning action responsibility
4. check points on completion
stage4: re-evaluation of risk
1. Recalculation of risk priority number
a. functions
b. possible failure modes
c. root causes
d. effects
m
e. detection/prevention
2. Quantifying risk
.co
a. probability of cause
b. severity of effect
B. detailing action
vi
4. Re-evaluation of risk
1. FEMA number
2. item
ww
3. Design responsibility
4. prepared by
5. model number/year
6. key date
7. FEMA date
8. Core team
9. Item function
10. potential failure mode
11. potential effects of failure
m
The process of FEMA and documentation
.co
1. process function requirements
2. potential failure mode
3. potential effects of failure
4. severity
5. classification
6.
7.
8.
9.
potential causes mechanisms of failure
occurrence
current process controls
detection
tas
lda
28.4 Risk Priority Number (RPN) 10
“RPN” is a numerical ranking of the risk of each potential failure mode/cause, made up of the
arithmetic product of the three elements:
severity of the effect
vi
28.5 SIGNIFICANCE:
w.
Understanding the fundamentals and procedure of FMEAs, including the concepts and definitions
preparation steps for each FMEA project
applying lessons learned and quality objectives
providing excellent facilitation
ww
28.6 APPLICATION:
FMEA OF A CAR DOOR.
An automobile manufacturer had a peculiar problem of corrosion of interior door panel in a car.
This affected a appearance functioning and added cost of repaint,etc.
The failiure effect led to severity ranking of seven.
m
INFORMATION TECHNOLOGY.
.co
Information technology is a tool like the other tools and it helps the TQM organization to
achieve its goals. Over the past few decades, computers and quality management practices have
evolved together and have supported each other. This interdependence will continue in the near
future.
DEFINITION:
tas
Information technology is defined as computer technology for processing and storing information,
as well as communications technology for transmitting information.
lda
1. Data
2. Information
Ci
3. knowledge
Computers and the quality function
Computers play an essential role in the quality function. They perform very simple operations
w.
at fast speeds with an exceptionally high degree of accuracy. A computer must be programmed to
execute these simple operations in the correct sequence in order to accomplish a given task.
Computers can be programmed to perform complex calculations, to control a process or test, to
analyze data, to write reports, and to recall information on command. The quality function needs
ww
1. data collection
2. data analysis and reporting
3. statistical analysis
4. process control
5. test and inspection
6. system design
Data collection:
m
additional information with a minimum of programming and to improve the storage utilization
.co
While some of the quality information is merely stored in the computer for retrieval at a future
time, most of the information is analyzed, reduced to a meaningful amount, and disseminated in the
form of a report. These activities of analysis reduction and reporting are programmed to occur
automatically as the data are collected or to occur on command by the computer operator.
Statistical analysis:
tas
The first and still an important use of the computer in quality control is for statistical
analysis. Most of the statistical techniques can be easily programmed. Once programmed
lda
considerable calculation time is saved, and the calculations are error free.
Process control:
The first application of computers in process control was with numerically controlled
vi
machines. Numerically controlled machines used punched paper to transmit instructions to the
computer which then controlled the sequence of operations. Paper tape is no longer used to provide
instructions to a machine
Ci
If test and inspection are considered a process in itself or part of a production process then
w.
automated test and inspection is similar to the previous section on automated process control,
computer controlled test and inspection systems offer the following advantages improved test
quality, operating cost, better report preparation, improved accuracy, automated calibration, and
malfunction diagnostics.
ww
System design
Software applications adapted to the quality function are becoming more sophisticated and
comprehensive. Execution of the menu is by function key, cursor and enters key, voice, mouse, or
linkage from another program.
1. Intranet
2. Instant messaging
m
3. Video conferencing
4. Virtual teaming
5. Document management
.co
6. E-learning
7. E-government
8. E-commerce
9. Business-to-business
10. Business-to-customers
11. Website design
1. sufficiency
2. accuracy
3. timeliness
vi
4. intellectual property
5. security
6. privacy
Ci
7. pollution
8. creativity control and prevention
28.7 Glossary
w.
RELIABILITY
Reliability of an entity is defined as the probability that will perform its intended function for
a specified period of time under stated operating conditions
ww
m
.co
tas
vi lda
Ci
w.
ww
m
considered.
