Sie sind auf Seite 1von 102

U DRAWING LIST I-601 INTERLOCK CHAIR

I-602 BED DETAIL

GABLE HOME
G-001 SHEET LIST I-603 BEDROOM TABLE DETAIL
G-002 SYMBOLS AND NOTES I-604 BEDROOM CLOSET
G-003 ABBREVIATIONS
T
G-101 TARGET MARKET DESCRIPTION F-101 FIRE PROTECTION

G-901 NORTHWEST RENDERING


G-902 NORTHEAST RENDERING P-001 SYMBOLS AND NOTES
G-903 SOUTHEAST RENDERING P-101 SUPPLY & TEMP
P-102 INTERIOR SUPPLY
S G-904 WEST RENDERING
P-103 VENT

P-901 SUPPLY AND REMOVAL


C-001 SYMBOLS AND NOTES
P-902 WATER SUPPLY
C-101 UIUC SITE
R C-102 NATIONAL MALL SITE
HVAC EQUIPMENT
M-101
C-103 GROUND CONTACT PLAN
M-401 ENLARGED HVAC
C-104 ORGANIZER WALKWAY
M-501 WATER HEATER DETAILS
M-601 SCHEMATIC HVAC
Q L-101 SITE PLAN
E-001 SYMBOLS AND NOTES
L-401 PLANTING
E-101 POWER
L-501 PLANTER DETAILS
E-102
L-901 PLANTING IMAGERY E-103 AC CIRCUIT PLAN

P E-201 EXTERIOR LIGHTING ELEVATION


STRUCTURAL E-501 GRID INTERCONNECTION
S-001 SYMBOLS AND NOTES E-502 ELECTRICAL CLOSET DETAILS
S-101 FOUNDATION PLAN E-602

S-102 DECK PLAN


N S-103 FLOOR FRAMING PLAN X-001 SYMBOLS AND NOTES DESIGNER:
S-104 LAMBOO AND ROOF FRAMING PLAN X-101 TOUR ROUTE AND ADA ACCESSIBILITY UNIVERSITY OF ILLINOIS
SHEAR WALL X-102 PUBLIC EXHIBIT PLANS
GABLE HOME TEAM
S-106

X-401 ADA DETAILS


S-301 NORTH-SOUTH X-501 PUBLIC EXHIBIT DETAILS
611 LOREDO TAFT DR.
M S-302 DECK SECTION X-502 PUBLIC EXHIBIT DETAILS CHAMPAIGN, IL 61820
X-511 TEAM UNIFORM
S-501 FOUNDATION X-521 TEAM BROCHURE SEALS:
S-502 FLOOR JOIST AND LAMBOO
S-503 DOUBLE LAMBOO AND WINDOW HEAD DETAIL O-001 SYMBOLS AND NOTES
L S-504 TYPICAL LAMINATED BAMBOO FRAMES O-101 ARRIVAL SEQUENCE
S-505 BRACED WALL O-102 TRUCK LOADING
S-506 TYPICAL DETAILS 0-201 FLUID STORAGE AND CONTAINMENT
S-507 CONNECTION DETAILS

K S-508 SHEAR WALL AND CORNER DETAILS PROJECT:


S-509 DECK DETAILS
US DEPT. OF ENERGY
S-510 TIE-ROD DETAILS
SOLAR DECATHLON
OCTOBER 1-21 2009
J A-101 SITE PLAN NREL & DOE
A-111 FLOOR PLANS
A-113 ROOF CAP PLAN ISSUANCE:
A-114 REFLECTED CEILING PLAN BID DOCUMENTS
H
A-115 PHOTOVOLTAIC AND ROOF PLAN
#01 01/15/2009 JJS
A-116 CONDITIONED SPACE PLAN
A-117 SOLAR FOOTPRINT AREA
DOE REVIEW
A-201 NORTH & SOUTH SITE ELEVATIONS
#02 04/16/2009 JJS
A-202 EAST AND WEST SITE ELEVATIONS
G A-211 NORTH AND SOUTH BUILDING ELEVATIONS
A-212 EAST AND WEST BUILDING ELEVATIONS CONSTRUCTION DOCS
A-311 BUILDING SECTION
#03 06/01/2009 JJS
A-312 BUILDING SECTION
F
A-313 BUILDING SECTION
A-314 BUILDING SECTION
A-315 WALL SECTION

E A-401 ENLARGED BATHROOM


A-402 ENLARGED SHED
INFORMATION:
A-511 DOOR SCHEDULES AND ELEVATIONS PROJECT NAME
A-512 WINDOW ELEVATIONS AND SCHEDULE
UIUC_SD_2009
D A-513 WALL TYPES
A-514 INTERCONNECTION DETAIL DRAWING LOCATION
A-515 ROOF G-001 SHEET LIST.DWG
A-521 SOUTH SHADING DEVICE
DRAWN BY
A-524 WINDOW DETAIL
C A-601 SCHEMATIC BOARD REQUIREMENT
JJS

A-602 BOARD SCHEDULE CHECKED BY


MT

B
I-101 INTERIOR PLAN
SHEET:
I-201
I-202
I-221
KITCHEN AND LIVING ELEVATIONS
BATHROOM ELEVATIONS
BEDROOM ELEVATION
G-001
A SHEET LIST

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U

GABLE HOME
T ARCHITECTURAL SYMBOLS
A. FIRE RESISTANCE COMPLIANCE
GENERAL [8'-0"] CEILING TAG

1
A.01 SEE CODE COPMLIANCE PLANS IN A-SERIES FOR DETAILED CODE COMPLIANCE REQUIREMENTS COLUMN LINE TAG W/ COLUMN NUMBER / LETTER
A
A.02 FIRE RATING INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH OF THE WALL IS TO BE FIRE RATED.
S ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE REQIREMENTS OF THE APPLICABLE CODES. ±0" DATUM TARGET
ALL PIPING, DUCTS, ETC. THAT PENETRATE FLOOR SLABS SHALL BE INSTALLED IN A MANNER THAT WILL 1.) ENGINEERING SHALL CONFIRM WITH ALL APPICABLE MUNICIPAL, STATE AND FEDERAL REGULATIONS HAVING
PERESERVE THE FIRE-RESISTIVE AND STRUCTURAL INTEGRITY. PENETRATIONS INTO FIRE-REATED WALLS OF JURISDICTION INCLUDING ACCESSIBILITY STANDARDS AND ILLINOIS ACCESSIBILITY REQUIREMENTS A1
A.03 G-101 DETAIL TAG
MORE THAN 1 HR. RATING SHALL BE PROVIDED WITH APPROVED FIRE DAMPERS WHETHER OR NOT SHOWN IN DETAIL IDENTIFICATION
THE MECHANICAL DRAWINGS. SHEET WHERE DETAIL IS DRAWN
ALL RATINGS ARE TO COMPLY WITH UNDERWRITERS LABORATORIES (UL) TEST RATINGS. IN THE ABSENCE OF AREA DETAIL REFERENCES
R A.04 TESTED ASSEMBLY, PROVIDE CERTIFICATE OF EQUIVALENCY FROM UL. MEET ALL THE REQUIREMENTS OF THE CONTRACTOR ALONG SHALL BE RESPONSIBLE FOR THE SAFETYAND ADEQUANCY OF HIS PLANT,
FACTORY MUTUAL ENGINEERING FOR BOTH CONSTRUCTION AND FIRE PROTECTION APPLIANCES, METHODS AND FOR DAMAGE WHICH MAY RESULT FROM THEIR IMPROPOER REMOVAL, DETAIL TAG
CONSTRUCTION, MAINTENANCE OR OPERATION. HE SHALL ERECT AND PROPERLY MAINTAIN AT ALL TIMES AS TITLE DETAIL TITLE
B. DIMENSIONING 2.)
REQUIRED BY THE CONDITIONS AND PROGRESS OF THE WORK, PROPER SAFEGUARDS FOR THE PROTECTION
A1 SCALE DETAIL
DETAIL
IDENTIFICATION
SCALE
OF WORKMEN, OWNER, AND OWNERS PROPERTY, AND SHALL POST DANGER WARNINGS AGAINST HAZARDS
B.01 UNLESS NOTED OTHERWISE, PARTITIONS ARE DIMENSIONED TO THE FACE OF THE WALL. CREATED BY CONSTRUCTION OPERATIONS. DOOR TAG
Q 01
DOOR NUMBER
ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD BEFORE PROCEEDING WITH THE WORK. THE ARCHITECT
B.02 A1
SHALL BE NOTIFIED OF ANY CORRECTION.
DOOR OPENINGS ARE GENERALLY DIMENSIONED TO CENTERLINE OF OPENING. DOOR OPENINGS THAT ARE ELEVATION(S) TAG
B.03 NOT DIMENSIONALLY LOCATED ARE TO BECENTERED BETWEEN WALLS OR POSITIONED WITH ONE JAMB B1 A-601 G1
INSPECTION BY CONTRACTOR: THE CONTRACTOR ACKNOWLEDGES AND AGREES THAT HE HAS INIVISIBLE ELEVATIONS IDENTIFICATION
AGAINST AN ADJACENET WALL OR COLUMN AS SHOWN ON THE PLANS. INDELEGABLE AND INTRANSFERABLE AND CONTRACTURAL OBLICATION TO THE OWNER TO MAKE HIS OWN SHEET WHERE ELEVATION IS DRAWN
P INSPECTIONS ON HIS OWN WORK AT THE STAGES OF CONSTRUCTION, AND SHALL SUPERVIS AND C1
B.04 ALL DIMENSIONS SHALL BE VERIFIED AND COORDINATED WITH THE WORK OF ALL TRADES 3.)
SUPERINTEND PERFORMANCE OF WORK IN SUCH MANNER AS TO ENABLE HIM TO CONFIRM, CERTIFY AND
VEQUIPMENT TAG
C. INSULATION
CORROBORATE AT ALL TIMES THAT ALL WORK HAS BEEN EXECUTED ACCORDING TO THE CONTRACT 000
DOCUMENT EQUIPMENT TYPE

WHETHER SPECIFICALLY SHOWN, OR NOT, PROVIDE INSULATION WITH VAPOR BARRIER BETWEEN ALL LOUVER TAG
C.01 000
N EXTERIOR AND INTERIOR HEATED SPACES TO MAINTAIN DESIGN U VALUES LOUVER NUMBER DESIGNER:
C.02
ALL JOINTS AND PENETRATIONS IN INSULATION BARRIER SHALL BE FULLY BUTTED/SEALED WITH UNIVERSITY OF ILLINOIS
ADHESIVE/SEALANT TO PROVIDE A CONTINUOUS AIR/VAPOR TIGHT INSTALLATION. THE CONTRACTOR SHALL SUPPLY ALL LABOR, TRANSPORTATION, APPARATUS, SCAFFOLDING, AND ANY
TOOLS FOR THE COMPLETION OF THE WORK, MAINTAIN AND REMOVE ANY TEMPORARY EQUIPMENT, AND GABLE HOME TEAM
D. MECHANICAL AND ELECTRICAL AREAS 4.) CONSTRUCTION THE COMPLETE WORK AND EVERYTHING PROPERLY INCIDENTAL THERTO AS STATED IN THE
CONTRACT DOCUMENTS OR REASONABLY IMPLIED THEREFROM. ALL PARTS MUST BE COORDINATED,
NORTH ARROW
611 LOREDO TAFT DR.
M UNLESS OTHERWISE NOTED, ALL WALLS BETWEEN MECHANICAL OR ELECTRICAL SPACES AND OCCUPIED COMPLETE, READY TO OPERATE AND DELIVERED TO THE OWNER IN NEW CONDITION. CHAMPAIGN, IL 61820
D.01 SPACES SHALL BE ACOUSTICALLY ISOLATED FROM THE OCCUPIED SPACES AND SHALL MAINTAIN A MINIMUM
STC RATING OF 52 NOTE TAG
1 NOTE NUMBER SEALS:
GENERAL CONTRACTOR TO COORDINATE ALL MECHANICAL AND ELECTRICAL FLOOR, ROOF AND WALL
SLEEVES AND ALL MECHANICAL SHAFTS AND OPENINGS WITH MECHANICAL, PLUMBING, FIRE PROTECTION, CONTRACTOR'S WARRANTY: THE CONTRACTOR WARRENTS THAT HE IS FAMILAR WITH THE CODES AND REFERENCE NOTE TAG
ELECTRICAL, STRUCTURAL AND ARCHITECTURAL DRAWINGS AND NOTIFY THE ARCHITECT OF ANY 11 13 00.A1 REFERENCE NOTE NUMBER
L D.02
DISCREPANCIES. GENERAL CONTRACTOR SHALL PROVIDE SLEEVES AND FLOOR AND ROOF OPENINGS AS 5.)
REGULATIONS APPLICABLE TO THE WORK AND THAT HE HAS THE SKILL, KNOWLEDGE, COMPETENCE,
ORGANIZATION AND PLANT TO EXECUTE THE WORK PROMPTELY AND EFFICIENTLY IN COMPIANCE WITH THE
REQUIRED TO ALLOW INSTALLATION OF ALL DUCTS AND PIPING AS SHOWN ON THE MECHANICAL AND REQUIREMENTS OF THE CONTRACT DOCUMENTS, INCLUDING THE TIME SCHEDULE.
1 REVISION TAG
ELECTRICAL DRAWINGS.
REVISION NUMBER
FIRE DAMPERS SHALL BE PROVIDED AS SHOWN AND WHEREVER AIR DUCTS PENETRATE FIRE RATED WALLS OR CLOUD AROUND REVISION
D.03
CEILINGS. FIRE DAMPERS SHALL BE FIRE DEPARTMENT LISTED AND APPROVED.
K THE OWNER WILL NOT ACCEPT REQUESTS FOR EXTRA WORK CONDITIONS WHICH CAN BE REASONABLY SPACE ROOM IDENTIFICATION TAG PROJECT:
E. EXTERIOR WALL 6.)
ASCERTAINED FROM THE DRAWINGS AND SPECIFICATIONS. ROOM NAME
US DEPT. OF ENERGY
ROOM NUMBER

E.01
THE EXTERIOR WALL AS SHOWN SHALL BE A COMPLETE SYSTEM INCLUDING ALL STIFFENERS, FASTENERS,
STEALANTS, JOINGING MISCELLANEOUS PIECES AND MATERIAL THICKNESS AS REQUIRED TO FORM A
SOLAR DECATHLON
1 WALL TYPE TAG
WATERTIGHT ENCLOSURE. 7.) ABESTOS - CONTAINING MATERIALS MAY NOT BE USED ON THIS PROJECT OCTOBER 1-21 2009
WINDOW TAG
J E.02 DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE DETAILED. 1
WINDOW NUMBER NREL & DOE
ALL DETAILS ARE TO BE COORDINATED WITH THE STRUCTURAL FRAMING AND OTHER BUILDING
1
E.03 COMPONENTS INCLUDING ROOFING, EXTERIOR-CLADDING ITEMS, GLAZING, INTERIOR FINISH AND OTHER 8.) LEAD-CONTAINING PAINT MAY NOT BE USED ON THIS PROJECT.
WINDOW DETAIL TAG
DETAIL IDENTIFICATION
ISSUANCE:
RELATED BUILDING COMPONENTS.
SHEET WHERE DETAIL IS DRAWN BID DOCUMENTS
ALL SEALANT JOINTS SHALL BE SIDED SUCH THAT THEY WILL BE WITHIN THE SIZE RANGE RECOMMENDED BY
H
E.04
THE SEALANT MANUFACTURER #01 01/15/2009 JJS
WALL SECTION TAG
SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT INFORMATION PERTINENT TO THEIR WORK MAY A1 SECTION IDENTIFICATION
E.05 VERIFY OR GUARANTEE ALL CLEAR OPENINGS FOR LOUVERS AND WINDOW INSTALLATION. 9.)
OCCUR IN OTHER PORTIONS OF THE CONTRACT DOCUMENTS. ALL SHEETS AND NOTES TO BE REVIEWED. A-503 SHEET WHERE SECTION IS DRAWN
E.06
ALL SILLS, WINDOW HEADS, AND SHELF ANGLES SHALL HAVE FLASHING EXTENDED TO THE OUTSIDE OF THE DOE REVIEW
WALL WHETHER OR NOT SHOWN ON THE DRAWINGS. CONCRETE
U.N.O. PROVIDE EXTERIOR WALL COMPONENTS SUCH AS WINDOWS, DOORS, TO RESIST A WIND LOAD OF A
#02 04/16/2009 JJS
EARTH (ORIGINAL)
G E.07
MINIMUM OF 30 psf
THE STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS ARE OF EQUAL IMPORTANCE WITH GROUT
E.08
U.N.O. PROVIDE SOFFITS DESIGNED TO RESIST A WIND LOAD OF A MINIMUM OF 45psf OR 1.5 TIMES THE THE ARCHITECTURAL DRAWINGS IN DEFINING THE WORK OF THE CONTRACT DOCUMENTS. SHOULD THERE BE
GYPSUM BOARD CONSTRUCTION DOCS
DESIGN WIND LOAD. A DISCREPANCE BETWEEN THE ARCHITECTURAL DRAWINGS AND THE ENGINEERING DRAWINGS THAT WOULD
10.)
CAUSE AN IMPROPER INSTALLATION, IT SHALL BE BROUGHT TO THE ARCHITECTS ATTENTENTION FOR INSULATION - RIGID #03 06/01/2009 JJS
F. MISCELLANEOUS NOTES CLARIFICATION PRIOR TO INSTALLATION OF SAID WORK. ANY WORK INSTALLED IN CONFLICT WITH THE
INSULATION - FOAM
F ALL BASE BUILDING INTERIOR PARTITIONS SHALL WITHSTAND MINIMUM INWARD AND OUTWARD ACTING
ARCHITECTURAL DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS EXPENSE.
F.01 PLYWOOD
PRESSURES OF 5 psf.
STEEL
ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FORM EACH OTHER TO AVOID MOLECULAR
F.02
BREAKDOWN. WOOD (BLOCKING)
PROVDIE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED FOR ACCESS OR 11.) THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURATE PLACEMENT OF BUILDINGS ON THE SITE. WOOD (FINISH)
E F.03 MAINTENANCE OF MECHANICAL AND ELECTRICAL EQUIPMENT INCLUDING JUNCTION BOXES. ALL ACCESS
PANELS LOCATIONS SHALL BE REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING. WOOD (ROUGH)

WHERE DISCREPANCIES EXIST BETWEEN THE DRAWINGS OF THE VARIOUS TRADES, CONSULT THE ARCHITECT
INFORMATION:
BUILDING SECTION TAG
F.04
BEFORE PROCEEDING WITH WORK. 12.)
DO NOT SCALE THE DRAWINGS. THE DRAWINGS ARE NOT NECESSARILY TO SCALE. EXPLICIT DIMENSIONS
SHALL HAVE PRECEDENCE OVER SCALE.
A1
A-301 SECTION IDENTIFICATION PROJECT NAME
WHETHER OR NOT EXPLICITYL INDICATED, ALL GLAZING SHALL BE SAFETY GLAZED WHEN WITHIN 18" OF THE SHEET WHERE SECTION IS DRAWN UIUC_SD_2009
D F.05
FLOOR OR WITHIN 3'-0" HORIZONTAL DISTANCE FROM ANY DOOR. A CERTIFICATE MUST ACCOMPANY ALL
GLAZING PRODUCTS STATING THAT THE PRODUCTS CONFORM WITH APPICABLE CONSUMER PRODUCT A1 DRAWING LOCATION
SAFETY STANDARDS. NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR CONDITIONS WHETHER REPEATED OR NOT. DETAILS NOT SECTION IDENTIFICATION
13.) A-301
SHEET WHERE SECTION IS DRAWN
SHOWN ARE SIMILAR IN CHARACTER TO THOSE SHOWN. G-002 SYMBOLS AND NOTES.DWG
F.06 UNLESS OTHERWISE NOTED, ALL EXTERIOR EXPOSED METAL SHALL BE GALVANIZED AND PAINTED
A1 DETAIL SECTION TAG DRAWN BY
ALL EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, WETWEEN WALLS AND FOUNDATION, BETWEEN
C F.07 WALLS AND ROOF, BETWEEN WALL PANEL, AT PENETRATION OF UTILITIES THROUGH THE ENVELOPE, SHALL BE THE CONTRACTOR SHALL VISIT THE SITE AND BE KNOWLEDGEABLE OF CONDITIONS THEREON. PRIOR TO
A-201 DETAIL IDENTIFICATION JJS
SHEET WHERE DETAIL IS DRAWN
SEALED, CAULKED OR WEATHER-STRIPPED TO PRVENT AIR LEAKAGE / INFILTRATION.
14.)
SUBMITTING A BID HE SHALL INVESTIGATE, VERIFY AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE
PROJECT AND SHALL NOTIFY THE OWNER OF ANY CONDITIONS REQUIRING MODIFICATION BEFORE ELEVATION TAG
CHECKED BY
ALL REFUSE AND DEBRIS SHALL BE REMOVED FROM THE SITE AND LEGALLY DISPOSED OF BY THE PROCEEDING WITH THE WORK. A1 ELEVATION IDENTIFICATION
F.08 MT
A-202 SHEET WHERE ELEVATION IS DRAWN
CONTRACTOR

B SHEET:
SYMBOLS AND
NOTES
GENERAL ARCHITECTURAL NOTES GENERAL NOTES GRAPHIC AND MATERIAL SYMBOLS

G-002
A1 A11 A20
A
SCALE: NTS SCALE: NTS SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U

GABLE HOME
ABBREVIATIONS
ID INSIDE DIAMETER
T
IN INCH
ANGLE INSUL INSULATION
& AND INT INTERIOR
@ AT INV INVERT
S CENTER LINE KD KNOCK DOWN
DIAMETER KIT KITCHEN
# POUND OR NUMBER KO KNOCKOUT
ADJ ADJACENT KW KILOWATT
AFF ABOVE FINISH FLOOR KWH KILOWATT HOUR
R AGR AGGREGATE LBR LUMBER
AL ALUMINUM LG LONG

APPROX APPROXIMATE LL LIVE LOAD


ARCH ARCHITECTURAL LP LOW POINT
B/ BOTTOM OF LT LIGHT
Q
BD BOARD MATL MATERIAL
BLDG BUILDING MAX MAXIMUM
BLOG BLOCKING MECH MECHANICAL
BLK BLOCK` MTL METAL

P BM BEAM MFR MANUFACTURER


CER CERAMIC MIN MINIMUM
CJ CONTROL JOING MISC MISCELLANEOUS
CLG CEILING N NORTH
CL CLOSET NIC NOT IN CONTRACT
N CLRC LEAR NO NUMBER DESIGNER:
COL COLUMN NOM NOMINAL UNIVERSITY OF ILLINOIS
CONC CONCRETE NTS NOT TO SCALE GABLE HOME TEAM
OC ONCENTER
CONCR CONSTRUCTION
611 LOREDO TAFT DR.
CONT CONTINUOUS OD OUTSIDE DIAMETER
M CONTR CONTRACTOR OH OPPOSITE HAND
CHAMPAIGN, IL 61820
CT CERAMIC TILE OPNG OPENING
CTR CENTER OPP OPPOSITE SEALS:
DBL DOUBLE PL PLATE

L DET DETAIL PLWD PLYWOOD


DIA DIAMETER PLUM PLUMBING
DIM DIMENSION PR PAIR
DN DOWN PT PAINT
DO DOOR OPENING QTY QUANTITY
K PROJECT:
DR DOOR RAD RADIUS
DS DOWNSPOUT RCP REFLECTED CEILING PLAN US DEPT. OF ENERGY
DWG DRAWING REINF REINFORCED SOLAR DECATHLON
E EAST REQ'D REQUIRED
OCTOBER 1-21 2009
EA EACH REV REVERSE
J NREL & DOE
ELEC ELECTRICAL RM ROOM
ELEV EWLEVATION RO ROUGH OPENING
ISSUANCE:
E.P. ELECTRICAL PANEL S SOUTH
EPE POXY PAINT SCHED SCHEDULE
BID DOCUMENTS
H EQ EQUAL SECT SECTION #01 01/15/2009 JJS
EQUIP EQUIPMENT SHT SHEET
EXP EXPOSED SIM SIMILAR
DOE REVIEW
EXT EXTERIOR SPEC SPECIFICATION
FD FLOOR DRAIN SQ SQUARE #02 04/16/2009 JJS
G FDN FOUNDATION SS STAINLESS STEEL
FF FINISH FLOOR ST STAIN
CONSTRUCTION DOCS
FE FIRE EXTINGUISHER STD STANDARD
FIN FINISH STL STEEL
#03 06/01/2009 JJS
FLR FLOOR SUSP SUSPENDED
F
FOS FACE OF STUD SYM SYMMETRICAL
FT FOOT OR FEET T/ TOP OF
FTG FOODING THK THICK
GA GAUGE THSH THRESHOLD
E GALV GALVANIZED TYP TYPICAL
GB GYPSUM BOARD UNO UNLESS NOTED OTHERWISE
GL GLASS VERT VERTICAL INFORMATION:
GND GROUND V.I.F. VERIFY IN FIELD PROJECT NAME
GR GRADE VOL VOLUME UIUC_SD_2009
D GYP GYPSUM W WEST
HC HANDICAPPED WC WATER CLOSET
DRAWING LOCATION
HDWR HARDWARE WD WOOD G-003 ABBREVIATIONS.DWG

HM HOLLOW METAL WP WATER PROOF DRAWN BY


HORIZ HORIZONTAL WT WEIGHT
C JJS
HP HIGHPOINT W/ WITH
HR HOUR W/O WITH OUT CHECKED BY
HT HEIGHT YD YARD MT

B SHEET:
ABBREVIATIONS
ABBREVIATIONS

G-003
A18
A
SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
ILLINOIS TARGET MARKET

GABLE HOME
THE ILLINOIS SOLAR DECATHLON HAS APPROACHED THE SOLAR
DECATHLON COMPETITION FROM INITIAL CONCEPTION TO
T FINAL CONSTRUCTION WITH A GOAL TO CREATE PRACTICAL,
HIGH QUALITY AND AESTHETICALLY PLEASING INNOVATION IN
SUSTAINABILITY FOR THE HOUSING INDUSTRY FOR A
REASONABLE PRICE. WHILE NOT THE LOWEST COST PER SQ.FT.,
THE ILLINOIS TEAM SEEKS TO CREATE A HOME WITH INHERENT
VALUE AND LONG TERM RELIABILITY THAT WILL MATCH THE
S NEEDS AND DESIRES OF OUR TARGET MARKET. PRIMARILY
DESIGNED TO APPEAL TO PROFESSIONAL COUPLES WITHOUT
CHILDREN LOCATED IN THE HEART OF THE MIDWEST, THE
HOUSE FEATURES AN OPEN DESIGN, MODERN
ACCOMMODATIONS AND SUPERIOR ENERGY PERFORMANCE
WHILE REMAINING PRACTICAL, BUILDABLE AND
COST-EFFECTIVE.
R
TARGET MARKET DESCRIPTION

THE ILLINOIS SOLAR DECATHLON TARGET MARKET IS A


Q PROFESSIONAL COUPLE, LIVING WITHOUT CHILDREN JN GIBSON
CITY, ILLINOIS WITH A HOUSEHOLD INCOME OF $80,000 PER
YEAR. THEY OWN A TYPICAL PLOT OF LAND THAT ENABLES
COMFORTABLE DEVELOPMENT WITHOUT EXCESSIVE WASTAGE.
EASILY COMPARED WITH THE TYPE OF PEOPLE WHO WOULD BE
INTERESTED IN PURCHASING A SCION VEHICLE, THE TARGET
P MARKET VIEWS THEMSELVES AS TRENDSETTERS. THEY ARE
INDIVIDUALS CONCERNED WITH QUALITY, COST, UNIQUE
DESIGN, SUSTAINABILITY AND INDIVIDUALITY. THE TARGET
MARKET WOULD VIEW A HOME AS AN EXTENSION OF THEIR
PERSONALITY, AN INTEGRAL PART OF THEIR LIFE THAT SHOULD
REFLECT THEIR VIEWS AND VALUES TO THE FULLEST EXTENT.
N DESIGNER:
UNIVERSITY OF ILLINOIS
WHILE THE ILLINOIS SOLAR DECATHLON GABLE HOME
REPRESENTS A LARGE AND HISTORICALLY SIGNIFICANT GABLE HOME TEAM
M2
MIDWEST VERNACULAR IMAGE
M2
EXTERIOR RENDERING VERNACULAR AND STRIVES TO EPITOMIZE ENVIRONMENTALLY 611 LOREDO TAFT DR.
FRIENDLY DESIGN, THIS PARTICULAR HOME HAS BEEN DESIGNED
M
SCALE: NTS SCALE: NTS
WITH A SPECIFIC HOMEOWNER IN MIND. THE ILLINOIS TEAM CHAMPAIGN, IL 61820
ENVISIONS A PROFESSIONAL COUPLE, WITHOUT CHILDREN AT
HOME, WHO ARE INTERESTED IN A HOME THAT PROVIDES FOR
ALL THE MODERN AMENITIES, LEADS-THE-WAY WITH REGARD SEALS:
TO DESIGN AND SUSTAINABILITY YET REMAINS REALIZABLE,
VALUABLE AND COST-EFFICIENT.
L

DISTINCTLY MIDWESTERN, THE COUPLE EMBODIES THE


CHARACTERISTICS TYPICAL OF THE AREA - HARDWORKING,
PRACTICAL AND HONEST AND CONSEQUENTLY SEEK THE SAME
K CHARACTERISTICS IN A HOME. CHOOSING TO LOCATE IN A PROJECT:
RELATIVELY SMALL BUT WELL-ESTABLISHED TOWN, GIBSON
CITY, IL, THE COUPLE ENJOYS THE COMFORTS OF SOCIETY US DEPT. OF ENERGY
WHILE MINIMIZING URBAN COMMOTION AND WASTE. WITH A
DESIRE FOR TRUTH, THE COUPLE SEEKS A DESIGN THAT DOES
SOLAR DECATHLON
NOT MISREPRESENT; ONE THAT REFLECTS HISTORY WHILE OCTOBER 1-21 2009
SIMULTANEOUSLY LEADING THE WORLD WITH REGARD TO
J SUSTAINABILITY, ENERGY CONSUMPTION AND DESIGN. NREL & DOE
PROFESSIONALS WITH A COMBINED INCOME OF $80,000 PER
YEAR, THE COUPLE IS ABLE TO LIVE COMFORTABLY IN A HOME
THAT MEETS ALL THEIR DESIRES AND GOALS WHILE REFRAINING
ISSUANCE:
FROM ANY UNNECESSARY OPULENCE. OVERALL, THE TARGET BID DOCUMENTS
H
HOMEOWNER IS A TYPICAL AMERICAN COUPLE LOOKING FOR
THE COMFORTS OF THE PAST IN A HOME FOR THE FUTURE. #01 01/15/2009 JJS
SAMPLE SITE DESCRIPTION
DOE REVIEW
THE SITE SHOWN TO THE LEFT REPRESENTS A POTENTIAL
LOCATION THAT WOULD BE CHOSEN BY OUR TARGET MARKET. #02 04/16/2009 JJS
G LOCATED ONLY A FEW BLOCKS FROM DOWNTOWN GIBSON CITY,
THE HOME ENJOYS PRIVATE LAND AND CLEAR SOUTHER
EXPOSURE WHILE REMAINING IN A MIXED USE DISTRICT AND
WITHIN A FEW MINUTES OF ALL MODERN AMENITIES. AVOIDING
CONSTRUCTION DOCS
THE HUSSLE AND BUSTLE OF CITY LIFE, THE COUPLE WOULD #03 06/01/2009 JJS
ENJOY THE COMFORTS OF THE HOME, THE TRANQUILITY OF THE
OPEN MIDWEST AND THE BENEFITS OF SUSTAINABLE AND
F PRACTICAL SOLAR DESIGN FROM A SINGLE LOCATION.

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
G-101 TARGET MARKET.DWG

DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
TARGET MARKET
0 64' 128' 256'
POTENTIAL TARGET SITE POTENTIAL TARGET SITE

G-101
A12 A12
A
SCALE: NTS SCALE: 1/128" = 1'-0"

SCALE: 1/64" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U

GABLE HOME
T

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

K PROJECT:
US DEPT. OF ENERGY
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
G-901 NORTHWEST RENDERING.DWG

DRAWN BY
C CG

CHECKED BY
MT

B SHEET:
NORTHWEST
RENDERING
NORTHWEST RENDERING

G-901
A1
A
SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U

GABLE HOME
T

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

K PROJECT:
US DEPT. OF ENERGY
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
G-902 NORTHEAST RENDERING.DWG

DRAWN BY
C CG

CHECKED BY
MT

B SHEET:
NORTHEAST
RENDERING
NORTHEAST RENDERING

G-902
A1
A
SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U

GABLE HOME
T

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

K PROJECT:
US DEPT. OF ENERGY
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
G-903 SOUTHEAST RENDERING.DWG

DRAWN BY
C CG

CHECKED BY
MT

B SHEET:
SOUTHEAST
RENDERING
SOUTHEAST RENDERING

G-903
A1
A
SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U

GABLE HOME
T

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

K PROJECT:
US DEPT. OF ENERGY
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
G-904 WEST RENDERING.DWG

DRAWN BY
C CG

CHECKED BY
MT

B SHEET:
WEST RENDERING
WEST RENDERING

G-904
A1
A
SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U

GABLE HOME
T
GENERAL CIVIL NOTES

S THE LOCATION OF EXISTING UNDERGROUND UTILITIES, SUCH AS WATER MAINS, SEWERS, GAS LINES, ETC. HAS
NOT BEEN DETERMINED AND HAS NOT BEEN SHOWN ON THE PLANS. BEFORE CONSTRUCTION, OWNER
SHOULD HIRE A LICENSED CIVIL ENGINEER TO DETERMINE LOCATION BASED ON THE BEST AVALIABLE
1 INFORMATION. ALL INFORMATION SHOWN IS GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE
INSTRUMENTATION HQ OWNER AND THE ENGINEER DO NOT ASSUME RESPONSIBILITY IN THE EVENT THAT DURING CONSTRUCTION,
UTILITIES OTHER THAN THOSE SHOWN MAY BE ENCOUNTERED AND THAT THE ACTUAL LOCATION OF THOSE
WHICH EXIST MAY BE DIFFERENT FROM THE LOCATION ASSUMED.
R

119 117 115 113 111 EXHIBIT 109 107 105 103 101 CONTRACTOR SHALL NOTIFY THE OWNER, ENGINEER AND THE LOCAL PRESIDING MUNICIPALITY A MINIMUM
UPR VT UKU UWM 2
SCU BOS PSU ONTBC RICE MST OF 48 HOURS IN ADVANCE OF PERFORMING ANY WORK.
Q
ALL AREAS, ON OR OFF SITE, DISTURBED DURING CONSTRUCTION OPERATIONS AND NOT PART OF THE WORK
DECATHLETE WAY DECATHLETE WAY AS SHOWN HERON SHALL BE RESTORED TO ORIGINAL CONDITION TO THE SATISFACTION OF THE OWNER AT
3
NO ADDITIONAL COST TO THE OWNER. IT IS INCUMBENT UPON CONTRACTOR TO SHOW THAT DAMAGED
AREAS WERE NOT DISTURBED BY CONSTRUCTION OPERATIONS

P 118
UMN
116
CORNELL
114
TUD
112
OSU
METRO 110
UPM
108
ISU
106
ALB
104
UAZ
102
LAF
WELCOME THESE DRAWINGS ASSUME THAT THE CONTRACTOR WILL UTILIZE AN ELECTRONIC DRAWING FILE AND STAKE
TENT 4 ALL SITE IMPROEVEMNTS USING COORDINATES TIED INTO THE CONTROL POINTS. THE DIMENSIONS
INDICATED ON THE DRAWINGS ARE FOR THE CONVENIENCE OF THE CONTRACTOR ONLY.
120
UIUC
N 5
IN THE CASE OF CONFLICT BETWEEN THESE DRAWINGS, THE FOUNDATION DRAWINGS AND THE
ARCHITECTURAL SITE PLAN, THE USER OF THIS INFORMATION SHALL CONTACT THE ENGINEER IMMEDIATELY.
DESIGNER:
UNIVERSITY OF ILLINOIS
OWNER TO COORDINATE THE EXACT LOCATIONS OF ALL UTILITY SERVICE LINES WITH PLUMBING DRAWINGS. GABLE HOME TEAM
6
REFER TO PLUMBING DRAWINGS FOR CONTINUATION OF ALL UTILITIES WITHIN 5 FEET OF BUILDING AREA 611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
CONTRACTOR SHALL FIELD VERIFY INVERT & LOCATIONS OF EXISTING UTILITY MAINS PRIOR TO INSTALLING
7
ANY ON-SITE UTILITIES OR STRUCTURES.
0 32' 64' 128' SEALS:
NATIONAL MALL SITE
L1 8
SEPARATION OF WATER AND SEWER LINES SHALL BE 10' MINIMUM HORIZONTALLY. IF 10' IS NOT POSSIBLE,
L
SCALE: 1/32" = 1'-0"
SEWER SHALL BE OF WATER MAIN QUALITY MATERIAL AND CONSTRUCTION.
SCALE: 1/64" = 1'-0"
CLEAN OUT ALL EXISTING AND PROPOSED STORM INLETS AND CATCH BASISNS AT THE COMPLETION OF
9
CONSTRUCTION

K ACES PROJECT:
LIBRARY THE "STANDARD SPECIFICATIONS FOR WATER AND SEWER MAIN CONSTRUCTION IN ILLINOIS" CURRENT
TURNER
10
EDITION SHALL GOVERN WORK WHERE APPLICABLE. US DEPT. OF ENERGY
HALL SOLAR DECATHLON
LEGEND
OCTOBER 1-21 2009
J NREL & DOE

EXISTING MANHOLE ISSUANCE:


BID DOCUMENTS
H OH EXISTING OVERHEAD WIRES
#01 01/15/2009 JJS

EXISTING FIRE HYDRANT


DOE REVIEW
#02 04/16/2009 JJS
G
EXISTING UTILITY POLE
CONSTRUCTION DOCS
EXISTING / NEW SIGN #03 06/01/2009 JJS
F
16 CAR X X X FENCE
PARKING

CURB & GUTTER


E
CURB ELEVATION
INFORMATION:
C 782.50
G 782.00 GUTTER ELEVATION
PROJECT NAME
TURNER
GREENHOUSES P 783.25 PAVEMENT ELEVATION UIUC_SD_2009
D
SOUTH DRAWING LOCATION
GOODWIN
AVENUE W 782.10 SIDEWALK ELEVATION C-001 SYMBOLS AND NOTES.DWG

DRAWN BY
C
DN

GROUND ELEVATION
1:2O

X 784.0 JJS
ANNEX 1 ANNEX 2
CHECKED BY
781 CONTOUR LINE JJS

B SHEET:
SYMBOLS AND
0 16' 32' 64' NOTES
UIUC OVERALL SITE GENERAL CIVIL NOTES

C-001
A1 A19
A
SCALE: 1/32" = 1'-0" SCALE: NTS

SCALE: 1/32" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1.) MAXIMUM PRESSURE ON SOIL TO BE <1500 PSF

GABLE HOME
OWNER SHALL REPAIR AND/OR REPLACE GRASS AFTER
REMOVAL OF HOUSE. WORK TO BE COORDINATED WITH
2.)
FACILITIES AND SERVICES AND APPROVED BY THE COLLGE OF
T ACES.
SITE TO BE MARKED AND SHALL REMAIN ADA COMPLAINT AT
3.)
ALL TIMES ONCE COMPLETE.
ALL EXISTING UTILITIES, FIXTURES, & PROPERTY TO REMAIN
4.)
WITHOUT MODIFICATION.

S
4 1

Q 01 53 00.A2

P 3

N DESIGNER:
UNIVERSITY OF ILLINOIS
2
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

S. GOODWIN AVE.
L
24'-9"

PROJECT:
K
REFERENCE KEYNOTES US DEPT. OF ENERGY
SOLAR DECATHLON
01 53 00.A2 3 DIVISION 01 - GENERAL REQUIREMENTS
OCTOBER 1-21 2009
J NREL & DOE
01 53 00 - TEMPORARY CONSTRUCTION
01 53 00.A2 - TEMPORARY PROTECTIVE FLOOR COVER ISSUANCE:
BID DOCUMENTS
H
DIVISION 10 - SPECIALTIES
#01 01/15/2009 JJS

10 14 00 - SIGNAGE
DOE REVIEW
10 14 00.A1 - EXTERIOR POST AND PANEL SIGN
#02 04/16/2009 JJS
G 4

68'-2"
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

SHEET KEYNOTES
COMPETITION DEFINED SOLAR ENVELOPE - FOR REFERENCE
1
E PURPOSES ONLY

2 EXISTING ROADWAY TO REMAIN


INFORMATION:
10 14 00.A1
3 1:20 MAX. SLOPED WALKWAY PROJECT NAME
UIUC_SD_2009
D 4 EXISTING LIGHT POLE TO REMAIN
DRAWING LOCATION
C-101 UIUC SITE.DWG

DRAWN BY
C JJS

CHECKED BY
JS

B SHEET:
UIUC SITE
0 4' 8' 16'
UIUC SITE PLAN

C-101
A1
A
SCALE: 1/8" = 1'-0"

SCALE: 1/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL NOTES

GABLE HOME
1 MAXIMUM PRESSURE ON GRASS TO BE < 1500PSF
T 2
01 53 00.A2
2 US DOE TO LOCATE EDGES OF SOLAR ENVELOPE

3 WALKWAY TO BE PROVIDED BY ORGANIZERS

4 SEE O-SERIES FOR THE ARRIVAL SEQUENCE

N DESIGNER:
5
UNIVERSITY OF ILLINOIS

4 REFERENCE KEYNOTES GABLE HOME TEAM


611 LOREDO TAFT DR.
M 14'-134" CHAMPAIGN, IL 61820
DIVISION 01 - GENERAL REQUIREMENTS
3
SEALS:
01 53 00 - TEMPORARY CONSTRUCTION
03 31 00.J6 01 53 00.A2 - TEMPORARY PROTECTIVE FLOOR COVER
L
DIVISION 03 - CONCRETE

K
03 31 00 - STRUCTURAL CONCRETE PROJECT:
03 31 00.J6 - 6" CAST-IN-PLACE CONCRETE SLAB
US DEPT. OF ENERGY
SOLAR DECATHLON
OCTOBER 1-21 2009
J 01 53 00.A2 NREL & DOE
1

28'-3"
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
SHEET KEYNOTES
CONSTRUCTION DOCS
1 SLOPED WALKWAY - MAXIMUM SLOPE 1:20
#03 06/01/2009 JJS
TBD BY ORGANIZERS
2 DEPARTMENT OF ENERGY SOLAR ENVELOPE
F
3 WATER STORAGE TANKS AND FILL LOCATION

4 ILLINOIS SOLAR DECATHLON HOUSE

E 5 INTERCONNECTION LOCATION

INFORMATION:

TBD BY ORGANIZERS
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
C-102 NATIONAL MALL SITE.DWG

DRAWN BY
C JJS

CHECKED BY
JJS

B SHEET:
NATIONAL MALL
0 2'-8" 5'-4" 10'-8" SITE
NATIONAL MALL SITE

C-102
A1
A
SCALE: 1/18" = 1'-0"

SCALE: 3/16" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL NOTES

GABLE HOME
TOTAL PRESSURE ON SOIL WILL NOT EXCEED 1500 PSF. AT
1 ANY POINT OF GROUND CONTACT. SEE PROJECT MANUAL
T FOR STRUCTURAL CALCULATIONS
FOUNDATIONS TO BE LOCATED TO ACCEPT HOME AS
REQUIRED. DIMENSIONS SHOWN HERE ARE FOR REFERENCE
2
ONLY. CONTRACTOR TO VERIFY CONDITIONS OF
PRE-CONSTRUCTED ELEMENTS AND ADJUST ACCORDINGLY.

S DECK FOUNDATIONS TO BE INSTALLED AFTER HOME MODULE


AND ROOF CAP HAVE BEEN SET. THIS DRAWINGS SHOWS ALL
3
POTENTIAL GROUND SURFACE CONTACT AND IS NOT MEANT
TO DIPLAY ORDER OF CONSTRUCTION.
BUILDING HAS SUFFICIENT WEIGHT AND DESIGN TO RESIST
OVERTURNING AND DOES NOT REQUIRE ANY GROUND
4
R PENETRATIONS FOR TIE DOWNS. SEE STRUCTURAL
CALCULATIONS IN PROJECT MANUAL.
6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 1'-8" 2'-8"
ONLY GROUND PENETRATION TO BE GROUNDING LIGHTING
5 ROD AND SHALL BE INSTALLED PER MANUF. SPECIFICATIONS.
LOCATION TO BE COORDINATED WITH EVENT ORGANIZERS.
Q

6'-0"
P

2'-741" 4"
N DESIGNER:
1'-1134" UNIVERSITY OF ILLINOIS

3'-034"
2'-8" 6'-0" 4'-11" 5'-6" 6'-0" 6'-0" 6'-0" 5'-0" 5'-0"
06 11 00.D2
REFERENCE KEYNOTES GABLE HOME TEAM
611 LOREDO TAFT DR.

