ENGOS Assignment
Statement of Works
Taxiway Bridge Design
Ethan Dilettoso 265909
Jiaming Liu 276245
James Miller 260016ENGA0s, 5265909, s276245, 264014
Introduction — esas
‘The project wiliwole costuton ofa rad to Ink the existing motorway with the airport access
road, An underpass beneath the exiting taxiway wil eed to be built anda bridge to support the
taxiway wil also need tote constructed, Important pein to consider are:
‘The design ive loat across the enti bridge decks 20.0 ki.
“The taxiway can only be closed for seven continuous days per year. 5
| temporary taxvay route can be used, butt wll havea high price to use.
No obstruction within SO m of taxiway centre nei allowed
Clearance envelopes that the cent has provided (append 2} mute adhered to,
aw?
Itisdlar the major constraint of this projects that the taxiway can ony be closed for even day.
For this reason, the bridge ue precast concrete slabs, beams, columns and footings and steel
‘rus, These can be constricted oft and then apy assembled when the txiay scsed.
‘econ wall uray
Stakeholders .
Statzholders shouldbe ergage with over the proc etime by establishing god nes of
‘commision and ug reltionshps. Stakeholders include:
+ Theclient —landowner. 4
The iines operng athe ior
5 State apo. prin woud sa ean and menace opts who
sa the aera msnterance han
+The pobie- roses of matory andor ces rod Temporary ne dsireson
these roads wil afect them
Contractors (construction and maintenance).
rutre uses off tbe consctedo
‘Services (Power aid Water) 1,
cel bodies ? cll accuas
Tanmorttodes, | 2 Deal buns 9 eet
2
Conceptual Desigr/ Jw ve Uae? Sager /
Rie
jhe sh
remus gle Th
150. Hower hs le does
ret account forte tttr of 5°, The minimum angle of rpoee oF mol, sf clays 40" an the
tmasmur 50" (Suro, 2017) Ths abate of 45 allows for excvation of the ope thot
ted ofa reting wal, he otal oe ofthe ie, Vin =27, 587 15+ 0x 8x05250¥2)+
(ears enanriaa)= aes = WE dane lo then Pyar ot
1
oni fom
oe
? slowrabse wrayer fur time road is
Figure 1~ Cross section ofarea tobe excavatedenctos lI? 26550, 27685, 64034
4
‘Toestinate the excavation tne requte, 21200 rm (2.09 capac) bucket rom the aterplar
Catalogue willbe asso, atoched othe largest excavator possible, (aterpa, 2017) ts
‘stated tht one maclne wil be able to ecavate 000 thins 36-hour pero. Ths, 7
‘xcatrs shold be sft a compete the job 8 machines an be sed to naire ht
‘xcvaton ae completed bythe end of th fst 36-hour eid The cated mata we
Fissientialeeer Sven cave ene REST Oo oe. ye bh
‘Taxiway Bridge eoanyle ee
‘Many options are possve forthe ridge design Due othe seven day ine const the se of
precast concrete lemert necesary One posible design forthe aia ge sg precast
Concetslabsspportedby asters, The columns nd foundation wil ao be conse
ing precast conte
‘concrete dba see tus system hasbeen devised to support the imposed oadsoverthe >
Fequired span fg? 3). The truses are supported by stel universal beams, which willbe welded to"
the colurns. The cols transmitthe loads through the footings othe bedrock. The arrangement —
ofthe lbs and ruses ze shown in detain figures 4 and.vrovezs‘sezsuzs ‘sats sovona‘encaas 265905, 276045, 264014
ALL Wns oy)
Tous onbec cnr
calm sypet ?Ness 5265908, 5276245, 5264014
ic ths Wey?
‘ : 1 J se, hy
be fot >
Damersine ?
Lhd we
gn Sy,
ee?
SECTION C-C
Tao TTaee
section 6-8 Nadie ty
pnp Jagr “ge
?
Foundation and Columns
“The bridge wil have 12 columys supporting the bridge at the starting, mi, and end span. Kite bend
columns wl be precast clumn and connected toa precast spread footing The load fom the bridge
‘willbe directed through the columns to the foundations.
shiney | pol « Hp?sos 5265905, 5276285, 264014
wha a hh?
Prk, te
shad
poly & yh
{alin he igen te epesed one. Te bie drainage willbe desene for an Anal
‘xeedance Proper (Rt) o 209% (130 yar ven Tiswalensrethe taxiway on emia oF
open rlge som vers onthe port ot eed deve The dae ds the
snderpnsrond lb send for an AEP oF 10 (1 n 10 yar ever) Prec cones pipes ae“
Sree are net Pes Te af pw penne
design fours rom thechosen ASP. — sok ?