Quality circles have the advantage of continuity; the circle remains intact from project to project.
4.2 CONCEPT:
.co
A quality circle is a volunteer group composed of workers (or even students).
Supervisor Meet regularly in paid time who are trained to identify, analyze and solve work-related
problems and present their solutions to management.
When matured, true quality circles become self-managing, having gained the confidence of
management.
tas
Quality circles are an alternative to the rigid concept of division of labor, where workers operate in a
more narrow scope and compartmentalized functions.
Typical topics are improving occupational safety and health, improving product design, and
improvement in the workplace and manufacturing processes.
4.3 Improve Customer Satisfaction
lda
Stock is available at the right time and right location.
Simply stated, stock is available at the right time and right location. Inventory Optimization balances
the investment in an inventory with the fill-rate (service level) goals of a company. Financial
considerations and/or constraints can also be applied in the development of the algorithm. These
highly complex algorithms work behind the scene, allowing the user to feel confident in using
vi
now more profitable than acquiring new customers! If your money is tied up in a very slow moving,
excess and inactive stock you won’t have the cash you need to buy more of the items your customers
are looking for and they will go elsewhere.
w.
ww
4.4APPLICATIONS:
Quality circles have been implemented even in educational sectors in India, and QCFI (Quality Circle
Forum of India) is promoting such activities. However this was not successful in the United States, as
it (was not properly understood and) turned out to be a fault-finding exercise although some circles
do still exist.
References:
m
http://www.valogix.com/improve_customer_satisfaction.html
.co
Prerequisite discussion:
Ultimately the goal of QFD is to translate often subjective quality criteria into objective ones.
That can be quantified and measured and which can then be used to design and manufacture the
product.
It is a complimentary method for determining how and where priorities are to be assigned in product
development.
tas
Quality Function Deployment was developed by Yoji Akao in Japan in 1966.
4.6 QFD TEAM :
There are two types of teams namely
lda
1. Team for designing a new product
1. Team for improving an existing product
Based on consensus
ww
Creates communication
Identifies actions
4. Provides Documentation
m
.co
Interrelationship
Between
Technical
Technical
tas
Descriptors
Descriptors
Customer Requirements
lda
(Voice of the customer)
Relationship between
Prioritized
Requirements and
vi
Descriptor
Prioritized
Technical Descriptors
Ci
w.
m
.co
tas
Phase 1, Product Planning: Building the House of Quality. Led by the marketing department,
lda
Phase 1, or product planning, is also called The House of Quality.
.
Phase 1 documents customer requirements, warranty data, competitive opportunities, product
measurements, competing product measures, and the technical ability of the organization to meet
each customer requirement.
vi
Getting good data from the customer in Phase 1 is critical to the success of the entire QFD process.
Phase 2, Product Design: This phase 2 is led by the engineering department. Product design requires
creativity and innovative team ideas. Product concepts are created during this phase and part
specifications are documented. Parts that are determined to be most important to meeting customer
Ci
prevent failures.
Significance: QFD "is a method for developing a design quality aimed at satisfying the consumer and
then translating the consumer's demand into design targets and major quality assurance points to be
used throughout the production phase. ...
QFD is a way to assure the design quality while the product is still in the design stage.
Quality Function Deployment is a planning tool used to fulfill customer expectations.
m
.co
tas
vi lda
Ci
The primary planning tool used in QFD is the house of quality. The house of quality converts
the voice of the customer into product design characteristics. QFD uses a series of matrix diagrams,
also called ‘quality tables’, resembles connected houses.
ww
1. Customer requirements
2. Prioritized customer requirements
3. Technical descriptors
4. Relationship matrix
5. prioritized technical descriptors
6. Competitive assessments
m
Step3: Develop a relationship matrix between HOWS
Step4: competitive assessments
.co
Step5: Develop prioritized customer requirements
Step6: Develop prioritized technical descriptors
4.9 QUALITY FUNCTION DEVELOPMENT PROCESS:
Step8: Deploy QFD process down to sub-components level both in terms of requirements and
characteristics.
ww
Step9: Deploy the component deployment chart. Relate the critical sub-component control
characteristics.
Step10: Develop the relationship between the critical characteristics and process used to create the
characteristics
Step11: Develop the control plan relating critical control to critical processes.