2"
M CHAMPAIGN, IL 61820
2'-0"

DIVISION 03 - CONCRETE
03 31 00.J6
4'-8"

SEALS:
2'-0"

6'-9"
03 31 00 - STRUCTURAL CONCRETE
1'-1141" 2'-8" 2'-734" 03 31 00.J6 - 6" CAST-IN-PLACE CONCRETE SLAB
L
2'-0"

26 41 16

DIVISION 05 - METALS
4'-8"
2'-0"

K
05 05 00 - COMMON WORK RESULTS FOR METALS PROJECT:
2'-0"

05 05 29.I10 - 1/4" STEEL PLATE


US DEPT. OF ENERGY

6'-9"
SOLAR DECATHLON
2'-0"

4'-8"

05 05 29.I10 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES


OCTOBER 1-21 2009
J NREL & DOE
2'-0"

2"
06 11 00 - WOOD FRAMING
06 11 00.D2 - TREATED 2X4
ISSUANCE:

1'-8"
2'-0"

BID DOCUMENTS
H
DIVISION 26 - ELECTRICAL
#01 01/15/2009 JJS

2'-8"
2'-0"

26 41 00 - FACILITY LIGHTNING PROTECTION


DOE REVIEW
2'-0"

2'-034" 1'-8"
26 41 16 - LIGHTNING GROUNDING ROD
#02 04/16/2009 JJS
G 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 3'-0"

CONSTRUCTION DOCS

2'-741"
#03 06/01/2009 JJS
SHEET KEYNOTES
F

1'-4"
NONE USED

6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 1'-8" 2'-8"

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
C-103 GROUND CONTACT PLAN.DWG

DRAWN BY
C JJS

CHECKED BY
JJS

B SHEET:
GROUND CONTACT
0 2' 4' 8' PLAN
GROUND CONTACT AND PENETRATION PLAN

C-103
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ORGANIZER TO PROVIDE TEMPORARY WALKWAY AS SHOWN

GABLE HOME
1 AND SHALL HAVE ADDITIONAL SURFACES AVALIABLE TO
ACCOMODATE VARIATIONS IN SITE CONDITIONS
DIMENSIONS SHOWN ASSUME FLAT SITE CONDITIONS, WITH A
T 1:25 SLOPED WALKWAY. SITE GRADE CAN VARY UP TO 5"
2 BEFORE ADDITIONAL LENGHT MUST BE ADDED. ORGANIZER
SHALL MAINTAIN ENOUGH PROTECTIVE WALKWAY ON-HAND
TO ACCOMODATE UP TO AN 18" CHANGE IN GRADE
01 53 00.A2 WALKWAY TO BE CONSTRUCTED TO MEET ANSI 117.1
3 STANDARDS AND SHALL REMAIN ACCESSIBLE THROUGHOUT
S ALL PUBLIC TOURS AND OPENINGS
WIDTH OF WALKWAYTO BE DETERMINED BY SITE ORGANIZERS
4 AND SHALL MEET ADA AND NATIONAL PARK SERVICE
REQUIREMENTS AT ALL TIMES

21'-1"
1
R

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:
2

PROJECT:
K
REFERENCE KEYNOTES US DEPT. OF ENERGY
SOLAR DECATHLON
DIVISION 01 - GENERAL REQUIREMENTS
OCTOBER 1-21 2009
J NREL & DOE
01 53 00 - TEMPORARY CONSTRUCTION
01 53 00.A2 - TEMPORARY PROTECTIVE FLOOR COVER ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
01 53 00.A2 #03 06/01/2009 JJS
23'-1021" ±
F

SHEET KEYNOTES
COMPETITION DEFINED SOLAR ENVELOPE - FOR REFERENCE
1
E PURPOSES ONLY

2 ILLINOIS GABLE HOME - SEE A-SERIES DRAWINGS


INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
C-104 ORGANIZER WALKWAY.DWG

DRAWN BY
C JJS

CHECKED BY
JJS

B SHEET:
ORGANIZER
0 2' 4' 8' WALKWAY
ORGANIZER SUPPLIED WALKWAY PLAN

C-104
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL LANDSCAPE NOTES
ALL CONSTRUCTION SHALL CONFORM TO THE DEPARTMENT

GABLE HOME
OF ENERGY SOLAR DECATHLON 2009 BUILDING CODE AS
1
WELL AS THE CODE OF THE LOCAL GOVERNMENT HAVING
JURISDICTION.
T THE CITY INSPECTOR SHALL INPECT THE IRRIGATION METER
2 ASSEMBLY AND THE IRRIGATION BACKFLOW ASSEMBLY AS
REQUIRED PER LOCAL CODES AND REGULATIONS
UPON COMPLETITION OF WORK, CONTRACTOR TO REPAIR
SURROUNDING AREAS TO PRIOR CONDITION. ANY DAMAGED
3
PUBLIC FACILITIES MUST BE REPLACED TO THE SATISFACTION
S OF THE CITY INSPECTOR.
CONTRACTOR SHALL BE RESPONSIBLE FOR FINE GRADING
4
AND POSITIVE SURFACE DRAINAGE IN ALL LANDSCAPE AREAS.
CONTRACTOR SHALL REMOVE FROM THE SITE AND LEGALLY
5 DISPOSE OF ALL DEBRIS AND UNSUITABLE MATERIAL
GENERATED BY HIS OPERATIONS
R IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO OBTAIN
ALL REQUIRED PERMITS FROM THE RESPONSIBLE
JURISDICTIONS PRIOR TO CONSTRUCTION, INCLUDING BUT
6
NOT LIMITED TO, GRADING PERMITS, TRANSPORTATION
PERMITS, BUILDING PERMITS, FIRE HYDRANT PERMITS, AND
TREE REMOVAL PERMITS.
Q

GENERAL SHEET NOTES


ALL CONSTRUCTION SHALL CONFORM TO THE DEPARTMENT
P 32 90 00
TYP. OF ENERGY SOLAR DECATHLON 2009 BUILDING CODE AS
A12 A15 1
WELL AS THE CODE OF THE LOCAL GOVERNMENT HAVING
L-102 TYP. L-501 TYP.
JURISICTION.
1 1 1 1 1 1 1 1 1 1 1 1 1 1
THE CITY INSPECTOR SHALL INSPECT THE IRRIGATION METER
2 ASSEMBLY AND THE IRRIGATION BACKFLOW ASSEMBLY AS
N REQUIRED PER LOCAL CODES AND REGULATIONS DESIGNER:
UPON COMPLETION OF WORK, CONTRACTOR TO REPAIR UNIVERSITY OF ILLINOIS
3
SURROUNDING AREAS TO PRIOR CONDITION. ANY DAMAGED
PUBLIC FACILITIES MUST BE REPLACED TO THE SATISFACTION
GABLE HOME TEAM
2
OF THE NATIONAL PARK SERVICE OR CITY INSPECTOR AS 611 LOREDO TAFT DR.
APPLICABLE.
M CONTRACTOR SHALL BE RESPONSIBLE FOR FINE GRADING
CHAMPAIGN, IL 61820
4
AND POSITIVE SURFACE DRAINAGE IN ALL LANDSCAPE AREAS
CONTRACTOR SHALL REMOVE FROM THE SITE AND LEGALLY SEALS:
2 5 DISPOSE OF ALL DEBRISE AND UNSUITABLE MATERIAL
GENERATED BY OPERATIONS

L IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO OBTAIN


ALL REQUIRED PERMITS FROM THE RESPONSIBLE
JURISDICTIONS PRIOR TO CONSTRUCTION, INCLUDING BUT
6
NOT LIMITED TO, GRADING PERMINTS, TRANSPORTATION
2 PERMITS, BUILDING PERMITS, FIRE HYDRANT PERMITS AND
TREE REMOVAL PERMITS.

K PROJECT:
NO GRAYWATER SHALL BE USED FOR IRRIGATION OF
7
LANDSCAPING ELEMENTS. ALL WATER USED FOR IRRIGATION US DEPT. OF ENERGY
TO BE OBTAINED OFF-SITE FROM AN ORGANIZER APPROVED
LOCATION SOLAR DECATHLON
2 OCTOBER 1-21 2009
J 8 FOR PLANTER SCHEDULE, SEE SHEET L-502
NREL & DOE
A1
L-501
ISSUANCE:
TYP.
BID DOCUMENTS
H 2 #01 01/15/2009 JJS
A5
L-102
REFERENCE KEYNOTES DOE REVIEW
3 3 3 3 3 3 3 3 3 3 3 3 3 3
DIVISION 32 - EXTERIOR IMPROVEMENTS
#02 04/16/2009 JJS
G
32 90 00 - PLANTING CONSTRUCTION DOCS
32 90 00 - LANSCAPE PLANTING #03 06/01/2009 JJS
A12 A15
F L-102
TYP.
L-501
TYP. SHEET KEYNOTES
COMPETITION DEFINED SOLAR ENVELOPE - FOR REFERENCE
1
PURPOSES ONLY

2 EXISTING ROADWAY TO REMAIN


E
3 1:20 MAX. SLOPED WALKWAY
INFORMATION:
4 EXISTING LIGHT POLE TO REMAIN
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
L-101 SITE PLAN.DWG

LEGEND DRAWN BY
C PLANTER TYPE AND PLANTING LAYOUT 1
CG
1
CHECKED BY
2 PLANTER TYPE AND PLANTING LAYOUT 2 JJS

B 3 PLANTER TYPE AND PLANTING LAYOUT 3 SHEET:


SITE PLAN
0 2' 4' 8'
LANDSCAPE PLAN

L-101
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
WINDOW SCHEDULE GENERAL LANDSCAPE NOTES

GABLE HOME
MARK TYPE LOCATION NOTES 1 MAXIMUM PRESSURE ON GRASS TO BE <1500 PSF
001 009 010 001 GREEK OREGANO EAST
T US DEPARTMENT OF ENERGY TO LOCATE EDGES OF SOLAR
2 ENVELOPE. IF NECESSARY, OWNER TO TRIP VEGETABLES &
002 GARDEN SAGE EAST HERBS TO REMAIN BELOW ENVELOPE AT ALL TIME.
002 011 012 003 APPLE MINT & VARIEGATED MINT EAST FOLLOW RECOMMENDED PLANTING SPECIFICATIONS PER
3
SPECIFIC TYPE OF PLANT.
S 004 GOLDEN SAGE EAST
DURING COMPETITION, ALL WATER TO OCCUR USING
003 013 014 4 ORGANIZER PROVIDED WATER SEPARATE FROM POTABLE
005 UPRIGHT ROSEMARY EAST
WATER.

006 SPICY GLOBE BASIL EAST


5 NO GRAYWATER SYSTEM WILL BE USED
R 004 015 016
007 ORGANIC RADISH DAIKON EAST
6 SEE L-601 FOR SCHEDULES
008 ORGANIC WHEAT GRASS EAST
005 017 018
Q 009 ORGANIC HOPI RED DYE AMARANTH EAST

010 ORGANIC MIZUNA EAST


006
019 020
011 ORGANIC ARUGULA, ROQUETTE EAST
P 012 ORGANIC SUNFLOWER GREENS EAST
007 008 021 022
013 ORGANIC SNOW PEA SHOOTS EAST

014 BRONZE FENNEL EAST


N 001 009 010 DESIGNER:
015 ORGANIC BROCCOLI EAST
UNIVERSITY OF ILLINOIS
016 ORGANIC SPRING MIX EAST GABLE HOME TEAM
002 011 012 611 LOREDO TAFT DR.
017 ORGANIC BUCKWHEAT EAST
M CHAMPAIGN, IL 61820
018 ORGANIC RADISH, CHINA ROSE EAST
003 013 014
SEALS:
019 ORGANIC CAULIFLOWER, PURPLE EAST

L 020 ORGANIC BASIL, GREEN & PURPLE EAST


004 015 016
021 ORGANIC ONION EAST

022 SALAD MIX SPROUTS EAST


K 005
PROJECT:
017 018
023 SILKY WILD RYE NORTH
US DEPT. OF ENERGY
024 TALL BELLFLOWER NORTH SOLAR DECATHLON
006
019 020
OCTOBER 1-21 2009
025 MISCANTHUS SOUTH
J NREL & DOE
026 FEATHER REED SOUTH
ISSUANCE:
007 008 021 022
027 ORNAMENTAL RASPBERRY SOUTH BID DOCUMENTS
H #01 01/15/2009 JJS
001 009 010
DOE REVIEW
REFERENCE KEYNOTES #02 04/16/2009 JJS
G 002 011 012
023 023 023
CONSTRUCTION DOCS
024 024
#03 06/01/2009 JJS
003 013 014
F

004 015 016 0 8" 1'-4" 2'-8"


PLANTER BOX 01
E12
E
SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0"


005 017 018
INFORMATION:
PROJECT NAME

SHEET KEYNOTES
UIUC_SD_2009
D 006
019 020
DRAWING LOCATION
L-102 PLANTING.DWG

025
DRAWN BY
026 026 025
C 025 CG
027 027 027 027
CHECKED BY
JJS

B SHEET:
PLANTING
0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8"
PLANTER BOX 2 PLANTER BOX 03

L-401
A5 A12
A
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1 MAXIMUM PRESSURE ON GRASS TO BE <1500 PSF

GABLE HOME
US DEPARTMENT OF ENERGY TO LOCATED EDGES OF SOLAR
1 2 ENVELOPE. IF NECESSARY, OWNER TO TRIM VEGETATION TO
06 15 13.91
REMAIN WITHIN ENVELOPE AT ALL TIMES
T 06 11 00.D2
3 ALL WOOD USED FOR PLANTERS TO BE TREATED
06 15 13.91 06 11 00.X1 4 SIDING TO BE PAINTED TO MATCH HOME SIDING
32 94 33.A1 06 05 23.J28 ALL RECLAIMED WOOD USED IN CONSTRUCTION TO RECEIVE
PAINT ON ALL SIDES, TWO COATS. ALL HOLES TO BE FILLED
32 90 00.A2 06 11 00.X3 5
WITH MASTIC PRIOR TO PAINTING. COLOR TO BE SELECTED BY
S 32 91 19.13
A1
ARCHITECT TO MATCH HOUSE
6 FOR PLANTING SCHEDULE AND DETAIL, SEE SHEET L-102
06 11 00.X3 L-501

06 05 23.T2 06 05 23.T2 REFERENCE KEYNOTES


R 06 16 00.D10 06 15 13.91 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 11 00.L2
06 11 00.L2 06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND
COMPOSITES
22 12 00.A1
Q 2 06 11 00.B12 06 05 23.J28 - HU26

06 05 23.T2 - BCS2-2/4 POST CAP


06 05 23.T3 - ABE44 POST BASE W/ 1" STANDOFF
06 05 23.T4 - CONCEALED 2X6 JOIST HANGER
06 22 00.A2
P

1'-4"
06 11 00.D2
06 11 00.B10 06 11 00 - WOOD FRAMING
06 05 23.T3 06 05 23.T3 06 11
- 1X8
06 16 00.D7 06 16 00.D7 00.B10
06 16 00.D5
06 11 00.C1 06 11
N 00.B12
- 1X10 DESIGNER:
UNIVERSITY OF ILLINOIS

2"
1
06 11 00.C1 - 2X3
06 11 00.D2 - TREATED 2X4 GABLE HOME TEAM
06 11 00.L2 - 4X4 POST 611 LOREDO TAFT DR.
M 06 11 00.X1 - TREATED 2X6 CHAMPAIGN, IL 61820
06 11 00.X3 - TREATED 2X10

0 4" 8" 1'-4" 0 4" 8" 1'-4" SEALS:


PLANTER SECTION PLANTER SECTION 06 15 00 - WOOD DECKING
L1 L15
L
SCALE: 1" = 1'-0" SCALE: 1 1/2" = 1'-0"
06 15 13.91 - RECLAIMED 2X6 WOOD DECKING
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"
06 16 00 - SHEATHING
06 16 00.D5 - 3/8" EXTERIOR GRADE PLYWOOD

K PROJECT:
06 16 00.D7 - 1/2" EXTERIOR GRADE PLYWOOD

06 16
US DEPT. OF ENERGY
6'-0" 00.D10
- 5/8" EXTERIOR GRADE PLYWOOD
SOLAR DECATHLON
3'-8" 1'-1121" OCTOBER 1-21 2009
J 06 22 00 - MILLWORK NREL & DOE
06 22 00.A2 - 1X2 WOOD TRIM
ISSUANCE:
06 05 23.T4
06 16 00.D10
DIVISION 10 - SPECIALTIES BID DOCUMENTS
06 11 00.X1
H
06 16 00.D10
06 15 13.91 06 15 13.91 #01 01/15/2009 JJS

1'-4"
10 70 00 - EXTERIOR SPECIALTIES
06 11 00.X3 06 11 00.X3
10 70 00.A1 - REUSED 1GALLON PAINT CAN DOE REVIEW
#02 04/16/2009 JJS
G 06 05 23.T4 DIVISION 22 - PLUMBING

22 12 00 - FACILITY POTABLE-WATER STORAGE TANKS


CONSTRUCTION DOCS
22 12 00.A1 - WATER STORAGE TANK #03 06/01/2009 JJS
06 11 00.X1

4'-034"
06 16 00.D10 06 11 00.X1 DIVISION 32 - EXTERIOR IMPROVEMENTS

4'-034" 32 90 00 - PLANTING
06 05 23.T4 32 90 00.A2 - EXTERIOR PLANTINGS
E
06 11 00.B12
32 91 00 - PLANTING PREPARATION INFORMATION:
PROJECT NAME

11"
32 91 19.13 - TOPSOIL
06 16 00.D10 10 70 00.A1
UIUC_SD_2009
D
1'-434"

L1
L-501
32 94 00 - PLANTING ACCESSORIES DRAWING LOCATION
06 11 00.C1 06 22 00.A2 32 94 33.A1 - LANDSCAPE LINER
06 11 00.B10 06 16 00.D5 L-501 PLANTER DETAILS.DWG
06 11 00.X1
06 16 00.D10
DRAWN BY
C
SHEET KEYNOTES CG

CHECKED BY
USE PLASTIC TRAY INCLUDED WITH PURCHASE OF PLANTING AS
1
CONTAINER. NO ADDITIONAL SUPPORT REQUIRED JJS

B
2 REFER TO STRUCTURAL DRAWINGS FOR DECK DETAILS
SHEET:
PLANTER DETAILS
0 4" 8" 1'-4" 0 4" 8" 1'-4"
PLANTER PLAN PLANTER SECTION

L-501
A1 L15
A
SCALE: 1" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
PLANTING NUMBERS REFER TO LANDSCAPE SCHEDULE. ALL PRODUCTS TO BE
PURCHASED FROM ORGANIC SUPPLIER LOCATED WITHIN 150 MILES OF
1 CHAMPAIGN, ILLINOIS. ARCHITECT RECOMMENDED SUPPLIER:
WWW.TINYGREENS.ORG

PLANTING 004 PLANTING 010 PLANTING 016 PLANTING 022


R6 R10 R10 R18
R
SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS

PLANTING 005 PLANTING 011 PLANTING 017 PLANTING 023


N6 N10 N14 N18
N DESIGNER:
SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS

UNIVERSITY OF ILLINOIS
GABLE HOME TEAM

M
REFERENCE KEYNOTES 611 LOREDO TAFT DR.
CHAMPAIGN, IL 61820

SEALS:

PLANTING 006 PLANTING 012 PLANTING 018 PLANTING 024


K6 K10 K14 K18
K
SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS PROJECT:
US DEPT. OF ENERGY
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
G2
PLANTING 001
G6
PLANTING 007
G10
PLANTING 013
G14
PLANTING 019
G18
PLANTING 025 #02 04/16/2009 JJS
G
SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS

CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
SHEET KEYNOTES
INFORMATION:
PROJECT NAME
PLANTING 002 PLANTING 008 PLANTING 014 PLANTING 020 PLANTING 026
D2 D6 D10 D14 D18 UIUC_SD_2009
D
SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS

DRAWING LOCATION
L-901 PLANTING IMAGERY.DWG

DRAWN BY
C CG

CHECKED BY
JJS

B SHEET:
PLANTING IMAGERY
PLANTING 003 PLANTING 009 PLANTING 015 PLANTING 021 PLANTING 027

L-901
A2 A6 A10 A14 A18
A
SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL STRUCTURAL NOTES & SPECIFICATIONS MISCELLANEOUS
THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN OF PREFABRICATED CONNECTOR PLATE WOOD FLOOR
TRUSSES. THESE MEMBERS SHALL BE DESIGNED BY THE MANUFACTURER IN ACCORDANCE WITH THE “DESIGN
REFER TO ARCHITECTURAL, MECHANICAL, ELECTRICAL, CIVIL, ELEVATOR, OR OTHER SPECIALTY ENGINEERING
SPECIFICATION FOR METAL PLATE CONNECTED WOOD TRUSSES,” TPI LATEST EDITION, BY THE TRUSS PLATE
GENERAL INSTITUTE FOR THE SPANS AND CONDITIONS SHOWN ON THE PLANS. THE FOLLOWING TRUSS LOADING IS
DRAWINGS FOR DIMENSIONS NOT SHOWN, INCLUDING BUT NOT LIMITED TO: SIZE AND LOCATION OF CURBS,

GABLE HOME
EQUIPMENT HOUSEKEEPING PADS, WALL AND FLOOR OPENINGS, BLOCKOUTS, FLOOR DEPRESSIONS, SUMPS,
ALL TYPICAL DETAILS AND NOTES SHOWN ON DRAWINGS SHALL APPLY UNLESS NOTED OTHERWISE. TYPICAL 12 TYPICAL UNLESS NOTED OTHERWISE ON PLANS AND/OR LOAD MAPS.
DRAINS, ANCHOR BOLTS, EMBEDDED ITEMS, ARCHITETURAL TREATMENT, ETC. CONTRACTOR SHALL VERIFY
DETAILS MAY NOT NECESSARILY BE INDICATED ON THE PLANS BUT SHALL STILL APPLY AS SHOWN OR DESCRIBED IN TOP CHORD LIVE LOAD PER LOAD MAPS
DIMENSIONS AND RESOLVE DISCREPANCIES OR CONFLICTS PRIOR TO CONSTRUCTION.
THE DETAILS. WHERE TYPICAL DETAILS ARE NOTED ON THE DRAWINGS, THE SPECIFIED TYPICAL DETAIL SHALL BE TOP CHORD DEAD LOAD 5 PSF
T G.01 USED. WHERE NO DETAIL IS NOTED, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CHOOSE THE BOTTOM CHORD DEAD LOAD 9 PSF
WHERE SECTIONS ARE INDICATED ON THE PLAN BY A NUMBER AND A DRAWING THUS, 1/S1, THE INDICATED
APPROPRIATE TYPICAL DETAIL FROM THOSE PROVIDED. THE CONTRACTOR SHALL SUBMIT ALL PROPOSED SELF-WT OF JOISTS PER MFR.
SECTION (1) IS SHOWN ON THE STRUCTURAL DRAWING S1.
ALTERNATE TYPICAL DETAILS TO THOSE PROVIDED WITH RELATED CALCULATIONS TO THE ENGINEER FOR FLOOR TRUSS DEFLECTION SHALL MEET THE MINIMUM ICBO REQUIREMENTS UNLESS A MORE STRINGENT
13 CONCRETE
APPROVAL PRIOR TO SHOP DRAWING PRODUCTION AND FIELD USE. CRITERIA IS NOTED ON THE PLANS.
BUILDING CODE WOOD TRUSSES SHALL UTILIZE APPROVED CONNECTOR PLATES (GANGNAIL OR APPROVED EQUAL). SUBMIT MIXING, BATCHING, TRANSPORTING, PLACING, AND CURING OF ALL CONCRETE, AND SELECTION OF CONCRETE
SHOP DRAWINGS AND DESIGN CALCULATIONS COMPLETE WITH STRESS DIAGRAMS FOR REVIEW A MINIMUM OF MATERIALS, SHALL CONFORM TO ACI 301, “SPECIFICATION FOR STRUCTURAL CONCRETE FOR BUILDINGS,”
S B.01
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE BUILDING CODE. THE PUBLICATIONS LISTED BELOW
ARE THE GOVERNING CODES AND STANDARDS AND ARE REFERENCED BY THEIR BASIC DESIGNATION. IN THE
14 TWO WEEKS PRIOR TO FABRICATION. PROVIDE FOR ALL TEMPORARY AND PERMANENT TRUSS BRACING AND EXCEPT AS NOTED BELOW. PROPORTIONS OF MATERIALS FOR CONCRETE SHALL BE ESTABLISHED TO
BRIDGING.SHOP DRAWINGS AND CALCULATIONS SHALL BE SEALED BY A LICENSED STRUCTURAL ENG. IN THE PROVIDE: (A) WORKABILITY AND CONSISTENCY TO PERMIT CONCRETE TO BE WORKED REDILY INTO FORMS
CASE OF CONFLICTING REQUIREMENTS, THE BUILDING CODE SHALL GOVERN AND AROUND REINFORCEMENT UNDER CONDITIONS OF PLACEMENT TO BE EMPLOYED, WITHOUT SEGREGATION
STATE OF IL.
APPLICABLE CODES AND STANDARDS PLYWOOD OR EXCESSIVE BLEEDING. (B) RESISTANCE TO SPECIAL EXPOSURES AS REQUIRED AND (C) CONFORMANCE
INTERNATIONAL BUILDING CODE (IBC), 2006 EDITION WITH STRENGTH TEST REQUIREMENTS.
BUILDING 15
PLYWOOD SHEATHING SHALL BE GRADE C-D EXTERIOR GLUE OR STRUCTURAL II. ORIENTED STRAND BOARD
INTERNATIONAL RESIDENTIAL CODE (IRC), 2006 EDITION
CODE (OSB) OF EQUIVALENT THICKNESS, EXPOSTURE RATING AND PANEL INDEX MAY BE USED IN LIEU OF PLYWOOD.
R SOLAR DECATHLON BUILDING CODE, LATEST EDITION ALL CONCRETE EXPOSED TO FREEZING AND THAWING OR DEICING CHEMICALS SHALL BE AIR ENTRAINED WITH

AMERICAN WELDING SOCIETY D1.1-2000, “STRUCTURAL WELDING CODE - STEEL”


TIMBER CONNECTORS AIR CONTENT INDICATED IN THE TABLE BELOW. TOLERANCE ON AIR CONTENT AS DELIVERED SHALL BE +/- 1.5
AWS D1.1 PERCENT. FOR SPECIFIED COMPRESSIVE STRENGTH (F'C) GREATER THAN 5,000 PSI, REDUCTION OF AIR
TIMBER CONNECTORS CALLED OUT BY LETTERS AND NUMBERS SHALL BE SIMPSON STRONG -TIE COMPANY,
AWSA2.4 AMERICAN WELDING SOCIETY A2.4-98, “SYMBOLS FOR WELDING AND NONDESTRUCTIVE TESTING” CONTENT INDICATED IN THE TABLE BELOW BY 1.0 PERCENT IS PERMITTED. AIR CONTENT SHALL BE MEASURED
INC, AS SPECIFIED IN THE LATEST EDITION OF THEIR CATALOG. EQUIVALENT DEVICES BY OTHER
AT THE DISCHARGE OF THE TRUCK. IF CONCRETE IS PUMPED, AIR CONTENT SHALL BE MEASURED AT THE
AMERICAN IRON AND STEEL INSTITUTE, “SPECIFICATIONS FOR THE DESIGN OF COLD-FORMED STEEL MANUFACTURERS MAY BE SUBSTITUTED, PROVIDED THEY HAVE ICC-ES APPROVAL FOR EQUAL OR GREATER
AISI DISCHARGE END OF THE PUMP LINE. TESTS FOR AIR CONTENT SHALL MEET ASTM C172 REQUIREMENTS.
STRUCTURAL MEMBERS,” 1996 EDITION WITH SUPPLEMENT NO. 1, JULY 30, 1999. LOAD CAPCITIES. PROVIDE NUMBER AND SIZE OF FASTENERS AS SPECIFIED BY MANUFACTURER.
Q ASTM AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM INTERNATIONAL) CONNECTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S PUBLISHED SPECIFICATIONS.
MIX DESIGNS LISTED BELOW SHALL BE SUBMITTED TO THE ARCHITECT AND STRUCTURAL ENGINEER AND
WHERE CONNECTOR STRAPS CONNECT TWO MEMBERS, PLACE HALF OF THE NAILS OR BOLTS IN EACH
STEEL: STRUCTURAL STEEL 16 APPROVED PRIOR TO USE. SELECTION OF CONCRETE MIX PROPORTIONS SHALL BE IN ACCORDANCE WITH ACI
MEMBER.
301. MIX PROPORTIONS SHALL MEET OR EXCEED THE REQUIREMENTS LISTED BELOW FOR THE LOCATIONS
ALL STEEL SHAPES SHALL CONFORM TO THE FOLLOWING:
NOTED. THE MORE STRINGENT OF THE REQUIREMENTS LISTED SHALL GOVERN.
W-SHAPES ASTM A992, FY=50 KSI ALL BOLTS IN WOOD MEMBERS SHALL CONFORM TO ASTM A307. PROVIDE WASHERS UNDER THE HEADS AND
ASTM A913, FY=50 KSI NUTS OF ALL BOLTS AND LAG SCREWS BEARING ON WOOD. UNLESS NOTED OTHERWISE, ALL NAILS SHALL BE
MAXIMUM SIZE OF AGGREGRATE SHALL BE AS LISTED BELOW. MAXIMUM FLY ASH AS A PERCENTAGE OF TOTAL
P
ALL ANGLES U.N.O ASTM A36, FY=36 KSI COMMON. ALL SHIMS SHALL BE SEASONED AND DRIED AND THE SAME GRADE (MINIMUM) AS MEMBERS
WEIGHT OF CEMENTITIOUS MATERIAL SHALL BE 25 PERCENT. FLY ASH SHALL BE CLASS F, MEETING ASTM C618
SQUARE OR RECTANGULAR ASTM A500 GRADE B, CONNECTED. ALL SINGLE, DOUBLE AND TRIPLE JOISTS SHALL BE CONNECTED WITH “U” SERIES JOIST HANGERS.
REQUIREMENTS. WATER/CEMENT RATIO SHALL BE BASED ON TOTAL CEMENTITIOUS MATERIAL, INCLUDING FLY
STRUCTURAL TUBE FY=46 KSI
WOOD FRAMING DETAILS ASH AND OTHER POZZOLANIC MATERIALS.
STEEL PIPE DIAMETER LESS ASTM A53, TYPE E OR
1 THAN OR EQUAL TO 12 INCHES S GRADE B, FY=35 KSI THE FOLLOWING APPLY UNLESS OTHERWISE SHOWN ON THE PLANS:
THE CONTRACTOR SHALL DETERMINE SLUMP. EACH CONCRETE MIX SUBMITTED SHALL HAVE THE SLUMP
AT JOIST AREAS: PROVIDE CROSS-BRIDGING AT 8'-0” ON CENTER MAXIMUM. PROVIDE SOLID BLOCKING OR SPECIFIED. SLUMP SHALL BE MEASURED AT THE DISCHARGE OF THE TRUCK. IF CONCRETE IS PUMPED, SLUMP
MAT'L CALLED OUT ON PLAN AS (A36) ASTM A36, FY=36 KSI
N DESIGNER:
CONTINUOUS RIM AT ALL BEARING POINTS. PROVIDE SOLID BLOCKING UNDER ALL BEARING WALLS ABOVE. SHALL BE MEASURED AT THE DISCHARGE OF THE PUMP LINE. SLUMPS SHALL BE WITHIN + 1 INCH AND -2
MAT CLD OUT ON PLANS AS (FY=65 KSI) ASTM A913, FY=65 KSI INCHES OF THE SPECIFIED SLUMP.
ALL OTHER STEEL U.N.O. ASTM A572, FY=50 KSI
ASTM A588, FY=50 KSI PROVIDE DOUBLE JOISTS UNDER ALL PARALLEL PARTITIONS THAT EXTEND OVER MORE THAN HALF THE JOIST UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
LENGTH. PROVIDE DOUBLE JOISTS EACH SIDE OF ALL OPENINGS IN FLOORS AND ROOFS UNLESS DETAILED THE USE OF SUPER PLASTICIZERS AND WATER REDUCERS IS ALLOWED, BUT NOT REQUIRED. ALL ADMIXTURES
ASTM A441, FY=50 KSI SHALL BE CHLORIDE FREE UNLESS OTHERWISE APPROVED BY THE ENGINEER.
OTHERWISE. COORDINATE SIZE AND LOCATION OF ALL OPENINGS WITH ARCHITECTURAL AND MECHANICAL
GENERAL NOTES FOR STEEL CONNECTIONS SHALL APPLY TO ALL STEEL CONNECTIONS UNLESS NOTED
DRAWINGS. 611 LOREDO TAFT DR.
2 EVALUATION AND ACCEPTANCE OF CONCRETE: CONCRETE SHALL BE TESTED IN ACCORDANCE WITH THE
M OTHERWISE.
PROVIDE TWO 2X6 HEADERS OVER AND DOUBLE STUDS EACH SIDE OF ALL OPENINGS IN STUD BEARING WALLS REQUIREMENTS OF ACI 318 SECTIONS 5.6.2 THROUGH 5.6.5. QUALIFIED FIELD TESTING TECHNICIANS SHALL CHAMPAIGN, IL 61820
ALL WORK SHALL BE IN ACCORDANCE WITH THE AISC SPECIFICATION. SHOP DRAWINGS SHALL BE SUBMITTED UNLESS NOTED OTHERWISE. PERFORM TESTS ON FRESH CONCRETE AT THE JOB SITE, PREPARE SPECIMENS REQUIRED FOR CURING UNDER
AND REVIEWED BY THE ARCHITECT/ENGINEER BEFORE COMMENCING FABRICATION. ALL STEEL ANCHORS AND FIELD CONDITIONS, PREPARE SPECIMENS REQUIRED FOR TESTING IN LABORATORY, AND RECORD THE
3
TIES AND OTHER MEMBERS EMBEDDED IN CONCRETE OR MASONRY SHALL BE LEFT UNPAINTED. DIMENSIONAL PROVIDE SOLID BLOCKING AT FLOORS FOR WOOD COLUMNS AND MULTIPLE STUD POSTS TO PASS THROUGH. TEMPERATURE OF THE FRESH CONCRETE WHEN PREPARING SPECIMENS FOR STRENGTH TESTS. QUALIFIED SEALS:
TOLERANCE FOR BUILT-UP MEMBERS SHALL BE PER AWS D1.1 LABORATORY TECHNICIANS SHAL PERFORM ALL REQUIRED LABORATORY TESTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE SELECTION OF OPTIONAL DETAILS SHOWN PROVIDE CONTINUOUS SOLID BLOCKING AT MID-HEIGHT OF ALL STUD WALLS OVER 10'-0” IN HEIGHT.
L 4 ON THE DRAWINGS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ALL ERECTION AIDES THAT INCLUDE, PREPARATION BEFORE CONCRETE PLACEMENT SHALL INCLUDE THE FOLLOWING:
BUT ARE NOT LIMITED TO, ERECTION ANGLES, LIFT HOLES AND OTHER AIDES. UNLESS NOTED OTHERWISE, ALL STRUCTURAL STUD WALLS SHOWN ON THE PLANS SHALL BE 2X6 AT 16 INCHES
A. ALL EQUIPMENT FOR MIXING AND TRANSPORTING CONCRETE SHALL BE CLEAN;
STRUCTURAL STEEL WELDING ON CENTER. ALL NON-STRUCTURAL WALLS SHALL BE 2X4 AT 16 INCHES ON CENTER.
STRUCTURAL STEEL SHOP DRAWINGS SHALL SHOW ALL WELDING WITH AWS A2.4 SYMBOLS. ALL WELDING USE FULL LENGTH STUDS (BALLOON FRAME) ON EXTERIOR WALLS AT STAIRWAYS AND AT VAULTED CEILINGS. B. ALL DEBRIS AND ICE SHALL BE REMOVED FROM SPACES TO BE OCCUPIED BY CONCRETE;
SHALL BE DONE WITH AWS/WABO (WASHINGTON STATE ASSOCIATION OF BUILDING OFFICIALS) CERTIFIED

K
WELDERS AND IN ACCORDANCE WITH AWS D1.1. WELDS SHOWN ON THE DRAWINGS ARE THE MINIMUM SIZES. PLYWOOD WALL SHEATHING SHALL HAVE SOLID BLOCKING AT ALL PANEL EDGES. PROVIDE THE FOLLOWING C. FORMS SHALL BE PROPERLY COATED; PROJECT:
INCREASE WELD SIZE TO AWS MINIMUM SIZES, BASED ON PLATE THICKNESS. THE MINIMUM WELD SIZE SHALL MINIMUM NAILING UNLESS NOTED OTHERWISE ON PLANS:
BE 3/16 INCH. FIELD WELDING SYMBOLS HAVE NOT NECESSARILY BEEN INDICATED ON THE DRAWINGS. WHERE D. MASONRY FILLER UNITS THAT WILL BE IN CONCTACT WITH CONCRETE SHALL BE WELL DRENCHED; US DEPT. OF ENERGY
SOLAR DECATHLON
SHOWN, PROPER FIELD WELDING PER AWS D1.1 SHALL BE USED. WHERE NOT FIELD WELDING SYMBOLS ARE 8D AT 6 INCHES ON CENTER AT SHEET EDGES (PANEL EDGES)
5 SHOWN, IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE USE OF SHOP AND FIELD WELDS. ALL E. REINFORCEMENT SHALL BE THOROUGHLY CLEAN OF ICE OR OTHER DELETERIOUS COATINGS;
PARTIAL PENETRATION GROOVE WELD SIZES SHOWN ON THE DRAWINGS REFER TO EFFECTIVE THROAT
THICKNESS. ALL WELDS SHALL BE MADE USING LOW HYDROGEN ELECTRODES WITH MINIMUM TENSILE
8D AT 12 INCHES ON CENTER AT INTERMEDIATE FRAMING
F. WATER SHALL BE REMOVED FROM PLACE OF DEPOSIT BEFORE CONCRETE IS PLACED UNLESS A TREMIE IS
OCTOBER 1-21 2009
J STRENGTH PER AWS D1.1 (MINIMUM 70 KSI). LOW HYDROGEN SMAW ELECTRODES SHALL BE USED WITHIN FOUR UNLESS OTHERWISE NOTED ON THE PLANS, ALL WOOD STUD WALLS SHALL HAVE THEIR LOWER WOOD TO BE USED OR UNLESS OTHERWISE PERMITTED BY THE BUILDING OFFICIAL; NREL & DOE
HOURS OF OPENING THEIR HERMETICALLY SEALED CONTAINERS, OR SHALL BE REFRIED PER AWS D1.1, PLATED ATTACHED TO THE WOOD FRAMING BELOW WITH 16D NAILS AT 6 INCHES ON CENTER
ISSUANCE:
SECTION 4.5. ELECTRODES SHALL BE REDRIED NO MORE THAN ONE TIE, AND ELECTRODES THAT HAVE BEEN G. ALL LAITANCE AND OTHER UNSOUND MATERIAL SHALL BE REMOVED BEFORE ADDITIONAL CONCRETE IS
WET SHALL NOT BE USED. STRUCTURAL DESIGN DATA PLACED AGAINST HARDENED CONCRETE.
ALL WELDING SHALL BE PERFORMED IN STRICT ADHERENCE TO A WRITTEN WELDING PROCEDURE FLOOR LIVE LOADS: SHALL BE IN ACCORDANCE WITH THE LOAD DIAGRAMS AND GENERAL STRT NOTES. BID DOCUMENTS
JJS
ROOF LIVE LOADS: 20 P.S.F., PER THE SOLAR DECATHLON RULES
#01 01/15/2009
SPECIFICATION (WPS) PER AWS D1.1. ALL WELDING PARAMETERS SHALL BE WITHIN THE ELECTRODE CONCRETE MIX SPECIFICATION TABLE
H 6 MANUFACTURER'S RECOMMENDATIONS. WELDING PROCEDURES SHALL BE SUBMITTED TO THE OWNER'S WIND LOADS: 60 M.P.H., EXP. C, I = 1.0, PER THE SOLAR DECATHLON RULES
(ALL CONCRETE SHALL BE NORMAL-WEIGHT CONCRETE, 145 PCF
TESTING AGENCY FOR REVIEW BEFORE STARTING FABRICATION OR ERECTION. COPIES OF THE WPS SHALL BE
FOUNDATIONS F'C TEST MAX AIR MIN MAX
ON SITE AND AVAILABLE TO ALL WELDERS AND THE SPECIAL INSPECTOR. MIN AGE W/C CONTENT AGGREGATE AGGREGATE
GROUND ANCHORS ALLOWABLE BEARING PRESSURE: 1,500 PSF (PER SOLAR DECATHLON RULES)
LOCATION (PSI) (DAYS) RATIO PERCENT SIZE SIZE DOE REVIEW
7
GROUND ANCHORS SHALL BE 15” X 3” BLADE DIAMETER X 1-1/2” ROD DIAMETER ANCHOR. UPLIFT CAPACITY = 200
#02 04/16/2009 JJS
LB (BASED ON FIRM DENSE SOIL). WITH 18" MAXIMUM EMBEDMENT SPREAD FOOTINGS 4,500 28 0.50 6.0 3/4” 1”
G
NON-LOAD BEARING PARTITIONS
WOOD 1. FRAMING FOR INTERIOR PARTITIONS SHALL CONSIST OF WOOD STUD TYPE FRAMING. PARTITIONS SHALL BE
DEFORMED REINFORCING STEEL
CONSTRUCTION DOCS
CONNECTED TO THE STRUCTURE SO AS TO ALLOW FOR BOTH VERTICAL AND LATERAL DEFORMATIONS OF THE
FRAMING LUMBER STRUCTURE.
ALL DEFORMED REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF THE “STANDARD
FRAMING LUMBER SHALL BE KILN DRIED OR MC-15, AND GRADED AND MARKED IN CONFORMANCE WITH WEST
COAST LUMBER INSPECTION BUREAU STANDARD GRADING RULES FOR WEST COAST LUMBER NO. 16, LATEST
SEQUENCING CONSTRUCTION AND LATERAL STABILITY
SPECIFICATION FOR DEFORMED AND PLAIN CARBON-STEEL BARS FOR CONCRETE REINFORCEMENT” ASTM #03 06/01/2009 JJS
A-615, GRADE 60... BARS SHALL BE SECURELY TIED IN PLACE WITH #16 DOUBLE-ANNEALED IRON WIRE. BARS
EDITION. FURNISH TO THE FOLLOWING MINIMUM STANDARDS: 2. THE STRUCTURAL COMPONENTS BY THEMSELVES ARE A NON-SELF SUPPORTING STRUCTURE. LATERAL
F FORCES DUE TO WIND, EARTHQUAKE, OR SOIL ARE CARRIED BY THE ROOF AND FLOOR DIAPHRAGMS TO THE
SHALL BE SUPPORTED ON ACCEPTABLE CHAIRS.

