PROJECT : DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 230/132KV AIR INSULATED
SWITCHGEAR (AIS) SUBSTATION AT BARISAL ON TURNKEY BASIS.
CONTRACT NUMBER: PGCB/SC/SS/2011/02, DATED: 01.08.2012
DOCUMENT SUBMITTAL REF: LECLDR14/08/24-094 DATED: 24/08/2014
Master File
√
Dear Sir,
We are pleased to enclose the following documents for the purpose indicated below:
Issued by:
(1)
In case of any modification other than those desired are carried out, the same shall be
SUKANTO LAL NAG
highlighted clearly in the Drawing/Document with full justification thereof and resubmitted
for approval. Superintending Engrineer,
(Civil Design& Q/C), PGCB, Dhaka
(2)
Approval/Comments/Information conveyed herein neither relieves the contractor of his
contractual obligation and his responsibilities for correctness of dimensions, material of Our Ref: 04-PGCB/SE(Civil)/Design & QC/2014/08
constructions, weight, quantities, design details, assemble fits, performance particulars
and conformity of the supplies with the Statutory Laws of Bangladesh as may be
applicable, nor does it limit the Employer’s right under the contract.” Date: 26/08/2014
For information √
(FI)
Note:
(1)
The above paragraph shall be added if the status of the document is C/RR/FI.
(2)
The above paragraph shall be added if the status of the document is A or C.
04-PGCB/SE(Civil)/Design & QC/2014/08 Date: 26 August, 2014
Sl. Name of Test Material Frog Mark Nominal Dia. Test Report No. & Date Comments
no (mm)
Considered as
BTRC No. 1100-68768/CE/14-15/,
01. Test Report of Deformed MS Bar, 25, 22, 20 & 16. date : 18.08.2014
acceptable.
Rebar of Brand Name: MAGNUM.400
MAGNUM.400
Considered as
02. Test Report of Deformed MS Bar, BTRC No. 1100-68768/CE/14-15/, acceptable.
Rebar Brand Name: MAGNUM.400 12,10 & 8. date : 18.08.2014
MAGNUM.400