4.10 APPLICATION:
QFD is applied in a wide variety of services, consumer products, military needs, [2] and
m
emerging technology products. The technique is also included in the new ISO 9000:2000 standard
which focuses on customer satisfaction.[3]
While many books and articles on "how to do QFD" are available, there is a relative paucity of
.co
example matrices available. QFD matrices become highly proprietary due to the high density of
product or service information found therein.
GLOSSARY:
QFD: The voice of the customer translated into the voice of the engineer.
Reference:
tas
http://www.ciri.org.nz/downloads/Quality%20Function%20Deployment.pdf
lda
4.11TAGUCHI’S QUALITY LOSS FUNCTION
Taguchi’s Quality Loss Function concept combines cost, target and variation in one metric with
vi
Taguchi has defined quality as the loss imparted to society from the time a product is shipped.
Ci
Societal losses include failure to meet customer requirements, failure to meet ideal performance and
harmful side effects.
w.
L
LSL USL
m
.co
Loss (Rs)
tas
lda
Y
0
τ-∆ τ τ+∆
Performance Characteristic
vi
The quadratic function is shown in figure. In this situation, the loss occurs as soon as the performance
characteristic, y, departs from the target τ.
w.
Thus,
K = A / (y – τ)2 = A / ∆ 2 .
m
L
.co
A
tas
Loss (Rs)
lda
y
0 y
Performance Characteristic
vi
Ci
Smaller-the-better
4.13 SMALLER – THE – BETTER :
The target value for smaller – the – better is 0. There are no negative values for the performance
characteristic.
ww
The radiation leakage from a microwave appliance, the response time for a computer, pollution from
an automobile, out of round for a hole etc. are the performance characteristics for this concept.
The following figure shows the concept of the Larger – the – better.
m
.co
Loss (Rs)
0
A
tas y
y
lda
Performance Characteristic
vi
Larger-the-better
In the Larger – the – better concept, the target value is ∞ (infinity), which gives a zero loss. There are
no negative values and the worst case is at y = 0. Actually, larger – the – better is the reciprocal of
Ci
smaller – the – better. The performance characteristics in Larger – the – better are bond strength of
adhesives, welding strength etc.
preventive maintenance was introduced in Japan. However the concept of preventive maintenance
was
taken from USA. Nippondenso was the first company to introduce plant wide preventive maintenance
in 1960. Preventive maintenance is the concept wherein, operators produced goods using machines
and the maintenance group was dedicated with work of maintaining those machines, however with
the automation of Nippondenso, maintenance became a problem as more maintenance personnel were
required. So the management decided that the routine maintenance of equipment would be carried out
by the operators. (This is Autonomous maintenance, one of the features of TPM). Maintenance group
m
excellence. Total productive maintenance (TPM) is keeping the current plant and equipment at its
highest productivity level through cooperation of all areas of the organization. Generally, the first
bridge to cross is to break down the traditional barriers between maintenance and
.co
production personnel so they are working together. Now, Maintenance management is planning,
organizing, controlling maintenance activities such that the over all maintenance cost is the minimum.
Maintenance is required not only by equipment but also by other facilities such as building, land,
garden, lawn etc. Maintenance lawns and garden of the premises of the factory may be important
aspects of environment protection especially in process industries. However, maintenance of
tas
equipment used directly in the production process is much more important for a business enterprise.
Maintenance of facilities and equipment is done to ensure that these are in good working condition at
any point of time and if breakdowns occur, necessary repairs should be done in order to bring these
back to running condition as early as possible.
4.16 What is Maintenance and what is Maintenance Management?
lda
� Maintenance is an initiatives that covers all those operations such as monitoring , inspecting,
adjusting, repairing and / or doing whatever is necessary to keep a machine, a facility, a
piece of equipment or transportation vehicle in the proper working conditions.
� Maintenance Management is reviewing, planning, organizing and controlling maintenance
activities such that the overall maintenance cost is the minimum.
vi
equipment fails and must be repaired on an emergency or priority basis. It means that people
waits until equipment fails and repair it. Such a thing could be used when the equipment failure does
not significantly affect the operation or production or generate any significant loss other than
repair cost.
w.