2X JOISTS AND BUILT-UP MEMBERS DOUGLAS FIR-LARCHNO.2 LATERAL SYSTEM. CERTAIN ELEMENTS SHOWN ON THE STRUCTURAL DRAWINGS (SUCH AS SHEARWALLS,
MINIMUM CAST-IN-PLACE CONCRETE COVER OVER REINFORCING STEEL, UNLESS NOTED OTHERWISE, SHALL BE
SLABS ON GRADE AND ROOF DIAPHRAGM) ARE REQUIRED FOR OVERAL STABILITY OF OTHER ELEMENTS (SUCH
AS FOLLOWS:
3X AND 4X BEAMS AND POSTS DOUGLAS FIR-LARCH NO. 2 AS BEAMS, COLUMNS AND WALLS). IF, DUE TO SEQUENCING OF CONSTRUCTION, THESES STABILITY ELEMENTS
1. CONCRETE EXPOSED TO EARTH OR WEATHER:
ARE NOT IN PLACE, THE CONTRACTOR SHALL RETAIN A LICENSED STRUCTURAL ENGINEER WHO SHALL
NO. 5 BAR, W31 OR D31 WIRE, AND SMALLER: 1 1/2 INCHES
1 6X AND LARGER BEAMS & STRINGERS DOUGLAS FIR-LARCH NO. 1 INVESTIGATE WHERE TEMPORARY SHORING / BRACING IS REQUIRED, AND SHALL DESIGN THIS TEMPORARY
AT THE TIME CONCRETE IS PLACED, REINFORCEMENT SHALL BE FREE FROM MUD, OIL, OR OTHER NONMETALLIC
E SHORING / BRACING. THE CONTRACTOR SHALL PROVIDE THIS SHORING / BRACING UNTIL THE REQUIRED
STRUCTURAL ELEMENTS AND THEIR CONNECTIONS HAVE BEEN INSTALLED AND REACH THEIR FINAL DESIGN
COATINGS THAT DECREASE BOND. REINFORCEMENT SHALL BE ACCURATELY PLACED AND ADEQUATELY
6X AND LARGER POSTS AND TIMBERS DOUGLAS FIR-LARCH NO. 1 SUPPORTED BEFORE CONCRETE IS PLACED, AND SHALL BE SECURED AGAINST DISPLACEMENT.
INFORMATION:
STRENGTHS.
STUDS, PLATES AND MISC. LIGHT FRAMING DOUGLAS FIR-LARCH STANDARD GRADE SHOP DRAWINGS
PROJECT NAME
DRILLED-IN CONCRETE ANCHORS (DICA)

TOP AND BOT. PLATES AT BEARING WALLS DOUGLAS FIR-LARCH CONSTRUCTION GRADE ACCEPTABLE DRILLED-IN CONCRETE ANCHORS, OF SIZE, NUMBER, AND SPACING AS SHOWN ON THE DRAWINGS, UIUC_SD_2009
D SHOP DRAWINGS FOR OPEN WEB WOOD TRUSSES SHALL BE SUBMITTED FOR REVIEW PRIOR TO FABRICATION SHALL BE AS FOLLOWS: HILTI “KWIK-BOLT-II AND POST NUT KWIK BOLT II CONCRETE ANCHORS” (ICC-ES REPORT
DRAWING LOCATION
BOLTED STUDS, LEDGERS AND PLATES DOUGLAS FIR-LARCHSTANDARD GRADE OF THESE ITEMS. #ESR-1355),OR HILTI “KWIK BOLT 3 CONCRETE AND MASONRY ANCHORS (ICC-ES REPORT #ERS-1385) OR
LAMINATED VENEER LUMBER APPROVED EQUAL. MINIMUM EMBEDMENT DEPTH SHALL BE 4.5 BOLT DIAMETERS UNLESS OTHERWISE NOTED
DIMENSIONS AND QUANTITIES ARE NOT REVIEWED BY THE ENGINEER OF RECORD; THEREFORE THEY SHALL BE ON THE DRAWINGS. S-001 SYMBOLS AND NOTES.DWG
LAMINATED VENEER LUMBER SHALL BE MANUFACTURED UNDER A PROCESS APPROVED BY THE NATIONAL VERIFIED BY THE CONTRACTOR. CONTRACTOR SHALL REVIEW AND STAMP DRAWINGS PRIOR TO REVIEW BY
RESEARCH BOARD. EACH PIECE SHALL BEAR A STAMP OR STAMPS NOTHING THE NAME AND PLANT NUMBER OF
THE MANUFACTURER, THE GRADE, THE NATIONAL RESEARCH BOARD NUMBER AND THE QUALITY CONTROL
THE ENGINEER OF RECORD. CONTRACTOR SHALL REVIEW DRAWINGS FOR CONFORMANCE WITH THE MEANS, ANCHORS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE APPROVED ICC-ES REPORT. NO DRAWN BY
C
METHODS, TECHNIQUES, SEQUENCES, AND OPERATIONS OF CONSTRUCTION, AND ALL SAFETY PRECAUTIONS REINFORCEMENT SHALL BE CUT TO INSTALL ANCHORS. DEFECTIVE HOLES SHALL BE GROUTED WITH EPOXY
2 AGENCY. ALL LAMINATED VENEER LUMBER SHALL BE MANUFACTURED IN ACCORDANCE WITH THE AND PROGRAMS INCIDENTAL THERETO. SUBMITTALS SHALL INCLUDE ONE REPRODUCIBLE AND ONE COPY; JJS
ADHESIVE.
INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS (ICBO) ER-4979 USING DOUGLAS FIR VENEER GLUED
WITH A WATERPROOF ADHESIVE MEETING THE REQUIREMENTS OF ASTM D2559 WITH ALL GRAIN PARALLEL WITH
REPRODUCIBLE WILL BE MARKED AND RETURNED.
SHOP DRAWING SUBMITTALS PROCESSED BY THE ENGINEER ARE NOT CHANGE ORDERS. THE PURPOSE OF EPOXY ADHESIVE
CHECKED BY
THE LENGTH OF THE MEMBER. SHOP DRAWING SUBMITTALS BY THE CONTRACTOR IS TO DEMONSTRATE TO THE ENGINEER THAT THE --
ALL MEMBERS SHALL BE WESTERN SPECIES, GRADE 2.0E, CONTRACTOR UNDERSTANDS THE DESIGN CONCEPT, BY INDICATING WHICH MATERIAL IS INTENDED TO BE
3 EPOXY ADHESIVE SHALL CONFORM TO ASTM C881 FOR BONDING STEEL TO HARDENDED CONCRETE. EPOXY
FB = 3100 PSI, FV = 290 PSI.
SHEET:
FURNISHED AND INSTALLED, AND BY DETAILING THE INTENDED FABRICATION AND INSTALLATION METHODS. IF ADHESIVE SHALL BE USED FOR DRILLED AND GOUTED REINFORCING BARS OR BOLTS UNLESS NOTED
B DESIGN SHOWN ON PLANS IS BASED ON LVL MEMBERS MANUFACTURED BY GEORGIA PACIFIC WOOD DEVIATIONS, DISCREPANCIES, OR CONFLICTS BETWEEN THE SHOP DRAWING SUBMITTALS AND THE CONTRACT OTHERWISE. APPROVED
PRODUCTS LLC. ALTERNATE MANUFACTURERS MAY BE USED SUBJECT TO REVIEW AND APPROVAL BY THE
ARCHITECT AND STRUCTURAL ENGINEER. ALTERNATE JOIST HANGERS AND OTHER HARDWARE MAY BE
DOCUMENTS ARE DISCOVERED EITHER PRIOR TO OR AFTER THE SHOP DRAWING SUBMITTALS ARE PROCESSED
BY THE ENGINEER, THE DESIGN DRAWINGS AND SPECIFICATIONS SHALL CONTROL AND SHALL BE FOLLOWED.
EPOXIES INCLUDE: “HILTI HIT HY-150 ADHESIVE ANCHOR SYSTEMS” (ICC-ES #ER-5193) AS MANUFACTURED BY
HILTI INCORPORATED, TULSA, OKLAHOMA, OR APPROVED EQUAL.
SYMBOLS AND
4
SUBSTITUTED FOR ITEMS SHOWN PROVIDED THEY HAVE THE ICBO APPROVAL FOR EQUAL OR GREATER LOAD
CAPACITIES. ALL JOIST HANGERS AND OTHER HARDWARE SHALL BE COMPATIBLE IN SIZE WITH THE MEMBERS SHOP DRAWINGS OF DESIGN BUILD COMPONENTS SHALL INCLUDE THE DESIGNING PROFESSIONAL ENGINEER'S EPOXY SHALL HAVE AN APPROVED ICC-ES REPORT AND SHALL BE MIXED, APPLIED AND CURED IN STRICT
NOTES

S-001
PROVIDED STAMP, AND SHALL BE APPROVED BY THE COMPONENT DESIGNER PRIOR TO THE CURSORY REVIEW BY THE ACCORDANCE WITH THE ICC-ES REPORT. ALL PLACEMENT AND CURING SHALL BE CONDUCTED WITH
A ENGINEER OF RECORD FOR LOADS IMPOSED ON THE BASIC STRUCTURE. THE COMPONENT DESIGNER IS
RESPONSIBLE FOR CODE CONFORMANCE AND ALL NECESSARY CONNECTIONS NOT SPECIFICALLY CALLED OUT
CONCRETE AND AIR TEMPERATURES ABOVE 50 DEGREES. APPLY EPOXY ONLY TO CLEAN, DRY CONCRETE.
PROVIDE POSITIVE PROTECTION SO ANCHORS ARE NOT DISTURBED DURING THE CURING PERIOD. HOLES FOR
ON ARCHITECTURAL OR STRUCTURAL DRAWINGS. SHOP DRAWINGS SHALL INDICATE MAGNITUDE AND
PREFABRICATED CONNECTOR PLATE WOOD FLOOR TRUSSES DOWELS AND BOLTS SHALL BE DRILLED WITH ROTARY IMPACT HAMMER OR EQUIVALENT METHOD TO PRODUCE
DIRECTION OF ALL LOADS IMPOSED ON BASIC STRUCTURE. DESIGN CALCULATIONS SHALL BE INCLUDED IN THE A HOLE WITH A ROUGH INSIDE SURFACE. NO REINF. SHALL BE CUT TO INSTALL DOWELS, BARS, OR BOLTS.
SUBMITTAL.

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
PROVIDE 18" X 19" OPENING FREE OF EXTERIOR GIRTS, RIGID INSULATION OR
1 PLYWOOD CENTERED OVER EACH FOUNDATION TO ALLOW FOR PLACEMENT OF
HOME ON FOUNDATION. COORDINATE WITH A-SERIES SHEETS

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

L A B C D E F G Ga H J
REFERENCE KEYNOTES
6'-0" 4'-11" 5'-6" 6'-0" 6'-0" 6'-0" 5'-0" 5'-0" 7'-3"
DIVISION 03 - CONCRETE

K PROJECT:
03 31 00 - STRUCTURAL CONCRETE
US DEPT. OF ENERGY
03 31 00.J6 - 6" CAST-IN-PLACE CONCRETE SLAB
2 SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
1 BID DOCUMENTS
03 31 00.J6 (TYP.)
#01 01/15/2009 JJS

EQ
(TYP.)
H

DOE REVIEW
P15 P15
S-508 S-508
#02 04/16/2009 JJS
47'- 13
G 21 "
1"
4'-2 2
13'-6"

6 5

2
CONSTRUCTION DOCS
2 2 2 #03 06/01/2009 JJS
F

SHEET KEYNOTES

EQ
E 1 EDGE OF MODULE ABOVE - SEE S-103

LVL JOISTS ABOVE, TO BE CENTERED ON FOUNDATIONS. INFORMATION:


1 2 COORDINATE WITH MODULAR HOME MANUFACTURER & SHEET
S-103
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
D1 S-101 FOUNDATION PLAN.DWG
S-501
TYP. DRAWN BY
C JJS

CHECKED BY
--

B SHEET:
FOUNDATION PLAN
0 1'-4" 2'-8" 5'-4"
FOUNDATION PLAN

S-101
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
3'-0" 6'-0" 4'-8"

GABLE HOME
1 REFER TO STRUCTURAL CALCULATIONS FOR EXACT LOADING

T 06 11 00.F11 06 11 00.F11 6'-0" 06 11 00.F11

1'-8"

1'-8"
1'-8"
ALL STRUCTURAL DECKING WOOD TO BE PRESSURE TREATED. ALL STRUCTURAL
2
M14 M14 M14 CONNECTIONS TO BE GALVANIZED.
S-509 S-509 S-509
06 11 00.F11
06 11 00.L2 3
ALL RECLAIMED WOOD USED FOR DECKING TO BE SEALED ON ALL SIDES WITH A
06 11 00.L2 06 11 00.L2 06 11 00.L2 LINSEED OIL FINISH.

1'-4"
1'-4"

1'-4"
S

1'-4"
05 05 23.I1 05 05 23.I1 05 05 23.I1

6'-0"
6'-0"

6'-0"
05 05 23.I1
1'-4"

1'-4"

1'-4"
A1

4'-0"

1'-4"
A1 M14 S-509

1'-6"

1'-6"

1'-6"
S-509 S-509
R

1'-6"
A1
S-509
A1
1'-8"

1'-8"

1'-8"
1'-4"
S-509
1'-6" 1'-6" 1'-6"
1'-6"
A11
Q 06 11 00.H2 S-509 06 11 00.H2 06 11 00.H2 06 11 00.H2
A11 A11
A11
S-509 S-509
S-509

0 1' 2' 4' 0 1' 2' 4' 0 1' 2' 4' 0 1' 2' 4'
DECK MODULE 1 DECK MODULE 2 DECK MODULE 3 DECK MODULE 4
N1 N6 N12 N17
N DESIGNER:
SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0"

SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0"
UNIVERSITY OF ILLINOIS
6'-0" GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

36'-0"
2
SEALS:

6'-0"
L 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0"
REFERENCE KEYNOTES

12'-0"
DIVISION 05 - METALS
D1 3 3 3 3 3 3
K S-302
PROJECT:
2 05 05 00 - COMMON WORK RESULTS FOR METALS
US DEPT. OF ENERGY

6'-0"
05 05 23.I1 - 1/2" STEEL PLATE
SOLAR DECATHLON
06 11 00.X1 OCTOBER 1-21 2009
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
J NREL & DOE
06 11 00 - WOOD FRAMING ISSUANCE:
4'-8"

4
06 11 00.F11 - 2X6 JOISTS @ 16" O.C.
BID DOCUMENTS
H
06 11 00.H2 - 2X10 JOISTS
#01 01/15/2009 JJS
06 11 00.L2 - 4X4 POST

DOE REVIEW
4'-8"

4 #02 04/16/2009 JJS


G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
4'-8"

4
F

SHEET KEYNOTES
E 1 DECK MODULE 1 - SEE PLAN DETAIL N1 SHEET S-102
6'-0"

6'-0"
2 2 2 2 2 2 2 2 1 2 2 DECK MODULE 2 - SEE PLAN DETAIL N6 SHEET S-102 INFORMATION:
A1 PROJECT NAME
DECK MODULE 3 - SEE PLAN DETAIL N12 SHEET S-102
S-302 3

12'-0"
SLOPE TO BE 1:25 ON LEVEL GRADE UIUC_SD_2009
D 06 11 00.X1 06 11 00.X1 06 11 00.X1 06 11 00.X1
6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 3'-0" 4 DECK MODULE 4 - SEE PLAN DETAIL N17 SHEET S-102
DRAWING LOCATION
S-108 DECK PLAN.DWG

6'-0"
2
DRAWN BY
C D1
3 3 3 3 3 3
JJS
S-302
CHECKED BY
--
6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0"
B 36'-0"
SHEET:
DECK PLAN
0 2' 4' 8'
DECK PLAN

S-102
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
WOOD JOIST SCHEDULE HANGER SCHEDULE GENERAL SHEET NOTES
MARK MODEL # NOTES

GABLE HOME
1 MAXIMUM PRESSURE ON GRASS TO BE <1500 PSF
MARK LENGTH WIDTH DEPTH NOTES *1 MMLU139 SIMPSON
T US DEPARTMENT OF ENERGY TO LOCATED EDGES OF SOLAR
F1 13'-0" 0'-1 21" 0'-9 41" OPEN WEB JOIST *2 HGLS210-3 SIMPSON 2 ENVELOPE. IF NECESSARY, OWNER TO TRIM VEGETATION TO
REMAIN WITHIN ENVELOPE AT ALL TIMES

F2 13'-0" 0'-1 21" 0'-9 41" BROADSPAN LVL *3 HGLS210-3Z SIMPSON

S *4 HGLS210-3Z SIMPSON 3 ALL WOOD USED FOR PLANTERS TO BE TREATED


F3 13'-6" 0'-1 21" 0'-9 41" TREATED WD.

*5 LUS26Z SIMPSON
F4 4'-1" 0'-1 21" 5 21" TREATED WD. 4 SIDING TO BE PAINTED TO MATCH HOME SIDING

*6 LUS26-2Z SIMPSON ALL RECLAIMED WOOD USED IN CONSTRUCTION TO RECEIVE


R F5 7'-0" 0'-1 1
2" 0'-9 1
4" TREATED WD. 5
PAINT ON ALL SIDES, TWO COATS. ALL HOLES TO BE FILLED
WITH MASTIC PRIOR TO PAINTING. COLOR TO BE SELECTED BY
*7 HUC210-2Z SIMPSON ARCHITECT TO MATCH HOUSE
ALIGN TOP WITH
F6 5'-1 1
2" 0'-1 1
2" 5 1
2" T/F2 *8 MMLU26 SIMPSON
6 FOR PLANTING SCHEDULE AND DETAIL, SEE L-SERIES
Q ALIGN BOTTOM WITH
F7 5'-1 21" 0'-1 21" 5 21"
B/F2

F8 39'-6 21" 0'-1 21" 9 41"

P
F9 44'-6 21" 0'-1 21" 9 41"

F10 12'-4 21" 0'-1 21" 9 41" BROADSPAN LVL


N
REFERENCE KEYNOTES DESIGNER:
UNIVERSITY OF ILLINOIS
F11 7'-4 21" 0'-1 21" 9 41" BROADSPAN LVL GABLE HOME TEAM
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND
COMPOSITES
06 05 23.J28 - HU26 SEALS:

L 06 11 00 - WOOD FRAMING
06 11 00.F3 - 2X6 FRAMING @ 12" 0.C.

06 16 00 - SHEATHING

K 06 16 PROJECT:
- 3/4" PLYWOOD
00.D11
52'-021" US DEPT. OF ENERGY
5'-121" 23'-481" 5'-0" 7'-6" SOLAR DECATHLON
06 17 00 - SHOP-FABRICATED STRUCTURAL WOOD
06 17
OCTOBER 1-21 2009
A1 1 A1 1 1'-1121" 9 1/4" OPEN WEB WOOD JOIST
J 4
S-507 S-507
00.C12
-
NREL & DOE
06 17 13 06 17 00.C12
F9 F11 06 17 13 - 9 1/4" X 1 1/2" LVL
*7 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1
*2
*2 *1 *1 *1 *1 *1
F8 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 F10
*1 *1 *1 *1 *3 *5 *5 *5 *5 *5 *6 *5 *7 ISSUANCE:
F6 F10 F10 F10 F10
BID DOCUMENTS
*8 *8

F10 F10 F10 F10


F6
H
*8 *8 F10
M12 #01 01/15/2009 JJS
F6 S-507

F4

F4

F4

F4

F4

F4

F4
*8 *8

F6 DOE REVIEW
#02 04/16/2009 JJS
*8 *8

*5 *5 *5 *5 *5 *6 *5 *4
F2
*4

F6 F5
G *8 *8
F5
*5 F5
F2 F2
*5 *5 *5 *5 *6 *5

F2
*8
F6
*8 3 2
F2
F10
CONSTRUCTION DOCS
F2
F2 F2 F6
F10
F4 F4 F2 #03 06/01/2009 JJS

13'-6"
F4 F4 F4

4'-521"
*8
F7 *8
F4 F4
F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F4
F F1 F1 F1 F1 F1 M1 F2 F3
F1 F1 F1 F1 F1 *8
F7 S-507 *8 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F5
F2
F2 *4 *5 *5 *5 *5 *5 *6 *5 *4
*8
F7 *8
F5
F5
*5 *5 *5 *5 F5 *5 *6 *5 S-507

E F7 M12
7'-0"

*8 *8

F10
F10 F4 OPP.
F7 F4
INFORMATION:
*8 *8
F4 F4 F4

4'-4"
*8 F7 *8
F4 F4 F4 PROJECT NAME
F10 F10 F10 F10 UIUC_SD_2009
D F7
F10 F10 F10 F10
*7 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *8 F6
F8
*8 *2 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1 *1
F10
*1 *1 *1 *1 *3 *5 *5 *5 *5 *5 *6 *5 *7
DRAWING LOCATION
F9 F11
START 12" O.C. S-103 FLOOR FRAMING PLAN.DWG
A1
A8
1
S-507
1 S-507
SHEET KEYNOTES DRAWN BY
C 39'-621" 5'-0" 7'-6" JJS
1 SPLICE LOCATION - SEE DETAIL S-507
52'-021" CHECKED BY
BEAMS TO BEAR ON INTERIOR FOOTINGS - SHIM AS REQUIRED. NO --
2
POSITIVE ATTACHMENT REQUIRED.

B SHEET:
FLOOR FRAMING
3 PIPE PENETRATION CENTERED IN LVL

0 1'-4" 2'-8" 5'-4" 4


2X FLAT BLOCKING WHERE LAMBOO FRAMES OCCUR. PROVIDE
DIAPHRAM BOUNDARY NAILING @ BLOCKING
PLAN
FLOOR FRAMING PLAN

S-103
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
STRUCTURAL FRAM CONSISTS OF 3-PLY LAMBOO JOISTS WITH

GABLE HOME
AN INTEGRAL SPLICE TO PEN WEB JOIST FRAMIN. 2X4
1 BRIDGING BETWEEN CEILING JOITS TO BE PROVIDED AT 24"
O.C. MAX TO ALLOW FOR INTERIOR FINISH INSTALLATION AS
T REQUIRED.

#2 SPF WOOD TO BE USED IN ALL LOCATIONS THAT ARE NOT


2 SPECIFIED AS LAMBOO. FOR DETAILS, SEE ATTACHED
4'-3" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" SPECIFICATIONS.

ROOF CONSTRUCTION TO BE UL TYPE 436. ROOF CAP TO BE


S BUILT IN SECTIONS AND ASSEMBLED SEPARATELY ON SITE.
3 CONTRACTOR TO PROVIDE A 1" HOLD BACK OF THE
12:12 12:12 12:12
PLYWOOD SHEATHING TO ALLOW FOR VENTILATION OF
3'-6" SLOPE SLOPE SLOPE
RIDGE. SEE ROOF DETAILS.
6

R
7'-0"

12:12 12:12 12:12


SLOPE SLOPE SLOPE
Q

06 16 00.D10 06 11 00.F16
A11

P S-508

N DESIGNER:
UNIVERSITY OF ILLINOIS
0 1'-4" 2'-8" 5'-4" GABLE HOME TEAM
A1
ROOF-CAP FRAMING PLAN 611 LOREDO TAFT DR.
M
REFERENCE KEYNOTES
SCALE: 3/8" = 1'-0"
CHAMPAIGN, IL 61820
SCALE: 3/8" = 1'-0"
SEALS:
DIVISION 05 - METALS

L
05 05 00 - COMMON WORK RESULTS FOR METALS
05 05 23.K1 - SIMPSON CS20 CONTINUOUS COIL STRAP
52'-3"

K
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT:
981" 3'-0" 1'-0" 3'-0" 3'-041" 1'-1134" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 1'-6" 2'-0" 2'-0" 1'-6" 3'-0" 3'-0" 3'-0" 1'-0" 5'-3" 2'-0"
US DEPT. OF ENERGY
06 11 00 - WOOD FRAMING
06 11 00.D6 - 2X4 FRAMING @ 24" O.C.
SOLAR DECATHLON
A12 A12
06 11 00.F16 - 2X6 CEILING JOISTS @ 24" O.C.
OCTOBER 1-21 2009
J S-503 S-503
NREL & DOE
OPP. 2 OPP.
05 05 23.K1 06 17 13 3 06 18 00.01 06 11 00.D6 4 06 16 00.D7 06 11 00.D6 06 11 00.F16
05 05 23.K1 06 16 00 - SHEATHING
ISSUANCE:
1/2" EXTERIOR GRADE PLYWOOD
06 16 00.D7 -
BID DOCUMENTS
1081"

06 16 00.D10 - 5/8" EXTERIOR GRADE PLYWOOD


H #01 01/15/2009 JJS
2'-0"

06 17 00 - SHOP-FABRICATED STRUCTURAL WOOD


06 17 13 - 9 1/4" X 1 1/2" LVL DOE REVIEW
#02 04/16/2009 JJS
G 06 18 00 - GLUED-LAMINATED CONSTRUCTION
06 18 00.01 - 1/2" LAMINATED BAMBOO CONSTRUCTION DOCS
4'-0"

#03 06/01/2009 JJS


1
1
F
13'-6"

1'-0"

F1 A1
S-508 S-508

E
SHEET KEYNOTES
3'-0"

1
DIMENSIONS ARE TO EXT. OF LAMBOO FRAM - GIRTS & 21" INFORMATION:
SHEATHING ADD ADDITIONAL WIDTH PROJECT NAME
PROVIDE DOUBLE LAMBOO FRAME ON EITHER SIDE OF ANY
2 UIUC_SD_2009
D OPENING 6'-0" WIDE OR GREATER
2'-0"

2X4 PURLINS BETWEEN ANY LAMBOO FRAME 3'-0" O.C. SHALL BE DRAWING LOCATION
3 SPACED 2'-0" O.C. AND HUNG WITH APPLICABLE SIMPSON JOIST
S-104 LAMBOO FRAMING PLAN.DWG
HANGERS

4 TYPICAL LAMBOO FRAME


DRAWN BY
1
C 4
JJS
05 05 23.K1 06 17 13 3 06 18 00.01 06 11 00.D6 2 06 16 00.D7 06 11 00.D6 06 11 00.F16 HOLD BACK SHEATHING 1" TO ALLOW FOR VENTING OF RIDGE.
5
ROOF TYPE CONSTRUCTION TO BE UL 436 CHECKED BY
A12 J1 A12
S-503 S-503 S-503 PROVIDE 4' REMOVABLE SECTION OF ROOF CAP WITHOUT --
INSULATION TO ALLOW FOR ON-SITE INSTALLATION OF
6
ELECTRICAL WORK. CONTRACTOR TO COORDINATE WITH
B ELECTRICAL AND MECHANICAL CONTRACTORS. SHEET:
LAMBOO & ROOF
0 1'-4" 2'-8" 5'-4" FRAMING PLAN
LAMBOO FRAMING PLAN

S-104
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
BRACED WALL SCHED./ SHEAR WALL SCHEDULE GENERAL SHEET NOTES
SHEAR WALL PLANS ARE REPRESENTATIVE OF THEIR
PANEL EDGE NAILING (NOTE 1, 3) CAPACITY (PLF)

GABLE HOME
MARK PLY WOOD SHEATHING BLK TOP PL TO FRAMING ABOVE BOTTOM PL TO WOOD BELOW HOLD DOWN EACH END OF WALL RELATIONSHIP TO THE ARCHITECTURAL PLANS. REFER TO
1 A-SERIES FOR EXACT PLACEMENT. DIMENSIONS SHOWN ARE
1 MSTR 48B3 EACH END THE MINIMIMUM BRACED WALL / SHEAR WALL LENGTHS
T BW-A 2" ONE SIDE YES 8d @ 6" O.C. A35 @ 24" O.C. 6d @ 6" O.C. 260#/FT ACCEPTABLE
OF WALL
1 MSTC 66NC EACH
BW-B 2" ONE SIDE YES 8d @ 3" O.C. A35@ 12" O.C. 16d @ 3" O.C. 460#/FT
END OF WALL
S
NOTES:
1. PANEL NAILING TO INTERMEDIATE FRAMING MEMBERS (FIELD NAILING) SHALL BE @ 6" OC.
2. FRAMING AT ADJOINING PANEL EDGES SHALL BE 3" NOMINAL OR WIDER AND NAILS SHALL BE STAGGERED WHERE NAILS ARE SPACED 2 INCHES ON CENTER.
R 3. WHERE PANELS ARE APPLIED ON BOTH FACES OF A WALL AND NAIL SPACING IS LESS THAN 6 INCHES O.C. EITHER SIDE, PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT FRAMING MEMBERS OR FRAMING SHALL BE 3
INCH NOMINAL OR THICKER AND NAILS ON EACH SIDE SHALL BE STAGGERED
4. WHEN FASTENING TO LAMBOO FRAME, SCREW PANELS TO LAMBOO MEMBER WITH A SCREW OF EQUIAVALENT DIAMETER AND PENETRATIONS. USE SPACING AS SHOWN IN THE SCHEDULES.
Q

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

L
REFERENCE KEYNOTES
DIVISION 05 - METALS

K PROJECT:
05 05 00 - COMMON WORK RESULTS FOR METALS
US DEPT. OF ENERGY
05 05 23.K1 - SIMPSON CS20 CONTINUOUS COIL STRAP
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
D16 BID DOCUMENTS
H D16 S-510
#01 01/15/2009 JJS
1 S-510 OPP. D16
14'-0" OPP. 7'-6"
05 05 23.K1 3 S-510
OPP.
DOE REVIEW
#02 04/16/2009 JJS
G BW-A BW-A
3'-0"

3'-0"
BW-A CONSTRUCTION DOCS
3'-058"

BW-B BW-B BW-A


#03 06/01/2009 JJS

6'-0"
F
4
SHEET KEYNOTES
4 4
SIMPSON CS20 CONTINUOUS COIL STRAP - ATTACH TO
1
STRUCTURAL 2X8 FASICIA.

2 STRUCTURAL STEEL TIE-ROD - SEE DETAILS


E
STRUCTUAL 2X8 PLATE - BREAK ONLY WHEN ADJACENT TO THE
3
LOCATION OF TIE ROD OR FLUSH FRAME HEADER INFORMATION:
2 2 2
PROJECT NAME
BW-B
FLUSH FRAME HEADER ACROSS OPENING - STRAP W/ SIMPSON
4 UIUC_SD_2009
D 5
CMSTC 16 OR EQUIV.
DRAWING LOCATION
6'-141"

4
HOLD DOWN EACH END OF WALL. SEE SHEAR WALL SCHEDULE FOR
5 S-106 SHEAR WALL PLAN.DWG
DETAILS (TYP) ALL SHEAR WALLS
BW-A
DRAWN BY
C BW-A
JJS
3'-0"

3'-0"
BW-A
BW-A
CHECKED BY
--

D16
B 3 D16 S-510 SHEET:
4'-6"
SHEAR WALL PLAN
7'-6"
S-510 D16
S-510
0 1'-4" 2'-8" 5'-4"
SHEAR WALL PLAN

S-106
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U A11
S-508
GENERAL SHEET NOTES
THIS SECTION FOR ILLUSTRATIVE PURPOSES ONLY. ALL DETAIL

GABLE HOME
1 DRAWINGS TAKE PRECEDENCE TO THIS SECTION. REFER TO
1 DETAILS SHOWN.

T ARCHITECTURAL FINISHES SHOWN FOR REFERENCE ONLY.


2 2 REFER TO A-SERIES DRAWINGS FOR ANY NON-STRUCTRURAL
COMPONENT

06 11 00.F20

06 18 00.02 REFERENCE KEYNOTES


R
DIVISION 03 - CONCRETE

06 18 00.01 03 31 00 - STRUCTURAL CONCRETE

Q 03 31 00.J6 - 6" CAST-IN-PLACE CONCRETE SLAB

DIVISION 05 - METALS

P A12
05 12 00 - STRUCTURAL STEEL FRAMING

S-502 05 12 00.N99 - WT8X18

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

N DESIGNER:
06 11 00.D6 06 11 00 - WOOD FRAMING
UNIVERSITY OF ILLINOIS
06 11 00.D6 - 2X4 FRAMING @ 24" O.C.
GABLE HOME TEAM
06 11 00.F20 - 2X6 RAFTERS @ 24" O.C.
611 LOREDO TAFT DR.
06 11 00.H1 - 2X10
M CHAMPAIGN, IL 61820
3
06 17 00 - SHOP-FABRICATED STRUCTURAL WOOD
S-510
SEALS:
06 17 00.C12 - 9 1/4" OPEN WEB WOOD JOIST
D9
06 17 13 - 9 1/4" X 1 1/2" LVL
L
06 18 00 - GLUED-LAMINATED CONSTRUCTION
06 18 00.01 - 1/2" LAMINATED BAMBOO

K
06 18 00.02 - 3/4" LAMINATED BAMBOO
PROJECT:
US DEPT. OF ENERGY
A1
SOLAR DECATHLON
S-502 OCTOBER 1-21 2009
J NREL & DOE
06 18 00.02

ISSUANCE:
BID DOCUMENTS
#01 01/15/2009 JJS
H
SHEET KEYNOTES
HOLD BACK PLYWOOD SHEATHING 1" ON EITHER SIDE TO ALLOW
1
FOR ROOF CAP VENTILATION DOE REVIEW
06 11 00.D6
#02 04/16/2009 JJS
2 ROOF CONSTRUCTION TO BE UL TYPE 436
G
STRUCTURAL TIE-ROD AND TURNBUCKLE AS SHOWN ON PLAN.
3
SEE DETAILS AS REQUIRED. CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

M8
S-502

E
06 11 00.H1
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
06 17 00.C12 DRAWING LOCATION
S-301 BUILDING SECTIONS.DWG
06 17 13
DRAWN BY
C JJS
05 12 00.N99
CHECKED BY
--
03 31 00.J6

B SHEET:
N16
S-301 BUILDING SECTIONS
0 6" 1' 2'
STRUCTURAL SECTION

S-301
A1
A
SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
MAXIMUM SLOPED WALKWAY SLOPE TO BE 1:20. SLOPE

GABLE HOME
SHOWN ASSUMES A FLAT SITE. GIVEN SITE CONDITIONS,
1
CONTRACTOR TO CONSTRUCT ADDITIONAL RAMP MODULES
AS REQUIRED TO MAINTAIN MAXIMUM SLOPE OF 1:20
T ALL EXPOSED, RECLAIMED LUMBER TO BE TREATED ON ALL
2
SIDES WITH LINSEED OIL FINISH. REFER TO SPECIFICATIONS

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

L
REFERENCE KEYNOTES
DIVISION 12 - FURNISHINGS

K PROJECT:
12 48 00 - RUGS AND MATS
US DEPT. OF ENERGY
14 48 00.B3 - METAL RAMP END - ADA
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

A11 DOE REVIEW


S-509
#02 04/16/2009 JJS
G A1

CONSTRUCTION DOCS
S-509

1'-5"
14 48 00.B3 1
25
#03 06/01/2009 JJS
1
±0"
F

E
SHEET KEYNOTES
MAXIMUM SLOPE TO BE 1:20. DEPENDING ON SIT CONDITIONS, INFORMATION:
0 2' 4' 8' 1 CONTRACTOR TO CONSTRUCT ADDITIONAL RAMP MODULES AS
PROJECT NAME
RAMP SECTION REQUIRED.
D1 UIUC_SD_2009
D
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0" DRAWING LOCATION


S-302 BUILDING SECTIONS.DWG
A1
3'-3"
A1
S-509 DRAWN BY
C S-509 JJS
1'-5"
CHECKED BY
±0" --

B SHEET:
BUILDING SECTIONS
0 2' 4' 8'
DECK SECTION

S-302
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
N1
U S-501
GENERAL SHEET NOTES

GABLE HOME
1 REFER TO STRUCTURAL CALCULATIONS

REFERENCE KEYNOTES
R
DIVISION 03 - CONCRETE

03 21 00 - REINFORCING STEEL

Q 03 21 00.A1 - #3 REBAR

03 31 00 - STRUCTURAL CONCRETE
03 31 00.P1 - 24" X 24" X 6" FTG.

P
DIVISION 05 - METALS

0 2" 4" 8" 0 2" 4" 8"


FOUNDATION ELEVATION FOUNDATION ELEVATION 05 05 00 - COMMON WORK RESULTS FOR METALS
N1 N16 05 05 23.X1 - (2) 1/2" DIAMETER X 5" LAG BOLT
N DESIGNER:
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" 05 05 23.X2 - 5/8" A153 THREADED ROD ANCHOR
UNIVERSITY OF ILLINOIS
05 05 23.X3 - EYEBOLTS
GABLE HOME TEAM
05 05 29.I10 - 1/4" STEEL PLATE
N16 611 LOREDO TAFT DR.
M S-501 CHAMPAIGN, IL 61820
05 12 00 - STRUCTURAL STEEL FRAMING
05 12 00.N99 - WT8X18
SEALS:
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
L
2'-0"
06 17 00 - SHOP-FABRICATED STRUCTURAL WOOD
06 17 13 - 9 1/4" X 1 1/2" LVL

K PROJECT:
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
US DEPT. OF ENERGY
07 21 00 - THERMAL INSULATION
SOLAR DECATHLON
07 21 00.B4 - 2" RIGID INSULATION
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
#01 01/15/2009 JJS
H
SHEET KEYNOTES
SPLICE OF PERIMETER BEAMS AS SHOWN ON PLAN. ALTERNATE
DOE REVIEW
2'-0"

1
SPLICE LOCATIONS

15 #02 04/16/2009 JJS


2 SEE S-501 FOR BALANCE OF NOTS AND DIMENSIONS
G
BEAM TO SPAN CONTINUOUS OVER 3--4 SUPPORTS MINIMUM AS
3
SHOWN ON PLAN CONSTRUCTION DOCS
0 2" 4" 8"
4 STEEL PLATE 7" X 12" X 41"
#03 06/01/2009 JJS
FOUNDATION ELEVATION
N1 F12
F
SCALE: 3" = 1'-0"
S-501 3
SCALE: 3" = 1'-0" 5 4" X 2 34" OPENING

6 LOCATE AT EACH FOOTING AS SHOWN ON PLAN

(2) 58" A307 THREADED ROD ANCHOR PROVIDE 4" MINIMUM


7
E EMBEDMENT INSTALL PER MFR. ICC REPORT

8 WT TO BE 1' LONG AND LOCATED AT EACH FOOTING


INFORMATION:
0 2" 4" 8"
1
2"
SHIM SPACE UNDER BEAM. BEAM SHOULD HAVE 4" MINIMUM PROJECT NAME
FOUNDATION PLAN 9
D1 CONTINUOUS BEARING ON STEEL T SECTION UIUC_SD_2009
D
SCALE: 1" = 1'-0"

(2) 58"
SCALE: 3" = 1'-0" 10 HOLES TO RECEIVE CONCRETE ANCHOR
DRAWING LOCATION
S-501 FOUNDATION DETAIL.DWG
11 SEE N1 SHEET S-501 FOR BALANCE OF NOTS AND DIMENSIONS

30" X 30" X 2" FOAMULAR 250 RIGID INSULATION FOR VERTICAL


DRAWN BY
C 12 ADJUSTMENT. CUT AS REQUIRED. UP TO 18" VERTICAL CHANGE JS
PERMITTED.
CHECKED BY
13 STANDARD HOLES FOR 34" BOLT
--

14 STANDARD HOLES FOR 58" BOLT


B SHEET:
IMPORTED FILL TO BE USED FOR MINOR LEVELING. ALL MATERIAL
SHALL BE RESTRAINED AT ALL TIME BY LANDSCAPE FABRIC,
FOUNDATION
0 2" 4" 8" . 15
WHOSE EDGES SHALL BE FOLDED OVER THE FILL AND REMAIN
BENEATH THE FOOTING. AFTER DECONSTRUCTION, FABRIC AND
DETAIL
SHIM PLATE DETAIL

S-501
A12 ALL FILL TO BE REMOVED FROM THE NATIONAL MALL AND
A
SCALE: 3" = 1'-0"
DISPOSED OF PROPERLY BY THE ILLINIOS TEAM
SCALE: 3" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
06 05 23.X3

GABLE HOME
1 2

06 16 00.D6 6
T
06 05 23.T7 06 18 00.02

06 05 23.F1
06 17 00.C12
S 3

06 17 13

06 05 23.T8 4

R 06 11 00.H1

5
Q
10 12

P
REFERENCE KEYNOTES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

N DESIGNER:
06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND
COMPOSITES UNIVERSITY OF ILLINOIS
0 2" 4" 8" 0 2" 4" 8" 0 2" 4" 8" 06 05 23.F1 - A34 GABLE HOME TEAM
M1
TYPICAL BUILT-UP LVL BEAM @ JOIST BEARING
M8
FRAMING BASE DETAIL
M15
HURRICANE STRAP DETAIL 06 05 23.T7 - SIMPSON JOIST HANGER 611 LOREDO TAFT DR.
M
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"
06 05 23.T8 - SIMPSON SDS 1/4" X 3 1/2" SCREWS CHAMPAIGN, IL 61820
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
06 05 23.T9 - #6 WOOD SCREW
06 05
- #8 WOOD SCREWS (.164" DIAM)
SEALS:
23.T10
06 05 23.X3 - SIMPSON H6 HURRICANE TIE
L
06 11 00 - WOOD FRAMING
06 11 00.D6 - 2X4 FRAMING @ 24" O.C.

K
06 11 00.H1 - 2X10
PROJECT:

06 16 00 - SHEATHING
US DEPT. OF ENERGY
06 16 00.D6 - 1/2" PLYWOOD
SOLAR DECATHLON
(2) 06 18 00.01
OCTOBER 1-21 2009
J 06 17 00 - SHOP-FABRICATED STRUCTURAL WOOD
NREL & DOE
06 17
00.C12
- 9 1/4" OPEN WEB WOOD JOIST ISSUANCE:
7 06 17 13 - 9 1/4" X 1 1/2" LVL BID DOCUMENTS
H #01 01/15/2009 JJS
06 18 00 - GLUED-LAMINATED CONSTRUCTION
06 05 23.T10 06 18 00.01 - 1/2" LAMINATED BAMBOO
DOE REVIEW
06 18 00.02 - 3/4" LAMINATED BAMBOO
#02 04/16/2009 JJS
G
SHEET KEYNOTES
CONSTRUCTION DOCS
1 DIAPHRAM BOUNDARY NAILING PER PLAN
#03 06/01/2009 JJS
2 SHEATHING PER BRACED WALL LINE SCHEDULE
F
3 BOTTOM PLATE NAILING PER BRACED WALL LINE SCHEDULE
06 18 00.02
NAIL CONTINUOUS 2X10 BOTTOM PLATE TO EACH JOIST WITH (2)
4
16d
E 5 FASTENER AND SPACING PER BRACED WALL LINE SCHEDULE
06 18 00.02
06 05 23.T9 PROVIDE AT EACH LAMBOO MEMBER. WHERE FRAMES ARE INFORMATION:
(2) 06 18 00.01 6 DOUBLED UP AT LARGE OPENINGS, PROVIDE TWO (2) HURRICANE PROJECT NAME
STRAPS - ONE EACH SIDE
11 UIUC_SD_2009
D 06 05 23.T10 7
(3X5) ARRAY WOOD SCREWS - #8 ROLLED THREAD (.164" DIAM.)
EVENLY SPACED (15 TOTAL)
DRAWING LOCATION
06 11 00.D6
8 GIRTS TO LAP VERTICALLY AS REQUIRED S-502 FLOOR JOIST AND LAMBOO
9 DETAIL.DWG

9
(4X4) ARRAY #8 ROLLED THREAD (0.164" DIAM) WOOD SCREWS DRAWN BY
EVENLY SPACED (16 TOTAL)
C JJS
WHERE A "LAMBOO FRAME" BEARS ON LAPPED MEMBERS, PROVIDE
10 (6) 41" X 3 21" SIMPSON SDS SCREWS - THREE EACH SIDE OF LAMBOO CHECKED BY
FRAME
--
2X4 GIRTS AT 24" O.C. VERTICALLY - ATTACHE (2) #6 WOOD

B
11 SCREWS @ EACH VERT. LAMBOO MEMBER. (MIN 1 21" EMBED INTO SHEET:
LAMBOO - USE PRE-DRILLED HOLES)
8
FOR BALANCE OF NOTES AND DIMENSIONS, SEE TYP. BUILT UP LVL
FLOOR JOIST AND
12
0 2" 4" 8" 0 2" 4" 8" DETAIL
LAMBOO DETAIL
WALL TO CEILING DETAIL RAFTER DETAIL

S-502
A1 A12
A
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
T

(4) 06 18 00.01
1

S
06 018 00.A7

06 05 23.F2
R 2

06 11 00.G16
06 11 00.A1

Q
3

06 16 00.D8
06 05 23.A9

P
(2) 06 18 00.02
06 11 00.F2

N 4 REFERENCE KEYNOTES DESIGNER:


UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
DIVISION 05 - METALS
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
05 05 00 - COMMON WORK RESULTS FOR METALS
05 05 23.K1 - SIMPSON CS20 CONTINUOUS COIL STRAP
SEALS:
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
L
06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND
COMPOSITES
06 05 23.A9 - 10 PENNY NAIL

K 06 05 23.F2 - A35 PROJECT:


06 05 23.X4 - SIMPSON L390 US DEPT. OF ENERGY
0 4" 8" 1'-4" 0 4" 8" 1'-4" SOLAR DECATHLON
J1
HEADER CONNECTION DETAIL
J12
DOUBLE FRAME DETAIL 06 11 00 - WOOD FRAMING OCTOBER 1-21 2009
J SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"
06 11 00.A1 - BLOCKING NREL & DOE
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" 06 11 00.A2 - WOOD BLOCKING AS REQUIRED
06 11 00.F2 - 2X6 FRAMING ISSUANCE:
06 11 00.G16 - TRPL. 2X8 HEADER BID DOCUMENTS
H #01 01/15/2009 JJS
06 16 00 - SHEATHING

06 11 00.A2 06 16 00.D8 - 5/8" PLYWOOD


DOE REVIEW
#02 04/16/2009 JJS
G 06 18 00.01 06 18 00 - GLUED-LAMINATED CONSTRUCTION
06 18 00.01 - 1/2" LAMINATED BAMBOO
06 18 00.02 - 3/4" LAMINATED BAMBOO
CONSTRUCTION DOCS
06 05 23.X4
06 018 00.A7 - 1.75 X 9.25 MICROLAM PLATE #03 06/01/2009 JJS
F
06 11 00.A1

06 05 23.X4

E SHEET KEYNOTES
05 05 23.K1 1
DOUBLE UP LAMBOO FRAMES AT ENDS OF WINDOWS 6'-0" OR INFORMATION:
GREATER. SEE DETAIL
PROJECT NAME
2 SIMPSON A35 CONNECTION TOP & BOTTOM (4 TOTAL) UIUC_SD_2009
D
06 018 00.A7 06 018 00.A7
3 10d NAILS - 2 PER ROW - SPACE NAILS AT 6" O.C.
DRAWING LOCATION
S-503 DOUBLE LAMBOO AND
1 WINDOW HEAD DETAIL.DWG
4 2X6 FOR HEADER BEARING NAIL TO LAMBOO FRAME AT POINTS
3
DRAWN BY
C 06 11 00.G16 JJS

CHECKED BY
-

B SHEET:
DOUBLE LAMBOO
0 4" 8" 1'-4" 0 4" 8" 1'-4" AND WINDOW HEAD
ROOF MEMBER BEARING DETAIL - SIDE VIEW ROOF MEMBER BEARING DETAIL (@ WINDOW HEADER_ SECTION
DETAIL

S-503
A1 A12
A
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
5
816 "
841"

GABLE HOME
285"
1 USE 10d NAILS @ 6" O.C. FOR ALL DOUBLE FRAMES

1
4"
"
3
216
5
T 2

1058" 1'-221"

1085"
LAMBOO FRAME SCHEDULE

1085"

1'-221"
R

06 18 00.02
06 18 00.02

Q MARK THICKNESS QTY REMARKS 07 21 00.B7

4'-1078"
7'-381"

8'-0"
8'-0"

8'-0"

7'-11"
P
3
1

7'-583"
4" 28 -

15
4'-816 "
07 21 00.B7

"

"
15
4'-816

6'-616

4'-1"
6'-6"
3
06 18 00.02
1 07 21 00.B7
2 2" 60 -
N REFERENCE KEYNOTES DESIGNER:
UNIVERSITY OF ILLINOIS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES GABLE HOME TEAM
611 LOREDO TAFT DR.
3
3 4" 36 -

M 06 11 00 - WOOD FRAMING CHAMPAIGN, IL 61820

11
916"
06 11 00.A2 - WOOD BLOCKING AS REQUIRED
1
SEALS:

1"
4 2" 60 -
06 18 00 - GLUED-LAMINATED CONSTRUCTION
1058"
L 06 18 00.01 - 1/2" LAMINATED BAMBOO

1'-221"
06 18 00.02 - 3/4" LAMINATED BAMBOO

1058"
3
5 4" 28 -
1
416 " DIVISION 07 - THERMAL AND MOISTURE PROTECTION
K 941" 1058" 941" PROJECT:
1085"
1
07 21 00 - THERMAL INSULATION US DEPT. OF ENERGY
6 2"
SOLAR DECATHLON
8 -
1 2 3 4 5 6 07 21 00.B7 - 3/4" RIGID INSULATION

