SAP® Documentation
Single view
Home
/
Support Portal
/
SAP® Online Help
/
SAP® Documentation
Definition
Indicator showing how the R/3 System calculates the price of a business process or activity type for a cost
center.
To do this there are two fields: The "Price indicator" field controls plan price calculation. For actual allocations
you can set an indicator in the "Actual price indicator" field that differs from the plan indicator.
You can enter "001", "002" or "003" in the "Price indicator" field or "005" or "006" in the "Actual
price indicator" field.
The plan price indicator can have the value "004", the actual price indicator "008". This occurs if you have
selected "Purely iterative Prices" in version maintenance within Customizing.
Note
https://www.consolut.com/en/s/sap-ides-access/d/s/doc/H-TARKZ~~~~~/ 18/21
4/13/2018 TARKZ - Price Indicator: Calculate Allocation Price: consolut
If you do not set a price indicator, the system uses the plan price.
001:
The price of the activity type is determined automatically based on the planned activity and the planned
costs required for this plan activity quantity.
002:
The variable portion of the price is calculated based on the plan activity quantity. To determine the fixed
portion, the system uses the capacity and not the plan activity quantity.
This procedure usually leads to an underabsorption of the cost center or business process from the
perspective of quantities.
Note
If you have entered the values "001" or "002", the system calculates new prices when determining the plan
prices.
003:
The plan price of the activity type or business process is determined iteratively only.
If you activate the indicator purely iterative price in the version, the R/3 System calculates an iterative
price along with the price resulting from planning.
The R/3 System determines the price of the activity type using the actual activity of the cost center.
The variable portion of the price is calculated based on the actual activity.
Note
If you have set the values "005" and "006", the system calculates new prices when you execute actual
price calculation. Revaluation of actual activity at actual prices occurs only if you have selected
https://www.consolut.com/en/s/sap-ides-access/d/s/doc/H-TARKZ~~~~~/ 19/21
4/13/2018 TARKZ - Price Indicator: Calculate Allocation Price: consolut
The actual price of the activity price or business process is set manually. Using this price indicator, you
can set an independent (manual) price that differs from the plan.
If you activate the indicator Purely iterative price in the version, the R/3 System calculates an iterative
price along with the price resulting from planning.
Use
In the master data of the activity type or business process, you can define a default value.
When planning for the first time, this default value can be overwritten.
Our Service
Consolut
Callback-Service
Leave us your contact details and we will call you back. Panels marked with * are mandatory.
Subject*
Your name*
Your Telephone number*
Your Email address*
Please contact me
Our
Mission
https://www.consolut.com/en/s/sap-ides-access/d/s/doc/H-TARKZ~~~~~/ 20/21