• Obviously this is not an ideal way of keeping equipment or machinery operating because of the
down time of the equipment or machinery when break down occurs.
• This results in loss of production due to idling of equipment and machinery and consequently idling
of labour also. Ultimately customers orders cannot be delivered as promised
ww
m
is responsible with work of maintaining those machines, however, maintenance became a problem as
more maintenance personnel are required.
3. Autonomous Maintenance:
.co
When the maintenance part is not always controlled by outside forces like maintenance group and the
operator can able to handle it everyday, called autonomous maintenance.
4.Productive Maintenance:
Thus preventive maintenance along with Maintenance prevention and Maintainability Improvement
gave birth to
tas
(4) Productive maintenance. According to Nakajima, ‘Total productive Maintenance is productive
maintenance carried out by all employees through small group activities. In TPM, the machine
operator is responsible for the maintenance of the machine as well as its operation.
4.18 What is Total Productive Maintenance?
It can be considered as the medical science of machines. Total Productive Maintenance (TPM) is a
lda
maintenance program which involves a newly defined concept for maintaining plants and equipment.
TPM seeks to maximize equipments effectiveness throughout the life time of that equipment. It
strives to maintain optimum equipment conditions in order to prevent unexpected break downs, speed
loses, and quality defects arising from process activities.
vi
Ci
w.
ww
The goal of the TPM program is to markedly increase production while, at the same time, increasing
employee morale and job satisfaction.
m
• Goods send to the customers must be non defective.
To fulfill those objectives and the goal TPM has dual targets: 1. Zero defects, zero accidents and zero
loss; 2. Zero breakdown (100%
.co
equipment availability). It is true that when defects and breakdown are reduced the operating costs
come down and hence productivity increases and the products are delivered to the customer at a
reasonable cost and at the right time.
4.20 Six core principles of TPM:
• Obtain Minimum 90% OEE (Overall Equipment Effectiveness) Run the machines even during
lunch.
(Lunch is for operators and not for machines!)
tas
2. Operate in a manner, so that there are no customer complaints.
3. Reduce the manufacturing cost by 30%.
4. Achieve 100% success in delivering the goods as required by the customer.
lda
5. Maintain a accident free environment.
6. Increase the suggestions by 3 times. Develop Multiskilled and flexible workers.
Now the question comes -why should we consider TPM is an
effective tech. for continuous Improvement? Because it
�Aims to maximize equipment effectiveness – overall effectiveness.
vi
� In TPM the machine operator is responsible for the maintenance of the machine as well as its
operation
However, Smart TPM requires the following:
• Restoring equipment to a like – new condition.
w.
strategy and
• The effective use of preventive and predictive maintenance technology.
Therefore, the aim of productive maintenance was to maximize plant and equipment effectiveness to
achieve optimum life cycle cost of production equipment. In 1971, the Japan Institute of
Plant Maintenance (JIPM) defined TPM as a system of maintenance. JIPM introduced TPM award to
respective organization as a standard of quality in 1972.
Motives of TPM
1. Adoption of life cycle approach for improving the overall performance of production equipment.
m
2. Involve people in all levels of organization.
3. Form different teams to reduce defects and Self Maintenance.
4.21Direct benefits o fTPM
.co
1. Increase productivity and OPE ( Overall Plant Efficiency ) by 1.5 or 2 times.
2. Rectify customer complaints.
3. Reducethe manufacturing cost by 30%.
4. Satisfy the customers needs by 100 % ( Delivering the right quantity at the right time, in the
required quality. )
5. Reduce accidents.
6. Follow pollution control measures.
4.22 Indirect benefits of TPM
1. Higher confidence level among the employees.
tas
2. Keep the work place clean, neat and attractive.
lda
3. Favorablechange in the attitude of the operators.
4. Achieve goals by working as team.
5. Horizontaldeployment of a new concept in all areas of the organization.
6. Share knowledge and experience.
7. The workers get a feeling of owning the machine.
vi
individuals if required.
4.23.3 - Initial education and propaganda for TPM :
Training is to be done based on the need. Some need intensive training and some just an awareness.
Take people who matters to places where TPM already successfully implemented.
ww
m
In this stage eight activities are carried which are called eight pillars in the development of TPM
activity. Of these four activities are for establishing the system for production efficiency, one for
initial control system of new products and equipment, one for improving the efficiency of
.co
administration and are for control of safety, sanitation as working environment.