OCTOBER 1-21 2009


J NREL & DOE
ISSUANCE:
0 6" 1' 2'
LAMBOO FRAME TYPES BID DOCUMENTS
H10
H
SCALE: 1" = 1''0"
#01 01/15/2009 JJS
SCALE: 1" = 1'-0" SHEET KEYNOTES
6" 6" 6" 6" 6" 6" 6" 6"
1 3
4" RIGID INSULATION BETWEEN 1X4 BLOCKING CLUED AT BOTTOM DOE REVIEW
A12 12
A12 S-502 A12 S-502
3
#02 04/16/2009 JJS
2 4" RIGID INSULATION BETWEEN 1X2 BLOCKING GLUED AT TOP
G S-502 S-502
1'-10"

CONSTRUCTION DOCS

3"
(2) 06 18 00.01 3 (2) 06 18 00.01 3 3 DOUBLE LAMBOO FRAME BEYOND
07 21 00.B7 07 21 00.B7

3"
07 21 00.B7
06 18 00.02
07 21 00.B7
06 18 00.02 #03 06/01/2009 JJS
06 11 00.A2 2 06 11 00.A2 2
2 2 4 2 6 4
F 06 11 00.A2
(2) 06 18 00.01
06 11 00.A2
(2) 06 18 00.01
1 1
1 1

A1 A1
S-502 D9
E S-502 S-502 M16
10'-958"

10'-958"

6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6"

6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6"
A1 S-510
S-510
M16
S-510 INFORMATION:
06 18 00.02
3
PROJECT NAME
UIUC_SD_2009
D 1 5 5
DRAWING LOCATION
S-504 TYPICAL LAMBOO
06 18 00.02 06 18 00.02 DETAILS.DWG
DRAWN BY
C JJS

13'-6" 13'-6" 3" 3" 3" 3" CHECKED BY


--

B SHEET:
TYPICAL LAMBOO
0 1'-4" 2'-8" 5'-4" 0 1'-4" 2'-8" 5'-4" 0 1'-4" 2'-8" 5'-4" DETAILS
TYPICAL LAMBOO FRAME LAMBOO FRAME @ WINDOW SCALE: 3/8" = 1'-0"

S-504
A1 A8 A15
A
SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0" DOUBLE LAMBOO FRAME NAILING

SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1 REFER TO STRUCTURAL CALCULATIONS

GABLE HOME
16
REFERENCE KEYNOTES
T
8
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
16
6
1 06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND
COMPOSITES
S 5
06 16 00.D1 15 06 05
- 8 PENNY NAIL
23.A7

06 16 00.D1 06 11 00 - WOOD FRAMING


06 11
R 06 05 23.A7 18 00.H2
- 2X10 JOISTS
9

06 16 00 - SHEATHING
2
06 16
- PLYWOOD SHEATHING
Q 17 00.D1

06 17 00 - SHOP-FABRICATED STRUCTURAL WOOD


3 10 06 17 13 - 9 1/4" X 1 1/2" LVL
06 05 23.A7
P
06 18 00 - GLUED-LAMINATED CONSTRUCTION
11
06 18
- 3/4" LAMINATED BAMBOO
00.02
4

N
06 11 00.H2

5 12 13
14 SHEET KEYNOTES DESIGNER:
1 DIAPHRAM BOUNDARY UNIVERSITY OF ILLINOIS
7
GABLE HOME TEAM
PROVIDE BLOCKING @ ALL PANEL EDGES WHERE DIAPHRAMS ARE
M1
DIAPHRAM NAILING
M11
DIAPHRAM NAILING 2
SPECIFIED TO BE BLOCKED ON PLAN 611 LOREDO TAFT DR.
M
SCALE: NTS SCALE: NTS

3 CONT. PANEL JOINTS - PROVIDE BOUNDARY NAIL


CHAMPAIGN, IL 61820

4 NAILING TO INTERMEDIATE FRAMING MEMEBER, 8d AT 12" O.C. SEALS:

5 PLYWOOD PANEL EDGE


L
NAILING TO PLYWOOD PANEL EDGES & DIAPHRAM BOUNDARY PER
6
PLAN (8d @ 6" MIN)
DRAG STRUTS, BEARING WALL AND SHEAR WALL INTERSECTIONS
7
SHALL BE CONSIDERED DIAPHRAM BOUNDARIES, TYPICAL
K PROJECT:
8 PROVIDE NAILING EDGE AT PL, TYPICAL
US DEPT. OF ENERGY
9 PLYWOOD MAY BE EITHER VER. OR HORIZONTAL SOLAR DECATHLON
OCTOBER 1-21 2009
J 10 NAILING TO INTERMEDIATE FRAMING MEMBERS
NREL & DOE
16

8
11 NAILING TO PANEL EDGES
ISSUANCE:
22
12 CONT. SILL PLATE
BID DOCUMENTS
H
1 23 06 18 00.02
16 #01 01/15/2009 JJS
13 EDGE NAILING AT ALL JAMB, CORNER & WALL END MEMBERS

5 15
14 ANCHOR BOLT DOE REVIEW
10 #02 04/16/2009 JJS
G 15 DOUBLE TOP PLATE

16 BLK OR RIM JOIST CONSTRUCTION DOCS


06 16 00.D1
#03 06/01/2009 JJS
17 OPENING
9
F 13
18 HEADER

21 19 2X4 CROSS BLOCKING, SEE PLAN

FLOOR DRM SHEATHING SHALL BE 34" PLYWD WITH A PANEL NDEX RATING OF 24/0
E 24
NAIL DIAPHRAM AS FOLLOWS:
20
06 17 13 10d @ 6" O.C. @ SUPPORTED PANEL EDGES & BOUNDARIES
10d @ 12" O.C. @ INTERMEDIATE FRAMING MEMBERS INFORMATION:
19
21 NAILING TO INTERMEDIATE FRAMING MEMBERS
PROJECT NAME
25 UIUC_SD_2009
D 06 11 00.H2 27
22 PLYWOOD PANEL EDGES AND DIAPHRAM BOUNDARY NAILING DRAWING LOCATION
5
14 S-505 BRACED WALL DETL. AND
23 BOUNDARY NAILING @ CROSS BLOCKING WHERE SHOWN ON PLAN SCHEDULE.DWG
7 DRAWN BY
C 24 NAILING TO PANEL EDGE, SEE NOTE 4 OF SCHEDULE, SHEET ......
JJS

20 26 25
SHEAR WALL INFILL STUD FRAMING BETWEEN LAMBOO STUDS CHECKED BY
SHALL BE A MINIMUM OF 2X4 SPACED AT 24" O.C. MAX
--
WALL DIAPHRAM SHEATHING SHALL BE 21" PLYWOOD WITH A PANEL
INDEX RATING OF 24
B 26
0
NAIL DIAPHRAM AS FOLLOWS (UNLESS NOTED OTHERWISE):
SHEET:
8d @ 6" O.C. @ SUPPORTED PANEL EDGES & BOUNDARIES
8d @ 12" O.C. @ INTERMEDIATE FRAMING MEMBERS
BRACED WALL
DETL. AND
TYPICAL SHEAR FLOOR / BRACED FLOOR LINE SHEAR WALL / BRACED WALL LINE 27 MUD SILL
SCHEDULE

S-505
A1 A12
A
SCALE: NTS SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U EXTERIOR WALL,
PARTY WALLS,
INTERIOR
NON-LOAD
TYPICAL NAILING SCHEDULE GENERAL SHEET NOTES
BEARING WALLS BEARING WALLS R602.6 Drilling and notching-studs.
STUD CONNECTION NAILING *a,b,c,d

GABLE HOME
W W SIZE Drilling and notching of studs shall be in accordance with the following:
dn MAX dh MAX dn MAX dh MAX 1. Notching. Any stud in an exterior wall or bearing partition may be cut or
JOIST TO SILL OR GIRDER, TOENAIL (3) 8d notched to a depth not exceeding 25 percent of its width. Studs in nonbearing
7 3 3
2x4 8" 1 8" 1 8" 2" partitions may be notched to a depth not to exceed 40 percent of a single stud
T 7
2x6 3 1 1 1
1" x 6" SUBFLOOR OR LESS TO EACH JOINT, FACE NAIL (2) 8d, 2 STAPLES, 1 3 4" width.
1 8" 2 8" 2 8" 3 4" 1 2. Drilling. Any stud may be bored or drilled, provided that the diameter of the
(2) 16d resulting hole is no more than 60 percent of the stud width, the edge of the hole
3 7 7 1
2x8 1 4" 2 8" 2 8" 4 4" is no more than 5/8 inch (16 mm) to the edge of the stud, and the hole is not
SOLE PLATE TO JOIST OR BLOCKING, FACE NAIL 16d @ 16" O.C. located in the same section as a cut or notch. Studs located in exterior walls or
bearing partitions drilled over 40 percent and up to 60 percent shall also be
1 dn - DEPTH OF NOTCH TOP OR SOLE PLATE TO STUD, END NAIL (2) 16d doubled with no more than two successive doubled studs bored. See Figures
S dh - DIAMETER OF HOLE R602.6(1) and R602.6(2).
STUD TO SOLE PLATE, TOE NAIL (3) 8d OR (2) 16d

MAX
L/3
06 11 00.D7 NOTES:
DOUBLE STUDS, FACE NAIL 10d @ 24" O.C.
1. MAXIMUM OF 2 PENETRATIONS PER STUD. NO MORE THAN 5
CONSECUTIVE STUDS WITH PENETRATIONS. DOUBLE TOP PLATE, FACE NAIL 10d @ 24" O.C.

R 2 2. SEE SCHEDULE FOR MAXIMUM PENETRATION SIZES. (3) 16d @ 16" O.C.
DOUBLE TOP PLATES, MINIMUM 24" OFFSET OF END

NO NOTCHES
5 5
dn MAX 8" MIN 8" MIN (8) 16d

OR HOLES
3. STUD PACKS OR POSTS SHALL NOT BE PENETRATED BY A CUT, JOINTS, FACE NAIL IN LAPPED AREA
06 11 00.D7 NOTCH OR HOLE WITHOUT VERIFYING WITH ENGINEER. BLOCKING BETWEEN JOISTS OR RAFTERS

L
(3) 8d
TO TOP PLATE, TOE NAIL
4. BORED HOLES SHALL NOT BE LOCATED AT THE SAME SECTION OF A
RIM JOIST TO TOP PLATE, TOE NAIL 8d @ 6" O.C.
Q

3" MAX
STUD AS A CUT OR NOTCH.
TOP PLATES, LAPS AT CORNERS AND INTERSECTIONS,
4 (2) 10d
5. WHERE PLUMBING, HEATING OR OTHER PIPES ARE PLACED IN OR FACE NAIL
2 1
PARTLY IN A PARTITION, NECESSITATING THE CUTTING OF SOLES OR BUILT-UP HEADER, TWO PIECES WITH 2" SPACER 16d @ 16" O.C. ALONG EACH EDGE
1
PLATES. A METAL TIE NOT LESS THAN 16 Ga. GALVANIZED AND 1 2"
WIDE SHALL BE FASTENED TO EACH PLATE ACROSS AND TO EACH SIDE CONTINUED HEADER, TWO PIECES (3) 8d
P OF THE OPENING WITH NOT LESS THAN SIX 16d NAILS.
CONTINUOUS HEADER TO STUD, TOE NAIL (4) 8d
3
MAX
L/3

W - dn MAX
CEILING JOIST, LAPS OVER PARTITIONS, FACE NAIL (3) 10d

CEILING JOIST TO PARALLEL RAFTERS, FACE NAIL (3) 10d

N RAFTER TO PLATE, TOE NAIL (2) 16d DESIGNER:


7 1" BRACE TO EACH STUD AND PLATE, FACE NAIL (2) 8d, 2 STAPLES, 1 3 4" UNIVERSITY OF ILLINOIS
1"x6" SHEATHING TO EACH BEARING, FACE NAIL (2) 8d, 2 STAPLES, 1 3 4"
GABLE HOME TEAM
611 LOREDO TAFT DR.
1"x8" SHEATHING TO EACH BEARING, FACE NAIL (2) 8d, 3 STAPLES, 1 3 4"
M WIDER THAN 1"x8" SHEATHING TO EACH CHAMPAIGN, IL 61820
BEARING, FACE NAIL (3) 8d, 4 STAPLES, 1 3 4"
10d, NAIL EACH LAYER @ 32" O.C.
BUILT-UP GIRDERS AND BEAMS, 2" LUMBER LAYERS TOP AND BOTTOM STAGGERED. SEALS:
SPACING OF NOTCHES OR HOLES CUTS & NOTCHES BORED HOLES TWO NAILS AT ENDS AND AT
L1 L5 L8 EACH SPLICE
L
SCALE: NTS SCALE: NTS SCALE: NTS
BUILT-UP CORNER STUDS 10d @ 24" O.C.

(2) 16d AT EACH BEARING


REFERENCE KEYNOTES
5
ROOF RAFTERS TO RIDGE, VALLEY OR HIP RAFTERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

K 4' -0" MIN LAP TOE NAIL (4) 16d PROJECT:


9
FACE NAIL (3) 16d 06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND US DEPT. OF ENERGY
COMPOSITES
DESCRIPTION OF
DESCRIPTION OF FASTENER
SPACING INTERMEDIATE SOLAR DECATHLON
06 05 23.A7 - 8 PENNY NAIL
OCTOBER 1-21 2009
BUILDING EDGES (INCHES) SUPPORTS
*b,c,d,e
MATERIALS *i (INCHES) *c,e
06 05 23.A11 - 16 PENNY NAIL
J WOOD STRUCTURAL PANELS, SUBFLOOR, ROOF AND WALL SHEATHING NREL & DOE
5
16" - 12" TO FRAMING, AND PARTICLEBOARD WALL SHEATHING TO FRAMING
6
19
32" - 1"
6d COMMON NAIL (SUBFLOOR, WALL)
6 12 *g
06 11 00 - WOOD FRAMING
ISSUANCE:
8d COMMON NAIL (ROOF) *f 06 11 00.D7 - 2X4 STUDS
BID DOCUMENTS
118" - 114" 12 *g
SHEET KEYNOTES
8d COMMON NAIL 6
H
8 #01 01/15/2009 JJS
10d COMMON NAIL OR 8d DEFORMED 6 12

OTHER WALL SHEATHING


1
2"REGULAR
CELLULOSIC *h
1 4d MAX (MIN) DOE REVIEW
FIBERBOARD-
112" GALVANIZED ROOFING NAIL 6d
#02 04/16/2009 JJS
SHEATHING 3 6 2 HOLE OR NOTCH TYPE PEN
G COMMON NAIL STAPLE 16 ga., 1 12
LONG
1
2" STRUCTURAL
112" GALVANIZED ROOFING NAIL 8d 3 4dn MAX (MIN SPC) CONSTRUCTION DOCS
(4) 06 05 23.A11 MIN. 3 6
#03 06/01/2009 JJS
14 CELLULOSIC
COMMON NAIL STAPLE 16 ga., 1 12
FIBERBOARD-
LONG EXT WALL,S PARTY WALLS & BRG WALLS, PROVIDE SIMPSON STUD
SHEATHING 4
SHOES
F
25
32" STRUCTURAL 13 4" GALVANIZED ROOFING NAIL 8d 3 6
CELLULOSIC
SCHEDULE NOTES CONTINUED COMMON NAIL STAPLE 16 ga., 1 3 4"
FIBERBOARD- 5 PLATES NAILED ELSEWHERE WITH 16d @ 12" O.C. STAGGERED
LONG
SHEATHING
C. NAILS SHALL BE SPACED AT NOT MORE THAN 6 INCHES ON CENTER AT ALL SUPPORTS WHERE SPANS ARE 48 OR 1
2" GYPSUM 112" GALVANIZED ROOFING NAIL 8d; 8
GREATER. 4
12 SHEATHING 6d COMMON NAIL; STAPLE GALVANIZED, 6 SPLICE TO OCCUR OVER STUD (TYP)
E D. FOUR FOOT BY 8 FOOT OR 4 FOOT BY 9 FOOT PANELS SHALL BE APPLIED VERTICALLY.
112" LONG; 114" SCREWS, TYPE W OR S
5
8" GYPSUM 13 4" GALVANIZED ROOFING NAIL; 4 8 7 SEE NOTES
06 05 23.A11
E. SPACING OF FASTENERS NOT INCLUDED IN THIS TABLE SHALL BE BASED ON TABLE R602.3 (1). SHEATHING 8d COMMON NAIL; STAPLE GALVANIZED, INFORMATION:
158" LONG; 158" SCREWS, TYPE W OR S
F. FOR REGIONS HAVING BASIC WIND SPEED OF 110 MPH OR GREATER, 8D DEFORMED NAILS SHALL BE USED FOR 8 DOUBLE 2X TOP PLATE
PROJECT NAME
13 ATTACHING PLYWOOD AND WOOD STRUCTURAL PANEL ROOF SHEATHING TO FRAMING WITHIN MINIMUM 48 INCH
WOOD STRUCTURAL PANELS, COMBINATION SUBFLOOR UNDERLAYMENT UIUC_SD_2009
D DISTANCE FROM GABLE END WALLS, IF MEAN ROOF HEIGHT IT MORE THAN 25 FEET, UP TO 35 FEET MAXIMUM.
3
4" AND LESS
TO FRAMING NAIL TOP PLATE TO LOWER PLATE W/ (2) ROWS 16d NAILS @ 4"
10
(2) 06 05 23.A7
G. FOR REGIONS HAVING BASIC WIND SPEED OF 100 MPH OR LESS, NAILS FOR ATTACHING WOOD STRUCTURAL PANEL
9
O.C. (16 TOTAL NAILS) DRAWING LOCATION
7
ROOF SHEATHING TO GABLE END WALL FRAMING SHALL BE SPACED 6 INCHES ON CENTER. WHEN BASIC WIND SPEED 8" - 1" 6d DEFORMED NAIL; 8d COMMON NAIL 6 12 S-506 TYPICAL DETAILS.DWG
IS GREATER THAN 100 MPH, NAILS FOR ATTACHING PANEL ROOF SHEATHING TO INTERMEDIATE SUPPORTS SHALL BE 10 NAILS AT 12" O.C. EACH STUD
SPACED 6 INCHES ON CENTER FOR MINIMUM 48 INCH DISTANCE FROM RIDGES, EAVES AND GABLE END WALLS; AND 4
118" - 114" 8d DEFORMED NAIL; 8d COMMON NAIL 6 12 DRAWN BY
C
INCHES ON CENTER TO GABLE END WALL FRAMING.
6d DEFORMED NAIL; 10d COMMON NAIL 6 12 PROVIDE (1) KING STUD AT OPENINGS LESS THAN 6'-0"
06 11 00.D7 (2) 06 11 00.D7 JJS
11 PROVIDE (2) KING STUDS AT OPENINGS GREATER THAN 6'-0" AND
H. GYPSUM SHEATHING SHALL CONFORM TO ASTM C 79 AND SHALL BE INSTALLED IN ACCORDANCE WITH GA 253.
FIBERBOARD SHEATHING SHALL CONFORM TO EITHER AHA 194.1 OR ASTM C 208.
SCHEDULE NOTES: LESS THAN 12'-0" CHECKED BY
A. ALL NAILS ARE SMOOTH-COMMON, BOX OR DEFORMED SHANKS EXCEPT WHERE OTHERWISE STATED. NAILS --
I. SPACING OF FASTENERS ON FLOOR SHEATHING PANEL EDGES APPLIES TO PANEL EDGES SUPPORTED BY FRAMING 12 TOE NAIL TO EACH STUD
USED FOR FRAMING AND SHEATHING CONNECTIONS SHALL HAVE MINIMUM AVERAGE BENDING YIELD STRENGTHS
SHEET:
MEMBERS AND AT ALL FLOOR PERIMETERS ONLY. SPACING OF FASTENERS ON ROOF SHEATHING PANEL EDGES
B APPLIES TO PANEL EDGES SUPPORTED BY FRAMING MEMBERS AND AT ALL ROOF PLANE PERIMETERS. BLOCKING OF
AS SHOWN; 80 KSI (551 MPA) FOR SHANK DIAMETER OF 0.192 INCH (20D COMMON NAIL), 90 KSI (620 MPA) FOR

TYPICAL DETAILS
SHANK DIAMETERS LARGER THAN 0.142 INCH BUT NOT LARGER THAN 0.177 INCH, AND 100 KSI (689 MPA) FOR
ROOF OR FLOOR SHEATHING PANEL EDGES PERPENDICULAR TO THE FRAMING MEMBERS SHALL NOT BE REQUIRED 13 HEADER PER PLAN
11 SHANK DIAMETERS OF 0.142 INCH OR LESS.
EXCEPT AT INTERSECTION OF ADJACENT ROOF PLANES. FLOOR AND ROOF PERIMETER SHALL BE SUPPORTED BY
FRAMING MEMBERS OR SOLID BLOCKING.
B. STAPLES ARE 16 GAUGE WIRES AND HAVE A MINIMUM OF 7/16 INCH ON DIAMETER CROWN WIDTH. 14 CONTINUOUS DBL TOP PLATE
SCALE: NTS

S-506
A1
A
TYP. HEADER & SPICE DETAILS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
1 REFER TO STRUCTURAL CALCULATIONS

1
S
06 16 00.D11
06 11 00.F10

Q 2

06 11 00.F10
4

3
P
06 05 23.J28

N 12
REFERENCE KEYNOTES DESIGNER:
UNIVERSITY OF ILLINOIS
0 4" 8" 1'-4" 0 4" 8" 1'-4" GABLE HOME TEAM
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
M1
BATHROOM - HALL ELEVATION CHANGE
M12
CORNER JOIST DETAIL 611 LOREDO TAFT DR.
M
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"
CHAMPAIGN, IL 61820
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" 06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND
COMPOSITES
06 05 SEALS:
- HU26
23.J28
06 05 23.X5 - SIMPSON LGU HIGH CAPACITY GIRDER HANGER
L
06 05 23.X6 - SIMPSON MSTC PRE-BENT STRAP

06 11 00 - WOOD FRAMING

K
06 11
- 2X6 JOISTS @ 12" O.C. PROJECT:
00.F10
US DEPT. OF ENERGY
6 06 16 00 - SHEATHING SOLAR DECATHLON
06 16
- 3/4" PLYWOOD OCTOBER 1-21 2009
00.D11
J NREL & DOE
11 06 17 00 - SHOP-FABRICATED STRUCTURAL WOOD ISSUANCE:
06 17 13 - 9 1/4" X 1 1/2" LVL BID DOCUMENTS
H #01 01/15/2009 JJS
10
DOE REVIEW
#02 04/16/2009 JJS
G 7
06 05 23.X6 SHEET KEYNOTES
CONSTRUCTION DOCS
1 RECESSED FLOOR AREA FOR STAINLESS STEEL TRAY - SEE A-SERIES
#03 06/01/2009 JJS
ALIGN SPECIFIED WOOD MEMBERS WITH TOP OF ADJACENT LVL
2
F 06 17 13
MEMBERS
ALIGN SPECIFIED WOOD MEMBERS TO ACCEPT SLOPED STAINLESS
3 STEEL TRAY SERIES. SEE A-SERIES FOR EXACT HEIGHT AND
LOCATION

4 BEAM AND HANGER PER PLAN


E
9 5 BEAM BEYOND
INFORMATION:
8
6
FOUNDATION BELOW - SEE DETAIL S-501 FOR BALANCE OF NOTES
AND DRAWINGS
PROJECT NAME
UIUC_SD_2009
D 7 DBL LVL TREATED
06 05 23.X5
DRAWING LOCATION
8 PROVIDE 4" MINIMUM BEARING ON SHIM S-507 CONNECTION DETAILS.DWG

9
SPECIFIED GIRDER HANGER ON EACH FACE OF BEAM UNDER SHEAR DRAWN BY
C WALLS AT GRIDS C & H
JJS

10 SPECIFIED STRAP HOLD DOWN PER BRACED WALL SCHEDULE CHECKED BY


--
11 DBL STUD @ EACH END OF SHEAR WALL

B SIMPSON FACE MOUNT HANGERS (TYP)


SHEET:
12
CONNECTION
0 4" 8" 1'-4" 0 4" 8" 1'-4" DETAILS
SPLICE DETAIL SHEAR WALL BASE DETAIL

S-507
A1 A12
A
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U 1 2'-0" GENERAL SHEET NOTES
3"

GABLE HOME
1 REFER TO STRUCTURAL CALCULATIONS

3"
06 11 00.A2
T
2
06 05 23.A7
12 REFERENCE KEYNOTES
06 18 00.01 06 16 00.D7
DIVISION 03 - CONCRETE
06 11 00.A2
S

2'-0"
48 14 13.16A
03 15 00 - CONCRETE ACCESSORIES
6
03 15 00.A2 - BULB SERRATED
06 18 00.02
06 11 00.D6
20 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
R
06 16 00.D7 17 06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND
COMPOSITES
06 05 23.A7 - 8 PENNY NAIL
Q 3
06 05
- 16 PENNY NAIL
23.A11
06 05 23.T11 - SIMPSON SDS 25600
0 2" 4" 8" 0 4" 8" 1'-4"
06 05 23.X7 - NO. 10 X 1" PANCAKE HEAD WOOD SCREWS
SHEATHING CONNECTION DETAIL FOUNDATION PLAN
P9 P9
P
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

SCALE: 3" = 1'-0" SCALE: 1 1/2" = 1'-0" 06 11 00 - WOOD FRAMING


06 11 00.A2 - WOOD BLOCKING AS REQUIRED

07 41 13 02 06 11 00.D6 - 2X4 FRAMING @ 24" O.C.


06 11
N 00.F16
- 2X6 CEILING JOISTS @ 24" O.C.
DESIGNER:
16
UNIVERSITY OF ILLINOIS
06 05 23.X7 06 16 00 - SHEATHING GABLE HOME TEAM
10 06 16 00.D7 - 1/2" EXTERIOR GRADE PLYWOOD 611 LOREDO TAFT DR.
M 06 16
- 5/8" EXTERIOR GRADE PLYWOOD CHAMPAIGN, IL 61820
00.D10

0 2" 4" 8"


13 SEALS:
06 18 00 - GLUED-LAMINATED CONSTRUCTION
EXTERIOR SHEAR WALL - DIAPHRAM DETAIL
F1 06 18 00.01 - 1/2" LAMINATED BAMBOO
L
SCALE: 3" = 1'-0"

06 18 00.02 - 3/4" LAMINATED BAMBOO


SCALE: 3" = 1'-0" 06 18 00.01

DIVISION 07 - THERMAL AND MOISTURE PROTECTION


2'-0"
K PROJECT:
07 21 00 - THERMAL INSULATION
07 21 19.01 - FOAMED-IN PLACE INSULATION
US DEPT. OF ENERGY
0 2" 4" 8" SOLAR DECATHLON
J9
ROOF CONSTRUCTION DETAIL 07 41 00 - ROOF PANELS OCTOBER 1-21 2009
J SCALE: 3" = 1'-0"
07 41 13 02 - 12" LOKSEAM METAL ROOF NREL & DOE
SCALE: 3" = 1'-0"
ISSUANCE:

1"
1"
SHEET KEYNOTES BID DOCUMENTS
JJS
H #01 01/15/2009
1 DIAPHRAM BOUNDARY NAILING PER PLAN
07 21 19.01
1
2 BLOCKING PER LAMBOO FRAME DETAIL DOE REVIEW
06 11 00.A2 06 11 00.F16 #02 04/16/2009 JJS
G 3 TOP PLATE TO FRAMING ABOVE PER SHEAR WALL SCHEDULE

06 16 00.D10 2X4 STRUT BETWEEN BOTOM OF LAMBOO JOIST AT SHEAR WALL


2
14 4 AND TOP OF LAMBOO JOIST AT ADJACENT STRUCTURAL RIB PER CONSTRUCTION DOCS
06 18 00.01
07 41 13 02
PLAN
#03 06/01/2009 JJS
5 TOP PLATE TO FRAMING ABOVE PER SHEAR WALL SCHEDULE
F
4
6 8D NAILS COMMON OR BOX PER SHEAR WALL SCHEDULE

06 05 23.T11 2"
7 BRACED WALL LINE PER PLAN
8
E 4X6 WOOD MEMBER CUT IN HALF BETWEEN EACH JOIST TO RUN

5"
9 8
ENTIRE LENGTH OF ROOF CAP

2"
06 11 00.D6 9
WOOD MEMBER CUT IN HALF BETWEEN EACH JOIST FOR ENTIRE INFORMATION:
15
LENGTH OF BUILDING. ATTACH WOOD MEMBER TO2X6 PURLIN PROJECT NAME
03 15 00.A2 ROOF DECK FASTENERS
UIUC_SD_2009
D 10
ONE PIECE ASSEMBLY, 3 21" WIDE BY 1 78" HIGH
11 SPACING TO BE 48" O.C. AND DRAWING LOCATION
BENEATH EACH S-5! CLIP LOCATION
5 07 26 00.A2 SEE S-SERIES FOR BALANCE OF LAMBOO AND PURLIN
S-508 SHEAR WALL & CORNER
11 DETAILS.DWG
CONSTRUCTION REQUIREMENTS
DRAWN BY
06 05 23.A11 @ 3" 0.C.
C 12 OR #6 SCREWS PER SHEAR WALL SCHEDULE: 12" O.C. MAXIMUM JJS

ALL BUTT JOINTS TO BE SEALED AGAINST LEACKAGE BY USING CHECKED BY


7 13
TAPE AND/OR CAULKING
--
14 ROOF CONSTRUCTION TO BE UL TYPE 436
B SHEET:
15 PROVIDE SIMPSON JOIST HANGER AT EACH END OF PURLIN SHEAR WALL &
0 2" 4" 8" 0 2" 4" 8"
16 TWO SCREWS PER CLIP
CORNER DETAILS
INTERIOR SHEAR WALL - DIAPHRAM DETAIL ROOF CAP CONNECTION DETAIL

S-508
A1 A11
A
SCALE: 3" = 1'-0" SCALE: 1" = 1'-0"
17 EYEBOLT - SEE MAIN CONCRETE FOOTING
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
CONCRETE FOOTING TO BE IDENTICAL TO STANDARD, BUT SHALL
20
NOT HAVE STEEL T-SECTION OR ASSOCIATED ATTACHMENT.

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
1 REFER TO STRUCTURAL CALCULATIONS FOR EXACT LOADING

T ALL STRUCTURAL DECKING WOOD TO BE PRESSURE TREATED.


2
ALL STRUCTURAL CONNECTIONS TO BE GALVANIZED.
1'-6"
06 15 13.91

1'-5" ALL RECLAIMED WOOD USED FOR DECKING TO BE SEALED ON


06 11 00.X3 3
DECK FLOOR LEVEL ALL SIDES WITH A LINSEED OIL FINISH.
S 1'-3 1/2"
T/ DECK JOISTS 06 05 23.T5
05 05 29.I10
06 11 00.X1
05 05 23.A2
06 05 23.T2
R

8 1/2"

1'-6"
Q B/ FLOOR JOIST 06 11 00.L2

06 05 23.T3
1

05 05 23.A2
4 1/4"
P B/ FLOOR JOIST

REFERENCE KEYNOTES
05 05 29.I10

DIVISION 05 - METALS
N ±0"
GRADE DESIGNER:
05 05 00 - COMMON WORK RESULTS FOR METALS
UNIVERSITY OF ILLINOIS
0 2" 4" 8" 0 2" 4" 8" 05 05 23.A2 - 5/8" A307 BOLT GABLE HOME TEAM
M1
DECK SECTION
M14
PLATE SECTION 05 05 611 LOREDO TAFT DR.
- 1/4" STEEL PLATE
M
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
29.I10 CHAMPAIGN, IL 61820
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES SEALS:

06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND


L COMPOSITES
06 05 23.T2 - C44 - 4X4 POST CAP BY USP STRUCTURAL CONNECTORS
06 05 23.T3 - PA44E - 4X4 POST BASE BY USP STRUCTURAL CNTRS.
06 05 23.T5 - 2X6 CONCEALED FLANGE HANGER - USP STRUCTURAL
K PROJECT:
06 05 23.T6 - JUS 26 - USP STRUCTURAL CONNECTORS
US DEPT. OF ENERGY
06 11 00 - WOOD FRAMING SOLAR DECATHLON
06 11 00.L2 - 4X4 POST OCTOBER 1-21 2009
J 06 11 00.X1 - TREATED 2X6 NREL & DOE
06 11 00.X3 - TREATED 2X10
ISSUANCE:
06 15 00 - WOOD DECKING
BID DOCUMENTS
H 06 15 13.91 - RECLAIMED 2X6 WOOD DECKING #01 01/15/2009 JJS

06 15 13.91 DIVISION 07 - THERMAL AND MOISTURE PROTECTION DOE REVIEW


1'-5" 1'-5" #02 04/16/2009 JJS
06 11 00.X3 DECK FLOOR LEVEL 06 15 13.91
G DECK FLOOR LEVEL 07 46 00 - SIDING
1'-3 1/2" 1'-3 1/2"
07 46 23 01 - RECLAIMED BOARD SIDING
T/ DECK JOISTS 06 05 23.T5 T/ DECK JOISTS 06 11 00.X3 CONSTRUCTION DOCS
06 11 00.X1 06 05 23.T5 #03 06/01/2009 JJS
F 06 05 23.T2 06 11 00.X1

06 05 23.T6

06 05 23.T2
E 8 1/2"
B/ FLOOR JOIST 06 11 00.L2 07 46 23 01
INFORMATION:
06 05 23.T3 06 11 00.L2
PROJECT NAME
05 05 23.A2 06 05 23.T3 UIUC_SD_2009
D 4 1/4" 4 1/4"
B/ FLOOR JOIST
B/ FLOOR JOIST
05 05 29.I10
DRAWING LOCATION
S-509 DECK DETAILS.DWG

SHEET KEYNOTES DRAWN BY


C ±0" ±0" 1
4"X 1'-6" X 1'-6" STEEL PLATE GALGANIZED W/ 21" ALL THREAD
JJS
GRADE GRADE 1
STUD WELDED AT CENTER OF PLATE
CHECKED BY
--

B SHEET:
DECK DETAILS
0 2" 4" 8" 0 2" 4" 8"
DECK SECTION DECK SECTION

S-509
A1 A11
A
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
1 REFER TO STRUCTURAL CALCULATIONS

06 18 00.01
T 05 05 23.X10 06 11 00.G1
05 05 23.A1

06 11 00.G1
7
S
05 05 23.K1
05 05 23.K1
05 05 23.K1
7

06 11 00.D1
R 7
06 11 00.D1
1 1
06 18 00.02 3

Q
REFERENCE KEYNOTES
05 12 23.X1

DIVISION 05 - METALS
05 16 00 A1
P 06 18 00.02 06 18 00.02
05 05 00 - COMMON WORK RESULTS FOR METALS
05 05 23.A1 - 1/2" A307 BOLT
05 05 23.K1 - SIMPSON CS20 CONTINUOUS COIL STRAP
05 05 23.X10 - 5/8" DIAMETER ROD
N DESIGNER:
UNIVERSITY OF ILLINOIS
05 12 00 - STRUCTURAL STEEL FRAMING
0 2" 4" 8" 0 2" 4" 8" 0 2" 4" 8"
05 12 23.X1 - 3/8" A35 STEEL PLATE
GABLE HOME TEAM
M1
TIE-ROD ASSEMBLY DETAIL
M8
DETAIL AT TYP. SINGLE FRAME
M16
DETAIL AT TYP. SINGLE FRAME 611 LOREDO TAFT DR.
M
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

05 16 00 - STRUCTURAL CABLING
CHAMPAIGN, IL 61820
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
05 16 00 - STEEL TURNBUCKLE
7 05 05 23.K1 06 17 13 06 18 00.02
#2 CLEVIS W/ 3/4" DIAMETER PIN
SEALS:
05 16 00 A1 -
06 17 13
L 6 11 00.G1
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

05 05 23.K1 06 11 00 - WOOD FRAMING


06 11 00.D1 - 2X4
K 7 PROJECT:
06 11 00.G1 - 2X8
US DEPT. OF ENERGY
6 11 00.D1 06 17 00 - SHOP-FABRICATED STRUCTURAL WOOD SOLAR DECATHLON
1 06 17 13 - 9 1/4" X 1 1/2" LVL OCTOBER 1-21 2009
J 3
NREL & DOE
06 18 00 - GLUED-LAMINATED CONSTRUCTION
4
1/2" LAMINATED BAMBOO
ISSUANCE:
06 18 00.01 -
4
3/4" LAMINATED BAMBOO
BID DOCUMENTS
06 18 00.02 -
H #01 01/15/2009 JJS
6

DOE REVIEW
05 12 23.X1 05 12 23.X1
#02 04/16/2009 JJS
G
05 16 00 A1
SHEET KEYNOTES
2X4 BLOCKING ATTACHED TO EACH SIDE OF LAMBOO FRAME FOR
CONSTRUCTION DOCS
1
2 2X8 PLATE ATTACHMENT - ORIENT WOOD GRAIN VERTICALLY #03 06/01/2009 JJS
DOUBLE LAMBOO FRAME - SEE PRIOR DETAILS FOR BALANCE OF
2
F NOTES AND DIMENSIONS
TIE ROD ASSEMBLY - SEE PLANS FOR LOCATIONS AND OTHER
3
DETAILS, THIS SHEET FOR ASSEMBLY AND DIMENSIONS

4 WINDOW HEADER ASSEMBLY DASHED FOR CLARITY

E 5 STANDARD HOLES TO ACCEPT BOLTS

INFORMATION:
0 2" 4" 8" 0 2" 4" 8" 0 2" 4" 8" 6 WINDOW OPENING
PROJECT NAME
DETAIL AT DOUBLE FRAME - SIDE VIEW DETAIL AT DOUBLE FRAME - TRANSVERSE TIE-ROD ASSEMBLY DETAIL
D1 D9 D16 2X8 PLATE ATTACHED TO OUTSIDE OF LAMBOO FRAMES - BUT UIUC_SD_2009
D
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
7 JOINTED AT FRAMES CONTAINING TIE-ROD OR SHEAR WALL
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" ASSEMBLY ONLY DRAWING LOCATION
S-510 TIE-ROD DETAILS.DWG

05 16 00 A1
DRAWN BY
05 05 23.A1
C 05 05 23.X10 05 16 00 05 05 23.X10 05 05 23.X10 05 05 23.X10 JJS

CHECKED BY
--

5
B SHEET:
TIE-ROD DETAILS
0 2" 4" 8"
TIE-ROD AND TURNBUCKLE ASSEMBLY

S-510
A1
A
SCALE: 3" = 1'-0"

SCALE: 3" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL NOTES

GABLE HOME
SOLAR ENVELOPE: 82'-0"
1.) MAXIMUM PRESSURE ON GRASS TO BE < 1500PSF

T 2.) REFER TO CIVIL DRAWINGS FOR SITE PREPARATION, INITIAL HOME


PLACEMENT, ELEVATIONSAND WALKWAY DIMENSIONS.
1
3.) SITE TO REMAIN ADA COMPLIANT AT ALL TIMES

SOLAR ENVELOPE: 17'-0"


4.) FOR CALCULATIONS REGARDING SOIL SURFACE IMPACT ON THE MALL,
SEE PROJECT MANUAL
S 4.) ALL WATER USED DURING THE COMPETITION SHALL BE SENT TO GRAY
WATER TANK, NO ALTERNATE USE OF TRAYWATTER WILL OCCUR.

16'-1121"
EVENT DECKING TO BE PROVIDED TO ILLINOIS SOLAR DECATHLON TEAM BY
35'-10" ± EVENT ORGANIZERS.
R 8

24'-1"
A1
A201
Q 5

11

12'-121"
P
REFERENCE KEYNOTES

4'-121"
14'-1021"
D1
3 S-302

NONE USED
6'-121"
N 3'-6" 5'-3" DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
5
SEALS:

L 4

9
5
A1
K A202
PROJECT:
10
US DEPT. OF ENERGY
SOLAR DECATHLON
OCTOBER 1-21 2009
J A1 NREL & DOE
A-201 14'-1021"
ISSUANCE:
6 BID DOCUMENTS

6'-0"
H
5
#01 01/15/2009 JJS
9 A1

DOE REVIEW
S-302

#02 04/16/2009 JJS

1'-11"
G 3 SHEET KEYNOTES
1 ENTRY FROM DECATHLETE WAY
CONSTRUCTION DOCS

4'-0"
D1
2 DOUBLE-SIDED DESCRIPTIVE DISPLAYS
#03 06/01/2009 JJS
S-302

F 3 LANDCAPE PLANTINGS - SEE L-SERIES

11 4 SEATING SURFACE - SEE A-5 SERIES

35'-1021" ± 6'-3" 15'-934" 5 DECKING

7
E
6 SLIDING SHADING DEVICE
SOLAR ENVELOPE: 67'-0"

7 ORGANIZER PROVIDED TEMPORARY WALKWAY


INFORMATION:
PROJECT NAME
8 TEMPORARY LANDSCAPING

9 WATER STORAGE TANK UIUC_SD_2009


D
A1
10 HERB GARDEN
DRAWING LOCATION
A-201 11 1:20 ADA ACCESSIBLE SLOPED WALKWAY A-101 SITE PLAN.DWG

DRAWN BY
C JJS

CHECKED BY
MT

B SOLAR ENVELOPE: 16'-0" SOLAR ENVELOPE: 50'-0" SOLAR ENVELOPE: 16'-0"


SHEET:
SITE PLAN
0 2' 4' 8'
SITE PLAN

A-101
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
WALL AND PARTITION DIMENSIONS SHOWN ON PLANS ARE
1
NOMINAL DIMENSIONS

T WALL ANAD PARTITION DIMENSIONS ARE SHOWN TO


2
FINISHED FACE OF WALL
G

DIMENSIONS FOR AREAS DRAWN AT A LARGER SCALE ARE


3
SHOWN ON ENLARGED SCALE PLANS.

S 4 FOR PARTITION TYPES, SEE SHEET A-513


B
C G
5 FOR ROOM FINISH SCHEDULE, SEE I-SERIES

FOR DOOR AND FRAME INFORMATION, SEE A-5 SERIES

11'-941"
6
R DRAWINGS
7'-841"
FOR WINDOW AND CURTAIN WALL TYPES, SEE ELEVATIONS
7
AND A-5 SERIES

USE OF SPECIFICATION SECTION NUMBERS WITHIN KEYNOTES


Q

6'-141"
OR ELSEWHERE ON THE DRAWINGS IS MADE SOLELY FOR
MECHANICAL SPACE CONVENIENCE IN COORDINATION AND WITHOUT LIMITATION.
8
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE
WORK IN ACCORDANCE TO THE CONTRACT DOCUMNETS IN
THE ENTIRETY.

N DESIGNER:
UNIVERSITY OF ILLINOIS
0 1'-4" 2'-8" 5'-4" GABLE HOME TEAM
M1
MECHANICAL LEVEL PLAN 611 LOREDO TAFT DR.
M
SCALE: 3/8" = 1'-0"
CHAMPAIGN, IL 61820
SCALE: 3/8" = 1'-0"
SEALS:
REFERENCE KEYNOTES
L
52'-3"

45'-0" 7'-3"

K PROJECT:

6'-6" 17'-0" 3'-0" 10'-0" 3'-0" 3'-0" 2'-6" 5'-3" 2'-0"


US DEPT. OF ENERGY
SOLAR DECATHLON
A1
A1 A1 OCTOBER 1-21 2009
A-211 A-314
J A1 A211 A15 NREL & DOE
A-312 A-402

2 2 ISSUANCE:
BID DOCUMENTS
#01 01/15/2009 JJS
H
2 1 1 1
SHEET KEYNOTES
2'-5"

A F
4'-241"
C CLOSET G
D
DOE REVIEW
#02 04/16/2009 JJS
G
03 06
CONSTRUCTION DOCS
HALLWAY
01 02
N1
05
A12
A-212
#03 06/01/2009 JJS
E
F B
BEDROOM A1 I-201 A12
A1 A1
A-311 04 A-314
G1
KITCHEN LIVING ROOM
K1
E A-212
2 K1 2
K12
A1
A11 A-212

INFORMATION:
A-401 A-212
K11 A11 B
I-221
BATHROOM
C PROJECT NAME
A1 UIUC_SD_2009
D
3 3 4 4
DRAWING LOCATION
A-111 FIRST FLOOR PLAN.DWG

DRAWN BY
C 2
JJS
A1 A1
A1
A-312
K1
07
A-313 A-314 CHECKED BY
A-213
2'-6" 7'-0" 5'-0" 9'-0" 16'-0" 5'-6" 5'-3" 2'-0" MT

B SHEET:
FLOOR PLANS
0 1'-4" 2'-8" 5'-4"
FLOOR PLAN

A-111
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
WALL AND PARTITION DIMENSIONS SHOWN ON PLANS ARE

GABLE HOME
1
NOMINAL DIMENSIONS
WALL ANAD PARTITION DIMENSIONS ARE SHOWN TO
2
T A1 A1 FINISHED FACE OF WALL
A=314 A-314 DIMENSIONS FOR AREAS DRAWN AT A LARGER SCALE ARE
A1 3
SHOWN ON ENLARGED SCALE PLANS.
A-314
4 FOR PARTITION TYPES, SEE SHEET A-513

5 FOR ROOM FINISH SCHEDULE, SEE I-SERIES


S FOR DOOR AND FRAME INFORMATION, SEE A-5 SERIES
6
DRAWINGS
4 12:12
12:12 12:12 FOR WINDOW AND CURTAIN WALL TYPES, SEE ELEVATIONS
SLOPE 7
SLOPE SLOPE AND A-5 SERIES
USE OF SPECIFICATION SECTION NUMBERS WITHIN KEYNOTES
R OR ELSEWHERE ON THE DRAWINGS IS MADE SOLELY FOR
CONVENIENCE IN COORDINATION AND WITHOUT LIMITATION.
1 8
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE
WORK IN ACCORDANCE TO THE CONTRACT DOCUMNETS IN
THE ENTIRETY.

Q 07 41 13 01
9 ROOF CONSTRUCTION TO BE UL TYPE 436
13'-10"

A-311 A-311
A1 A1

P
ROOF CAP TO BE BUILT SUCH THAT SHIPMENT CAN OCCUR
10 SEPARATELY FROM MAIN HOME. CONTRACTOR TO INSTALL
1
ROOF CAP ON HOME AS PART OF STANDARD CONTRACT.

