Sie sind auf Seite 1von 2

KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 19. Ceiling Works
Klang, Selangor. Date: Date:

19. Ceiling Works


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Mechanical (4) To control lorries speeding at site. (max.15km/h)


-Minor injury (5) Workers stay away from moving vehicle / lorry.
Struck by moving part of 2 3 6
-Damage to property - Traffic controlled by designated person.
Delivery of Material vehicle. (lorry) (6) To provide appropriate PPE. Project Manager
1 Loading and
Site Manager
unloading material Physical ( Ergonomic ) (5) Manual handling / lifting should be carry out with
Spine injury - Improper method -Negligible injury 2 3 6 correct method. Site Agent
of handling (6) To provide appropriate PPE. Site Engineer
Site Supervisor
Physical (5) Supervised by designated person during stacking of
material. SHO / SSS
Stacking / Storing Slip / fall / collapse of material
2 -Serious injury 2 4 8 - To ensure material not obstruct any access / walkway. EO
Material at site / store due to poor material - Proper storage of material.
arrangement. (6) To provide appropriate PPE. Scaffolder
Work Leader
(4) Proper working platform for workers. Machinery opr/
Physical
-Serious injury 2 4 8 (5) Scaffolding erecting by experience workers.
Workers slip and fall. (6) To provide appropriate PPE. Driver
Signalman
(4) Erection of barricade.
Installation of ceiling Physical - Installation of safety catch net. Banksman
3 frame & board Fall of object from upper -Serious injury 2 4 8 - Erect safe access with overhead protection. Rigger
level. - Installation of toe board / debris net at scaffolds.
(6) To provide appropriate PPE. Welder
Workers
Physical
(5) Training for workers use PPE.
Body contact with sharp -Serious injury 2 4 8 (6) To provide appropriate PPE.
edges / object.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Ceiling Works (Cont’d)


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Project Manager
Site Manager
-Serious injury Site Agent
Physical (4) To ensure working platform are properly erected.
(long term can impair to 2 4 8 Site Engineer
Dust Exposure. (6) To provide appropriate PPE.
lung)
Site Supervisor
SHO / SSS
EO
Installation of ceiling Scaffolder
3
frame & board Work Leader
Machinery opr/
Driver
-Minor injury
Exposed to excessive noise. (5) Work carry out by skill workers. Signalman
(long term can impair 1 4 4
(usage of bullet gun) (6) To provide appropriate PPE.
workers hearing) Banksman
Rigger
Welder
Workers

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)