4.26 STAGE D - INSTITUTIONALISING STAGE
By all there activities one would has reached maturity stage. Now is the time for applying for PM
award. Also think of challenging level to which you can take this movement.
tas
vi lda
Ci
w.
ww
m
.co
tas
lda
PILLAR -1 - JISHU HOZEN ( Autonomous maintenance ) :
This pillar is geared towards developing operators to be able to take care of small maintenance tasks,
vi
thus freeing up the skilled maintenance people to spend time on more value added activity
and technical repairs. The operators are responsible for upkeep of their equipment to prevent it from
deteriorating.
Ci
Policy:
1. Uninterrupted operation of equipments.
2. Flexible operators to operate and maintain other equipments.
3. Eliminating the defects at source through active employee participation.
w.
m
o Dust, stains, oils and grease has to be removed.
o Following are the things that has to be taken care while
cleaning. They are Oil leakage, loose wires, unfastened nits and bolts and worn out parts.
.co
o After clean up problems are categorized and suitably tagged. White tags are place where problems
can be solved by operators. Pink tag is placed where the aid of maintenance department is needed.
o Contents of tag is transferred to a register.
o Make note of area which were inaccessible.
o Finally close the open parts of the machine and run the machine.
3. Counter Measures :
tas
o Inaccessible regions had to be reached easily. E.g. If there are many screw to open a fly wheel door,
hinge door can be used. Instead of opening a door for inspecting the machine, acrylic sheets can be
used.
o To prevent work out of machine parts necessary action must be taken.
lda
o Machine parts should be modified to prevent accumulation of dirt and dust.
4. Tentative Standard :
o JH schedule has to be made and followed strictly.
o Schedule should be made regarding cleaning, inspection and lubrication and it also should include
details like when, what and how.
vi
5. General Inspection :
o The employees are trained in disciplines like Pneumatics, electrical, hydraulics, lubricant and
coolant, drives, bolts, nuts and Safety.
Ci
o This is necessary to improve the technical skills of employees and to use inspection manuals
correctly.
o After acquiring this new knowledge the employees should share this with others.
o By acquiring this new technical knowledge, the operators are now well aware of machine parts.
w.
6. Autonomous Inspection :
o New methods of cleaning and lubricating are used.
o Each employee prepares his own autonomous chart / schedule in consultation with supervisor.
o Parts which have never given any problem or part which don't need any inspection are removed
ww
m
behind is that "a very large number of small improvements are move effective in an organizational
environment than a few improvements of large value. This pillar is aimed at reducing losses in the
workplace that affect our efficiencies. By using a detailed and thorough procedure we eliminate
.co
losses in a systematic method using various Kaizen tools. These activities are not limited to
production areas and can be implemented in administrative areas as well.
Kaizen Target:
Achieve and sustain zero loses with respect to minor stops, measurement and adjustments, defects
and unavoidable downtimes. It also aims to achieve 30% manufacturing cost reduction.
Tools used in Kaizen:
1. Problem analysis
2. (Root cause ) Why - Why analysis
3. Summary of losses
4. Kaizen register
tas
lda
5. Kaizen summary sheet.
PILLAR -3 - PLANNED MAINTENANCE :
It is aimed to have trouble free machines and equipments producing defect free products for total
customer satisfaction. This breaks maintenance down into 4 "families" or groups which was defined
earlier.
vi
1. Preventive Maintenance
2. Breakdown Maintenance
3. Corrective Maintenance
Ci
4. Maintenance Prevention
With Planned Maintenance we evolve our efforts from a reactive to a proactive method and use
trained maintenance staff to help train the operators to better maintain their equipment.
Policy :
w.
Target :
1. Zero equipment failure and break down.
2. Improve reliability and maintainability by 50 %
3. Reduce maintenance cost by 20 %
4. Ensure availability of spares all the time.
Six steps in Planned maintenance :
1. Equipment evaluation and recoding present status.
2. Restore deterioration and improve weakness.
m
to eliminate current quality concerns, then move to potential quality concerns. Transition is from
reactive to proactive (Quality Control to Quality Assurance). QM activities is to set equipment
conditions that preclude quality defects, based on the basic concept of maintaining perfect equipment
.co
to maintain perfect quality of products. The condition are checked and measure in time series to very
that measure values are within standard values to prevent defects. The transition of measured values
is watched to predict possibilities of defects occurring and to take counter measures before hand.
