Sie sind auf Seite 1von 1

Testing Generator Stator http://dieselgenerators.tpub.com/TM-5-6115-585-34/css/TM-5-6115-5...

Figure 8-2.
Figure 8-1. Generator Exploded View (Sheet
Testing Exciter
2 of 2) - TM-5-6115-585-34_153
Rotor

TM-5-6115-585-34 Generator Set Diesel Engine Driven Tactical Skid Mtd 5 KW 1 Phase 2 Wire 1
Phase-3 Wire 3 Phase-4 Wire 120 120/240 and 120/208 Volts Manual
Page Navigation
117 118 119 120 121 122 123 124 125 126 127

TM5-6115-585-34
NAVFAC P-8-623-34
TO-35C2-3-455-2
TM-05684C/05685B-34

period of time. The applied voltage must not be so (5) Results, Any evidence of insulation break-
high as to injure the insulation unless the insulation down is cause for replacement of the equipment
was initially defective. under test.

(2) Apparatus. Use acceptable high potential test


apparatus, following the operating instructions of the f. Winding Resistance Test. Perform winding re-
manufacturer. sistance test using a Wheatstone bridge. Follow the
manufacturer’s instructions given on the bridge. Re-
(3) Procedure. sistance reading should be 36 ohms ±3.6ohms. Check
resistance between each lead and frame. A low re-
(a) Adequately ground high potential apparatus sistance shows that the stator is shorted.
to a water pipe or similar electrical ground in ac-
cordance with instructions accompanying the appara-
tus.
g. Testing Exciter Rotor. Perform winding resis-
(b) Disconnect or remove rectifiers and semi- tance test and high potential test per MIL-STD - 705A,
conductors from the circuit prior to conducting the methods 401.1 and 302.1. Test between T - T , T - 1 2 2

tests. T , T T . See figure 6-2 for location of test points.


3 1 3

Resistance for each winding should be 0.6’77 ohms ± Related Ads


(c) Isolate the rotor windings, the main stator 0.067 ohms. Also test for shorts between windings
windings, and the exciter stator windings. This is and between each winding and rotor core. Online Electronics Courses
accomplished by disconnecting the various windings →
from any associated control circuits or other con-
nections.
h. Testing Generator Stator.
Android App Development
(d) Connect the high-voltage lead from the test →
apparatus to the winding or circuit under test. When (1) High Potential Test. Test generator stator as
testing stator rotor, all windings and circuits must be given in paragraph 8-2e of this manual. Replace
securely connected to ground. When testing rotor, all stator having faulty insulation.
stator windings and circuits must be connected to Wireless Temperature Sensor
ground. (2) Winding Resistance Test. Perform winding re- →
sistance test using a Kelvin bridge. Follow the manu-
(4) Test. facturer’s instructions given on the bridge. Resis-
tance readings should be made on the pins of P9 and Top 10 Racing Games
(a) Turn on test apparatus in accordance with P10 (see figure 8-3). Resistance between lead pairs →
manufacturer’s instructions, after making sure that T- T, T- T, T- T, T- T , T- T a n d T- T
1 4 2 5 3 6 7 10 8 1l 9 12
the initially applied voltage will be not greater than should be 0.115 ± 0.112 ohms at 77° F (25” C) for the
600 volts. MEP-003A. For the MEP-l12A, resistance should Engineering Project Ideas
be 0.071 ± 0.007 ohms. Refer to the table in figure →
(b) The test voltage then shall be raised uni-
formly to the required maximum. This increase shall 8-3 for location of the terminals.
be accomplished in not less than 10 seconds nor more
than 30 seconds. The maximum test voltage for rotor Also check resistance between each pin A through F
of P9 and P10 and the stator frame. Low resistance Dodge Ram Fuse Panel Diagrams
windings shall be equal to 1,000 volts plus twice the →
highest rated voltage of the generator. The test volt- indicates a shorted stator.
age for stator windings shall be equal to 10 times for
exciter ceiling voltage but in no case less than 1,500
volts nor more than 3,500 volts. Artificial Intelligence Technology
i. Testing Generator Rotor. →
(c) Apply the maximum voltage for 1 minute. (1) High Potential Test. Test generator rotor as
given in paragraph 8-2e of this manual. Replace rotor
(d) After 1 minute of applied maximum voltage, having faulty insulation. DMV Sample Test
the voltage then shall be reduced gradually to the →
voltage initially applied. This reduction shall not be
accomplished in less than 5 seconds. (2) Winding Resistance Test. Perform winding
resistance test using a Wheatstone bridge. Follow the Electrical Test Equipment
(e) Turn off test apparatus. Ground the high-
manufacturer’s instructions given on the bridge. Re- →
voltage lead of the test apparatus to make sure that no
sistance reading should be 3.31 ohms ± 0.33 ohms
charge remains on the windings which have been under 3.05 ± 0.305 ohms for the
for the MEP-003A and
test.
MEP-112A.
(f) Remove the high-voltage lead from the
winding and proceed with the tests of the remaining Check resistance between each lead and frame. A low
circuits to be tested. Make sure that all circuits not resistance indicates that the rotor is shorted, a high
under test are securely grounded. resistance indicates open winding.

8-4 Change 2

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.

Integrated Publishing, Inc.

Google +

1 of 1 3/7/2018, 5:41 PM

Das könnte Ihnen auch gefallen