Figure 7 stormwater pipe design example
he,
use ateler,
raed setae|
Sys bye € one?
encaos
Constraints
“Table constrains
Consraint
Time= only
allowed 7 days
osureof
taxiway
win
Method of avercoming
255909, 5276245, 264016
ae
‘Contruction willbe dane 2 hour acrows he 7 Sys
Precast concrete abs and prefabiated steel usp and beams wil be
used Constrcton time il be reduce the abs are constructed offs
tnd factor conto and ean be stored nearby the aipor. Tey can
then be transported onsite annealed immediatly when require. the
factay ie foravay fom the apr, materials canbe sored ata ost
Iacton to decrease transport tine, Mecast concrete hasan advantage 38
there inno walng period for concrete to cure, As the dab are copies of
the ame design, the epeatabity of constuction wills erase
effenygna reduce construction time The set lows the same
init anere il be moved to the airport and insted as requ
Proper planning and organ are needed to encure the ight sheds
‘rabtsined
Predrainge to reduce excavation tine and stop water entering excavation
and slowing construction maybe used.
No abstraction
“To raduce construction tine of the bridBe, work should be dane upto Hs
within 9.0m |" Somexcuson zone belore comeing constuction ofthe brdge and
enter side of | clog the taney for 7 days Defbve rd
line te cadnch
mes “The rad acing orgs sould be party constructed his wallensre
‘eh ranaporting material forthe brigeconstrction have acess and
Canes and auc flon an depart. laoreet v9
seabd ronda place
Taderground |= Gare tobe taken to ensure works ay above minima clarence Tevet
raitway service | avoid damage to theconeretetubes, "55 hy.
‘Weather ‘Construction to be completed during the dry season so rain will not be an
issue. i
Preliminary He eftimate
Dogan me fear
The intial construction petod wil involve all theprefabrication, builing DX precast segments for
thetrige ad steel worth ts. ting tise, work can begin on the roading rom
{ne enti mosornay,topovse aeestorte heey enmrocton veces neces rng
trcrvation and rg cosrocten Tips des not havea te tne resttion heer
pes panning is importent to ensure the materia ae ready forthe constuction phase when the
ays closed for sever days, ter the seven day period ls ver and the bridge hasbeen
constructed, the underpass oad can be bul The roadworks wa terre with the arplanes
sng the taxiway bridge, 0 can take place after the seven-day closure period
“The seven-day construct period will nae to follow a tight schedule, Works willbe twenty/four
hours aay. The time taken to assemble the stel trusses and concrete slabs wl sa
the crane operations. Themaximum indldual slab mensions are Sm
density of concrete s 2400, then the mas fone sib I 36,000 (36 tones) Heay duty cranes ¢)
nx30 x03 m, Assuming th
willbe needed to position the slabs onto the bridge structure. Tiss ve tothe large reach néeded
for a crane because ofthe with ofthe rie. A minimum 130 tonne crane wil be needed.
estimate hat wil takeabout 39min to poston sib above the Brg structure lowing 39
t
Tout ome? — Mbile ome?
dene
dh day Sie Me
)
Lb12 meng Slade 2 Bo ane awh?
A 9
tht?
for assembly, and havine multiple crapeS operating on each end ofthe bridge, the slabs could be
Installed i and hal das. The steel wil also need to be assembled wth the assitanceof rane
- : ( seam team)
enceos 5265908, 1276285, 264014
gure 6~1307onve Gene Lood Chart and clagrom Example.” | >"
i
8
|
;
tht is He
wax loud & be
Ufle amd how ee
deer He one
howe 4e sooch?
Wee vA te gee
be, aptoxindel 2
(Todano 130 tonne crane MAX Crane & Equpment Hire A, 2015)
5eNG405 265909, $276285, 5264018
Table 2—Time estimatlors for works during 7ay closure
‘Order_[haion ‘ntnated time needed (vs).
a [Excavation 36
2 | reet foundations ad columns Yor bidge 36
'3__[Assombie steel russ 36
‘4 | Assemble core abs 38
5 Surface taxiway Is
Deer euch wot haw, &
C pe Re ad one buyne >
Points for clarification with client Me te 2
{value forthe budget has not been given but i required fr later design works. Alarge amount of
‘the costs wil go towards the construction of structural elements prior othe taxiway closure. The
‘scsembly period during the taxiway closire short anal the materials required wile bult
‘offal, othe perad wil not have large costs asccited with, assuming te seven-daysae kept
to and he temporary taxivay route fnot needed. However, to overcome the time constant, extra
funds wil ned tobe allocated to work 24-7 and use machinery thats more time efcent (Le)
biager and beter
References
“Angle of Repose Values fr Various Sl Types. (2017) Struct.com. Retrieved 13 March 2017, rom
(mni//strucy.com/Soll Progetes005.himl
Cat | Australia, New Zealand jCoterpilr (2017). Cotcom, Retrieved 11 March 2017 from
eto:/pwa cat com/en_AU. hem
“Tadano 130 Tonne Crane-MAX Cane & Equptment Hire SA. (2015). Revived from
mtfémaxcranescom au/tadano-faun-atf-1305-5-130tonne-l-terrain-