Policy :
1. Defect free conditions and control of equipments.
2. QM activities to support quality assurance.
3. Focus of prevention of defects at source
4. Focus on poka-yoke. ( fool proof system ) tas
5. In-line detection and segregation of defects.
6. Effective implementation of operator quality assurance.
lda
Target :
1. Achieve and sustain customer complaints at zero
2. Reduce in-process defects by 50 %
3. Reduce cost of quality by 50 %.
Pilar – 5: Development Management / Early Management:
vi
Early management or development management helps in drastically reducing the time taken to
receive, install, and set – up newly purchased equipments (known as vertical start – up). Early
management can also be used for reducing the time to manufacture a new product in the factory.
Ci
It is aimed to have multi-skilled revitalized employees whose morale is high and who has eager to
come to work and perform all required functions effectively and independently. Education is given
to operators to upgrade their skill. It is not sufficient know only "Know-How" by they should also
learn "Know-why". By experience they gain, "Know-How" to overcome a problem what to be done.
ww
This they do without knowing the root cause of the problem and
why they are doing so. Hence it become necessary to train them on
knowing "Know-why". The employees should be trained to achieve
the four phases of skill. The goal is to create a factory full of
experts. The different phase of skills are :
Phase – 1: Do not know
Phase – 2: Know the theory but cannot do.
Phase – 3: Can do but can not teach
m
PILLAR- 7: SAFETY, HEALTH AND ENVIRONMENT
Target :
1. Zero accident,
.co
2. Zero health damage
3. Zero fires.
In this area focus is on to create a safe workplace and a surrounding area that is not damaged by our
process or procedures. This pillar will play an active role in each of the other pillars on a regular
basis.
tas
A committee is constituted for this pillar which comprises representative of officers as well as
workers. The committee is headed by Senior vice President ( Technical ). Utmost importance to
Safety is given in the plant. Manager (Safety) is looking after functions related to safety. To create
awareness among employees various competitions like safety slogans, Quiz, Drama, Posters, etc.
related to safety can be organized at regular intervals.
lda
PILLAR -8 : OFFICE TPM
Office TPM should be started after activating four other pillars of TPM (JH, KK, QM, PM). Office
TPM must be followed to improve productivity, efficiency in the administrative functions and
identify and eliminate losses. This includes analyzing processes and
procedures towards increased office automation. Office TPM addresses twelve major losses. They are
vi
1. Processing loss
2. Cost loss including in areas such as procurement, accounts, marketing, sales leading to high
inventories
Ci
3. Communication loss
4. Idle loss
5. Set-up loss
6. Accuracy loss
w.
QUALITY COSTS:-
Quality costs are defined as those costs associated with the non-achievement of
prodect/service quality as defined by the requirements established by the organization and its
m
contracts with customers and society.
Quality cost is a cost for poor product of service.
.co
4.29 ELEMENTS OF QUALITYCOST:-
Cost of prevention
Cost of appraisal
Cost of internal failures
Cost of external failures.
4.30 ANALYSIS OF QUALITY COSTS:-
Trend analysis
Pareto analysis
tas
vi lda
Ci
w.
ww
m
Miscellaneous Quality Evaluations
.co
Product or Service Design Failure Costs (Internal)
Purchasing Failure Costs
Operations (Product or Service) Failure Costs
4.30.4 EXTERNAL FAILURE COST
tas
Complaint Investigations of Customer or User Service
Returned Goods
lda
Retrofit and Recall Costs
Warranty Claims
Liability Costs
Penalties
Customer or User Goodwill
vi
Lost Sales
Ci
Trend Analysis is one where Time-to-Time comparisons can be made which illustrates the changes in
cost over time.
100
TR EN D A N A LY SIS - W A TCH ES 103.3
95
90
85 87.5
80
75
70
68.5
65
60 60.7 60 60
55 57
m
50
50
45
40 42.5
35
33.3
.co
30 31.4
25
20
15
10 10.7 10
8.6
5 7.5
tas 4
lda
Joseph Juran observed that most of the quality problems are generally created by only a few
causes.