N 12:12
DESIGNER:
12:12 12:12
SLOPE 1 SLOPE SLOPE 11
FLAT ROOF SURFACE OF ROOF TO BE 5
8"
EXTERIOR GRADE UNIVERSITY OF ILLINOIS
PLYWOOD SHEATHING WITH 30# ROOFING FELT
A-114 GABLE HOME TEAM
611 LOREDO TAFT DR.
M
REFERENCE KEYNOTES CHAMPAIGN, IL 61820
A1 A1
A1
A-314 A-314
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
SEALS:
A-314 06 16 00 - SHEATHING

52'-3"
L 06 16 00.D10 - 5/8" EXTERIOR GRADE PLYWOOD

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 31 00 - HVAC DUCTS AND CASINGS

K 23 31 00.A1 - ROOF VENT PROJECT:


DIVISION 26 - ELECTRICAL
US DEPT. OF ENERGY
26 05 00 - COMMON WORK RESULTS FOR ELECTRICAL
0 1'-4" 2'-8" 5'-4" SOLAR DECATHLON
07 41 13 01 - RIDGE CAP
J1
MAIN MODULE ROOF PLAN OCTOBER 1-21 2009
J SCALE: 3/8" = 1'-0"
NREL & DOE
SCALE: 3/8" = 1'-0"
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

A-515
G13 DOE REVIEW
4'-3" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0"
#02 04/16/2009 JJS
G
SHEET KEYNOTES
5 1
CONSTRUCTION DOCS
1 4" SIMPSON SCREW @ 2'-0" O.C. - SEE DETL.
12:12 12:12 12:12
#03 06/01/2009 JJS
SLOPE SLOPE SLOPE 2 5" RIDGE VENT
F
7'-0"

3 ROOF CONTRUCTION TYPE 436

06 16 00.D10
1 REMOVABLE 4'X5' ACCESS HATCH FOR ON-SITE
4
2 N-13 INSTALLATION OF CONDUIT AND DUCTWORK
E 12:12 A-515 12:12 12:12
SLOPE SLOPE SLOPE
5 ROOF CAP CONSTRUCTION TYPE UL 436
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
G13 DRAWING LOCATION
A-515
A-113 ROOF CAP PLAN.DWG

DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
ROOF CAP PLAN
0 1'-4" 2'-8" 5'-4"
ROOF CAP PLAN

A-113
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
WALL AND PARTITION DIMENSIONS SHOWN ON PLANS ARE
1

GABLE HOME
NOMINAL DIMENSIONS
WALL ANAD PARTITION DIMENSIONS ARE SHOWN TO
2
FINISHED FACE OF WALL
T 3
DIMENSIONS FOR AREAS DRAWN AT A LARGER SCALE ARE
SHOWN ON ENLARGED SCALE PLANS.
4 FOR PARTITION TYPES, SEE SHEET A-513
5 FOR ROOM FINISH SCHEDULE, SEE I-SERIES
FOR DOOR AND FRAME INFORMATION, SEE A-5 SERIES
6
S DRAWINGS
FOR WINDOW AND CURTAIN WALL TYPES, SEE ELEVATIONS
7
AND A-5 SERIES
USE OF SPECIFICATION SECTION NUMBERS WITHIN KEYNOTES
OR ELSEWHERE ON THE DRAWINGS IS MADE SOLELY FOR
CONVENIENCE IN COORDINATION AND WITHOUT LIMITATION.
8
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE
R WORK IN ACCORDANCE TO THE CONTRACT DOCUMNETS IN
THE ENTIRETY.
SEE ELECTRICAL LIGHTING PLANS FOR FIXTURES SCHEULES
9
AND WIRING INFORMATION
SEE INTERIOR ELEVATIONS FOR SOFFIT HEIGHTS AND
10
Q LOCATIONS
ROUTE ALL CONDUITS ON EXPOSED CEILINGS SQUARE TO
11
BUILDING WALLS AND GROUP TOGETHER

N
REFERENCE KEYNOTES DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
611 LOREDO TAFT DR.
06 16 00 - SHEATHING
M CHAMPAIGN, IL 61820
06 16 00.A4 - 5/8" GYPSUM SHEATHING

SEALS:
DIVISION 08 - OPENINGS
L 08 95 00 - VENTS

08 95 00.A8 - 6" ROUND VENT

K
DIVISION 26 - ELECTRICAL PROJECT:
26 51 00 - INTERIOR LIGHTING
US DEPT. OF ENERGY
26 51 00.A1 - RECESSED LED LIGHT FIXTURE
SOLAR DECATHLON
26 51 00.A7 - PENDANT LED FIXTURE OCTOBER 1-21 2009
26 51 00.B2 26 51 00.B2
J 26 51 00.A7
NREL & DOE
26 51 00.B2 - WALL MOUNTED LED PIXTURE
ISSUANCE:
26 51 00.C1 - TRACK LIGHTING
BID DOCUMENTS
H #01 01/15/2009 JJS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 00 - FIRE DETECTION AND ALARM
DOE REVIEW
28 31 46 - SMOKE DETECTOR
#02 04/16/2009 JJS
G
26 51 00.C1 (TYP) CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
26 51 00.A7
INFORMATION:
PROJECT NAME
1

SHEET KEYNOTES
UIUC_SD_2009
D
DRAWING LOCATION
1 EDGE OF ANGLED CEILING ABOVE A-119 REFLECTED CEILING.DWG

DRAWN BY
C JS
26 51 00.A1
08 95 00.A8 26 51 00.A7
CHECKED BY
06 16 00.A4 MT

B SHEET:
REFLECTED CEILING
0 1'-4" 2'-8" 5'-4"
REFLECTED CEILING PLAN

A-114
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U 52'-721"
GENERAL SHEET NOTES

GABLE HOME
52'-3" WALL AND PARTITION DIMENSIONS SHOWN ON PLANS ARE
1
NOMINAL DIMENSIONS
1 07 41 13 02 07 41 13 01
WALL ANAD PARTITION DIMENSIONS ARE SHOWN TO
T 2
FINISHED FACE OF WALL

DIMENSIONS FOR AREAS DRAWN AT A LARGER SCALE ARE


3
SHOWN ON ENLARGED SCALE PLANS.

4 FOR PARTITION TYPES, SEE SHEET A-513

S 5 FOR ROOM FINISH SCHEDULE, SEE I-SERIES

FOR DOOR AND FRAME INFORMATION, SEE A-5 SERIES


6
DRAWINGS

FOR WINDOW AND CURTAIN WALL TYPES, SEE ELEVATIONS


7
AND A-5 SERIES
R USE OF SPECIFICATION SECTION NUMBERS WITHIN KEYNOTES
OR ELSEWHERE ON THE DRAWINGS IS MADE SOLELY FOR
CONVENIENCE IN COORDINATION AND WITHOUT LIMITATION.
8
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE
WORK IN ACCORDANCE TO THE CONTRACT DOCUMNETS IN
THE ENTIRETY.
Q STANDING SEAM ROOF TO BE INSTALLED WITHOUT MASTIC
WHILE ON NATIONAL MALL. WASHINGTON D.C. CONTRACTOR
9
TO INSTALL MASTIC WITHIN BATTEN OF STANDING SEAM
ROOF BEFORE INSTALLATION AT ALL OTHER LOCATIONS.

S-5! CLIPS TO BE INSTALLED AS HIGH ON ROOF AS POSSIBLE -


10
P SEE ROOF EDETAIL A-529
PHOTOVOLTAIC PANELS ARE NUMBERED FOR CLARITY ONLY
11 AND DO NOT REPRESENT WIRING. FOR ALL ELECTRICAL
WORK, SEE E-SERIES
COORDINATE ALL ROOF PENETRATIONS WITH MECHANICAL,
12
PLUMBING AND ELECTRICAL CONTRACTORS
N DIMENSIONS AND LOCATIONS OF EQUIPMENT, INCLUDING DESIGNER:
13 PHOTOVOLTAIC PANELS ON ROOF ARE APPROXOMITE. DO
NOT SCALE THE DRAWINGS.
UNIVERSITY OF ILLINOIS
REFER TO PLUMBING, MECHANICAL, AND ELECTRICAL GABLE HOME TEAM
PLUMBING VENT PIPE PENETRATION 14
DRAWINGS FOR QUANTITIES, TYPES, AND LOCATIONS OF ALL
PENETRATIONS AND PROVIDE FLASHING / SUPPORTS IN
611 LOREDO TAFT DR.
M 6" 9" ACCORDANCE WITH ROOFING DETAILS. CHAMPAIGN, IL 61820
1'-0"
52'-3"
15 SEE S-513 FOR TYPICAL ROOF DETAILS SEALS:

L
16 SEAMS TO BE LOCATED AS SHOWN
0 1'-4" 2'-8" 5'-4"
ROOFING PLAN
K1
K
SCALE: 3/8" = 1'-0"
DIMENSIONS TAKEN FROM EXTERIOR FACE OF PLYWOOD PROJECT:
17
SCALE: 3/8" = 1'-0" SHEATHING ON HOME
52'-721" US DEPT. OF ENERGY
SOLAR DECATHLON
52'-3"
OCTOBER 1-21 2009
J 1 07 41 13 02 07 41 13 01 NREL & DOE
REFERENCE KEYNOTES ISSUANCE:
BID DOCUMENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
H #01 01/15/2009 JJS
07 41 00 - ROOF PANELS
07 41 13 01 - RIDGE CAP DOE REVIEW
07 41 13 02 - 12" LOKSEAM METAL ROOF #02 04/16/2009 JJS
G
DIVISION 48 - ELECTRICAL POWER GENERATION
CONSTRUCTION DOCS
#03 06/01/2009 JJS
48 14 00 - SOLAR ENERGY ELECTRICAL POWER GENERATION EQUIPMENT

F 48 14 00.01 - S-5! U-MINI CLIP


48 14 13.01 - SOLAR ENERGY COLLECTOR

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39
E
SHEET KEYNOTES
1 RECLAIMED BOARD SIDING
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D 21 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
DRAWING LOCATION
A-115 PHOTOVOLTAIC ROOF
PLAN.DWG
DRAWN BY
C 48 14 13.01 48 14 00.01
JJS
7
2'-716 "
CHECKED BY
52'-483" MT

B SHEET:
PHOTOVOLTAIC
0 1'-4" 2'-8" 5'-4" ROOF PLAN
PHOTOVOLTAIC PLAN

A-115
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
WALL AND PARTITION DIMENSIONS SHOWN ON PLANS ARE

GABLE HOME
1
NOMINAL DIMENSIONS
WALL ANAD PARTITION DIMENSIONS ARE SHOWN TO
2
T FINISHED FACE OF WALL
DIMENSIONS FOR AREAS DRAWN AT A LARGER SCALE ARE
3
SHOWN ON ENLARGED SCALE PLANS.

4 FOR PARTITION TYPES, SEE SHEET A-513

5 FOR ROOM FINISH SCHEDULE, SEE I-SERIES


S
FOR DOOR AND FRAME INFORMATION, SEE A-5 SERIES
6
DRAWINGS
FOR WINDOW AND CURTAIN WALL TYPES, SEE ELEVATIONS
7
AND A-5 SERIES

R USE OF SPECIFICATION SECTION NUMBERS WITHIN KEYNOTES


OR ELSEWHERE ON THE DRAWINGS IS MADE SOLELY FOR
CONVENIENCE IN COORDINATION AND WITHOUT LIMITATION.
8
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE
WORK IN ACCORDANCE TO THE CONTRACT DOCUMNETS IN
THE ENTIRETY.
Q 9 TOTAL CONDITIONED AREA 505.4 SQ.FT. > 450 SQ.FT.
THE TOTAL BUILDING SOLAR FOOTPRINT HAS BEEN
10 CALCULATED USING THE SHADED AREA SHOWN. THIS
REPRESENTS THE INTERIOR FACE OF ALL GYP. BD. SURFACES

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M
REFERENCE KEYNOTES CHAMPAIGN, IL 61820

SEALS:

K PROJECT:
US DEPT. OF ENERGY
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
SHEET KEYNOTES
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
A-118 CONDITIONED SPACE
AREA.DWG
DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
CONDITIONED
0 1'-4" 2'-8" 5'-4" SPACE AREA
CONDITIONED AREA PLAN

A-116
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
WALL AND PARTITION DIMENSIONS SHOWN ON PLANS ARE
1
NOMINAL DIMENSIONS

WALL ANAD PARTITION DIMENSIONS ARE SHOWN TO


T 2
FINISHED FACE OF WALL

DIMENSIONS FOR AREAS DRAWN AT A LARGER SCALE ARE


3
SHOWN ON ENLARGED SCALE PLANS.

4 FOR PARTITION TYPES, SEE SHEET A-513


S 5 FOR ROOM FINISH SCHEDULE, SEE I-SERIES

FOR DOOR AND FRAME INFORMATION, SEE A-5 SERIES


6
DRAWINGS

FOR WINDOW AND CURTAIN WALL TYPES, SEE ELEVATIONS


7
R AND A-5 SERIES

USE OF SPECIFICATION SECTION NUMBERS WITHIN KEYNOTES


OR ELSEWHERE ON THE DRAWINGS IS MADE SOLELY FOR
CONVENIENCE IN COORDINATION AND WITHOUT LIMITATION.
8
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE
WORK IN ACCORDANCE TO THE CONTRACT DOCUMNETS IN
Q THE ENTIRETY.

10 TOTAL BUILDING FOOTPRINT 795.06 SQ.FT. < 800 SQ.FT.

THE TOTAL BUILDING SOLAR FOOTPRINT HAS BEEN


CALCULATED USING THE SHADED AREA AS SHOWN. THIS
P 11
REPRESENTS THE VERTICAL PROJECTION OF ALL SPACES, BOTH
CONDITIONED AND EXPOSED THAT ARE STRUCTURALLY
ATTACHED TO THE BUILDING, INCLUDING ENTRY OVERHANG,
SHED AND ROOF OVERHANG.

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M
REFERENCE KEYNOTES CHAMPAIGN, IL 61820

SEALS:

K PROJECT:
US DEPT. OF ENERGY
52'-721"
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
SHEET KEYNOTES
CONSTRUCTION DOCS
#03 06/01/2009 JJS
14'-1116
3
"

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
A-117 SOLAR FOOTPRINT AREA.DWG

DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
SOLAR FOOTPRINT
0 1'-4" 2'-8" 5'-4" AREA
SOLAR FOOTPRINT DIAGRAM

A-117
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
WALL AND PARTITION DIMENSIONS SHOWN ON PLANS ARE

GABLE HOME
1
NOMINAL DIMENSIONS
WALL ANAD PARTITION DIMENSIONS ARE SHOWN TO
2
T FINISHED FACE OF WALL
DIMENSIONS FOR AREAS DRAWN AT A LARGER SCALE ARE
3
SHOWN ON ENLARGED SCALE PLANS.
4 FOR PARTITION TYPES, SEE SHEET A-513

5 FOR ROOM FINISH SCHEDULE, SEE I-SERIES


S FOR DOOR AND FRAME INFORMATION, SEE A-5 SERIES
6
DRAWINGS
FOR WINDOW AND CURTAIN WALL TYPES, SEE ELEVATIONS
7
AND A-5 SERIES
USE OF SPECIFICATION SECTION NUMBERS WITHIN KEYNOTES
R OR ELSEWHERE ON THE DRAWINGS IS MADE SOLELY FOR
CONVENIENCE IN COORDINATION AND WITHOUT LIMITATION.
8
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE
WORK IN ACCORDANCE TO THE CONTRACT DOCUMNETS IN
THE ENTIRETY.

Q
9 ROOF CONSTRUCTION TO BE UL TYPE 436

P
ROOF CAP TO BE BUILT SUCH THAT SHIPMENT CAN OCCUR
10 SEPARATELY FROM MAIN HOME. CONTRACTOR TO INSTALL
ROOF CAP ON HOME AS PART OF STANDARD CONTRACT.

N 1
DESIGNER:
11
FLAT ROOF SURFACE OF ROOF TO BE 5
8"
EXTERIOR GRADE UNIVERSITY OF ILLINOIS
PLYWOOD SHEATHING WITH 30# ROOFING FELT
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
2
SEALS:

16'-616
5
"
L
06 15 13.91 REFERENCE KEYNOTES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

K 2 12 00.A1 PROJECT:
06 15 00 - WOOD DECKING
US DEPT. OF ENERGY
06 15 13.91 - RECLAIMED 2X6 WOOD DECKING
SOLAR DECATHLON

1'-541"
OCTOBER 1-21 2009
DIVISION 22 - PLUMBING
J NREL & DOE
22 12 00 - FACILITY POTABLE-WATER STORAGE TANKS ISSUANCE:
0 2' 4' 8'
NORTH SITE ELEVATION
22 12 00.A1 - WATER STORAGE TANK BID DOCUMENTS
H1
H
SCALE: 1/4" = 1'-0"
#01 01/15/2009 JJS
SCALE: 1/4" = 1'-0" DIVISION 32 - EXTERIOR IMPROVEMENTS

32 90 00 - PLANTING
DOE REVIEW
32 90 00.A2 - EXTERIOR PLANTINGS #02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F
SHEET KEYNOTES
1 MAIN HOME CONSTRUCTION - SEE BUILDING ELEVATIONS

1 2 ORGANIZER DEFINED SOLAR ENVELOPE


E
2
INFORMATION:

16'-616
5
"
PROJECT NAME
UIUC_SD_2009
D 06 15 13.91
22 12 00.A1
DRAWING LOCATION
A-201 NORTH & SOUTH SITE
32 90 00.A2 ELEVATIONS.DWG
?
DRAWN BY
C

1'-541" 1'-778"
JJS

CHECKED BY
MT

B SHEET:
NORTH & SOUTH
0 2' 4' 8' SITE ELEVATIONS
NORTH SITE ELEVATION

A-201
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1.) MAXIMUM PRESSURE ON SOIL TO BE <1500 PSF

GABLE HOME
OWNER SHALL REPAIR AND/OR REPLACE GRASS AFTER
REMOVAL OF HOUSE. WORK TO BE COORDINATED WITH
2.)
FACILITIES AND SERVICES AND APPROVED BY THE COLLGE OF
T ACES.
SITE TO BE MARKED AND SHALL REMAIN ADA COMPLAINT AT
3.)
ALL TIMES ONCE COMPLETE.
ALL EXISTING UTILITIES, FIXTURES, & PROPERTY TO REMAIN
4.)
WITHOUT MODIFICATION.

Q
REFERENCE KEYNOTES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

P
06 15 00 - WOOD DECKING
06 15 13.91 - RECLAIMED 2X6 WOOD DECKING
2

DIVISION 22 - PLUMBING
N DESIGNER:
UNIVERSITY OF ILLINOIS
22 12 00 - FACILITY POTABLE-WATER STORAGE TANKS
22 12 00.A1 - WATER STORAGE TANK
GABLE HOME TEAM
611 LOREDO TAFT DR.
M 1 CHAMPAIGN, IL 61820

18'-0"
SEALS:

16'-616
5
"
L

06 15 13.91 06 15 13.91

K PROJECT:
± 1'-5 1/4"
US DEPT. OF ENERGY
SOLAR DECATHLON
FIN FLOOR

1'-521"
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
0 2' 4' 8'
WEST SITE ELEVATION BID DOCUMENTS
H1
H
SCALE: 1/4" = 1'-0"
#01 01/15/2009 JJS
SCALE: 1/4" = 1'-0"

DOE REVIEW
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F
SHEET KEYNOTES
1 ILLINOIS GABLE HOME - SEE BUILDING ELEVATIONS

2 ORGANIZER DEFINED SOLAR ENVELOPE


E 1
2
INFORMATION:

18'-0"
16'-616
5
"
PROJECT NAME
UIUC_SD_2009
D
06 15 13.91
DRAWING LOCATION
06 15 13.91 A-202 EAST & WEST SITE
ELEVATIONS.DWG
DRAWN BY
C 06 15 13.91

1'-541" 1'-841"
JJS
± 1'-5 1/4"
FIN FLOOR CHECKED BY
MT

B SHEET:
22 12 00.A1 22 12 00.A1
EAST & WEST SITE
0 2' 4' 8' ELEVATIONS
EAST SITE ELEVATION

A-202
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
FOR PLACEMENT OF ARCHITECTURAL ELEMENTS, REFER TO
1

GABLE HOME
FLOORPLANS.

ALL HEIGHTS RELATIVE TO THE FINISHED FLOOR LEVEL. THE


2 DISTANCE ABOVE GRADE MAY VARY DEPENDING ON SITE
T 48 14 13.16A CONDITIONS.

3 ALL EXPOSED WOOD TO BE PAINTED PER SPECIFICATIONS

DO NOT SCALE DRAWINGS. USE DIMENSIONED NUMBERS AND


4
FIELD NUMBERS ONLY
S

8'-416
1
"
R
REFERENCE KEYNOTES
DIVISION 03 - CONCRETE
48 14 00.01

"
03 31 00 - STRUCTURAL CONCRETE

16'-616
5
03 31 00.P1 - 24" X 24" X 6" FTG.

6" 6"
08 52 00.F9 08 52 00.F9 08 52 00.F9 08 52 00.F9 08 52 00.F9 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
P
06 15 00 - WOOD DECKING

15
6'-816 "
06 15 13.91 - RECLAIMED 2X6 WOOD DECKING

5'-878"
06 15 13.91
N DIVISION 07 - THERMAL AND MOISTURE PROTECTION
DESIGNER:
UNIVERSITY OF ILLINOIS
07 46 23 01
07 41 00 - ROOF PANELS
GABLE HOME TEAM
08 14 00.D1
08 14 00.D1
07 41 13 02 - 12" LOKSEAM METAL ROOF
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

1'-541"
03 31 00.P1 07 46 00 - SIDING
07 46 23 01 - RECLAIMED BOARD SIDING
SEALS:

L DIVISION 08 - OPENINGS

0 1'-4" 2'-8" 5'-4" 08 14 00 - WOOD DOORS


NORTH ELEVATION 08 14 00.D1 - WOOD FLUSH DOOR
K1
K
SOUTH ELEVATION PROJECT:
SCALE: 3/8" = 1'-0"
08 52 00 - WOOD WINDOWS US DEPT. OF ENERGY
08 52 00.F9 - CLAD WOOD WINDOW SOLAR DECATHLON
07 41 13 02 08 95 00.B9
OCTOBER 1-21 2009
J 08 95 00 - VENTS NREL & DOE
08 95 00.B9 - PLUMBING THROUGH-WALL VENT
ISSUANCE:
DIVISION 33 - UTILITIES
BID DOCUMENTS
H #01 01/15/2009 JJS
33 75 00 - HIGH-VOLTAGE SWITCHGEAR AND PROTECTION DEVICES

7'-1021"
33 75 00.A1 - AC DISCONNECT DOE REVIEW
#02 04/16/2009 JJS
G DIVISION 48 - ELECTRICAL POWER GENERATION

CONSTRUCTION DOCS
48 14 00 - SOLAR ENERGY ELECTRICAL POWER GENERATION EQUIPMENT
48 14 00.01 - S-5! U-MINI CLIP
#03 06/01/2009 JJS
F

"
48 14 13.16A - SUNPOWER 225 SOLAR PANEL

16'-616
5
6" 118"
5
08 52 00.F9 08 52 00.F9 08 52 00.F9 08 52 00.F9 08 52 00.F9 33 75 00.A1 08 52 00.F9

7'-216
9
"
INFORMATION:

5'-878"
06 15 13.91
PROJECT NAME

SHEET KEYNOTES
UIUC_SD_2009
D
07 46 23 01
DRAWING LOCATION
NONE USED A-211 NORTH ELEVATION.DWG

DRAWN BY

1'-541"
C 03 31 00.P1
JJS

CHECKED BY
MT

B SHEET:
NORTH & SOUTH
0 1'-4" 2'-8" 5'-4" ELEVATIONS
NORTH ELEVATION

A-211
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
FOR PLACEMENT OF ARCHITECTURAL ELEMENTS, REFER TO
1

GABLE HOME
FLOORPLANS.

ALL HEIGHTS RELATIVE TO THE FINISHED FLOOR LEVEL. THE


2 DISTANCE ABOVE GRADE MAY VARY DEPENDING ON SITE
T CONDITIONS.

3 ALL EXPOSED WOOD TO BE PAINTED PER SPECIFICATIONS

DO NOT SCALE DRAWINGS. USE DIMENSIONED NUMBERS AND


4
FIELD NUMBERS ONLY
07 41 13 02
S

REFERENCE KEYNOTES

8'-481"
R
07 46 23 01
48 14 13.16A

3'-958"
06 18 00.01 DIVISION 03 - CONCRETE
2
Q 06 11 00.X3
03 31 00 - STRUCTURAL CONCRETE
08 71 00.B11

"
03 31 00.P1 - 24" X 24" X 6" FTG.

16'-616
5
6"
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
P 08 52 00.F9
2
1
07 46 23 01

"
06 18 00.02

11
12'-316
06 11 00 - WOOD FRAMING
06 11 00.X3 - TREATED 2X10

"
"
7'-216
13
7'-016
7
08 14 00.D1

15
6'-216"
N 06 18 00 - GLUED-LAMINATED CONSTRUCTION
DESIGNER:
06 18 00.01 - 1/2" LAMINATED BAMBOO
UNIVERSITY OF ILLINOIS
06 18 00.02 - 3/4" LAMINATED BAMBOO
GABLE HOME TEAM
611 LOREDO TAFT DR.
M ± 1'-5 1/4" ± 1'-5 1/4"
DIVISION 07 - THERMAL AND MOISTURE PROTECTION CHAMPAIGN, IL 61820
FIN FLOOR FIN FLOOR

1'-541"
1'-541"
03 31 00.P1 03 31 00.P1
07 41 00 - ROOF PANELS
SEALS:
07 41 13 02 - 12" LOKSEAM METAL ROOF
L
07 46 00 - SIDING
0 1'-4" 2'-8" 5'-4" 0 1'-4" 2'-8" 5'-4" 07 46 23 01 - RECLAIMED BOARD SIDING
WEST ELEVATION EAST SHED ELEVATION
K1 K12
K
SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0" PROJECT:
DIVISION 08 - OPENINGS
SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0"
US DEPT. OF ENERGY
08 14 00 - WOOD DOORS SOLAR DECATHLON
08 14 00.D1 - WOOD FLUSH DOOR OCTOBER 1-21 2009
J NREL & DOE
08 52 00 - WOOD WINDOWS
08 52 00.F9 - CLAD WOOD WINDOW
ISSUANCE:
07 41 13 02 BID DOCUMENTS
H 08 71 00 - DOOR HARDWARE #01 01/15/2009 JJS
08 71 00.B11 - RECLAIMED DOOR RAIL

DOE REVIEW
7'-1021"

DIVISION 33 - UTILITIES #02 04/16/2009 JJS


G 48 14 13.16A
07 46 23 01
33 71 00 - ELECTRICAL UTILITY TRANSMISSION AND DISTRIBUTION
CONSTRUCTION DOCS
33 71 73.33 - ELECTRIC METER
2 #03 06/01/2009 JJS

3'-1116
9
"
F 33 75 00 - HIGH-VOLTAGE SWITCHGEAR AND PROTECTION DEVICES
"

33 75 00.A1 - AC DISCONNECT
16'-616
5
1185"

1'-0"316"
9
33 75 00.A1 DIVISION 48 - ELECTRICAL POWER GENERATION
1
E
07 46 23 01 48 14 00 - SOLAR ENERGY ELECTRICAL POWER GENERATION EQUIPMENT
INFORMATION:

11
12'-316"
08 52 00.F9
48 14 13.16A - SUNPOWER 225 SOLAR PANEL
PROJECT NAME
15
6'-216 "

7'-216
7
"
SHEET KEYNOTES
UIUC_SD_2009
D 33 71 73.33 08 14 00.D1

5'-1078"
3
DRAWING LOCATION
OPENING IN SIDING TO ALIGN WITH WINDOW BEYOND -
1 A-212 EAST SHED ELEVATION.DWG
DETERMINE IN FIELD EXACT SIZE AND LOCATION
± 1'-5 1/4" DRAWN BY
2 OVERHANG - REFER TO A-3 SERIES SECTION DRAWINGS
C FIN FLOOR
1'-541"

JJS
03 31 00.P1 ± 1'-5 1/4"
FIN FLOOR 3 PAINT FINISH 2 - THIS WALL ONLY REFER TO SPECIFICATIONS CHECKED BY

1'-541"
03 31 00.P1
MT

B SHEET:
EAST & WEST
0 1'-4" 2'-8" 5'-4" 0 1'-4" 2'-8" 5'-4" ELEVATIONS
NORTH ELEVATION WEST SHED ELEVATION

A-212
A1 A12
A
SCALE: 1/4" = 1'-0" SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
T

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

REFERENCE KEYNOTES SEALS:

K PROJECT:
A13
US DEPT. OF ENERGY
A-315 SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

5'-021"
DOE REVIEW
#02 04/16/2009 JJS
G

A1
A-508
SHEET KEYNOTES CONSTRUCTION DOCS
#03 06/01/2009 JJS
D1 D1
K1
F A-401
S-510 S-510

10'-016
9
"
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
K1 A-311 BUILDING SECTION.DWG
A-401
DRAWN BY
FF 1'-5 1/4"
C JJS

CHECKED BY
03 31 00.P1 GR ±0"
MT

B SHEET:
BUILDING SECTION
0 1'-4" 2'-8" 5'-4"
BUILDING SECTION

A-311
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
INSTALL FOAMED-INSULATION TO A MAXIMUM THICKNESS OF

GABLE HOME
1 8" IN THE WALLS AND A MAXIMUM THICKNESS OF 12" OF
CEILING, PER MANUF. TESTING
07 41 13 01
T 2 REFER TO STRUCTURAL DETAILS FOR CONNECTION DETAILS
48 14 00.01

483"
48 14 13.16A

A-515
REFERENCE KEYNOTES
S N13 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

07 41 13 02
06 11 00 - WOOD FRAMING
07 21 19.01 06 11 00.B6 - TREATED 1X4

R 06 11 00.F20
06 11 00.D3 - 2X4 FRAMING

15
3'-616"
06 11 00.D6 - 2X4 FRAMING @ 24" O.C.
06 11 00.F20 - 2X6 RAFTERS @ 24" O.C.
A13 06 11 00.G1 - 2X8
A-515
Q A13
A-515
06 11 00.H1 - 2X10

48 14 00.01
06 16 00 - SHEATHING
06 16 00.A4 - 5/8" GYPSUM SHEATHING
06 16 00.D6 - 1/2" PLYWOOD
P
06 16 00.D7 - 1/2" EXTERIOR GRADE PLYWOOD
06 16 00.D10 A13
A-515
06 16 00.D10 - 5/8" EXTERIOR GRADE PLYWOOD
06 16 00.D11 - 3/4" PLYWOOD
48 14 13.16A
N DESIGNER:
06 18 00 - GLUED-LAMINATED CONSTRUCTION
07 21 19.01 UNIVERSITY OF ILLINOIS
06 18 00.01 - 1/2" LAMINATED BAMBOO
GABLE HOME TEAM
06 18 00.01
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
07 26 00.A2
07 21 00 - THERMAL INSULATION

2'-1085"
06 11 00.D3 MECHANICAL SPACE SEALS:
07 21 00.B3 - 1 1/2" RIGID INSULATION
07 21 19.01 - FOAMED-IN PLACE INSULATION
L
07 26 00 - VAPOR RETARDERS
07 26 00.A1 - MOISTURE BARRIER
G13 S1
07 26 00.A2 - BUILDING FELT
K
A-518 A-515 PROJECT:
07 26 00.A6 - WEATHER BARRIER - NO. 15 ASPHALT FELT
US DEPT. OF ENERGY
07 41 00 - ROOF PANELS SOLAR DECATHLON
07 41 13 01 - RIDGE CAP OCTOBER 1-21 2009
06 11 00.G1
J 07 41 13 02 - 12" LOKSEAM METAL ROOF NREL & DOE
06 11 00.B6
08 11 13.G4
ISSUANCE:
07 46 00 - SIDING
24ga STEEL SIDING
BID DOCUMENTS
07 46 00.A3 -
H
07 46 23 01
07 46 23 01 - RECLAIMED BOARD SIDING
#01 01/15/2009 JJS
07 26 00.A6

07 46 00.A3
DIVISION 08 - OPENINGS DOE REVIEW
07 21 00.B3 #02 04/16/2009 JJS
G HALLWAY CLOSET
08 11 00 - METAL DOORS AND FRAMES

07 21 19.01 08 11 13.G4 - HANGING RESIN DOOR


CONSTRUCTION DOCS

"
BATHROOM

7'-016
7
#03 06/01/2009 JJS
10 28 00.C3 DIVISION 09 - FINISHES

F
06 18 00.01 06 11 00.D3 09 30 00 - TILING
09 30 13.A3 - FLOOR TILE
06 11 00.D6 09 30 29.A1 - METAL WALL TILE
06 16 00.D11
E 09 30 29.A1
09 62 00 - SPECIALTY FLOORING
06 16 00.D7
09 62 23.A1 - BAMBOO FLOORING SLATS
INFORMATION:
07 26 00.A1 PROJECT NAME
UIUC_SD_2009
D DIVISION 10 - SPECIALTIES

06 16 00.D6 DRAWING LOCATION


06 16 00.A4 10 28 00 - TOILET, BATH, AND LAUNDRY ACCESSORIES A-312 BUILDING SECTION.DWG
10 28 00.C3 - 42" GRAB BAR
DRAWN BY
C
06 11 00.H1 09 62 23.A1 FF 1'-5 1/4" JJS
DIVISION 48 - ELECTRICAL POWER GENERATION
09 30 13.A3 CHECKED BY
MT
06 16 00.D11 48 14 00 - SOLAR ENERGY ELECTRICAL POWER GENERATION EQUIPMENT

B
48 14 00.01 - S-5! U-MINI CLIP SHEET:
M8
GR ±0"
48 14 13.16A - SUNPOWER 225 SOLAR PANEL
BUILDING SECTION
SHEET KEYNOTES
S-502

0 6" 1' 2'


BATHROOM SECTION

A-312
A1
A
SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
INSTALL FOAMED-INSULATION TO A MAXIMUM THICKNESS OF
07 41 13 01

GABLE HOME
1.) 8" IN THE WALLS AND A MAXIMUM THICKNESS OF 12" IN THE
CEILING AND FLOOR PER MANUF. TESTING AND CODE REQ'TS
48 14 00.01

483"
T 48 14 13.16A
2.)
REFER TO STRUCTURAL PLANS AND DETAILS FOR
CONNECTION REQUIREMENTS

A-515
N13

S
REFERENCE KEYNOTES
07 41 13 02

07 21 19.01

06 11 00.F20 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

15
3'-616"
R 2
06 11 00 - WOOD FRAMING
A13
A-515 06 11 00.B6 - TREATED 1X4
A13
A-515
06 11 00.D3 - 2X4 FRAMING
06 11 00.D6 - 2X4 FRAMING @ 24" O.C.
Q 48 14 00.01
06 11 00.F20 - 2X6 RAFTERS @ 24" O.C.
06 11 00.G1 - 2X8
06 11 00.H1 - 2X10

06 16 00.D10 A13
P

1'-038"
A-515 06 16 00 - SHEATHING

48 14 13.16A 06 16 00.A4 - 5/8" GYPSUM SHEATHING


06 16 00.D6 - 1/2" PLYWOOD

07 21 19.01 06 16 00.D7 - 1/2" EXTERIOR GRADE PLYWOOD


N 06 16 00.D10 - 5/8" EXTERIOR GRADE PLYWOOD DESIGNER:
06 18 00.01 06 16 00.D11 - 3/4" PLYWOOD UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
07 26 00.A2
06 18 00 - GLUED-LAMINATED CONSTRUCTION 611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

2'-1085"
06 18 00.01 - 1/2" LAMINATED BAMBOO
06 11 00.D3

DIVISION 07 - THERMAL AND MOISTURE PROTECTION


SEALS:

L 07 21 00 - THERMAL INSULATION

G13 07 21 00.B3 - 1 1/2" RIGID INSULATION


A-518 07 21 19.01 - FOAMED-IN PLACE INSULATION

K 07 26 00 - VAPOR RETARDERS
PROJECT:
07 26 00.A1 - MOISTURE BARRIER US DEPT. OF ENERGY
06 11 00.G1 07 26 00.A2 - BUILDING FELT SOLAR DECATHLON
06 11 00.B6 07 26 00.A6 - WEATHER BARRIER - NO 15 ASPHALT FELT OCTOBER 1-21 2009
J NREL & DOE
07 41 00 - ROOF PANELS
07 46 23 01 07 41 13 02 - 12" LOKSEAM METAL ROOF
ISSUANCE:
07 26 00.A6 BID DOCUMENTS
H 07 46 00.A3 07 46 00 - SIDING #01 01/15/2009 JJS
07 46 00.A3 - 24ga STEEL SIDING
07 21 00.B3
07 46 23 01 - RECLAIMED BOARD SIDING DOE REVIEW
#02 04/16/2009 JJS
07 21 19.01
G

"
DIVISION 09 - FINISHES

7'-016
7
1 CONSTRUCTION DOCS
09 30 00 - TILING
09 30 13.A3 - FLOOR TILE
#03 06/01/2009 JJS
06 18 00.01
F
DIVISION 48 - ELECTRICAL POWER GENERATION
06 11 00.D6

48 14 00 - SOLAR ENERGY ELECTRICAL POWER GENERATION EQUIPMENT


06 16 00.D7 48 14 00.01 - S-5! U-MINI CLIP
E
48 14 13.16A - SUNPOWER 225 SOLAR PANEL
07 26 00.A1
INFORMATION:
PROJECT NAME
06 16 00.D6 UIUC_SD_2009
D 06 16 00.A4
DRAWING LOCATION
06 11 00.H1 A-313 BUILDING SECTION.DWG
FF 1'-5 1/4"
DRAWN BY
09 30 13.A3
C
06 16 00.D11
SHEET KEYNOTES JJS

CHECKED BY
INSULATION IN WALLS TO BE INSTALLED TO A MAXIMUM
THICKNESS OF 8". INSULATION IN CEILING TO BE A MAXIMUM OF MT
1
M8 12". BURN AND FLAME SPREAD CHARACTERISTICS MEET
APPLICABLE CODES - REFER TO SPECIFICATIONS
B S-502 GR ±0" SHEET:
2 OPEN PLENUM FOR RETURN AIR BUILDING SECTION
0 6" 1' 2'
BUILDING SECTION

A-313
A1
A
SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
07 41 13 01 1.) REFER TO STRUCTURAL PLANS FOR CONNECTION DETAILS

GABLE HOME
48 14 00.01

483"
48 14 13.16A
T

07 41 13 02
S

06 11 00.F20

15
3'-616"
R 2
REFERENCE KEYNOTES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
48 14 00.01
Q
06 11 00 - WOOD FRAMING
06 11 00.F12 - 2X6 JOISTS @ 24" O.C.
06 11 00.F20 - 2X6 RAFTERS @ 24" O.C.
06 16 00.D10
P

1'-083"
06 15 00 - WOOD DECKING
48 14 13.16A
06 15 13.91 - RECLAIMED 2X6 WOOD DECKING

06 16 00 - SHEATHING
N 06 11 00.F12
06 16 00.D10 - 5/8" EXTERIOR GRADE PLYWOOD
DESIGNER:
UNIVERSITY OF ILLINOIS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
GABLE HOME TEAM
07 26 00.A2
611 LOREDO TAFT DR.

2'-985"
M 07 26 00 - VAPOR RETARDERS CHAMPAIGN, IL 61820
1
07 26 00.A2 - BUILDING FELT
SEALS:
07 41 00 - ROOF PANELS
L 07 41 13 01 - RIDGE CAP
07 41 13 02 - 12" LOKSEAM METAL ROOF

DIVISION 08 - OPENINGS
K PROJECT:
08 14 00 - WOOD DOORS US DEPT. OF ENERGY
08 14 00.D1 - WOOD FLUSH DOOR SOLAR DECATHLON
OCTOBER 1-21 2009
J 08 52 00 - WOOD WINDOWS NREL & DOE
08 52 00.F9 - CLAD WOOD WINDOW
ISSUANCE:
DIVISION 48 - ELECTRICAL POWER GENERATION
BID DOCUMENTS
H #01 01/15/2009 JJS
08 52 00.F9 48 14 00 - SOLAR ENERGY ELECTRICAL POWER GENERATION EQUIPMENT
48 14 00.01 - S-5! U-MINI CLIP DOE REVIEW
48 14 13.16A - SUNPOWER 225 SOLAR PANEL #02 04/16/2009 JJS

7'-116
7
"
G
08 14 00.D1 CONSTRUCTION DOCS
#03 06/01/2009 JJS
F
SHEET KEYNOTES
1 SEE ARCHITECTURAL ELEVATIONS FOR FINISH REQUIREMENTS

2 PLENUM FOR RETURN AIR


E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D 06 15 13.91
DRAWING LOCATION
FF 1'-5 1/4" A-314 BUILDING SECTION.DWG

DRAWN BY
C JJS

CHECKED BY
MT

B
GR ±0"
SHEET:
BUILDING SECTION
0 6" 1' 2'
BUILDING SECTION

A-314
A1
A
SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
07 41 13.01

06 11 00.F20

07 21 19.01

3
R
REFERENCE KEYNOTES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

Q
06 11 00 - WOOD FRAMING
06 11 00.D3 - 2X4 FRAMING
06 16 00.D10
06 11 00.D6 - 2X4 FRAMING @ 24" O.C.
06 11 00.F20 - 2X6 RAFTERS @ 24" O.C.
P 06 16 00.D10 06 11 00.H1 - 2X10

07 21 19.01 06 16 00 - SHEATHING
06 16 00.A4 - 5/8" GYPSUM SHEATHING
N 06 16 00.D6 - 1/2" PLYWOOD
DESIGNER:
06 16 00.D10 - 5/8" EXTERIOR GRADE PLYWOOD
UNIVERSITY OF ILLINOIS
06 17 13
06 16 00.D11 - 3/4" PLYWOOD
GABLE HOME TEAM
611 LOREDO TAFT DR.
M 06 17 00 - SHOP-FABRICATED STRUCTURAL WOOD CHAMPAIGN, IL 61820
.06 17 13 - 9 41" X 1 21" LVL
06 11 00.D3
SEALS:
06 18 00 - GLUED-LAMINATED CONSTRUCTION
L 1
06 18 00 01 - 2" LAMINATED BAMBOO

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

K PROJECT:
07 21 00 - THERMAL INSULATION US DEPT. OF ENERGY
07 21 00.B3 - 1 1/2" RIGID INSULATION SOLAR DECATHLON
07 21 19 01 - FOAMED-IN PLACE INSULATION OCTOBER 1-21 2009
J NREL & DOE
07 46 23 01
ISSUANCE:
07 26 00 - VAPOR RETARDERS
07 26 00.A6 - WEATHER BARRIER
BID DOCUMENTS
H #01 01/15/2009 JJS
07 41 00 - ROOF PANELS
07 21 00.B3
07 41 13 01 - RIDGE CAP
07 26 00.A6
DOE REVIEW
07 46 00.A3
#02 04/16/2009 JJS
G
07 46 00 - SIDING
07 46 00.A3 - 24ga STEEL SIDING
07 21 00.B3
07 46 23 01 - RECLAIMED BOARD SIDING CONSTRUCTION DOCS
#03 06/01/2009 JJS
07 21 19.01
DIVISION 09 - FINISHES
F
2
09 30 00 - TILING
09 30 13.A3 - FLOOR TILE
06 18 00.01

E
06 11 00.D6 SHEET KEYNOTES
REFER TO STRUCTURAL DRAWINGS FOR BALANCE OF DETAILS INFORMATION:
06 16 00.D6 1 WITH REGARD TO FOUNDATIONS AND OTHER STTRUCTURAL
SYSTEMS
PROJECT NAME
06 16 00.A4 UIUC_SD_2009
MAXIMUM 8" OF FOAM TO BE INSTALLED IN WALL PER MANUF.
D 06 11 00.H1 SPECIFICATION AND TESTING. AON ALL WALLS AND CEILINGS, A
2
MINIMUM OF 58" GYP. BD. WILL BE INSTALLED
DRAWING LOCATION
A-315 BUILDING SECTION.DWG
A MAXIMUM OF 12" OF FOAM WILL BE SPRAYEED IN THE ROOF CAP
09 30 13.A3 3
OF OUR HOME DRAWN BY
C 06 16 00.D11 JJS

CHECKED BY
1 MT

B SHEET:
BUILDING SECTION
0 6" 1' 2'
WALL SECTION

A-315
A13
A
SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL DIMENSIONS SHALL BE VERIFIED IN FIELD PRIOR TO
1

GABLE HOME
FABRICATION

T REFERENCE KEYNOTES
DIVISION 05 - METALS
06 18 00.02
05 50 00 - METAL FABRICATIONS
S 05 50 00 - STAINLESS STEEL TRAY
09 65 00.A3

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 16 00.D11 05 50 00 06 11 00 - WOOD FRAMING


R 06 11 00.F3 - 2X6 FRAMING @ 12" 0.C.

06 11 00.F3 0 6" 1' 2' 06 16 00 - SHEATHING


TRAY DETAIL

1081"
Q1 06 16 00.D11 - 3/4" PLYWOOD
26 24 16.A1
Q SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"


11 31 23 06 18 00 - GLUED-LAMINATED CONSTRUCTION
48 19 16 22 33 00.A1 06 18 00.02 - 3/4" LAMINATED BAMBOO

2'-10"
P 1'-121" 1'-783" DIVISION 08 - OPENINGS

3'-6" 08 11 00 - METAL DOORS AND FRAMES


08 11 13.G4 - HANGING RESIN DOOR

N 4 DIVISION 09 - FINISHES DESIGNER:


06 18 00.02 06 18 00.02 09 65 00 - RESILIENT FLOORING UNIVERSITY OF ILLINOIS
521" 1
2" 08 11 13.G4
09 65 00.A3 - RUBBER FLOORING GABLE HOME TEAM
09 65 00.A3
611 LOREDO TAFT DR.
M DIVISION 10 - SPECIALTIES CHAMPAIGN, IL 61820
10 28 00 - TOILET, BATH, AND LAUNDRY ACCESSORIES
05 50 00
10 28 00.C3 - 42" GRAB BAR SEALS:

2'-10"
5'-0" 2'-841"
3
L 06 11 00.F3 06 16 00.D11 2 DIVISION 11 - EQUIPMENT

2'-8" 2'-4" 2'-841" 11 31 00 - RESIDENTIAL APPLIANCES


11 31 13.A1 - OVEN
0 6" 1' 2'
TRAY DETAIL 1'-7" 11 31 13.A2 - REFRIGERATOR/FREEZER
K1 08 11 13.G4
K
SCALE: 1" = 1'-0" 11 31 23 - WASHER/DRYER PROJECT:
5'-541"
SCALE: 1" = 1'-0"
US DEPT. OF ENERGY
2" 5'-141" 2"
DIVISION 22 - PLUMBING
SOLAR DECATHLON

1'-5"
5
08 11 13.G4 22 13 00 - FACILITY SANITARY SEWERAGE
OCTOBER 1-21 2009
J
-5/8" 22 13 16.A2 - FLOOR DRAIN
NREL & DOE
22 33 00 - ELECTRIC DOMESTIC WATER HEATERS ISSUANCE:
2"

2" DRAIN
22 33 00.A1 - WATER HEATER BID DOCUMENTS
4"

H 1 #01 01/15/2009 JJS


22 40 00 - PLUMBING FIXTURES

1'-841"
11 31 13.A2

-13/32
22 13 16.A2 4" 22 40 00.A3 - LAVATORY
22 40 00.B1 DOE REVIEW
22 40 00.B1 - SHOWER
22 40 00.A3 #02 04/16/2009 JJS
22 40 00.B9 - HOTEL HANDSHOWER KIT
G

6'-141"
A1
22 40 00.E3 - TOILET

A11 K1
CONSTRUCTION DOCS
22 40 00.B9
DIVISION 26 - ELECTRICAL #03 06/01/2009 JJS

1'-6"
K11 26 24 00 - SWITCHBOARDS AND PANELBOARDS
F Q1
26 24 16.A1 - 200A MAIN PANEL
A-401
..
6'-541"

6'-141"

05 50 00

3'-0"
DIVISION 48 - ELECTRICAL POWER GENERATION
48 19 00 - ELECTRICAL POWER CONTROL EQUIPMENT
1
E 1 11 31 13.A1
48 19 16 - SPR-5000M INVERTER

SHEET KEYNOTES

1'-6"
10 28 00.C3 INFORMATION:
22 40 00.E3
PROJECT NAME
Q1 1 SLOPE METAL TRAY AT 81" MIN FOR DRAINAGE UIUC_SD_2009
D A-401

2
SET 2X6 FRAMING AS REQUIRED TO ACCEPT SLOPED STEEL TRAY. DRAWING LOCATION
MITER AS REQUIRED
A-401 ENLARGED BATHROOM
ALL OTHER FRAMING TO REMAIN ALIGNED WITH TOP OF PLAN.DWG
3
ADJACENT LVL STRUCTURE DRAWN BY
C -5/8" 4
1 X 6 X 34" SLATS TO BE FASTENED TO GRIPPING RUBBER BAD WITH JJS
CONTERSUNK MARINE-GRADE STAINLESS STEEL SCREWS
1
WALL FRAMING TO ALLOW FOR INSTALLATION OF HOME
CHECKED BY
5
CONTROL MONITOR IN WALL - SEE SECTION MT
2"

K7

SHEET:
A-401
B
0" ENLARGED
K1 0 6" 1' 2' 0 6" 1' 2' BATHROOM PLAN
ENLARGED TRAY PLAN A-401
ENLARGED PLAN

A-401
A1 A11
A
SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL DIMENSIONS ARE FOR REFERENCE ONLY. VERIFY ALLOWABLE SPACES IN FIELD
1.)

GABLE HOME
PRIOR TO FABRICATION OF ANY ELEMENT

06 11 00.X15

Q
REFERENCE KEYNOTES
06 11 00.X15
06 11 00.X15
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

P
06 11 00 - WOOD FRAMING
06 16 00.D12 1'-4" 06 11 00.D2 - TREATED 2X4
06 11 00.X1 - TREATED 2X6
06 11 00.X5 - 5/4" X 8" X 3" TREATED WOOD
N DESIGNER:
06 11 00.X15 - TREATED 2X8
UNIVERSITY OF ILLINOIS
06 15 00 - WOOD DECKING
GABLE HOME TEAM
06 15 13.91 - RECLAIMED 2X6 WOOD DECKING
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
2
06 16 00 - SHEATHING
06 11 00.X1
1/2" EXTERIOR GRADE PLYWOOD
SEALS:
06 16 00.D7 -
06 16 00.D12 - 3/4" EXTERIOR GRADE PLYWOOD
L
06 16 00.D12 06 18 00 - GLUED-LAMINATED CONSTRUCTION
06 18 00.02 - 3/4" LAMINATED BAMBOO

K
06 16 00.D7 PROJECT:
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
US DEPT. OF ENERGY

7'-041"
07 46 00 - SIDING SOLAR DECATHLON
06 11 00.X15 07 46 23 01 - RECLAIMED BOARD SIDING OCTOBER 1-21 2009
J 06 11 00.X5
NREL & DOE
06 11 00.X15 06 11 00.X15

ISSUANCE:
BID DOCUMENTS
07 46 23 01
#01 01/15/2009 JJS
H
06 16 00.D12
SHEET KEYNOTES
06 11 00.X15 1 TREATED 2X8 FOR SHELVING SUPPORT ABOVE DOE REVIEW
#02 04/16/2009 JJS
2 2X8 SUPPORT FOR RECLAIMED SLIDING DOOR - SEE DOOR DTL.
G
1
CONSTRUCTION DOCS

1'-4"
#03 06/01/2009 JJS
06 11 00.X15
06 18 00.02 06 18 00.02
F
06 11 00.D2
06 18 00.02
06 11 00.X15

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
A-402 ENLARGED SHED AREA.DWG

06 15 13.91 DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
ENLARGED SHED
0 6" 1' 2' 0 6" 1' 2' AREA
SHED SECTION ENLARGED FLOOR PLAN

A-402
A1 A15
A
SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
DOOR AND FRAME SCHEDULE GENERAL SHEET NOTES

GABLE HOME
DOOR FRAME
HARDWARE
FIRE RATING
SIZE FRAME DIMENSIONS DETAIL NOTES
T LABEL
MARK MATL GLAZING MATL EL
WD HGT THK WD HGT HEAD JAMB SILL SET NO KEYSIDE RM NO
OPTIWIN FROSTKORKEN
1 3' 7' 2" WD -- 3'-7" 7'-4" WD 7'-4" H1 J1/J2 T1 -- 1 105
WOOD DOOR
S
2 3' 6'-7" 3
16" CHRYSSALIS FULL 6'-0" -- STL 7'-4" -- 3
4" HOLE 103 FLAT-TRACK HARDWARE

3 4'-0" 6'-7" 3
16" CHRYSSALIS FULL 7'-8 41" -- STL 6'-8" -- 3
4" HOLE 103 HANGING TRACK

R 4 1'-10" 6'-7" 3
16" CHRYSSALIS FULL 5'-0" -- STL 6'-8" -- 3
4" HOLE 103 HANGING TRACK

5 3'-0" 7'-0" 2" WD -- 3'-7" 7'-4" WD 7'-4" J3/J4 T2 -- 1 101 OPTIWIN DOOR - 180° SWING

REFER TO DETAILS FOR


7 8'-0" 6'-8" 1 21" WD FULL 24'-0" 7'-2' STL 7'-2" -- -- --
HARDWARE REQ'TS.
Q

P
Section Section

Exterior Interior Interior Exterior

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

0 4" 8" 1'-4" 0 4" 8" 1'-4" 0 4" 8" 1'-4" 0 4" 8" 1'-4" SEALS:
THRESHOLD 1 THRESHOLD 2 JAMB 1 JAMB 2
L1 L6 L11 L16
L
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

PROJECT:
K
REFERENCE KEYNOTES US DEPT. OF ENERGY
SOLAR DECATHLON
OCTOBER 1-21 2009
J2
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
02
#03 06/01/2009 JJS
01 02 0 4" 8" 1'-4" 0 4" 8" 1'-4"
T1
JAMB 3 JAMB 4
F11 F15
F
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SHEET KEYNOTES
E

J5 INFORMATION:
PROJECT NAME
UIUC_SD_2009
D J4
DRAWING LOCATION
A-511 DOOR SCHEDULES &
ELEVATIONS.DWG
DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
DOOR SCHEDULES
03 04
T5

06 0 6" 1' 2' & ELEVATIONS


DOOR ELEVATIONS

A-511
A1
A
SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
T

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
WINDOW SCHEDULE
SIZE SEALS:
MARK TYPE MATERIAL NOTES
WIDTH HEIGHT
L
1 2'-5 3/8" 2'-5 41" NO. A, C TRIPLE GLASS WD OPTIWIN PICTURE WINDOW - 3 WOOD - EURPOEAN FIR

OPTIWIN PICTURE WIDNOW - 3 WOOD - EUROPEAN FIR - OPERABLE - ALUMINUM MACO HANDLE - TEMPERED GLASS
2 2'-8 3/4" 2'-8 21" NO. A TRIPLE GLASS WD
IN BATHROOM PROJECT:
K
3 2'-5 3/8" 4'-7 41" NO. A TRIPLE GLASS, SAFETY WD OPTIWIN PICTURE WINDOW - 3 WOOD - EUROPEAN FIR - TEMPERED
REFERENCE KEYNOTES US DEPT. OF ENERGY
SOLAR DECATHLON
4 8'-5 3/8" 6'-7 41" NO. A: SAFETY GLASS WD OPTIWIN PICTURE WINDOW - 3 WOOD - EUROPEAN FIR - TEMPERED
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

H1
H1 H3
DOE REVIEW
H2
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
2'-5 1/4"
1'-10"

J1
2'-8 1/2""

J1 J1
F 1
1'-10"

J2 2

SHEET KEYNOTES
4'10 3/4"
4'-0"

E 1'-10" 4

6'-1078"
"
2'-5 3/8" 1'-10"
INFORMATION:

6'-016
1
2'-8 3/4" S1 PROJECT NAME
S1 UIUC_SD_2009
D S2
DRAWING LOCATION
A-512 WINDOW ELEVATIONS &
1'-10" SCHEDULE.DWG
2'-8 3/4" DRAWN BY
C S3
JJS

CHECKED BY
MT

B 11
8'-016 "
SHEET:
8'-1121" WINDOW
0 8" 1'-4" 2'-8" ELEVATIONS &
WINDOW ELEVATIONS
SCHEDULE

A-512
A1
A
SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
07 46 23 01 07 46 23 01
1
T
5
06 11 00.B6 06 16 00.A4 06 16 00.A4

S 07 46 00.A3 06 11 00.D5 06 11 00.D5 07 46 00.A3


REFERENCE KEYNOTES
07 26 00.A6 07 26 00.A6
06 16 00.D6 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 16 00.D7 06 16 00.D7
R 07 21 00.B3 07 21 00.B3
4 06 11 00 - WOOD FRAMING
06 18 00.02 06 18 00.02
07 21 19.01 07 21 19.01 06 11 00.B6 - TREATED 1X4
3 3 06 11 00.D5 - 2X4 FRAMING @ 16" O.C.
06 11 00.D6 06 11 00.D6 06 11 00.D6 - 2X4 FRAMING @ 24" O.C.
Q
06 16 00.D6 06 16 00.D6 06 11 00.D9 - 2X4 STUDS @ 24" O.C.
06 16 00.A4 06 16 00.A4 06 11 00.D11 - TURNED 2X4

06 16 00 - SHEATHING
P 06 16 00.A4 - 5/8" GYPSUM SHEATHING
06 16 00.A8 - MOISTURE-RESISTANT GYPSUM SHEATHING
0 4" 8" 1'-4" 0 4" 8" 1'-4" 0 4" 8" 1'-4" 0 4" 8" 1'-4" 06 16 00.D6 - 1/2" PLYWOOD
WALL TYPE A WALL TYPE B WALL TYPE C WALL TYPE D
N1 N6 N11 N16 06 16 00.D7 - 1/2" EXTERIOR GRADE PLYWOOD
N DESIGNER:
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"
06 18 00 - GLUED-LAMINATED CONSTRUCTION
UNIVERSITY OF ILLINOIS
06 18 00.02 - 3/4" LAMINATED BAMBOO GABLE HOME TEAM
611 LOREDO TAFT DR.
M DIVISION 07 - THERMAL AND MOISTURE PROTECTION CHAMPAIGN, IL 61820
07 46 23 01
07 46 23 01
07 21 00 - THERMAL INSULATION
SEALS:
1
1
07 21 00.B3 - 1 1/2" RIGID INSULATION
L 06 11 00.B6 06 16 00.A4
07 21 19.01 - FOAMED-IN PLACE INSULATION
06 11 00.B6
06 16 00.D7
2
2 07 26 00 - VAPOR RETARDERS

06 11 00.D5 07 46 00.A3 06 11 00.D5 07 26 00.A6 - WEATHER BARRIER


K
07 46 00.A3 PROJECT:
07 26 00.A6 07 46 00 - SIDING US DEPT. OF ENERGY
07 26 00.A6
06 16 00.D6
06 16 00.D7 07 46 00.A3 - 1/2" CORRUGATED STEEL - 24 GA SOLAR DECATHLON
06 16 00.D7
06 16 00.A8 07 46 23 01 - RECLAIMED BOARD SIDING OCTOBER 1-21 2009
07 21 00.B3
J 4 NREL & DOE
06 18 00.02
06 11 00.D9 09 30 29.A1 DIVISION 09 - FINISHES
07 21 19.01
3
ISSUANCE:
06 11 00.D6 09 30 00 - TILING
BID DOCUMENTS
H 06 16 00.D6 09 30 29.A1 - METAL WALL TILE #01 01/15/2009 JJS
06 16 00.A4

0 4" 8" 1'-4" 0 4" 8" 1'-4" 0 4" 8"


09 30 29.A1
1'-4" 0 4" 8" 1'-4" DOE REVIEW
G1
WALL TYPE E
G6
WALL TYPE F
G11
WALL TYPE G
G16
WALL TYPE H #02 04/16/2009 JJS
G
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"
CONSTRUCTION DOCS
#03 06/01/2009 JJS
07 46 23 01
F 1

06 16 00.A4 06 11 00.B6
06 16 00.A4
2
E
06 11 00.D5 07 46 00.A3
06 11 00.D5
INFORMATION:
PROJECT NAME
07 26 00.A6 06 16 00.A4
06 16 00.D6 UIUC_SD_2009
D 06 16 00.D7 06 11 00.D11
06 16 00.A8
4
07 21 00.B3 SHEET KEYNOTES DRAWING LOCATION
06 18 00.02 1X4 TREATED BATTEN AT 48" O.C. - EACH TO BE 8" LONG AND A-513 WALL TYPES.DWG
07 21 19.01
09 30 29.A1 1 CENTERED BEHIND RECLAIMED SIDING AT 12" O.C. INSTALL WITH
1
DRAWN BY
3 4" SLOPE TO PREVEENT WATER POOLING
C 06 11 00.D6
JJS
1X4 TREATED BATTEN @ 48" O.C. VERTICALLY TO RUN ENTIRE
06 16 00.D6 2
LENGTH OF HOUSE - ALL SIDES
CHECKED BY
06 16 00.A4 MT
INSULATION TO BE INSTALLED TO A MAXIMUM THICKNESS OF 8"
06 11 00.D11 3
PER MANUF. TESTING - REFER TO SPECIFICATIONS
B SHEET:
4 REFER TO STRUCTURAL DRAWINGS FOR NAILING SCHEDULE WALL TYPES
0 4" 8" 1'-4" 0 4" 8" 1'-4" 0 4" 8" 1'-4" 0 4" 8" 1'-4" RECLAIMED SIDING - THIS WALL TYPE ONLY - TO BE LAID
5
WALL TYPE J WALL TYPE K WALL TYPE L WALL TYPE M HORIZONTALLY IN 5 41" SECTIONS WITH 34" SPACING

A-513
A1 A6 A11 A16
A
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
THE INTERCONNECTION MOUNTING PANEL WILL BE PLACED

GABLE HOME
ADJACENT TO THE EAST WALL OF THE HOUSE AND WILL BE
PREPREARED FOR ORGANIZER INSTALLATION BY 10AM ON
1
DAY 2. IT WILL BE PLACED WITH EASY ACCESS AT ALL TIMES
T AND THE ENTIRE AREA IN FRONT OF THE EQUIPMENT SHALL
BE FREE TO CREATE A USABLE WORK SPACE
OWNER SHALL BE RESPONSIBLE FOR INSTALLING THE
MOUNTING PANEL, MOUNTING THE TERMINAL BOX AND
2
PULLING WIRES FROM THE METER HOUSING TO THE BACK OF
THE TERMINAL BOX.
S 3 REFER TO ELECTRICAL DRAWINGS FOR WIRING
06 16 00.D12
REFER TO "GRID INTERCONNECTION PROCESS FOR TEAMS"
SUPPLIED BY THE ORGANIZER FOR THE MOST CURRENT
06 05 23.A9 (TYP.) 4
INFORMATION. WHEN A CONFLICT ARISES, ORGANIZER
SUPPLIED INFORMATION TAKES PRECESDENCE.

R
06 11 00.D2

Q 4

06 11 00.X1
P

06 11 00.X1

N
REFERENCE KEYNOTES DESIGNER:
UNIVERSITY OF ILLINOIS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
GABLE HOME TEAM
06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND
COMPOSITES 611 LOREDO TAFT DR.
M 06 05 23.A9 - 10 PENNY NAIL CHAMPAIGN, IL 61820
06 05 23.B1 - 3/8" LAG SCREW

06 11 00 - WOOD FRAMING SEALS:


06 11 00.D2 - TREATED 2X4
L 06 11 00.X1 - TREATED 2X6
06 16 00 - SHEATHING
0 4" 8" 1'-4" 06 16
- 3/4" EXTERIOR GRADE PLYWOOD
00.D12
INTERCONNECTION SECTION
A12
K
SCALE: 1 1/2" = 1'-0" DIVISION 26 - ELECTRICAL PROJECT:
SCALE: 1 1/2" = 1'-0" 26 30 00 - FACILITY ELECTRICAL POWER GENERATING AND STORING
EQUIPMENT US DEPT. OF ENERGY
26 30 00.A4 - WEATHER PROOF RECEPTACLE SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
1'-0"
#01 01/15/2009 JJS
H 6" MAX 06 11 00.X1
SHEET KEYNOTES
06 11 00.D2 1
ALTERNATE LOCATION FOR INTERCONNECTION MOUNTING DOE REVIEW
PANEL AFTER ASSEMBLY OF HOUSE
#02 04/16/2009 JJS

5"
6"
06 16 00.D12
G 120 V RECEPTACLE - SQUARE D SERVICE PACK10C-1 FOR
2 ORGANIZERS' USE. POWER FROM THIS OUTLET SHALL NOT
4
COUNT AGAINST THE TEAM.
CONSTRUCTION DOCS
#03 06/01/2009 JJS

6"
06 16 00.D12
TERMINAL BOX - ORGANIZER SUPPLIED, TEAM INSTALLED.
F 3
TEAM SHALL CONNECT CONDUIT FROM METER HOUSING TO
BOTTOM OF TERMINAL BOX. TEAM SHALL LEAVE 3FT OF WIRE
INSIDE TERMINAL BOX.

1'-041"
2
4 DATA LOGGER BOX. NEMA 4X
4

3'-6"
E
1'-6"

26 30 00.A4
2 INFORMATION:
PROJECT NAME
UIUC_SD_2009
D 3
1034"

DRAWING LOCATION
3 A-514 INTERCONNECTION
DETAIL.DWG
06 11 00.D2 DRAWN BY
1"

C
1'-0"

JJS
06 11 00.X1
CHECKED BY
6"

MT
1"

B SHEET:
INTERCONNECTION
0 4" 8" 1'-4" 0 4" 8" 1'-4" DETAIL
INTERCONNECTION STAND ELEVATION INTERCONNECTION STAND PLAN

A-514
A1 A12
A
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
48 14 13.16A REFERENCE KEYNOTES
T 48 14 00.01
DIVISION 05 - METALS
07 62 00.A3
07 92 00.A2
05 05 00 - COMMON WORK RESULTS FOR METALS
05 05 23.J2 05 05 23.J1 - 1/8 X 3/16 POP RIVET FASTENER

S 09 92 00.B2
05 05 23.J2 -
METAL FASTENINGS (10-12 X 1 PANCAKE HEAD
05 05 23.X11 SELF-TAPPER)
05 05 23.X11 - 1/4 - 14 X 7/8" LONG - LIFE LAPTEX WITH WASHER

07 61 00.A1 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES


R
1 06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND
COMPOSITES

07 61 13.A1 06 05 23.T5 - LUC 26Z

Q
06 10 00 - ROUGH CARPENTRY
06 10 00 - WOOD BLOCKING
05 05 23.J2

07 61 00.A1
P 06 11 00 - WOOD FRAMING
06 11 00.A1 - BLOCKING
06 11 00.A2 - WOOD BLOCKING AS REQUIRED
0 2" 4" 8"
RIDGE DETAIL 06 11 00.F20 - 2X6 RAFTERS @ 24" O.C.
N13
N DESIGNER:
SCALE: 3" = 1'-0"

SCALE: 3" = 1'-0" 06 16 00 - SHEATHING


UNIVERSITY OF ILLINOIS
06 16 00.D7 - 1/2" EXTERIOR GRADE PLYWOOD
GABLE HOME TEAM
06 16 00.D8 - 5/8" PLYWOOD
48 14 13.16A
611 LOREDO TAFT DR.
06 16 00.D10 06 16 00.D10 - 5/8" EXTERIOR GRADE PLYWOOD
M CHAMPAIGN, IL 61820

4
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SEALS:
07 50 00
06 16 00.D10 6
07 26 00 - VAPOR RETARDERS
L
07 61 00.A1 07 61 13.A1 07 26 00.A2 - BUILDING FELT

06 10 00
48 14 00.01
07 50 00 - MEMBRANE ROOFING
07 61 13.A1

K
07 50 00 - MEMBRANE ROOFING PROJECT:
05 05 23.J2
5 US DEPT. OF ENERGY
07 61 00 - SHEET METAL ROOFING
05 05 23.J1 SOLAR DECATHLON
07 61 00.A1 - STANDING SEAM METAL ROOF
07 61 13.A1 - UL90 CLIP
OCTOBER 1-21 2009
J 06 05 23.T5 NREL & DOE
06 11 00.F20
07 62 00.A2
07 62 00 - SHEET METAL FLASHING AND TRIM
ISSUANCE:
06 05 23.T5
07 62 00.A2 - ALUMINUM FLASHING
BID DOCUMENTS
07 62 00.A3 - STAINLESS STEEL FLASHING
H #01 01/15/2009 JJS
07 62 00.K2 - BOX RAKE TRIM
07 62 00.K3 - Z CLOSURE
0 2" 4" 8" 0 2" 4" 8" DOE REVIEW
G1
NORTH OVERHANG DETAIL
G13
SOUTH ROOF OVERHANG DETAIL 07 92 00 - JOINT SEALANTS #02 04/16/2009 JJS
G
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
07 92 00.A1 - SEALANT
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
07 92 00.A2 - SILICONE SEALANT CONSTRUCTION DOCS
09 92 00.B2 - ELASTOMERIC JOINT SEALANT (URETHANE SEALANT)
#03 06/01/2009 JJS
F 07 61 13.A1
06 11 00.F20 DIVISION 48 - ELECTRICAL POWER GENERATION

07 62 00.K3
07 61 00.A1
07 62 00.K2 48 14 00 - SOLAR ENERGY ELECTRICAL POWER GENERATION EQUIPMENT
07 61 00.A1
07 26 00.A2
48 14 00.01 - S-5! U-MINI CLIP
05 05 23.J2
E 07 26 00.A2
07 92 00.A1 48 14 13.16A - SUNPOWER 225 SOLAR PANEL

05 05 23.J1 INFORMATION:
06 11 00.A2 PROJECT NAME
06 16 00.D8

5"
SHEET KEYNOTES
48 14 13.16A UIUC_SD_2009
D 05 05 23.J2 06 11 00.A1
DRAWING LOCATION
2 HOLD BACK ROOF SHEATHING 1" EITHER SIDE TO ALLOW FOR
1 A-515 ROOF DETAILS.DWG
ROOF VENTILATIN
48 14 00.01
ROOF CAP SHEATHING TO OVERLAP MAIN MODULE BY 1 21" -
DRAWN BY
2
C 06 16 00.D7 3
COORDINATE WITH MAIN MODULE SHEATHING CONSTRUCTION JJS
UL90 CLIP TO BE PLACED BENEATH S-5 LOCATION - MAXIMUM
3
SPACING OF 4'-0" O.C. CHECKED BY
INSTALL STANDING SEAM ROOF WITHOUT MASTIC AT THE TOP OF MT
4 THE BATTEN FOR INITIAL ILLINOIS AND WASHINGTON D.C.

B
LOCATION. SHEET:
5
DO NOT INSTALL END MASTIC FOR TEMPORARY INSTALLATIONS -
INSTALL FOR FINAL PER MANUF. INSTRUCTIONS
ROOF DETAILS
0 2" 4" 8" 0 2" 4" 8"
6 ROOF CONSTRUCTION TO BE UL TYPE 436
STANDING EAM DETAIL ROOF DETAIL @ S-5 ATTACHEMENT

A-515
A1 A13
A
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
24'-583"

T 2 2 2
4

R
REFERENCE KEYNOTES
DIVISION 05 - METALS

Q
05 05 00 - COMMON WORK RESULTS FOR METALS
05 05
- 5/8" A307 BOLT
23.A2

P DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND


COMPOSITES
06 05
N 23.B2
- 1/2" LAG SCREW
DESIGNER:
UNIVERSITY OF ILLINOIS
06 11 00 - WOOD FRAMING GABLE HOME TEAM
06 11
- 5/4 X 6 - PLANE TO 7/8" ACTUAL 611 LOREDO TAFT DR.
00.X4
M CHAMPAIGN, IL 61820
06 22 00 - MILLWORK
0 8" 1'-4" 2'-8" SEALS:
06 22
SLIDING DEVICE ELEVATION - 1X2 WOOD TRIM
00.A2
L1
L
SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0"

05 05 23.A2 PROJECT:
K
SHEET KEYNOTES US DEPT. OF ENERGY
8'-0" 1
1 COBURN 8-130 LATERALLY ADJUSTABLE BRACKET SOLAR DECATHLON
EQ EQ
7 OCTOBER 1-21 2009
2 COBERN OPEN BRACKET WITH LOCK-JOINT PLATE
J 3 NREL & DOE
3 COBURN 8-334 ROLLER TOP GUIDE
06 05 23.B2
06 11 00.X4 0 ISSUANCE:
TYP. 4 COBURN CLOSED END BRACKET BID DOCUMENTS

141"
H 06 11 00.X4 #01 01/15/2009 JJS

4"
3
TYP. 5 COBURN 72-402 MORTISE BALL BEARING BOTTOM ROLLER

06 22 00.A2 6 COBURN 72-3 BRASS BOTTOM TRACK DOE REVIEW


#02 04/16/2009 JJS
7 COBURN 8-25 TOP TRACK
G
CONSTRUCTION DOCS
0
#03 06/01/2009 JJS
F 06 11 00.X4
15
6'-316"

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
06 11 00.X4
3 1/2" A-521 SOUTH SHADING DETAIL.DWG
5
DRAWN BY
C 6
JJS

CHECKED BY
MT

B SHEET:
SOUTH SHADING
0 6" 1' 2' 0 6" 1' 2' DETAIL
SHADING DOOR ELEVATION SHADING DOOR SECTION

A-521
A1 A14
A
SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1 VERIFY ALL WINDOW SIZES IN FIELD

GABLE HOME
2 PROVIDE PELLA INSECT SCREEN AT ALL OPERABE WINDOWS
T
06 11 00.A2 06 16 00.D6
06 11 00.A2 06 16 00.D6
1
1
1
S 1

1
1

R
06 18 00.02 06 18 00.02
REFERENCE KEYNOTES
06 18 00.02
06 11 00.A2 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

Q 08 52 00.F9 08 52 00.F9

07 95 13.E1 08 52 00.F9 06 11 00 - WOOD FRAMING


07 95 13.E1
06 11 00.A2 - WOOD BLOCKING AS REQUIRED
07 95 13.E1
06 16 00.D6

06 16 00 - SHEATHING
P 06 16 00.D6 - 1/2" PLYWOOD
06 16 00.D7 - 1/2" EXTERIOR GRADE PLYWOOD
0 2" 4" 8" 0 2" 4" 8" 0 2" 4" 8"
WINDOW HEAD DETAIL WINDOW HEAD DETAIL WINDOW HEAD DETAIL
H1 H2 H3 06 18 00 - GLUED-LAMINATED CONSTRUCTION
N DESIGNER:
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

06 18 00.02 - 3/4" LAMINATED BAMBOO


SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
UNIVERSITY OF ILLINOIS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
GABLE HOME TEAM
611 LOREDO TAFT DR.
06 16 00.D6
M 07 62 00 - SHEET METAL FLASHING AND TRIM CHAMPAIGN, IL 61820
06 16 00.D6
07 62 00.A2 - ALUMINUM FLASHING
07 95 13.E1 06 16 00.D6
SEALS:
07 95 13.E1
07 95 13.E1 07 95 00 - EXPANSION CONTROL
08 52 00.F9
L 06 18 00.02 07 95 13.E1 - BACKER ROD W/ SEALANT
07 62 00.A2 08 52 00.F9
2 07 62 00.A2 06 18 00.02 08 52 00.F9
2 07 62 00.A2 06 18 00.02 DIVISION 08 - OPENINGS

K
2 PROJECT:
08 52 00 - WOOD WINDOWS
1
06 11 00.A2 1 1 08 52 00.F9 - CLAD WOOD WINDOW US DEPT. OF ENERGY
06 11 00.A2
06 11 00.A2
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
#01 01/15/2009 JJS
H
SHEET KEYNOTES
0 2" 4" 8" 0 2" 4" 8" 0 2" 4" 8" 1 REFER TO PREVIOUS SHEETS FOR DETAILS DOE REVIEW
S1
WINDOW SILL DETAIL
S2
WINDOW SILL DETAIL
S3
WINDOW SILL DETAIL METAL WINDOW SILL TRIM TO BE PROVIDED BY WINDOW MANUF. #02 04/16/2009 JJS
2
G
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
AT NO ADDITIONAL COST. SIZE AS REQUIRED IN FIELD
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
CONSTRUCTION DOCS
1 1
#03 06/01/2009 JJS
F

06 16 00.D7
06 16 00.D7

06 11 00.A2
E 06 11 00.A2

INFORMATION:
07 95 13.E1 PROJECT NAME
07 95 13.E1 UIUC_SD_2009
D
06 18 00.02
DRAWING LOCATION
A-511 WINDOW DETAILS.DWG
06 18 00.02 08 52 00.F9
DRAWN BY
08 52 00.F9
C JJS

CHECKED BY
MT

B SHEET:
WINDOW DETAILS
0 2" 4" 8" 0 2" 4" 8"
WINDOW JAMB DETAIL WINDOW JAMB DETAIL

A-524
J1 J1
A
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
BOARDS SHOWN ARE FOR REFERENCE ONLY. CONTRACTOR
1

GABLE HOME
TO VERIFY ALL DIMENSIONS ON SITE PRIOR TO INSTALLATION

ALL RECLAIMED LUMBER TO BE PAINTED ON ALL SIDES, TWO


2
T COATS - REFER TO SPECIFICATIONS

3 FOR FULL BOARD SCHEDULE, SEE FOLLOWING SHEET

1'-11"
10 10 10 10 10 10 12 12 12 12 14 14

Q 6 7 8 9 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 16

8'-683"
P

4'-121"
11 11 11 11 11 11 13 13 13 13 15 15

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
M1
NORTH BOARD DIAGRAM 611 LOREDO TAFT DR.
M
SCALE: 3/8" = 1'-0"
CHAMPAIGN, IL 61820

SEALS:
1078"

3 3 3 3 3 3

1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
7'-281"

PROJECT:
K
REFERENCE KEYNOTES US DEPT. OF ENERGY

3'-983"
NONE USED
SOLAR DECATHLON
OCTOBER 1-21 2009
1'-1083"

4 4 4 4 5 5

J NREL & DOE


ISSUANCE:
SCALE: 3/8" = 1'-0" BID DOCUMENTS
H1
H
SOUTH BOARD DIAGRAM
#01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

56
57
SHEET KEYNOTES
NONE USED
55

E 53
54

20 21 22 23 24 25 26 27 29 30 31 52

51

51
INFORMATION:
51

48 58
PROJECT NAME
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
48 58
UIUC_SD_2009
D 48 58

DRAWING LOCATION
49 50 58

49 50 58

32 49 50 58

49 50 58 A-215 SIDING BOARD


49 50 58
DIAGRAMS.DWG
DRAWN BY
17 18 19

49 50 58

49 50 58

C 48
49 50

58
58
JJS

CHECKED BY
28 28 48 58

48 58

48 58

48 58 MT
48 58

SHEET:
48 58

B 48 58

SIDING BOARD
48 58

48 58

DIAGRAMS
WEST BOARD DIAGRAM EAST BOARD DIAGRAM SHED BOARD DIAGRAM

A-601
A1 A8 A15
A
SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U RECLAIMED SIDING BOARD SCHEDULE
GENERAL SHEET NOTES
MARK QUANTITY WIDTH LEFT HEIGHT RIGHT HEIGHT 1 ALL BOARD DIMENSIONS ARE GIVEN FOR CONVENIENCE ONLY. CONTRACTOR TO

GABLE HOME
VERIFY ALL DIMENSIONS IN FIELD PRIOR TO FABRICATION OR INSTALLATION
1 1 7.5 7'-2 1/8" 7'-2 1/8" 2
ALL SIDES OF RECLAIMED BOARDS SHALL BE PAINTED WITH 2 COATS AS SPECIFIED.
2 24 10.5 7'-2 1/8" 7'-2 1/8"
T
REFER TO SPECIFICATIONS

3 6 10.5 10 7/8" 10 7/8"

4 4 10.5 1'-10 3/8" 1'-10 3/8"

5 2 10.5 3'-9 3/8" 3'-9 3/8"


S
6 33 10.5 8'-6 3/8" 8'-6 3/8"

7 1 10.5 7'-8 1/4" 7'-8 1/4"

8 1 2 1/4" 7'-8 1/4" 7'-8 1/4"

R 9 1 6 8'-6 3/8" 8'-6 3/8"

10 6 10.5 1'-7 1/4" 1'-7 1/4"

11 6 10.5 4'-8 1/2" 4'-8 1/2"

Q 12 4 10.5 1'-5' 1'-5'

13 4 10.5 4'7 1/2" 4'7 1/2"

14 2 10.5 1'-11" 1'-11"

P 15 2 10.5 4'-1 1/2" 4'-1 1/2"

16 1 7.5 8'-6 3/8" 8'-6 3/8"

17 1 6.5 7'-11 1/2" 8'-6"

18 1 10.5 8'-7 1/2" 9'-6


N DESIGNER:
19 1 10.5 9'-7 1/2" 10'-6" UNIVERSITY OF ILLINOIS
20 1 10.5 10'-7 1/2" 11'-6" GABLE HOME TEAM
21 1 10.5 4'-7 1/2" 5'-6"
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
22 1 10.5 5'-7 1/2" 6'-6"

23 1 10.5 6'-7 1/2" 7'-6" SEALS:


24 1 10.5 14'-7 1/2" 14'-7 1/2"
L 25 1 10.5 14'-6" 13'-7 1/2"

26 1 10.5 7'-2 3/4" 6'-4 1/4"

27 1 10.5 6'-2 3/4" 5'-4 1/4"


PROJECT:
K 28 2 10.5 3'-9 3/8" 3'-9 3/8"
REFERENCE KEYNOTES US DEPT. OF ENERGY
29 1 10.5 11'-6" 10'-7 1/2" NONE USED
SOLAR DECATHLON
30 1 10.5 10'-6 9'-7 1/2" OCTOBER 1-21 2009
J 31 1 10.5 9'-6 8'-7 1/2" NREL & DOE
32 1 6.5 8'-6 7'-11 1/2"
ISSUANCE:
33 1 6.5 8'-9 3/4" 9'- 4 1/4" BID DOCUMENTS
H 34 1 10.5 9'-5 3/4" 10'-4 1/4" #01 01/15/2009 JJS
35 1 10.5 10'-5 3/4" 11'-4 1/4"

36 1 10.5 11'-5 3/4" 12'-4 1/4"


DOE REVIEW
#02 04/16/2009 JJS
37 1 10.5 12'-5 3/4" 13'-4 1/4"
G
38 1 10.5 13'-5 3/4" 14'-4 1/4"
CONSTRUCTION DOCS
39 1 10.5 14'-5 3/4" 15'-4 1/4"
#03 06/01/2009 JJS
40 1 10.5 15'-5 3/4" 15'-5 3/4"
F
41 1 10.5 15'-4 1/4" 14'-5 3/4"

42 1 10.5 14'-4 1/4" 13'-5 3/4" SHEET KEYNOTES


43 1 10.5 13'-4 1/4" 12'-5 3/4" NNE USED
E
44 1 10.5 12'-4 1/4" 11'-5 3/4"

45 1 10.5 11'-4 1/4" 10'-5 3/4" INFORMATION:


PROJECT NAME
46 1 10.5 10'-4 1/4" 9'-5 3/4"
UIUC_SD_2009
D 47 1 6.5 9'-4 1/4" 8'-9 3/4"
DRAWING LOCATION
48 13 4 7'-3 1/8" 7'-3 1/8" A-602 SIDING BOARD
SCHEDULE.DWG
49 8 4 3'-6 1/2" 3'-6 1/2" DRAWN BY
C 50 8 4 1'-7 1'-7 JJS

51 3 4 14'-2 1/2" 14'-2 1/2" CHECKED BY


MT
52 1 4 14'-1 5/8" 13'-5 5/8"

B 53 1 4 13'-5 5/8 12'-9 5/8" SHEET:


54 1 4 12'-9 5/8" 12'-1 5/8" SIDING BOARD
55 1 4 12'-1 5/8" 11'-5 5/8" SCHEDULE

A-602
56 1 4 11'-5 5/8" 10'-9 5/8"
A
57 1 4 10'-9 5/8" 10'-1 5/8"

58 1 21 3'-1 1/8" 3'-1 1/8"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
ROOM FINISH SCHEDULE GENERAL SHEET NOTES
1.) SEE SPECIFICATIONS FOR FINISH MATERIALS
WALLS CEILING

GABLE HOME
ROOM NAME FLOOR NOTES CONTRACTOR TO VERIFY ALL MATERIALS WITH OWNER PRIOR
N S E W MATL HEIGHT 2.)
TO BID AND INSTALLATION
T
LIVING F1 PT1 PT1 PT1 PT1 PT1 10'-1" UNLESS NOTED OTHERWISE ON SPECIFIC ELEVATIONS OR
3.) PLANS, SEE SPECIFICATIONS FOR TYPICAL MOUNTING
KITCHEN F1 PT1 PT1 PT1 PT1 PT1 10'-1" HEIGHTS
FIXTURES AND ACCESSORIES SHALL BE INSTALLED IN
HALLWAY F2 PT1 PT1 PT1 PT1 PT1 10'-1" ACCORDANCE WITH THE LATEST EDITIONS OF THE ILLINOIS
S 4.)
PLUMBING CODE AND THE IRC, WHICHEVER IS MORE
7'-0" - STRINGENT
ELEC. CLOSET F2 PT1 PT1 PT1 PT1 PT1
10'-0" PROVIDE BLOCKING, BRACKETS AND MISCELLANEOUS
5 MATERIALS NECESSARY FOR THE PROPER INSTALLATION OF
BATHROOM F3 PT1 PT1 PT1 PT1 PT1 7'-0" ALL ACCESSORIES SHOWN

R MECH. SPACE F4 PT1 PT1 PT1 PT1 PT1 2'-10" FOR A FULL LIST OF FURNISHINGS, REFER TO THE COMPOSITE
LIST OF ALL KEYNOTES ON INTERIOR DOCUMENTS. EFFORT
WAS MADE TO REDUCE DUPLICATE NOTING THEREBY
BATHROOM F5 PT2 PT2 PT2 PT2 PT2 10'-1" 6
REDUCING THE CHANCES FOR ERRORS OR INCORRECT COST
ESTIMATES. THE SPECIFICATIONS LISTS ALL PRODUCTS
REQUIRED
Q 12 24 00.A1

REFERENCE KEYNOTES
P DIVISION 12 - FURNISHINGS

12 43 00.A1
12 06 00 - SCHEDULES FOR FURNISHINGS
10 57 13.A1
12 06 50.A1 - DECK CHAIR
27 41 00.A1
N 12 06 50.A2 - HAMMOCK DESIGNER:
12 06 50.A3 - SECTIONAL UNIVERSITY OF ILLINOIS
N1 A1 12 06 50.A4 - DINING TABLE GABLE HOME TEAM
K1
A1
12 06 50.A7
I-501 12 06 50.A5 - DINING CHAIR 611 LOREDO TAFT DR.
I-503
M K11 K221 A11 H13
A1 I-201 A12 12 06 50.A6 - INTERLOCK CHAIR CHAMPAIGN, IL 61820
I-502 12 06 50.A5 12 06 50.A7 - DESK CHAIR
12 06 50.A6
A1
G1
SEALS:
12 48 00.B4
12 24 00 - WINDOW SHADES

L 12 24 00.A1 - BLINDS
A1
A13
I-503 12 06 50.A4 12 48 00.B4
12 45 13.13 12 43 00 - PORTABLE LAMPS
A12 I-201 K1
12 43 00.A1 - LED LAMP

K K11
12 06 50.A3
PROJECT:

12 43 00.A1
US DEPT. OF ENERGY
12 43 00.A1
SOLAR DECATHLON
OCTOBER 1-21 2009
J
SHEET KEYNOTES NREL & DOE
ISSUANCE:
12 06 50.A1 12 06 50.A1
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
I-101 FINISH PLAN.DWG
12 06 50.A2
DRAWN BY
C JJS

CHECKED BY
--

B SHEET:
FINISH PLAN
0 1'-4" 2'-8" 5'-4"
INTERIOR PLAN

I-101
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL DIMENSIONS PROVIDED FOR REFERENCE ONLY.
1.)

GABLE HOME
CONTRACTOR TO USE FIELD MEASURMENTS
08 95 00.B10
J15 CONTRACTOR TO VERIFY KITCHEN DESIGN WITH OWNER
2.)
T I-505
PRIOR TO INSTALLATION

3.) SEE SPECIFICATIONS FOR CABINETRY DETAILS

4.)

S
22 40 00.E9
11 31 13.A3
REFERENCE KEYNOTES
J15
I-505 DIVISION 08 - OPENINGS
R 12 30 00.A1 12 30 00.A1 12 30 00.A1 12 30 00.A1 12 30 00.A1 12 30 00.A1
27 41 00.A1

08 14 00 - WOOD DOORS
11 31 13.A4
12 36 23.13 08 14 00.A1 - 1 3/8" SOLID CORE DOOR

60x72
Q 60x72 60x72 60x72 60x72 30x72 12 30 00.A1 12 30 00.A1 12 30 00.A1 12 30 00.A1
08 52 00 - WOOD WINDOWS

60x18 08 52 00.F9 - CLAD WOOD WINDOW


90x60 90x60 90x60 90x60

08 95 00 - VENTS
12 30 00.A2
P 08 95 00.B10 - RECIRCULATING VENT HOOD

0 8" 1'-4" 2'-8" DIVISION 11 - EQUIPMENT


NORTH ELEVATION
N1
N DESIGNER:
SCALE: 3/4" = 1'-0"
11 31 00 - RESIDENTIAL APPLIANCES
SCALE: 3/4" = 1'-0"
11 31 13.A1 - OVEN UNIVERSITY OF ILLINOIS
11 31 13.A2 - REFRIGERATOR/FREEZER GABLE HOME TEAM
11 31 13.A3 - STOVE 611 LOREDO TAFT DR.
M 11 31 13.A4 - DISHWASHER CHAMPAIGN, IL 61820
12 12 19.A1
DIVISION 12 - FURNISHINGS SEALS:

L 12 12 00 - WALL DECORATIONS
08 52 00.F9 08 52 00.F9 12 12 19.A1 - FRAMED PRINT

12 12 19.A1
12 30 00 - CASEWORK

K 12 30 00.A1 - KITCHEN CABINETRY PROJECT:


12 30 00.A2 - CABINETRY TOE KICK US DEPT. OF ENERGY
SOLAR DECATHLON
12 36 00 - COUNTERTOPS OCTOBER 1-21 2009
J 12 36 23.13 - LAMINATE COUNTERTOP NREL & DOE

12 46 00 - FURNISHING ACCESSORIES ISSUANCE:


12 46 00.A1 - COAT HOOK BID DOCUMENTS
H #01 01/15/2009 JJS
12 48 00 - RUGS AND MATS

0 8" 1'-4" 2'-8"


12 48 53.A1 - CARPET TILE
DOE REVIEW
G1
NORTH ELEVATION #02 04/16/2009 JJS
12 58 00 - RESIDENTIAL FURNITURE
G
SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0" 12 58 00.A1 - COFFEE TABLE


12 58 13.A2 - SECTIONAL SOFA CONSTRUCTION DOCS
#03 06/01/2009 JJS
DIVISION 22 - PLUMBING
F
12 30 00.A1 22 40 00 - PLUMBING FIXTURES

90x60 22 40 00.E9 - WALL FAUCET


12 46 00.A1

E DIVISION 27 - COMMUNICATIONS
08 52 00.F9
INFORMATION:
11 31 13.A1 27 41 00 - AUDIO-VIDEO SYSTEMS PROJECT NAME
08 14 00.A1 27 41 00.A1 - TELEVISION UIUC_SD_2009
D 11 31 13.A2 12 36 23.13
DRAWING LOCATION
I-201 KITCHEN ELEVATIONS.DWG

DRAWN BY
C
12 30 00.A1
90x60
12 58 00.A1 SHEET KEYNOTES JJS

90x60 90x60 12 30 00.A1 NONE CHECKED BY


75 X 72 USED
WITH DRAWERS --
12 30 00.A1
H5
B I-501 12 48 53.A1
SHEET:
KITCHEN
0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" ELEVATIONS
WEST ELEVATION WEST ELEVATION

I-201
A1 A12
A
SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0"

SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
LOADING REPRESENTS A SUGGESTED METHOD OF LOADING.