For example, 80% of all internal failures are due to one (or) two manufacturing problems.
Identifying these “vital few” and ignoring the “trivial many” will make the corrective action give
a high return for a low money input.
vi
VITAL FEW
40
Ci
36.4 %
35
30 27.3 %
25 22.7 %
20 TRIVIAL MANY
w.
15
10
4% 3%
5 2% 3% 1% 2%
ww
Rough Surface
Less polishing
Miss sharpen
Surface scars
Surface pits
Incomplete
Scratches
Cracks
Others
PARETO DIAGRAM
Index Numbers are often used in a variety of applications to measure prices, costs (or) other
numerical quantities and to aid managers in understanding how conditions in one period compare
with those in other periods.
m
1 2000
2 2200
.co
3 2100
4 1900
QUARTER
tas
COST RELATIVE INDEX
lda
1 (2000/2000) x 100 = 100
4 (1900/2000) x 100 = 95
Ci
Performance measures are required for the managers for managing an organization perfectly.
4.36.2 Customers
m
1. Number of complaints from customers.
2. Number of on-time deliveries.
3. Warranty data.
.co
4. Dealer satisfaction.
4.36.3 Production
2. Inventory.
3. SPC Charts.
4.
5.
2.
Amount of scrap / rework.
Machine down time.
4.36.5 Suppliers
2. On-time delivery.
vi
3. Service rating.
4. Quality performance.
5. Average lead time.
Ci
3. New customers.
4.36.7 Administration
1. Revenue per employee.
ww
4.37 STRATEGY :
The quality council has the overall responsibility for the performance measures.It ensures that all the
measures are integrated into a total system of measures.
m
There are six basic techniques for presenting performance measures. They are
.co
2. Control charts.
3. Capability Index.
4. Taguchi’s loss function.
5. Cost of poor quality.
6. Malcolm Baldrige National Quality Award.
a) Manufacturing
b) Service
c) Small business
tas
In MBNQA, five categories are analyzed. They are
lda
d) Health care
e) Education
vi
Ci
w.
ww
m
.co
ISO 9000
ISO 9001
ISO 9002
ISO 9003
tas
vi lda
Ci
w.
ISO 9001
ww
ISO 9002
ISO 9004
Provides guidelines on the technical, administrative and human factors affecting the product or
services.
m
.co
tas
vi lda
Ci
w.
ww
m
.co
tas
lda
5.3 CLAUSES (ELEMENTS) OF ISO 9000 (During the year 1987)
vi
m
.co
tas
5.4 CLAUSES (ELEMENTS) OF ISO 9000 (During the year 2000)
lda
1. Scope
2. Normative Reference
3. Terms and Definitions
4. Quality Management System (QMS)
General Requirements
vi
Documentation
5. Management Responsibility
Management Commitment
Ci
Customer Focus
Quality Policy
Planning
Responsibility, Authority and Communication
w.
Management Review
6. Resource Management
Provision of Resources
Human Resources
ww
Infrastructure
Work Environment
7. Product Realization
Planning of Product Realization
Customer related processes
Design and Development
Purchasing
Production and Service Provision
Control of Monitoring and Measuring devices
m
1. Top Management Commitment
2. Appoint the Management Representative
3. Awareness
.co
4. Appoint an Implementation Team
5. Training
6. Time Schedule
7. Select Element Owners
8. Review the Present System
9.
10.
11.
12.
13.
Write the Documents
Install the New System
Internal Audit
Management Review
Pre-assessment
tas
lda
14. Registration
5.7 DOCUMENTATION
w.
In every organization, the quality system must be documented properly. The documentation of the
system can be seen as a hierarchical format as shown.
ww
1
POLICY
2
PROCEDURE
4
PROOF
m
The term Audit refers to a regular examination and checking of accounts or financial records,
settlement or adjustment of accounts.
.co
It also refers to checking, inspection and examination of Production Processes.
Quality audit can also be classified on the basis of the area taken into account for the audit such as
Ci
System Audit.
Process Audit.
Product Audit.
Adequacy Audit.
w.
Compliance Audit.
ww
m
.co
tas
5.11 ISO 14000 – ENVIRONMENTAL MANAGEMENT SYSTEM
lda
The overall aim of the Environmental Management systems is to provide protection to the
environment and to prevent pollution.
The success of ISO 9000 along with increased emphasis on Environmental issues were
instrumental in ISO’s decision to develop Environmental Management Standards.
vi
In 1991, ISO formed the Strategic Advisory Group on the Environment (SAGE) which led to
the formation of Technical Committee (TC) 207 in 1992.
Ci
w.
EMS should include policy, planning implementation & operation, checking & corrective
action, management review.
m
5.13.2 ENVIRONMENTAL POLICY (Should be based on mission)
.co
5.15 Management’s Commitment (for continual improvement & preventing pollution).
5.16 Should be a framework (for Environmental objectives & Targets).
5.17 Must be Documented, Implemented, & Maintained.
5.13.3 PLANNING
5.18
5.19
5.20
5.21
Environmental Aspects
Legal & other Requirements
Objectives & Targets
tas
Environmental Management Programs
lda
5.13.4 IMPLEMENTATION & OPERATION
5.16 Communication
5.17 EMS Documentation
5.18 Document Control
Ci
m
5.22 Meeting customer requirement
5.23 Improve public relation
5.24 Increase investor satisfaction
.co
5.25 Market share increase
5.26 Conserving input material & energy
5.27 Better industry/government relation
5.28 Low cost insurance, easy attainment of permits & authorization
INFORMATION TECHNOLOGY.
tas
Information technology is a tool like the other tools and it helps the TQM organization to
achieve its goals. Over the past few decades, computers and quality management practices have
lda
evolved together and have supported each other. This interdependence will continue in the near
future.
DEFINITION:
vi
Information technology is defined as computer technology for processing and storing information,
as well as communications technology for transmitting information.
Ci
4. Data
5. Information
w.
6. knowledge
Computers and the quality function
Computers play an essential role in the quality function. They perform very simple operations
ww
at fast speeds with an exceptionally high degree of accuracy. A computer must be programmed to
execute these simple operations in the correct sequence in order to accomplish a given task.
Computers can be programmed to perform complex calculations, to control a process or test, to
analyze data, to write reports, and to recall information on command. The quality function needs
served by the computer are:
7. data collection
8. data analysis and reporting
Data collection:
m
relationships with other activities such as inventory control, purchasing, design, marketing,
accounting, and production control. It is essential for all the quality needs described in this chapter.
Linkages are developed between the stored data records of the various activities in order to obtain
.co
additional information with a minimum of programming and to improve the storage utilization
While some of the quality information is merely stored in the computer for retrieval at a future
tas
time, most of the information is analyzed, reduced to a meaningful amount, and disseminated in the
form of a report. These activities of analysis reduction and reporting are programmed to occur
automatically as the data are collected or to occur on command by the computer operator.
lda
Statistical analysis:
The first and still an important use of the computer in quality control is for statistical
analysis. Most of the statistical techniques can be easily programmed. Once programmed
considerable calculation time is saved, and the calculations are error free.
vi
Process control:
Ci
The first application of computers in process control was with numerically controlled
machines. Numerically controlled machines used punched paper to transmit instructions to the
computer which then controlled the sequence of operations. Paper tape is no longer used to provide
instructions to a machine
w.
If test and inspection are considered a process in itself or part of a production process then
ww
automated test and inspection is similar to the previous section on automated process control,
computer controlled test and inspection systems offer the following advantages improved test
quality, operating cost, better report preparation, improved accuracy, automated calibration, and
malfunction diagnostics.
Software applications adapted to the quality function are becoming more sophisticated and
comprehensive. Execution of the menu is by function key, cursor and enters key, voice, mouse, or
linkage from another program.
m
foundation which was responsible for the internet, released the ban on commercial use of it.
.co
12. Intranet
13. Instant messaging
14. Video conferencing
15. Virtual teaming
16.
17.
18.
19.
20.
Document management
E-learning
E-government
E-commerce
Business-to-business
tas
lda
21. Business-to-customers
22. Website design
9. sufficiency
10. accuracy
11. timeliness
12. intellectual property
w.
13. security
14. privacy
15. pollution
16. creativity control and prevention
ww