GABLE HOME
EXACT PLACEMENT OF EACH ITEM TO BE COORDINATED WITH
1.) SHIPPING COMPANIES SO THAT TRANSPORTATION
REQUIREMENTS ARE MET, LOADS ARE DISTRIBUTED AND
T CONSTRUCTION SEQUENCE IS OPTIMIZED.

09 30 29.A1 CONTRACTOR TO DETERMINE APPLICABLE SHIPPING ROUTE


2'-7" FROM CONSTRUCTION SITE TO NATIONAL MALL IN
26 51 00.A6 2'-7" 2.)
WASHINGTON D.C. AND VERIFY WITH OWNER PRIOR TO
06 18 00.02 06 18 00.02 TRANSPORTATION
08 52 00.F9 CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL
08 84 00.A1
S 1 NECESSARY PERMINTS AND TRANSPORTATION VEHICLES TO

1041"
08 81 00.G1 3.)
MOVE TRUCKS FROM CONSTRUCTION LOCATION TO THE
NATIION MALL IN WASHINGTON D.C. AND BACK.
06 18 00.02 06 18 00.02 ALL ITEMS TO BE SECURED TO THE TRUCK PER REQUIREMENTS
SET FORTH BY THE DEPARTMENT OF TRANSPORTATION, THE
4.)
SHIPPING COMPANY AND ANY OTHER APPLICABLE LEGAL

2'-621"
2'-6"
1041"
08 84 00.A1
R BODIES.

22 40 00.E9
06 18 00.02 06 18 00.02 REFERENCE KEYNOTES

1041"
09 30 29.A1
22 40 00.B9 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
Q
22 40 00.E8 06 18 00.02
06 18 00.02
06 18 00 - GLUED-LAMINATED CONSTRUCTION
22 40 00.A3
06 18 00.01 - 1/2" LAMINATED BAMBOO

1'-216
7
"
10 28 00.C3
06 18 00.02 - 3/4" LAMINATED BAMBOO
P 10 28 00.C3

06 18 00.01 DIVISION 08 - OPENINGS


10 28 00.A2

10 28 00.B2 08 52 00 - WOOD WINDOWS


N 10 28 00.B2 08 52 00.F9 - CLAD WOOD WINDOW DESIGNER:
J1 22 40 00.E2
UNIVERSITY OF ILLINOIS

2'-3"
I-505
22 40 00.E2 12 44 13.16 08 81 00 - GLASS GLAZING GABLE HOME TEAM
08 81 00.G1 - 1/4" GLASS MIRROR 611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
08 84 00 - PLASTIC GLAZING
±0" 08 84 00.A1 - RESIN GLAZING SEALS:

L DIVISION 09 - FINISHES

0 6" 1' 2' 0 6" 1' 2' 09 30 00 - TILING


BATHROOM ELEVATION BATHROOM ELEVATION 09 30 29.A1 - METAL WALL TILE
K1 K11
K
SCALE: 1" = 1'-0" SCALE: 1" = 1'-0" PROJECT:
SCALE: 1" = 1'-0" SCALE: 1" = 1'-0" DIVISION 10 - SPECIALTIES US DEPT. OF ENERGY
1'-10"
1'-10" SOLAR DECATHLON
1'-10"
10 28 00 - TOILET, BATH, AND LAUNDRY ACCESSORIES OCTOBER 1-21 2009
J 10 28 00.A2 - TOILET TISSUE DISPENSER NREL & DOE
10 28 00.B2 - TOWEL BAR
10 28 00.C3 - 42" GRAB BAR ISSUANCE:
BID DOCUMENTS
22 40 00.B1
H 06 18 00.02 DIVISION 12 - FURNISHINGS #01 01/15/2009 JJS
08 84 00.A1
1
12 44 00 - BATH FURNISHINGS DOE REVIEW
06 18 00.02
12 44 13.16 - BATH TOWELS
#02 04/16/2009 JJS
G

3'-981"
08 84 00.A1 DIVISION 22 - PLUMBING
CONSTRUCTION DOCS
06 18 00.02 22 40 00 - PLUMBING FIXTURES #03 06/01/2009 JJS
22 40 00.E9
22 40 00.A3 - LAVATORY
F
22 40 00.B1 - SHOWER
22 40 00.B9 - HOTEL HANDSHOWER KIT
06 18 00.02 22 40 00.X1
22 40 00.E2 - WATER CLOSET
22 40 00.A3
22 40 00.E8 - WATER SENSOR
E
22 40 00.E9 - WALL FAUCET
10 28 00.C3
22 40 00.X1 - TEMPERATURE CONTROL INFORMATION:
06 18 00.01
PROJECT NAME
DIVISION 26 - ELECTRICAL UIUC_SD_2009
D
10 28 00.B2 DRAWING LOCATION
26 51 00 - INTERIOR LIGHTING

2'-3"
I-211 BATHROOM ELEVATION.DWG

22 40 00.E2
26 51 00.A6 - SURFACE MOUNTED LED FIXTURE
DRAWN BY
C
SHEET KEYNOTES JJS

CHECKED BY
ROUTE OUT (2) 21" TRACKS FOR RESIN PANEL TO SLIDE IN - FULL
1
LENGTH OF LAMBOO --

±0" SHEET:
B
BATHROOM
0 6" 1' 2' 0 6" 1' 2' ELEVATION
BATHROOM ELEVATION

I-211
A1 A12
A
SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1.) MAXIMUM PRESSURE ON SOIL TO BE <1500 PSF

GABLE HOME
OWNER SHALL REPAIR AND/OR REPLACE GRASS AFTER
REMOVAL OF HOUSE. WORK TO BE COORDINATED WITH
2.)
FACILITIES AND SERVICES AND APPROVED BY THE COLLGE OF
T ACES.
SITE TO BE MARKED AND SHALL REMAIN ADA COMPLAINT AT
3.)
ALL TIMES ONCE COMPLETE.
ALL EXISTING UTILITIES, FIXTURES, & PROPERTY TO REMAIN
4.)
WITHOUT MODIFICATION.
A1
S S-504
N12
S-504

R
12 20 00.A1

Q
REFERENCE KEYNOTES
DIVISION 05 - METALS
08 52 00.F9
P
05 50 00 - METAL FABRICATIONS

08 14 00.A1 05 50 00.A2 - 7/8" STEEL TRIM

12 20 00.A1 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES


N DESIGNER:
UNIVERSITY OF ILLINOIS
06 18 00 - GLUED-LAMINATED CONSTRUCTION
06 18 00.02 - 3/4" LAMINATED BAMBOO
GABLE HOME TEAM
611 LOREDO TAFT DR.
M 06 18 00.02
DIVISION 08 - OPENINGS
CHAMPAIGN, IL 61820

SEALS:
08 11 00 - METAL DOORS AND FRAMES
08 11 13.G4 - HANGING RESIN DOOR
L
08 14 00 - WOOD DOORS
0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" 08 14 00.A1 - 1 3/8" SOLID CORE DOOR
NORTH BEDROOM ELEVATION WEST BEDROOM ELEVATION
K1 K11
K
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" PROJECT:
08 52 00 - WOOD WINDOWS
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"
08 52 00.F9 - CLAD WOOD WINDOW US DEPT. OF ENERGY
SOLAR DECATHLON
08 84 00 - PLASTIC GLAZING OCTOBER 1-21 2009
J 08 84 00.A1 - RESIN GLAZING NREL & DOE
ISSUANCE:
DIVISION 12 - FURNISHINGS
BID DOCUMENTS
H 12 12 00 - WALL DECORATIONS
#01 01/15/2009 JJS
12 12 19.A1 - FRAMED PRINT
DOE REVIEW
12 20 00.A1 12 20 00.A1
12 20 00 - WINDOW TREATMENTS #02 04/16/2009 JJS
G 12 20 00.A1 - HORIZONTAL BLINDS

CONSTRUCTION DOCS
#03 06/01/2009 JJS
F
12 12 19.A1 SHEET KEYNOTES
1 SLIDE OUT DRAWERS
08 52 00.F9 08 52 00.F9
2 DOOR HANDLE
E 08 11 13.G4
3 STEEL CASTER
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
I-221 BEDROOM ELEVATIONS.DWG

DRAWN BY
C JJS

CHECKED BY
--

B SHEET:
BEDROOM
0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" ELEVATIONS
SOUTH BEDROOM ELEVATION EAST BEDROOM ELEVATION

I-221
A1 A11
A
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL DIMENSIONS PROVIDED FOR REFERENCE ONLY.
1

GABLE HOME
CONTRACTOR TO USE FIELD MEASURMENTS

CONTRACTOR TO VERIFY KITCHEN DESIGN WITH OWNER


2
T PRIOR TO INSTALLATION

3 SEE SPECIFICATIONS FOR CABINETRY DETAILS

1'-6"
1'-634"
3
4" 1'-241"
(3) 06 16 00.D3

1'-541"
R

178"
(3) 06 16 00.D3
09 91 00.A3
Q 1
REFERENCE KEYNOTES

321"
721"

721"
06 05 23.X9 09 91 00.A3
DIVISION 05 - METALS

4" 4"
1

3 3
06 05 23.F2

1'-3"
P 00 50 00.A3
06 05 23.F2 05 50 00 - METAL FABRICATIONS

4" 4"
06 05 23.X9

3 3
00 50
- 3/4" SQUARE STEEL TUBE
(3) 06 16 00.D3 00.A3

2
06 05 23.F2
N DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES DESIGNER:
UNIVERSITY OF ILLINOIS
09 91 00.A3
00 50 00.A3 06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND GABLE HOME TEAM
COMPOSITES
611 LOREDO TAFT DR.

1'-334"
1'-541"
06 05
M 23.F2
- A35
CHAMPAIGN, IL 61820
06 05
- #5 WOOD SCREWS @ 6" O.C. - ALTERNATE
23.X9
SEALS:

1'-541"
06 16 00 - SHEATHING
L 06 16
- 1/4" PLYWOOD
00.D3

DIVISION 09 - FINISHES

K PROJECT:

4"
3
09 91 00 - PAINTING US DEPT. OF ENERGY
3
1'-034" 3
4" 4" 09 91
- WHITE ENAMEL FINISH - 3 COATS SOLAR DECATHLON
00.A3
OCTOBER 1-21 2009
1'-241"
J NREL & DOE
ISSUANCE:
0 2" 4" 8" 0 2" 4" 8" 0 2" 4" 8"
CHAIR PLAN DETAIL CHAIR SIDE ELEVATION CHAIR BACK ELEVATION BID DOCUMENTS
H1 H8 H15
#01 01/15/2009 JJS
H
SHEET KEYNOTES
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"

SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"


ALL EXPOSED PLYWOOD SURFACES TO BE FINISHED WITH (3)
COATS OF INDUSTRIAL STRENGTH SPRAY ENAMEL WITH A PURE DOE REVIEW
1
WHITE FINISH. SAND SMOOTH BETWEEN EACH APPLICATION AND
#02 04/16/2009 JJS
ALLOW A MINIMUM OF 24 HOURS BETEEEN EACH APPLICATION
G
2 STEEL FRAMING BEYOND. ALL CORNERS TO BE WELDED AS REQ'D.
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
I-601 INTERIOR DETAILS.DWG

DRAWN BY
C ID

CHECKED BY
--

B SHEET:
INTERIOR DETAILS
CHAIR FUNCTION DIAGRAM

I-601
A1
A
SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

4"
ALL DIMENSIONS PROVIDED FOR REFERENCE ONLY.
1

GABLE HOME
9 CONTRACTOR TO USE FIELD MEASURMENTS
4'-716 "
4'-6" CONTRACTOR TO VERIFY KITCHEN DESIGN WITH OWNER
2
T RESSURE TANK 3'-1121" PRIOR TO INSTALLATION
4'-721"

2'-141"
26 031 00 3'-1121"
3 SEE SPECIFICATIONS FOR CABINETRY DETAILS
4"

4"
3"
334"
26 031 00

1'-0"

821"
WATER PRESSURE TANK

26 05 33 01
R

2'-10"
1'-434"
D6

1'-0"

3'-6"
0 6" 1' 2'
S-502
BED HEAD SECTION
Q1
Q
REFERENCE KEYNOTES
SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

6'-334"
1'-0"
DIVISION 05 - METALS
BED ELEVATION
P18
P
SCALE: 1" = 1'-0"

05 70 00 - DECORATIVE METAL
WATER PRESSURE
26 05 33 01 -

1'-0"
TANK

N DESIGNER:
2'-541"

WATER PR DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

UNIVERSITY OF ILLINOIS
06 18 00 - GLUED-LAMINATED CONSTRUCTION GABLE HOME TEAM

1'-0"
3'-6"

0 6" 1' 2'


F6
M14
BED HEAD ELEVATION 26 05 33 01 - JUCTION BOX 611 LOREDO TAFT DR.
M
SCALE: 1" = 1'-0"
CHAMPAIGN, IL 61820
SCALE: 1" = 1'-0" DIVISION 08 - OPENINGS

15
616"
SEALS:
334"

08 84 00 - PLASTIC GLAZING

L 26 05 33 01 26 031 00 - PHOTOVOLTAIC WIRING


9"

E14
H5 M14 A14

0 6" 1' 2' 0 6" 1' 2' M14


BED HEAD SECTION BED FRAME PLAN
K1 K1
K
SCALE: 1" = 1'-0" SCALE: 1" = 1'-0" PROJECT:
SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"
US DEPT. OF ENERGY
26 05 33 01
SOLAR DECATHLON
26 05 33 01
A5 OCTOBER 1-21 2009

334"
J I-502
NREL & DOE

3"
SECTION A
9"

ISSUANCE:
0 6" 1' 2'
BED FRAME SECTION BID DOCUMENTS
H6
H
SCALE: 1" = 1'-0"
#01 01/15/2009 JJS
SCALE: 1" = 1'-0"

0 6" 1' 2' (2) 26 05 33 01


DOE REVIEW
1
G1
STORAGE ELEV. 26 05 33 01
#02 04/16/2009 JJS
G
SCALE: 1" = 1'-0"

334"
3"
SCALE: 1" = 1'-0"
CONSTRUCTION DOCS
0 6" 1' 2'
#03 06/01/2009 JJS
BED FRAME SECTION
F6
F
SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"


2'-4"
0 6" 1' 2'
4" 3'-1121" 4"
BED SECTION
E14
E
SCALE: 1" = 1'-0"
26 031 00
SCALE: 1" = 1'-0"
(2) 26 05 33 01
INFORMATION:
1'-5"

0 6" 1' 2'


PROJECT NAME
D6
BED FRAME SECTION SECTION A
SHEET KEYNOTES
UIUC_SD_2009
D
SCALE: 1" = 1'-0"

26 05 33 01
SCALE: 1" = 1'-0" A6 DRAWING LOCATION
13
416 " S-502 3'-978" ROUTE 41" VALEY INTO CENTER OF 34" LAMINATED BAMBOO TO I-602 INTERIOR DETAILS.DWG
1
7"

3
95 ACCEPT 16 " RESIN PANEL. LENGTH AS REQUIRED
421" 8" 5"
98 DRAWN BY

3"
421"
C 11" ID

9"
CHECKED BY

3"
26 05 33 01
6"
9"

--
26 05 33 01 26 05 33 01
B 121"
SHEET:
221"
INTERIOR DETAILS
0 6" 1' 2' 0 6" 1' 2' 0 6" 1' 2'
STORAGE PLAN BED FRAME SECTION BED FRAME ELEVATION

I-602
A1 A6 SECTION A A14
A
SCALE: 1" = 1'-0" SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0" SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
3'-334"
GENERAL SHEET NOTES
3'-334" 5'-0" TOP VIEW ALL DIMENSIONS PROVIDED FOR REFERENCE ONLY.
1.)

GABLE HOME
1 1 1 7 CONTRACTOR TO USE FIELD MEASURMENTS
1'-5"

458"
CONTRACTOR TO VERIFY KITCHEN DESIGN WITH OWNER
2.)
T PRIOR TO INSTALLATION

2'-0"

2'-0"

2'-0"
2 2 2 3.) SEE SPECIFICATIONS FOR CABINETRY DETAILS

2'-0"
3 3 3 4.)

485"
11 23 26 11 23 26 11 23 26

8
5'-0" 3'-3 3/4"
R

0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8"
UNDERSIDE VIEW - NO LEAF UNDERSIDE VIEW - EXTENDED UNDERSIDE END TBL PLAN
Q1 Q7 Q13 Q18
Q
REFERENCE KEYNOTES
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

DIVISION 05 - METALS
7
P
05 05 00 - COMMON WORK RESULTS FOR METALS
1 1
2" WASHER/DRYER
1 11 23 26 -

4 4
4 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
N DESIGNER:
2'-6"

2 2

2'-6"
11 48 13 UNIVERSITY OF ILLINOIS
3 3 06 16 00 - SHEATHING
11 48 13 - DISHWASHER
GABLE HOME TEAM
8
6 6 611 LOREDO TAFT DR.
M 3'-034"
6 CHAMPAIGN, IL 61820
4'-1021"

0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" SEALS:
FRONT VIEW - COLLAPSED FRONT ELEVATION - EXPANDED SIDE ELEVATION FRNT. OPEN
L1 L7 L13 L18
L
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

PROJECT:
K
SHEET KEYNOTES US DEPT. OF ENERGY
3'-334"
1 1" SQUARE STEEL LEGS SOLAR DECATHLON
5'-0"
OCTOBER 1-21 2009
2 LEAF LOCK
J NREL & DOE
7 3 SLIDING TRACK
ISSUANCE:
2'-0"

2'-0"
4 TAPERED STEEL LEGS BID DOCUMENTS
11 48 13 11 48 13
H #01 01/15/2009 JJS
3
5 4" LAMINANATED BAMBOO DROP-DOWN

6 CASTER DOE REVIEW


#02 04/16/2009 JJS
7 LEAF IN PLACE WHILE TABLE IS OVER BED
G
8 HINGE CONSTRUCTION DOCS
0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8"
#03 06/01/2009 JJS
PLAN VIEW - COLLAPSED PLAN VIEW - EXPANDED FRNT ELEV SIDE ELEV
F1 F7 F13 F18
F
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

1'-841"
E
INFORMATION:
2
PROJECT NAME
2'-0"

UIUC_SD_2009
D
2'-0" 11 48 13 11 48 13 DRAWING LOCATION
5
I-603 INTERIOR DETAILS.DWG

5 8 8
DRAWN BY
2
C ID

CHECKED BY
--

B SHEET:
INTERIOR DETAILS
0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8"
TABLE LEAF PLAN TEABLE LEAF ELEVATION FRNT ELEV SECTION

I-603
A1 A7 A13 A18
A
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U 84" GENERAL SHEET NOTES
ALL DIMENSIONS PROVIDED FOR REFERENCE ONLY.

"
N11 J11

985"
J11 1.)

1016

GABLE HOME
7
J11 I-504 I-504
CONTRACTOR TO USE FIELD MEASURMENTS

70-12" 2.)
CONTRACTOR TO VERIFY KITCHEN DESIGN WITH OWNER
T PRIOR TO INSTALLATION
7 7

3.) SEE SPECIFICATIONS FOR CABINETRY DETAILS

2'-116
3
"
4.)

15
3'-716"
3'-781"
6'-821"

6'-1185"
4 4 4

15
1'-516 "
R J1 J11 J1
30" I-504 I-504 I-504

716
5
"
Q 11 48 13 11 48 13 11 48 13

2'-281"

9"
2'-516
3
"
3 3 3

9"
P 3-7 8"
0"

316
1
"
0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8"
CABINET SECTION CABINET SECTION CABINET SECTION
N1 N8 N15
N DESIGNER:
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"


9'-1141" UNIVERSITY OF ILLINOIS
5
1'-916 " 5
1'-916 " 3'-334" 7
1'-616 " 7
1'-616 " 5
1'-916 " 5
1'-916 " 3'-334" 7
1'-616 " 7
1'-616 "
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:
11 48 13
L 11 48 13
11 48 13

2'-0"

2'-0"
11 48 13

PROJECT:
K REFERENCE KEYNOTES US DEPT. OF ENERGY
0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8" SOLAR DECATHLON
DIVISION 05 - METALS
J1
CABINET PLAN
J11
CABINET PLAN OCTOBER 1-21 2009
J SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"
NREL & DOE
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" 05 70 00 - DECORATIVE METAL
WATER PRESSURE
TANK
- ISSUANCE:
BID DOCUMENTS
H
5
1'-916 " 5
1'-916 " 3'-334" 7
1'-616 " 7
1'-616 " 5
1'-916 " 5
1'-916 " 3'-334" 7
1'-616 " 7
1'-616 " DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES #01 01/15/2009 JJS

I-6-5 I-504 I-504 N1 I-504 I-504


N1 N9 N15 I-504 N8 N13
06 16 00 - SHEATHING DOE REVIEW
11 48 13 - DISHWASHER
#02 04/16/2009 JJS
G
DIVISION 12 - FURNISHINGS
"

6
CONSTRUCTION DOCS
1016
1

J11 J11
I-504 I-504

12 20 00 - WINDOW TREATMENTS
#03 06/01/2009 JJS
08 84 00.A1
F 12 20 00.A1 - HORIZONTAL BLINDS

SHEET KEYNOTES
5 2
1 WATER PRESSURE TANK

1 SLIDE OUT CLOSET UNITS


3'-8"

E
1
2 2" STEEL CLOTHES ROD
INFORMATION:
4 4 3 STEEL CLOSET DOOR TRACK AND CASTER PROJECT NAME
UIUC_SD_2009
D 12 20 00.A1 J11 J1 4 DOR PULL HANDLE - STEEL
I-504 I-504 DRAWING LOCATION
5 PULL OUT DOOR I-604 INTERIOR DETAILS.DWG

6 SLIDING DOORS - ROUTE GROOVE IN BAMBOO FOR FUNCTION


DRAWN BY
11 48 13
C
2'-281"

ID
06 18 00.02
CHECKED BY
1
7 2" STEEL CLOTHES ROD

3 --

B SHEET:
INTERIOR DETAILS
0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8"
CABINET PLAN CABINET ELEVATION

I-604
A1 N11
A
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1 THESE GENERAL NOTES APPLY TO ALL WORK SHOWN

GABLE HOME
2 DO NOT SCALE DRAWINGS, USE FIELD MEASURMENTS

NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR


3
T CONDITIONS WHETHER THEY ARE SIMILAR OR NOT

ANY EXPOSED PIPING, CONDUIT OR ASSOCIATED


COMPONENTS OF THE FIRE PROTECTION SYSTEM. PROVIDE
4
COMPLETE TRIM AS REQUIRED TO MEET NFPA & CODE
REQUIREMENTS

S THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FINAL


COORDINATION OF ALL ELECTRICAL REQUIREMENTS FOR ALL
EQUIPMENT. PROVIDE MANUFACTURER'S WRITTEN DATA FOR
EACH FIRE PROTECTION DEVICE REQUIRING ELECTRICAL
5 CONNECTION. PRIOR TO SUBMITTAL OF ANY ELECTRICAL
EQUIPMENT FOR REVIEW NO ADDITIONAL COMPENSATION
WILL BE ALLOWED FOR ANY CHANGES TO ELECTRICAL
R FEEDERS OR CIRCUIT BREAKERS REQUIRED FOR ANY FIRE
PROTECTION DEVICES
FIRE DETECTORS TO BE INSTALLED IN ACCORDANCE WITH
NFPA 72. REFER TO MANUFACTURERS INSTRUCTIONS &
6
SPECIFICATIONS FOR PLACEMENT OF DETECTORS RELATIVE
TO THE INTERSECTION BETWEEN THE WALL AND CEILING
Q
7 ALARMS SHALL BE INTERCONNECTED

P
REFERENCE KEYNOTES
DIVISION 10 - SPECIALTIES
N DESIGNER:
SMOKE DETECTOR SCHEDULE 10 44 00 - FIRE PROTECTION SPECIALTIES UNIVERSITY OF ILLINOIS
10 44 16.13 - FIRE EXTINGUISHER GABLE HOME TEAM
NO. DESCRIPTION MANUFACTURER MODEL SPEC. # 611 LOREDO TAFT DR.
M DIVISION 28 - ELECTRONIC SAFETY AND SECURITY CHAMPAIGN, IL 61820
120VAC PHOTOELECTRIC SMOKE
1
ALARM
KIDDE PE120E 28 31 46 28 31 00 - FIRE DETECTION AND ALARM
SEALS:
28 31 46 - SMOKE DETECTOR
L
FIRE EXTINGUISHER SCHEDULE
NO. DESCRIPTION MANUFACTURER MODEL SPEC. #

K PROJECT:

1
HEAVY-DUTY PLUS FIRE
FIRST ALERT FE3A40 10 44 16.A1
US DEPT. OF ENERGY
EXTINGUISHER SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
10 44 16.13 10 44 16.13
ISSUANCE:
28 31 46 28 31 46 BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
SHEET KEYNOTES
4'-3"

4'-3"
CONSTRUCTION DOCS
1 INTERCONNECT ALARMS
#03 06/01/2009 JJS
EXIT PAT
F
H DISTAN :
CE: DISTANCE
21'-8" EXIT PATH
1 27'-8"
5'-8"
4'-1121"

1
E
INFORMATION:
DINING / PROJECT NAME
KITCHEN
UIUC_SD_2009
D
DRAWING LOCATION
F-101 DETECTION ALARM AND
EGRESS.DWG
DRAWN BY
C
SYMBOL LEGEND JJS

CHECKED BY
FIRE EXTINGUISHER MT

B SMOKE DETECTOR
SHEET:
DETECTION ALARM
0 1'-4" 2'-8" 5'-4" EGRESS PATH AND EGRESS
FIRE AND EGRESS PLAN

F-101
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1.) THESE GENERAL NOTES APPLY TO ALL WORK SHOWN

GABLE HOME
2.) DO NOT SCALE DRAWINGS, USE FIELD MEASURMENTS

NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR


3.)
T CONDITIONS WHETHER THEY ARE REPEATED OR NOT

ALL NE EXPOSED DUCTWORK, PIPING, ELECTRICAL CONDUIT,


TEMPERATURE CONTROLS CONDUIT AND ASSOCIATED
3.)
COMPONENTS TO BE METAL FINISH. COORDINATE WITH
OWNER PRIOR TO INSTALLATION
THE DRAWINGS AND DETAILS SHALL BE TAKEN AS A
S DIAGRAMMATIC MEANS OF PROVIDING PIOPING AND
D;UCTOWRK. THEY DO NOT SHOW EVERY FITTING AND
4.)
OFFEST NOR EVERY STRUCTURAL, ELECTRICAL, PIPING OR
DUCTWORK DIFFICULTY THAT MAY BE ENCOUNTERED DURING
THE INSTALLATION OF THE WORK.
THE WORK HAS BEEN DESIGNED FOR THE EQUIPMENT
R INDICATED FOR THE EQUIPMENT INDICATED ON THE
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE AND PROVIDE ANY MODIFICATIONS TO THE
5.) WORK INCLUDING BUT NOT NECESSARILY LIMITED TO
DUCTWORK, PIPING, ELECTRICAL, PLUMBING, FIRE
PROTECTION, STRUCTURAL FRAMES, CASEWORK, ETC.
Q REQUIRED TO PROPERLY PROVIDE EQUIPMENT OTHER THAN
THAT INDICATED ON THE DRAWINGS.

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

L PLUMBING FIXTURE SCHEDULE


PRODUCT
BRAND NUMBER DESCRIPTION COLOR/FINISH LINK TO ROUGH-IN DETAILS

KOHLER 10257-R-CP DESIGNER WAND POLISHED CHROME http://www.us.kohler.com/onlinecatalog/pdf/1085896_1.pdf

K KOHLER 8487-CP HOTEL HANDSHOWER KIT POLISHED CHROME http://www.us.kohler.com/onlinecatalog/pdf/115210_1.pdf PROJECT:


PURIST LOW FLOW
http://www.us.kohler.com/onlinecatalog/pdf/1100341_1.pdf
US DEPT. OF ENERGY
KOHLER 997-CP SHOWERHEAD POLISHED CHROME
SOLAR DECATHLON
KOHLER 7395-CP SHOWER ARM AND FLANGE POLISHED CHROME http://www.us.kohler.com/onlinecatalog/pdf/113698_1.pdf OCTOBER 1-21 2009
J KOHLER T10940-4-CP
STILLNESS THERMOSTATIC
VALVE POLISHED CHROME http://www.us.kohler.com/onlinecatalog/pdf/1041506_1.pdf NREL & DOE
KOHLER 669-KS-NA THERMOSTATIC VALVE NA http://www.us.kohler.com/onlinecatalog/pdf/1041158_1.pdf
ISSUANCE:
STILLNESS VOLUME CONTROL
KOHLER T10943-4-CP TRIM POLISHED CHROME http://www.us.kohler.com/onlinecatalog/pdf/1041506_1.pdf BID DOCUMENTS
H STILLNESS VOLUME CONTROL #01 01/15/2009 JJS
KOHLER T10943-4-CP TRIM POLISHED CHROME http://www.us.kohler.com/onlinecatalog/pdf/1041506_1.pdf

KOHLER 671-K-NA VOLUME CONTROL NA http://www.us.kohler.com/onlinecatalog/pdf/1041157_1.pdf


DOE REVIEW
KOHLER 671-K-NA VOLUME CONTROL NA http://www.us.kohler.com/onlinecatalog/pdf/1041157_1.pdf
VESSELS CONICAL BELL
#02 04/16/2009 JJS
G KOHLER 2200-G-0 LAVATORY WHITE http://www.us.kohler.com/onlinecatalog/pdf/114430_1.pdf

http://www.us.kohler.com/onlinecatalog/pdf/1052942_1.pdf
KOHLER 7124-CP LAVATORY DRAIN POLISHED CHROME
CONSTRUCTION DOCS
#03 06/01/2009 JJS
KOHLER 9018-CP P-TRAP POLISHED CHROME http://www.us.kohler.com/onlinecatalog/pdf/115175_1.pdf
INSIGHT PURIST LAVATORY
KOHLER T11837-CP FAUCET POLISHED CHROME http://www.us.kohler.com/onlinecatalog/pdf/1085971_1.pdf
F
KOHLER 11830-NA ROUND CONTROL KIT NA http://www.us.kohler.com/onlinecatalog/pdf/1080064_1.pdf
13601-NA THERMOSTATIC CONTROL
KOHLER KIT NA http://www.us.kohler.com/onlinecatalog/pdf/115242_1.pdf

KOHLER 4460-C-0 SIFTON TOILET WHITE http://www.us.kohler.com/onlinecatalog/pdf/105099_1.pdf


E KOHLER 4652-0 LUSTRA TOILET SEAT WHITE http://www.us.kohler.com/onlinecatalog/pdf/1054650_2.pdf

PLUMBING EQUIPMENT SCHEDULE INFORMATION:


PROJECT NAME
SYMBOL BRAND DESCRIPTION MODEL #
UIUC_SD_2009
D
DRAWING LOCATION
630 GALLON CLEAN TEMPORARY
P-001 SYMBOLS AND NOTES.DWG
CWT PLASTIC TANKS WATER TANK 41238
630 GALLON GRAY TEMPORARY DRAWN BY
GWT PLASTIC TANKS WATER TANK 41238
C AS

CHECKED BY
CP GOULDS CENTRIFUGAL PUMP HSC10
JJS

5 GALLON IN-LINE PRESSURE


B PT WELLSAVER TANK LPT-5 SHEET:
SP WATCHDOG
3
4 HP SUBMERSIBLE SUMP PUMP BWT075
SYMBOLS AND
NOTES
MXB VANAGUARD MANABLOCK 21" MANIFOLD --

P-001
A

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1 THESE GENERAL NOTES APPLY TO ALL WORK SHOWN

GABLE HOME
2 DO NOT SCALE DRAWINGS, USE FIELD MEASURMENTS
2 3 6
NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR
3
T CONDITIONS WHETHER THEY ARE REPEATED OR NOT

ALL NE EXPOSED DUCTWORK, PIPING, ELECTRICAL CONDUIT,


TEMPERATURE CONTROLS CONDUIT AND ASSOCIATED
4
COMPONENTS TO BE METAL FINISH. COORDINATE WITH
OWNER PRIOR TO INSTALLATION
THE DRAWINGS AND DETAILS SHALL BE TAKEN AS A
S DIAGRAMMATIC MEANS OF PROVIDING PIOPING AND

8'-741"
D;UCTOWRK. THEY DO NOT SHOW EVERY FITTING AND
5
OFFEST NOR EVERY STRUCTURAL, ELECTRICAL, PIPING OR
DUCTWORK DIFFICULTY THAT MAY BE ENCOUNTERED DURING
THE INSTALLATION OF THE WORK.
1
THE WORK HAS BEEN DESIGNED FOR THE EQUIPMENT
R INDICATED FOR THE EQUIPMENT INDICATED ON THE
22 12 00.A1 DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO
COORDINATE AND PROVIDE ANY MODIFICATIONS TO THE
6 WORK INCLUDING BUT NOT NECESSARILY LIMITED TO
DUCTWORK, PIPING, ELECTRICAL, PLUMBING, FIRE
PROTECTION, STRUCTURAL FRAMES, CASEWORK, ETC.
Q 22 11 23.A2
REQUIRED TO PROPERLY PROVIDE EQUIPMENT OTHER THAN
THAT INDICATED ON THE DRAWINGS.

GENERAL SHEET NOTES


FOR THE PURPOSE OF THE COMPETITION, THE TOILET SHALL
NOT BE USED AT ANY POINT. THE WASTERWATER TANK WILL
P 1
NOT BE USED FOR ANY VEGITATION OR ALTERNATE USE AND
WILL BE REMOVED AT THE END OF THE EVENT.
INSTALL BALL SHUTOFF VALVES AT EVERY DEVICE WATER
A1 2
CONNECTION
S-302
INSTALL WATTER HAMMER ARRESTOR ACCORDING TO
3
MANUF. SPECIFICATIONS AT WASHER/DRYER
N DESIGNER:
4 ALL SUPPLY LINES TO BE 21"
DECKING ABOVE WATER TANK TO BE EASILY REMOVABLE TO
UNIVERSITY OF ILLINOIS
5
ALLOW FOR WATER DELIVERY DURING COMPETITION WITH A GABLE HOME TEAM
MINIMUM OF 12" CLEAR ABOVE. WATER INLET HAS A 16"
OPENING 611 LOREDO TAFT DR.
M 6
TEMPORARY SUPPLY AND RETURN LINES TO BE RUN ALONG CHAMPAIGN, IL 61820
UNDERSIDE OF BUILDING TOWARDS THE NORTH

0 2' 4' 8' SEALS:


EXTERIOR WASTE PLAN
A1
L
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

K PROJECT:
US DEPT. OF ENERGY
4
2 SOLAR DECATHLON
3
6 OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H 44 42 00.A1 #01 01/15/2009 JJS
22 11 13.A1
DOE REVIEW
22 05 25.A1
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
22 12 00.A1 SHEET KEYNOTES
F
1 320 GALLON GRAY WATER TANK
8'-741"

2 PLUMBING MANIFOLD
5

E 3 COLD WATER DISTRIBUTION

4 3
4" PEX INFORMATION:
A1 PROJECT NAME
S-302 5 320 GALLON CLEAN POTABLE WATER SUPPLY
UIUC_SD_2009
D
6 HOT WATER DISTRIBUTION DRAWING LOCATION
P-101 TEMPORARY PLUMBING
PLANS.DWG
DRAWN BY
C XXX

CHECKED BY
GRAY WATER RETURN
XXX
CLEAN POTABLE WATER SUPPLY

B HOT WATER DISTRIBUTION SHEET:


COLD WATER DISTRIBUTION SUPPLY & TEMP.
0 2' 4' 8' PLANS
EXTERIOR SUPPLY PLAN

P-101
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL INSTALLATION TO COMPLY WITH irc AND OTHER
1.)

GABLE HOME
APPLICABLE CODES. SEE SPECIFICATION FOR INSTALLATION
2.) TOILET SHALL NOT BE PLUMBED FOR COMPETITION
FOR THE PURPOSE OF THE COMPETITION, ALL WASTER WATER
T WILL BE SENT TO A SEPARATE WASTE WATER TANK WHICH
3.) WILL BE REMOVED AT THE END OF THE COMPETITION. THE
GRAYWATER WILL NOT BE USED FOR IRRIGATION OR ANY
OTHER PURPOSE DURING THE DURATION OF THE EVENT.
INSTALL BALL SHUTOFF VALVES AT EVERY DEVICE WATER
4.)
CONNECTION
S INSTALL WATTER HAMMER ARRESTOR ACCORDING TO
5.)
MANUF. SPECIFICATIONS AT WASHER/DRYER
6.) ALL SUPPLY LINES TO BE 21"

R HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW

HW
HW

HW
HW
HW
Q
HW HW
REFERENCE KEYNOTES

HW
DIVISION 11 - EQUIPMENT

HW
11 23 00 - COMMERCIAL LAUNDRY AND DRY CLEANING EQUIPMENT

HW
05 05 23.19 - STEEL ANGLE

HW
N DESIGNER:
11 48 00 - CLEANING AND DISPOSAL EQUIPMENT
UNIVERSITY OF ILLINOIS

HW
05 05 23.19 - STEEL ANGLE
11 48 13 01 - DISHWASHER
GABLE HOME TEAM
22 33 00.A1 - WATER HEATER
611 LOREDO TAFT DR.

HW
M DIVISION 22 - PLUMBING CHAMPAIGN, IL 61820

HW
22 40 00.A2 - SINK 22 33 00 - ELECTRIC DOMESTIC WATER HEATERS SEALS:

HW
22 33 00.A1 - WATER HEATER
L

HW
22 40 00 - PLUMBING FIXTURES
22 40 00.A3 - LAVATORY
HW 22 40 00.A2 - SINK

K PROJECT:
HW

22 40 00.A3 - LAVATORY
US DEPT. OF ENERGY
22 40 00.B1 - SHOWER
SOLAR DECATHLON
HW

22 40 00.B8 - HAND SHOWER OCTOBER 1-21 2009


HW

J NREL & DOE


22 40 00.E3 - TOILET

ISSUANCE:
HW

BID DOCUMENTS
HW HW

H #01 01/15/2009 JJS


HW

HW HW HW HW HW HW HW HW HW HW HW HW HW

DOE REVIEW
HW

11 48 13 01 - DISHWASHER
HW

#02 04/16/2009 JJS


22 40 00.B1 - SHOWER
HW

G
CONSTRUCTION DOCS
HW

22 40 00.B8 - HAND SHOWER


#03 06/01/2009 JJS
F
SHEET KEYNOTES
22 40 00.E3 - TOILET

E GRAY WATER RETURN

INFORMATION:
HW HW HW CLEAN POTABLE WATER SUPPLY PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
HOT WATER DISTRIBUTION P-102 SUPPLY PLANS.DWG

DRAWN BY
C XXX
COLD WATER DISTRIBUTION
CHECKED BY
XXX

B SHEET:
SUPPLY PLANS
0 6" 1' 2'
PLUMBING WATER DISTRIBUTION

P-102
A1
A
SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1.) THESE GENERAL NOTES APPLY TO ALL WORK SHOWN

GABLE HOME
2.) DO NOT SCALE DRAWINGS, USE FIELD MEASURMENTS
ALL INSTALLATION TO COMPLY WITH IRC AND OTHER
3.) APPLICABLE CODES. SEE SPECIFICATIONS FOR INSTALLATION
T NOTES
FOR THE PURPOSE OF THE COMPETITION, THE TOILET SHALL
NOT BE USED AT ANY POINT. THE WASTERWATER TANK WILL
3.)
NOT BE USED FOR ANY VEGITATION OR ALTERNATE USE AND
WILL BE REMOVED AT THE END OF THE EVENT.
INSTALL BALL SHUTOFF VALVES AT EVERY DEVICE WATER
S 4.)
CONNECTION
INSTALL WATTER HAMMER ARRESTOR ACCORDING TO
5.)
MANUF. SPECIFICATIONS AT WASHER/DRYER
6.) ALL SUPPLY LINES TO BE 21"

Q
?
REFERENCE KEYNOTES
DIVISION 11 - EQUIPMENT

11 23 00 - COMMERCIAL LAUNDRY AND DRY CLEANING EQUIPMENT

P 05 05 23.19 - STEEL ANGLE

11 48 00 - CLEANING AND DISPOSAL EQUIPMENT

11 48 13 01 - DISHWASHER

N DIVISION 22 - PLUMBING DESIGNER:


22 33 00 - ELECTRIC DOMESTIC WATER HEATERS UNIVERSITY OF ILLINOIS
22 33 00.A1 - WATER HEATER
GABLE HOME TEAM
05 05 23.19 - STEEL ANGLE
22 33 00.A1 - WATER HEATER 611 LOREDO TAFT DR.
22 40 00 - PLUMBING FIXTURES
M CHAMPAIGN, IL 61820
22 40 00.A2 - SINK

22 40 00.A3 - LAVATORY
SEALS:
22 40 00.A2 - SINK

L 22 40 00.B1 - SHOWER

22 40 00.B8 - HAND SHOWER

22 40 00.A3 - LAVATORY 22 40 00.E3 - TOILET

K PROJECT:
US DEPT. OF ENERGY
?
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
?
#01 01/15/2009 JJS
H
SHEET KEYNOTES
1 VENT PIPE TO MAIN VENT ABOVE, LEADING OUT NORTH ROOF DOE REVIEW
? 11 48 13 01 - DISHWASHER
#02 04/16/2009 JJS
2 TOILET DRAIN - SHALL NOT BE HOOKED UP FOR COMPETITION
G 22 40 00.B1 - SHOWER

CONSTRUCTION DOCS
22 40 00.B8 #03 06/01/2009 JJS
F 2
LEGEND
GRAY WATER RETURN
22 40 00.E3 - TOILET
CLEAN POTABLE WATER SUPPLY
HW

E HOT WATER DISTRIBUTION

COLD WATER DISTRIBUTION INFORMATION:


1 VENT PIPING PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
P-103 DRAIN WASTE VENT.DWG

DRAWN BY
C XXX

CHECKED BY
XXX

B SHEET:
VENT PLANS
0 6" 1' 2'
VENT PIPING

P-103
A1
A
SCALE: 1" = 1'-0"

SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1.) THESE GENERAL NOTES APPLY TO ALL WORK SHOWN

GABLE HOME
2.) DO NOT SCALE DRAWINGS, USE FIELD MEASURMENTS
T
NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR
3.)
CONDITIONS, WHETHER THEY ARE REPEATED OR NOT
ALL EXPOSED DUCTWORK, PIPING, ELECTRICAL CONDUIT,
TEMPERATURE CONTROLS CONDUIT AND ASSOCIATED
4.)
COMPONENTS SHALL BE STAINLESS STEEL OR COLOR AS
S SELECTED BY THE ARCHITECT
THE WORK HAS BEEN DESIGNED FOR THE EQUIPMENT
INDICATED ON THE DRAWINGS. THE CONTRACTOR SHALL BE
RESPONSIBLE TO COORDINATE AND PROVIDE ANY
MODIFICATIONS TO THE WORK INCLUDING BUT NOT
NECESSARILY LIMITED TO DUCTWORK, PIPING, ELECTRICAL,
5.)
R PLUMBING, PIPE PROTECTION, STRUCTURAL, LIGHTING,
OUTLETS AND ARCHITECTURAL FEATURES SUCH AS CEILINGS,
DOORS AND FRAMES, CASEWORK, ETC. REQUIRED TO
PROPERLY PROVIDE EQUIPMENT OTHER THAN THAT
INDICATED ON THE DRAWINGS

P
REFERENCE KEYNOTES
3
DIVISION 11 - EQUIPMENT
1

N DESIGNER:
11 31 00 - RESIDENTIAL APPLIANCES
4 UNIVERSITY OF ILLINOIS
11 31 13.A1 - DISHWASHER
GABLE HOME TEAM
11 31 23.A1 - WASHER/DRYER
611 LOREDO TAFT DR.
M DIVISION 22 - PLUMBING
CHAMPAIGN, IL 61820

SEALS:
22 33 00 - ELECTRIC DOMESTIC WATER HEATERS

5 22 33 00.A1 - WATER HEATER


L
22 40 00 - PLUMBING FIXTURES

HW
22 40 00.A2 - SINK
D D

22 40 00.A3 - LAVATORY
K
22 33 00.A1 PROJECT:
22 40 00.B1 - SHOWER
US DEPT. OF ENERGY

HW
22 40 00.E3 - TOILET
SOLAR DECATHLON
OCTOBER 1-21 2009

HW
22 40 00.B1
11 31 23.A1
J
SHEET KEYNOTES NREL & DOE
HW

W
HW

H
D
HW
D
22 40 00.A3

W
H
HW

ISSUANCE:

HW
HW
1 630 GALLON WATER STORAGE TANK

W
H
22 40 00.A2 BID DOCUMENTS

HW
HW

W
H
#01 01/15/2009 JJS
HW
2 VALVE
H
HW

HW
HW

H
HW

W
3 SUBMERSIBLE PUMP - IN TANK - SHOWN OUTSIDE FOR CLARITY

H
HW

HW

DOE REVIEW

W
H
HW
W

4 PRESSURE TANK - SEE SCHEDULE


#02 04/16/2009 JJS
H

HW

W
H
W

G
HW
H

W
H
HW
5 MAIN VALVE
W
H

CONSTRUCTION DOCS

HW
W
HW

H
W

11 31 13.A1
H

HW
22 40 00.B1
#03 06/01/2009 JJS

W
H

HW
22 40 00.E3

W
H
F

W
H

HW
W
H

HW
W
H
E
INFORMATION:
PROJECT NAME
COLD WATER UIUC_SD_2009
D HW HW
HOT WATER
TEMPERED WATER DRAWING LOCATION
TEMPERING VALVE P-901 SUPPLY & REMOVAL.DWG
THERMOMETER
VALVE DRAWN BY
C UNION AS
WASHING BOX MACHINE
CHECKED BY
D
DIVERTER VALVE/VOLUME CONTROL
BACK FLOW PREVENTER JJS

HAMMER ARRESTOR
B SHEET:
SUPPLY & REMOVAL
SCALE: NTS

P-901
A1
A
SUPPLY ISOMETRIC

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1.) THESE GENERAL NOTES APPLY TO ALL WORK SHOWN

GABLE HOME
2.) DO NOT SCALE DRAWINGS, USE FIELD MEASURMENTS
T
NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR
3.)
CONDITIONS, WHETHER THEY ARE REPEATED OR NOT
ALL EXPOSED DUCTWORK, PIPING, ELECTRICAL CONDUIT,
TEMPERATURE CONTROLS CONDUIT AND ASSOCIATED
4.)
COMPONENTS SHALL BE STAINLESS STEEL OR COLOR AS
S SELECTED BY THE ARCHITECT
THE WORK HAS BEEN DESIGNED FOR THE EQUIPMENT
INDICATED ON THE DRAWINGS. THE CONTRACTOR SHALL BE
RESPONSIBLE TO COORDINATE AND PROVIDE ANY
MODIFICATIONS TO THE WORK INCLUDING BUT NOT
2 NECESSARILY LIMITED TO DUCTWORK, PIPING, ELECTRICAL,
5.)
R PLUMBING, PIPE PROTECTION, STRUCTURAL, LIGHTING,
OUTLETS AND ARCHITECTURAL FEATURES SUCH AS CEILINGS,
DOORS AND FRAMES, CASEWORK, ETC. REQUIRED TO
PROPERLY PROVIDE EQUIPMENT OTHER THAN THAT
INDICATED ON THE DRAWINGS

REFERENCE KEYNOTES
N DESIGNER:
DIVISION 11 - EQUIPMENT
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
3 11 31 00 - RESIDENTIAL APPLIANCES
611 LOREDO TAFT DR.
11 31 13.a1 - DISHWASHER
M CHAMPAIGN, IL 61820
11 31 23.A1 - WASHER / DRYER

SEALS:
DIVISION 22 - PLUMBING

L 22 33 00 - ELECTRIC DOMESTIC WATER HEATERS


11 31 23.A1
22 33 00.A1 - WATER HEATER
22 33 00.A1

K
22 40 00 - PLUMBING FIXTURES
PROJECT:
22 40 00.A2 - SINK
22 40 00.A3 - LAVATORY
US DEPT. OF ENERGY
22 40 00.B1 - SHOWER
SOLAR DECATHLON
22 40 00.E3 - TOILET
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
1
#01 01/15/2009 JJS
H
SHEET KEYNOTES
22 40 00.A2
1 HVAC CONDENSATE FLOOR DRAIN DOE REVIEW
#02 04/16/2009 JJS
2 630 GALLON WASTE WATER TANK
G 22 40 00.A3
11 31 13.A1
3 PRE-TANK STORAGE CONSTRUCTION DOCS
4 SUMP PUMP
#03 06/01/2009 JJS
F C.O.
22 40 00.B1

22 40 00.E3
LEGEND
E
C.O. INFORMATION:
COLD WATER
HOT WATER PROJECT NAME
TEMPERED WATER UIUC_SD_2009
D TEMPERING VALVE
THERMOMETER DRAWING LOCATION
VALVE
UNION P-902 WATER SUPPLY.DWG
WASHING BOX MACHINE
D
DIVERTER VALVE/VOLUME CONTROL
DRAWN BY
C BACK FLOW PREVENTER AS
HAMMER ARRESTOR
CHECKED BY
JJS

B SHEET:
WASTE & VENT
WASTE WATER ISOMETRIC

P-902
A1
A
SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
REVERSING VALVE SCHEDULE GEN. MECHANICAL NOTES
SYMBOL MANUFACTURER LOCATION MODEL# NOM. TON RANGE (TON) SUCTION TUBE HIGH PRESSURE TUBE

GABLE HOME
1.) THESE GENERAL NOTES APPLY TO ALL WORK SHOWN
R-22: .4-1 3/8" 3/8"
RV1 RANCO MECH. LOFT. V1-406060-270 1
2.) DO NOT SCALE DRAWINGS, USE FIELD MEASURMENTS
T NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR
GRILL AND REGISTERS SCHEDULE 3.)
CONDITIONS, WHETHER THEY ARE REPEATED OR NOT
FACE
SYMBOL MANUFACTURER SERVICE AIRFLOW CFM NOM. DUCT SIZE. DIMENSIONS NOISE CRITERIA REMARKS ALL EXPOSED DUCTWORK, PIPING, ELECTRICAL CONDUIT,
0'-6" 0'-7" TEMPERATURE CONTROLS CONDUIT AND ASSOCIATED
4.)
GR1 FANTECH REFER TO PLANS -- -- COMPONENTS SHALL BE STAINLESS STEEL OR COLOR AS
S SELECTED BY THE ARCHITECT
GR2 MCMASTER CARR HALLWAY -- 6" DIAMETER 12" X 2 41" -- --
THE WORK HAS BEEN DESIGNED FOR THE EQUIPMENT
GR3 AMERIFLOW CEILING DIFF. -- 6" DIAM 8" FACE -- CEILING DIFFUSER INDICATED ON THE DRAWINGS. THE CONTRACTOR SHALL BE
RESPONSIBLE TO COORDINATE AND PROVIDE ANY
MODIFICATIONS TO THE WORK INCLUDING BUT NOT
NECESSARILY LIMITED TO DUCTWORK, PIPING, ELECTRICAL,
R ENERGY RECOVERY VENTILATOR (ERV) SCHEDULE
5.)
PLUMBING, PIPE PROTECTION, STRUCTURAL, LIGHTING,
OUTLETS AND ARCHITECTURAL FEATURES SUCH AS CEILINGS,
MANUFACTURE MAX EXT. SENSIBLE DOORS AND FRAMES, CASEWORK, ETC. REQUIRED TO
SYMBOL R SERVICE CFM RANGE PRESSURE EFF% ELECTRICAL UNIT WEIGHT REMARKS PROPERLY PROVIDE EQUIPMENT OTHER THAN THAT
ERV1 ULTIMATE AIR MECH. LOFT 70-210 .7 IN H20 95% 120V AC 60 HZ 6A (STARTUP) 72 LBS 1. MERV12 FILTERS PROVIDED W/ UNIT INDICATED ON THE DRAWINGS

Q THE DRAWINGS AND DETAILS SHOWN SHALL BE TAKEN AS A


DIAGRAMMATIC MEANS OF PROVIDING PIPING AND
DUCTWORK. THEY DO NOT SHOW EVERY FITTING AND
6.)
ELECTRONIC DAMPER SCHEDULE OFFSET, NOR EVERY STRUCTURAL, ELECTRICAL, PIPING OR
DUCTWORK DIFFICULTY THAT MAY BE ENCOUNTERED DURING
SYMBOL MANUFACTURER SERVICE MODEL # DIAMETER POWER REQ'T TYPE REMARKS THE INSTALLATION OF THE WORK.
P RESIDENTIAL 001-00027 24 VOLTS AC @ 1. SEE E-SERIES FOR CIRCUIT REQ'TS AND
ED1 CONTROL SYSTEMS BATHROOM 6RDNC 6" 500mA NORMALLY CLOSED SPECIFICATIONS

GENERAL SHEET NOTES


THERMOSTATIC EXPANSION VALVE
N DESIGNER:
MANUFACTURE NOM. TON CONNECTO
SYMBOL R LOCATION MODEL# RANGE. R OUTLET CONNECTOR INLET EVAP. TEMP RANGE UNIVERSITY OF ILLINOIS
1.) THESE GENERAL NOTES APPLY TO ALL WORK SHOWN
TE1 PARKER MECH. LOFT. EC-A-JW 1/4-1 0'-0 1/2" 3/8" -40°F TO +60°F GABLE HOME TEAM
2.) DO NOT SCALE DRAWINGS, USE FIELD MEASURMENTS 611 LOREDO TAFT DR.
M CHECK VALVE SCHEDULE CHAMPAIGN, IL 61820
SYMBOL MANUFACTURER ITEM # CONNECTION OUTSIDE DIAM. TYPE NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR
3.)
CONDITIONS, WHETHER THEY ARE REPEATED OR NOT
CV1 PARKER CV4-6FS-6FS
0'-0 3/8" 0'-0 1/2" BALL SEALS:
ALL EXPOSED DUCTWORK, PIPING, ELECTRICAL CONDUIT,
TEMPERATURE CONTROLS CONDUIT AND ASSOCIATED
4.)
COMPONENTS SHALL BE STAINLESS STEEL OR COLOR AS
L FILTER DRYER SCHEDULE
SELECTED BY THE ARCHITECT
SYMBOL MANUFACTURER ITEM # CONNECTION THE WORK HAS BEEN DESIGNED FOR THE EQUIPMENT
0'-0 3/8" INDICATED ON THE DRAWINGS. THE CONTRACTOR SHALL BE
CV1 PARKER 053S RESPONSIBLE TO COORDINATE AND PROVIDE ANY
MODIFICATIONS TO THE WORK INCLUDING BUT NOT

K 5.)
NECESSARILY LIMITED TO DUCTWORK, PIPING, ELECTRICAL, PROJECT:
PLUMBING, PIPE PROTECTION, STRUCTURAL, LIGHTING,
OUTLETS AND ARCHITECTURAL FEATURES SUCH AS CEILINGS, US DEPT. OF ENERGY
DOORS AND FRAMES, CASEWORK, ETC. REQUIRED TO
PROPERLY PROVIDE EQUIPMENT OTHER THAN THAT SOLAR DECATHLON
INDICATED ON THE DRAWINGS OCTOBER 1-21 2009
J NREL & DOE
REFERENCE KEYNOTES
ISSUANCE:
DIVISION 24 - HOT WATER HEATER BID DOCUMENTS
H 22 33 00.A1 22 33 00.A1 AIR TAP HEAT PUMP #01 01/15/2009 JJS

A1 DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) DOE REVIEW


5'-1185"

M-401
#02 04/16/2009 JJS
G 23 31 00 - HVAC DUCTS AND CASINGS
23 31 13.16 6" duct
23 31 13.19 6" "U" DUCT HANGER @ 2'-0" O.C.
CONSTRUCTION DOCS
#03 06/01/2009 JJS
23 33 13.19
F GR3 GR3

GR3
23 33 13.19
23 31 13.16
1 2 SHEET KEYNOTES
E 1 FOR HVAC DETAILS REFER TO SHEET M-401

DUCT TO BE SPIRAL BOUND 6" MOUNTED BETWEEN TRACK INFORMATION:


2
LIGHTING PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
M-101 HVAC EQUIPMENT.DWG

DRAWN BY
C MA

CHECKED BY
MT

B SHEET:
HVAC EQUIPMENT
0 1' 2' 4'
HVAC EQIPMENT & DISTRIBUTION PLAN

M-101
A1
A
SCALE: 1/2" = 1'-0"

SCALE: 1/2" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
1 THESE GENERAL NOTES APPLY TO ALL WORK SHOWN

GABLE HOME
2 DO NOT SCALE DRAWINGS, USE FIELD MEASURMENTS
T
NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR
3
CONDITIONS, WHETHER THEY ARE REPEATED OR NOT
ALL EXPOSED DUCTWORK, PIPING, ELECTRICAL CONDUIT,
TEMPERATURE CONTROLS CONDUIT AND ASSOCIATED
4
COMPONENTS SHALL BE STAINLESS STEEL OR COLOR AS
S SELECTED BY THE ARCHITECT
THE WORK HAS BEEN DESIGNED FOR THE EQUIPMENT
INDICATED ON THE DRAWINGS. THE CONTRACTOR SHALL BE
RESPONSIBLE TO COORDINATE AND PROVIDE ANY
MODIFICATIONS TO THE WORK INCLUDING BUT NOT
NECESSARILY LIMITED TO DUCTWORK, PIPING, ELECTRICAL,
5
R PLUMBING, PIPE PROTECTION, STRUCTURAL, LIGHTING,
OUTLETS AND ARCHITECTURAL FEATURES SUCH AS CEILINGS,
5 DOORS AND FRAMES, CASEWORK, ETC. REQUIRED TO
PROPERLY PROVIDE EQUIPMENT OTHER THAN THAT
INDICATED ON THE DRAWINGS
1'-638"
22 33 00.A2
Q
REFERENCE KEYNOTES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

P
06 16 00 - SHEATHING
06 16 00.D10 - 5/8" EXTERIOR GRADE PLYWOOD

DIVISION 22 - HOT WATER HEATER


N DESIGNER:
22 33 00.A2 AIR TAP HEAT PUMP
23 33 00.X1 UNIVERSITY OF ILLINOIS
22 33 00.23 ELECTRIC DOMESTIC WATER HEATER
GABLE HOME TEAM
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
611 LOREDO TAFT DR.
M 23 33 00.B4 CHAMPAIGN, IL 61820
5
23 31 00 - HVAC DUCTS AND CASINGS
SEALS:
23 31 13.17 23 31 13.16 6" duct

2 23 31 13.17 DUCT T SECTION


L 23 31 13.16
23 31 13.19 6" "U" DUCT HANGER @ 2'-0" O.C.
06 16 00.D10

23 33 00 - AIR DUCT ACCESSORIES


23 33 00.B4 - 6 SLOT LINEAR DIFFUSER
K PROJECT:
3 4 23 31 13.18 23 33 00.X1 ATTIC DRAFT STOP
4
23 81 43.I1
23 33 00.X1
US DEPT. OF ENERGY
23 81 43.A6
5 3
SOLAR DECATHLON
6
4 23 81 34 - AIR SOURCE UNITARY HEAT PUMP OCTOBER 1-21 2009
J 23 81 43.A2 23 81 43.A6 - ELECTRIC RESISTANCE HEATING COIL NREL & DOE
6
23 81 43.A2 23 81 43.I1 - ELECTRONIC DAMPER
ISSUANCE:
BID DOCUMENTS
H
23 31 13.19A
#01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G 1

CONSTRUCTION DOCS
#03 06/01/2009 JJS
23 72 23

F 23 72 23
SHEET KEYNOTES
1 MAIN LIVING ROOM SUPPLY DUCT - SEE PLAN FOR DISTRIBUTION

PROVIDE CLOSED SHEATHIGN FOR 5' ON EITHER SIDE OF DRAFT


2
E STOP

3 SUPPLY DUCT
INFORMATION:
4 RETURN DUCT
PROJECT NAME
UIUC_SD_2009
D 5 ELECTRONIC DAMPER
DRAWING LOCATION
6 CONDENSATE DRAIN M-401 ENLARGED PLAN &
SECTION.DWG
DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
ENLARGED PLAN &
0 6" 1' 2' 0 6" 1' 2' SECTION
ENLARGED PLAN ENLARGED SECTION

M-401
A1 A12
A
SCALE: 1" = 1'-0" SCALE: 1/4" = 1'-0"

SCALE: 1" = 1'-0" SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL DRAWINGS REPRESENT SUGGESTED METHOD OF

GABLE HOME
ATTACHMENT. IN ALL CIRCUMASTANCES, MANUF.
1.)
22 33 00.A1 RECCOMENDATIONS TAKE PRECEDENCE AND SHALL BE
23 71 13.A1 INSTALLED IN ACCORDNACE WITH CODE REQUIREMENTS
T 06 05 23.X8

05 41 00.B7 ALL FLUIDS IN THE SYSTEM SHALL HAVE A GOSSELIN RATING


2.) OF 1, INCLUDING CLORODIFLOUROMETHANE (R22), A
05 05 29.X4 HYDROFLUOROCARBEN REFRIGERENTS.

MSDS DATA FOR SAFETY AND TOXICITY CAN BE VIEWED AT


S 23 71 13.A1
3.) HTTP://complyplus.grainger.com/grainer/msds.asp?sheetid=
06 05 23.X8 3125728

05 41 00.B7 R-22 - INGESTION: NO HAZARDS TO BE SPECIALLY


4.)
MENTIONED.
05 05 29.X4 05 05 29.X4

358"
R
WITHIN THE AIR GENERATE HEAT EXCHANGER (CONDENSOR
22 33 00.A1 TUBE), THERE SHALL BE DOUBLE WALLS COPPER TUBE. OUTER
TUBE 5.6MM WALL THICKNESS 0.3 MM INTERNAL TUBE
5
5.6 MM WALL THICKNESS 0.5MM. DESIGN WORK PRESSURE:
460 PSIG FOR MODEL KRS-Y2.5F1/F, 550 PSIG FOR MODEL
Q KRS-Y3.6F1/F.

REFER TO SPECIFICATIONS FOR LINKS TO DATA SHEETS,


6 PRODUCT INSTALLATION SUGGESTIONS AND INSTALLATION
0 4" 8" 1'-4" 0 4" 8" 1'-4" REQUIREMENTS.
AIRTAP PLAN AIRTAP PERSPECTIVE
P7 P14
P
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

N
REFERENCE KEYNOTES DESIGNER:
UNIVERSITY OF ILLINOIS
1034"
GABLE HOME TEAM

1'
DIVISION 05 - METALS
611 LOREDO TAFT DR.

-2
"
M CHAMPAIGN, IL 61820
23 71 13.A1 05 05 00 - COMMON WORK RESULTS FOR METALS
05 05 23.X9 - 3/4" "T"
05 40 00.E7 SEALS:
05 05 29.X4 - 4 5/8" FENDER WASHERS
05 05 29.X5
05 05 29.X6 05 05 29.X5 - 3/8"-16 1" BOLT
L

1'-8"
05 05 29.X6 - A3008 3/8" - 16 CHANNEL NUT
05 05 29.X7
05 05 29.X6 05 05 29.X7 - P1008 3/8" - 16 CHANNEL NUT
05 40 00.E7
05 05 29.X8 - 3/8" - 16 3/4" BOLT
05 05 29.X6

K
05 05 29.X8 05 05 29.X9 - A1026 2 HOLE FITTING
PROJECT:
05 05 29.X5
05 05 29.X9 23 71 13.A1 05 40 00 - COLD-FORMED METAL FRAMING
US DEPT. OF ENERGY
05 05 29.X6
05 05 29.X8
22 05 23.A5
05 40 00.E7 - A2110 45 DEGREE FITTING
SOLAR DECATHLON
22 05 23.A2
OCTOBER 1-21 2009
22 05 23.A1
J 13
1'-1016 "
05 41 00 - STRUCTURAL METAL STUD FRAMING
NREL & DOE
05 05 23.X9
05 41 00.B7 - UNITSTRUT P1100 14 GAGE CHANNEL
ISSUANCE:
BID DOCUMENTS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
H #01 01/15/2009 JJS
22 33 00.A1 22 33 00.A1 06 05 00 - COMMON WORK RESULTS FOR WOOD, PLASTICS, AND
COMPOSITES DOE REVIEW
06 05 23.X8 - 4 1/2" WOOD SCREWS
#02 04/16/2009 JJS
G

7'-021"
DIVISION 22 - PLUMBING
CONSTRUCTION DOCS
22 05 00 - COMMON WORK RESULTS FOR PLUMBING #03 06/01/2009 JJS
22 05 23.A1 - 3/4" MPT TO SWEAT FIT - 3/4" MPT DRAIN VALVE
F
22 05 23.A2 - PRESSURE RELEASE VALVE
TYPE T THERMOCOUPLE - 3/4" MPT TO 1/8"
22 05 23.A5 -
COMPRESSION 3/4" SUCTION VALVE - 3/4" MPT PIPE

E 22 33 00 - ELECTRIC DOMESTIC WATER HEATERS


22 33 00.A1 - WATER HEATER
INFORMATION:
PROJECT NAME
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
UIUC_SD_2009
D
23 71 00 - THERMAL STORAGE
DRAWING LOCATION
23 71 13.A1 - AIRTAP HEAT PUMP M-501 WATER HEATER DETAILS.DWG

DRAWN BY
C SHEET KEYNOTES JJS

CHECKED BY
22 05 23.A1
MT
NONE USED

B SHEET:
WATER HEATER
0 4" 8" 1'-4" 0 4" 8" 1'-4" DETAILS
WATER HEATER ELEVATION WATER HEATER ELEVATION

M-501
A7 A14
A
SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0" SCALE: 1 1/2" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
3 GENERAL SHEET NOTES
1.) THESE GENERAL NOTES APPLY TO ALL WORK SHOWN

GABLE HOME
2.) DO NOT SCALE DRAWINGS, USE FIELD MEASURMENTS
1
T OUTDOOR
23 81 43.A4
COIL NOTES ON DRAWINGS SHALL APPLY TO ALL SIMILAR
3.)
CONDITIONS, WHETHER THEY ARE REPEATED OR NOT
ALL EXPOSED DUCTWORK, PIPING, ELECTRICAL CONDUIT,
2 TEMPERATURE CONTROLS CONDUIT AND ASSOCIATED
4.)
COMPONENTS SHALL BE STAINLESS STEEL OR COLOR AS
S SELECTED BY THE ARCHITECT
INDOOR COIL THE WORK HAS BEEN DESIGNED FOR THE EQUIPMENT
INDICATED ON THE DRAWINGS. THE CONTRACTOR SHALL BE
RESPONSIBLE TO COORDINATE AND PROVIDE ANY
23 81 43.A2 MODIFICATIONS TO THE WORK INCLUDING BUT NOT
HEAT IN NECESSARILY LIMITED TO DUCTWORK, PIPING, ELECTRICAL,
5.)
R PLUMBING, PIPE PROTECTION, STRUCTURAL, LIGHTING,
OUTLETS AND ARCHITECTURAL FEATURES SUCH AS CEILINGS,
23 81 43.A2
DOORS AND FRAMES, CASEWORK, ETC. REQUIRED TO
PROPERLY PROVIDE EQUIPMENT OTHER THAN THAT
INDICATED ON THE DRAWINGS

Q HEAT OUT

23 81 43.A1

P
6

N 5 REFERENCE KEYNOTES DESIGNER:


UNIVERSITY OF ILLINOIS
23 81 43.A3 23 81 43.A3
GABLE HOME TEAM
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
23 81 00 - DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 43.A1 - VARIABLE CAPACITY COMPRESSOR
23 81 43.A5 23 81 43.A5 SEALS:
23 81 43.A2 - FIN AND TUBE HEAT EXCHANGERS
23 81 43.A3 - THERMOSTATIC EXPANSION VALVE
L 23 81 43.A4 - REVERSING VALVE
4 CV1
23 81 43.A5 - CHECK VALVE
CV1 4
HEATING MODE
K1
K
SCALE: NTS PROJECT:
3
US DEPT. OF ENERGY
SOLAR DECATHLON
OCTOBER 1-21 2009
J 23 81 43.A4
NREL & DOE
ISSUANCE:
1 BID DOCUMENTS
H #01 01/15/2009 JJS
2

DOE REVIEW
23 81 43.A2
#02 04/16/2009 JJS
G
SHEET KEYNOTES CONSTRUCTION DOCS
23 81 43.A2
1 EVAPORATOR #03 06/01/2009 JJS
F 2 CONDENSOR

3 REVERSING VALVE
23 81 43.A1
4 CHECK VALVE
E
6
5 THERMOSTATIC EXPANSION VALVE
INFORMATION:
6 COMPRESSOR
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION

PIPING LEGEND
23 81 43.A3 M-601 HVAC SYSTEM.DWG
23 81 43.A3
DRAWN BY
MARK DESCRIPTION
C MA
HIGH PRESSURE GAS
HIGH PRESSURE LIQUID
CHECKED BY
23 81 43.A5 23 81 43.A5
MT
LOW PRESSURE GAS
CV1
B
LOW PRESSURE LIQUID SHEET:
4 CV1 LOW TEMPERATURE LIQUID HVAC SYSTEM
4
COOLING MODE

M-601
A1
A
SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
ELECTRICAL CALCULATIONS ELECTRICAL CALCULATIONS CONTINUED ELECTRICAL SYMBOLS GENERAL NOTES
Electrical System Design Details 1 THESE GENERAL NOTES APPLY TO ALL WORK IN THIS PROJECT

GABLE HOME
Breaker Sizing DESCRIPTION SYMBOL
REFER TO ARCHITECTURAL PLANS AND SPECIFICATIONS FOR
Ambient Temperature In the previous section, it has been pointed out that a 30 A circuit breaker is required for each inverter. The sub-panel main breaker will be 2
ADDTIONAL GENERAL NOTES WHICH WILL APPLY HERE
Temperature data obtained from the National Climatic Data Center (www.ncdc.noaa.gov), for National Arboretum DC, MD rated for 60 A (2 x 20.8 x 1.25 = 52 A, round to 60 A).
T suggests that the design temperature for the house ranges from -10oF to 104oF (-23oC to 40oC). Additionally, the SINGLE MOTOR FAN 3 DO NOT SCALE DRAWINGS, USE FILED MEASUREMENTS
operating temperature of the PV modules can reach up to 75oC. Sub-panel Rating NOTES ON DRAWINGS SHALL APPLY TO ALL, SIMILAR
4
To size the Sub-panel, we refer to NEC 690.64(B)(2) and denote the minimum rating as y. Given 30 A circuit breakers for the inverters and a CONDITIONS WHETHER THEY ARE REPEATED OR NOT
MULTIPLE MOTOR FAN
Electrical System Block Diagram 60 A sub-panel main breaker, THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE
Figure 1 depicts the one-line diagram of the electrical system (Detailed schematic attached, E-103). In Fig. 1, each 1.2 y = (2 x 30)+(60) => y = 100 A. WITH ANSI 710.1 AND THE A.D.A.A.G (AMERICANS WITH
Photovoltaic (PV) sub-array consists of 20 Sunpower SPR-225-BLK modules (Data Sheet attached). The 20 modules are Thus, the sub-panel will be rated for 100 A. 5 DISABILITIES ACT ACCESSIBILITY GUIDELINES), ILLINOIS
GROUNDING ROD
S arranged as 2 parallel strings of 10 series connected modules. This constrains the current and voltage of each string below ACCESSIBILITY CODE AND ANY OTHER GOVERNING
21 A (Inverter DC Max. Input Current) and 600 V (Inverter DC Max. Input Voltage) respectively. More precisely, at the Sub-panel to Main-Panel (7) ACCESSIBILITY CODE
minimum ambient temperature (-23oC), employing the temperature coefficient of voltage, (-0.1325 V/oC), the worst-case
value of the expected string voltage is 10[VOC+0.1325(25+23)] = 581.725 V. Also, at the maximum ambient temperature,
Note that these conductors will be routed in conduit from the sub-panel through a disconnect switch that will be installed in the exterior of
the house and back into the house and terminate at the main panel.Conductor Sizing
JUNCTION BOX J ELECTRICAL CONTRACTOR SHALL VERIFY TOTAL CONNECTED
LOAD / IIP AND VOLTAGE WITH MECHANICAL
(40oC), employing the temperature coefficient of current, (3.5 mA/oC), the worst-case value of expected string current is Note that the conductors in this run are also subject to constraints imposed by NEC 690.64(B)(2). Denoting the allowed ampacity of the 6 CONTRACTOROR PRIOR TO WIRING ALL HVAC EQUIPMENT.
ISC[1+0.0035(40-25)]=6.178 A. conductors as z, CONNECTION MAKE ANY CHANGES TO OVERCURRENT DEVICES OR FEEDER
1.2 z = (2 x 60) => z = 100 A. SIZE PER CURRENT NATIONAL ELECTRIC CODE
R Each sub-array is connected to a Sunpower 5000m inverter (Data Sheet attached). The inverter eliminates the need for CONTRACTOR SHALL VERIFY ALL FURNITURE, MOUDLAR
combiner boxes by accepting inputs from 4 strings (of which only 2 are used for each sub-array) and also provides The ampacity of 3 AWG THWN conductors at an assumed ambient temperature of 40oC is 127.6 A (145 x 0.88) [NEC 310.17], which enables PULL BOX PB FURNITURE AND QUIPMENT LOCATIONS WITH
integrated DC disconnects for the PV strings. their utilization for this run. ARCHITECTURAL PLANS, ELEVATIONS AND REVIEWED SHOP
7 DRAWINGS PRIOR TO MAKING THE ACTUAL ELECTRICAL
Conduit Selection
In accordance with NEC Table C-1, we will employ a 1” EMT conduit for this part of the system.
METER
M INSTALLATION. THIS CONTRACTOR SHALL ADJUST
Q RECEPTACLES, OUTLETS OR CONNCTION LOCATIONS TO
ACCOMODATE FURNITURE AND / OR EQUIPMENT
Figure 1: One-Line Diagram of Electrical System AC Disconnect Switch SEMI-RECESSED PANEL BOARD
ALL LIGHTING FIXTURES SHALL BE RATED FOR BUILDING
NEC 690.64(B)(2) will dictate the rating of the AC Disconnect Switch. Denoting the minimum rating of the switch as z, 8 SYSTEM VOLTAGE. CONTRACTOR MUST VERIFY

S2
The numbers attached in parentheses for each conductor correspond to the tags in the document, E-103. 1.2 z = (2 x 60) => z = 100 A. ALLLOCATIONS
Thus, the AC Disconnect Switch will be rated for 100 A. 2-WAY SWITCH
ELECTRICAL CONTRACTOR SHALL CHECK AND COORDINATE
PV Modules to Junction Boxes (1)
P Conductor Sizing Main-Panel design
WALL MOUNTED LIGHT
9
ALL LIGHTING FIXTURE CATALOG NUMBERS WITH THE INTENT
OF FIXTURE DESCRIPTIONS, LISTED ACCESSORIES AND TYPE
The short circuit current of the SPR-225-BLK module is 5.87 A, which implies a continuous current of 7.34 A (5.87 x 1.25). Breaker Sizing
OF INSTALLATION
The 80% operation is 9.18 A (7.34 x 1.25). The cable should hence have a 30oC ampacity of The main-panel includes a 60 A back-fed PV breaker and a 150 A main-breaker.
9.18 A. ALL FIXTURES TO BE "U.L." LABELED. ALL LIGHTING FIXTURES
FULLY-RECESSED PANEL BOARD EXPOSED TO WEATHER OR MOISTURE SHALL BEAR "U.L." WET
Main-panel Rating 10
LOCATION LABEL AND LIGHTING FIXTURES EXPOSED TO
Note that while these cables will be installed in free air, they will be in contact with the back of the PV modules, reaching To size the Main-panel, we refer to NEC 690.64(B)(2) and denote the minimum allowed rating as y. Given the sizes of the breakers installed,
DAMPNESS SHALL BEAR U.L. "DAMP LOCATION" LABEL.
N temperatures of up to 75oC. The following conductors could be used for this application [NEC 310.17]. 1.2 y = 60 + 150 => y = 175 A. WALL MOUNTED LIGHT DESIGNER:
Thus, the Main-panel will be rated for 200 A.
10 AWG USE-2/RHH/RHW-2: Ampacity in free air at 75oC: 22.55 A (55 x 0.41) 11
VERIFY ALL LIGHTING FIXTURE LOCATIONS, FINISHES, AND UNIVERSITY OF ILLINOIS
CEILING TYPES WITH ARCHITECT PRIOR TO INSTALLATION
12 AWG USE-2/RHH/RHW-2: Ampacity in free air at 75oC: 16.4 A (40 x 0.41) SPECIAL OUTLET - SEE NOTES GABLE HOME TEAM
14 AWG USE-2/RHH/RHW-2: Ampacity in free air at 75oC: 14.35 A (35 x 0.41)
AC Side Equipment Grounding (6) 611 LOREDO TAFT DR.
REFER TO APPLICABLE SECTIONS OF THE SPECIFICATIONS FOR
M Voltage Drop Calculations
It is generally suggested that the maximum voltage drop at full power from the PV source to the inverter be limited to 3%. We
To appropriately ground the equipment on the AC side of the system, we employ NEC 250.122, which governs the size of the
equipment-grounding conductor based on the rating of the over-current device protecting the relevant circuit.
TAMPER-RESISTANT DUPLEX OUTLET 12
ADDITIONAL REQUIREMENTS FOR LIGHTING FIXTURES CHAMPAIGN, IL 61820
will assume a DC bus voltage of 410 V for each sub-array (Number of series modules x Rated Voltage = 10 x 41). This
means that the voltage drop in the conductors should be less than or equal to 12.3 V. Note that 30 and 60 A circuit breakers are employed in this portion of the system (refer design of sub-panel and main-panel). From Table PULL CHAIN LIGHT
P SEALS:
250.122, we note that 10 AWG bare Cu suffices at these current levels. Thus, the Equipment Grounding Conductors for the Inverters,
The maximum length wire run from the PV sub-array to the inverter is approximately equal to 13.21 mt. The DC resistance Disconnect switch, sub- and main-panels will consist of 10 AWG Bare Cu conductor. This will be routed through conduit as appropriate.
of 10 AWG conductors is 3.27 x 10-3 mt-1. Assuming rated current, this implies that the maximum voltage drop Grounding Electrode Conductor (10) ELECTRICAL FUSE
L experienced is, NEC 250.66 dictates limits on the Grounding Electrode Conductor based on the size of the largest ungrounded service-entrance conductor.
5.49 A x 3.27 x 10-3 mt-1 x 13.21 mt = 2.37 V. This is much lesser than 3% limit. Assuming that 2/0 AWG conductors will be employed to service the house, Table 250.66 indicates that the Grounding Electrode Conductor
should be 4 AWG Bare Cu. ELECTRICAL SPEAKER
S
Conductor chosen x
Based on the considerations presented above, we use a 10 AWG conductor for this run. As dictated by the rules, we will employ an 8’ ground rod driven at a 45o angle into the earth.

K
DATA CONNECTION
PROJECT:
Junction Boxes to Inverters (2) Ground Bonding Conductor (8)
NEMA-3R rain-proof junction boxes will be employed to source the conduit runs into the interior of the house. The This conductor is utilized to connect the grounding point in the inverter to the grounding bus bar in the main electrical panel. This
DATA LINE
US DEPT. OF ENERGY
conductors from the PV source circuit will be spliced together with the cable in the conduit using approved means [NEC conductor originates from the grounding point of one of the inverters and terminates at the grounding rod. The other inverter’s grounding T
300.15]. point is spliced irreversibly to this conductor as depicted in the electrical schematic. The conductors will be enclosed in ¾” PVC conduit up to SOLAR DECATHLON
the point of floor penetration.
EXTERIOR WALL LIGHT OCTOBER 1-21 2009
Conductor Sizing
J Note that the 30oC ampacity of these conductors should still be 9.18 A. The only other corrective factors that need to be NEC 690.47(C)(2) dictates that the bonding conductor between the DC and AC systems should be sized as the larger of the DC requirement NREL & DOE
accommodated are for conduit fill. Assuming an ambient temperature of 40oC, the temperature correction factor for (in accordance with NEC 690.45) and the Inverter alternating current over-current device rating [NEC 250.122]. In addition, NEC 690.47(C)(4) SWITCH
THHN/THWN-2 cables in conduit is 0.91. In addition, the ampacity is de-rated by a factor of 0.8 [NEC 310.15] to
accommodate the fact that each conduit will contain five conductors (4 PV output conductors and 1 Equipment Grounding
indicates that a bonding conductor that serves multiple inverters shall be sized based on the sum of applicable currents used in NEC
690.47(C)(2).
ISSUANCE:
Conductor). ETHERNET OUTLET ET
BID DOCUMENTS
The data sheet of the SPR 5000m inverter indicates that the maximum permissible DC current is 21 A. In addition, 30 A circuit breakers are
H We will use 10 AWG THHN/THWN-2 cable for this portion of the run for uniformity and to reduce voltage drops. The installed on the AC output of each inverter. Denoting the minimum ampacity of the bonding conductor as z, to satisfy the postulates of NEC #01 01/15/2009 JJS
de-rated ampacity of 10 AWG cable [NEC 310.16] is 29.12 A (40 x 0.91 x 0.8), which is well above the required ampacity of 690.47(C)(2) and NEC 690.47(C)(4), ELECTRICAL WHIP
9.18 A. z = 2(21) + 2(30) = 102 A.
DOE REVIEW
Conduit Selection Based on NEC 250.122, we will employ a 6 AWG Cu conductor to realize the ground bonding conductor. FOURPLEX OUTLET
The conductors in this portion of the electrical system will be enclosed in a 3/4” EMT conduit. The conduit will begin at the #02 04/16/2009 JJS
G junction box and terminate in the interior of the house at the inverter (for each sub-array).
240V OUTLET
NEC Table C-1 (Appendix) indicates that up to ten 10 AWG conductors can be routed through a 3/4” EMT conduit. We are CONSTRUCTION DOCS
well within this limit as only five 10 AWG conductors will be routed in each conduit (4 PV output conductors and 1 Equipment
Grounding Conductor for each sub-array). PHONE JACK #03 06/01/2009 JJS
F Equipment Grounding Conductor (3/4)
Based on the calculations presented above, we will employ a 10 AWG conductor to realize the Equipment Grounding CATV CONNECTION
Conductor. As depicted in the Electrical Schematic (E-103), up to the junction box (tag: 3), a bare Copper conductor is TV
utilized, and for the run between the junction box and the inverter (tag: 4), 10 AWG THHN/THWN-2 is utilized.
SMOKE DETECTOR
D
Inverter output circuits (5)
We refer the conductor runs between each inverter and the electrical sub-panel as the inverter output circuits. Note that the
E conductors will be routed through EMT conduit.
ELECTRONIC DAMPER

Conductor Sizing INFORMATION:


The maximum inverter output current is 20.8 A (5000 W / 240 V). Ampacity requirements dictate a current of 26 A (20.8 x
1.25). Required circuit breaker for each inverter is 30 A. To minimize voltage drops, we will employ 10 AWG THWN
PROJECT NAME
conductors for the inverter output circuits. Note that the ampacity of these conductors [NEC 310.17] at an assumed ambient UIUC_SD_2009
D temperature of 40oC is 44 A (50 x 0.88) hence serving this application well.
DRAWING LOCATION
Conduit Selection
E-001 SYMBOLS AND NOTES.DWG
In accordance with NEC Table C-1, we will employ a 1” EMT conduit for this part of the system.

Sub-panel design
DRAWN BY
C As depicted in the schematic (E-103), a sub-panel is utilized to combine the output of the two inverters. JJS

CHECKED BY
SD

B SHEET:
SYMBOLS AND
NOTES

E-001
A

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
DESIGN CHOICES SUMMARY WIRE SCHEDULE GENERAL SHEET NOTES

GABLE HOME
MARK DESCRIPTION REMARKS REFER TO SHEET E-603 FOR DIMENSIONED PLACEMENT OF
CONDUCTOR CIRCUIT GROUNDING 1.)
CONTINUOUS 80% FIXTURES AND CIRCUIT DESIGNATIONS
BRANCH CONDUCTOR DERATED BREAKER CONDUCTOR CONDUIT 1 10 AWG USE-2 / RHH / RHW-2
T CURRENT (A) OPERATION (A)
AMPACITY (A) RATING (A) (A)
2 10 AWG THHN / THWN-2
COORDINATE PLACEMENT WITH ARCHITECTURAL FEATURES
2.)
PV Sub-Arrays to 10 AWG 10 AWG Solid, Bare 3 10 AWG SOLID CU, BARE AS REQUIRED
7.34 9.18 22.55 None None
Junction boxes 7.34 USE-2/RHH/RHW-2 Cu
4 10 AWG THNN / THWN-2 EQUIPME. GROUND CONDUCTOR
S 5 10 AWG THWN 3.)
REFER TO SPECIFICATIONS FOR LAMP DETAILS, INSTALLATION
Junction Boxes to 10 AWG Integrated with 10 AWG REQUIREMENTS.
8.34 9.18 22.72 1" EMT
Inverters THHN/THWN-2 Inverter THHN/THWN-2
6 10 AWG SOLID CU BARE MODULE:
VOC = 48.5V
Inverters to 10 AWG Solid, Bare 7 3 AWG THWN ISC = 5.87A
20.80 26 10 AWG THWN 44 30 1" EMT 4
Sub-Panel Cu
R 8 6 AWG SOLID CU BARE
Vmp = 41V
Imp = 5.49A

9 2/0 SE CABLE STRING:


Sub-panel to 10 AWG Solid, Bare TLOW = -23° C VOC - MAX = 10[VOC + 0.1325
100 N/A 3 AWG THWN 127.60 60 1" EMT
Main-panel Cu (25+23)] = 581.725V
10 4 AWG BARE CU.
5 INVERTER MAX VOLTAGE = 600V
Q THIGH = 40°C
ISC-MAX = ISC [1+0.0035940-250] = 6.178A
INVERTER MAX CURRENT = 21A

P
1
1

REFERENCE KEYNOTES
N DESIGNER:
2
SPR
3 UNIVERSITY OF ILLINOIS
225
BLK
GABLE HOME TEAM
DIVISION 26 - ELECTRICAL
611 LOREDO TAFT DR.
M 26 05 00 - COMMON WORK RESULTS FOR ELECTRICAL
CHAMPAIGN, IL 61820
4 26 0526.A1 - GROUNDING ROD
SEALS:
26 05 33.A1 1' EMT

26 05 33.A1
L 26 05 33.A3 - 2" EMT
22 05 25.A1
26 24 00 - SWITCHBOARDS AND PANELBOARDS

5 26 24 16.A1 - 200 A MAIN PANEL


26 24 16.A2
K 26 24 16.A2 - 100 A SUB PANEL PROJECT:
2 1 DIVISION 33 - UTILITIES US DEPT. OF ENERGY
33 71 00 - ELECTRICAL UTILITY TRANSMISSION AND DISTRIBUTION SOLAR DECATHLON
L1
26 05 33.A1 30A OCTOBER 1-21 2009
L2 33 71 73.33 - ELECTRIC METER
J 7
N
NREL & DOE
26 05 33.A3 DIVISION 48 - ELECTRICAL POWER GENERATION
26 05 33.A1
48 19 00 - ELECTRICAL POWER CONTROL EQUIPMENT ISSUANCE:
48 19 16 - SPR 5000M INVERTER BID DOCUMENTS
60A 22 11 13.A1
H #01 01/15/2009 JJS

DOE REVIEW
N
150A 60A L1 #02 04/16/2009 JJS
G 6 30A
L2
9 2
33 71 73.33 2 1 CONSTRUCTION DOCS
#03 06/01/2009 JJS
6
F 6
26 05 33.A1
10

8
E 26 05 26.A1 8 23 31 16

INFORMATION:
PROJECT NAME
#
3

SHEET KEYNOTES
UIUC_SD_2009
D 4
DRAWING LOCATION
1 NEMA3R JUNCTION BOX (2 TOTAL) E-101 POWER PLAN.DWG

DRAWN BY
2 100 A AC DISCONNECT INSTALLED IN EXTERIOR
C 3 JJS

1 2 CHECKED BY
FOR COMPETITION, TEAM TO INSTALL 8' GROUNDING ROD PER
1 SD
3 SPECIFICATIONS. FOR FINAL INSTALLATION, GROUNDING TO BE
TIED TO METAL PLUMBING LINE PER NEC 2008.

B SHEET:
POWER PLAN
3
4 4" PVC TUBING

POWER PLAN

E-101
A1
A
SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U LIGHT BULB SPECIFICATIONS LIGHTING FIXTURE SCHEDULE
GENERAL SHEET NOTES
MANUFACTURER & WATTAGE & RECESSED
MARK TYPE WATTS/DESCRIPTION MANUF. SUPPLIER INFORMATION MARK MOUNTING MISCELLANEOUS

GABLE HOME
CATALOG NO. LAMP DEPTH REFER TO SHEET E-603 FOR DIMENSIONED PLACEMENT OF
1.)
ALICO SILO CHROME B/FIXTURE @ 5'-6" AT DINING TABLE & B/FIXTURE @ FIXTURES AND CIRCUIT DESIGNATIONS
1 PENDANT PAR 20 LED --
PS4500-16-16 8'-6" AT HALLWAY
T PAR 38 LED 20-WATT CREE XLAMP XRE ARCADIA LED WAVES WARM WHITE, WIDE E 26
27, 100-240VAC 50/60 HZ
PLC LIGHTING GIMBAL NORA LIGHTING TRACK
2 PAR 30 LED -- TRACK TO RUN LENGTH OF ROOM
#TR-121 #NT-2302
COORDINATE PLACEMENT WITH ARCHITECTURAL FEATURES
2.)
WARM WHITE (2580-3500K), WIDE 88DEG, E26/27 PROGRESS LIGHTING AS REQUIRED
3 WALL PAR 38 -- MOUNT AT 114" A.F.F.
PAR 30 LED 15-WATT CREE XLAMP XRE RHODES LED WAVES
100-240 VAC 50-60 HZ #P5641
SATURN EXTERIOR 26W 4-TUBE
4 PENDANT - MOUNT AT 9'-0" A.F.F.
S PENDANT #1902 G24Q-3 CFL 3.)
REFER TO SPECIFICATIONS FOR LAMP DETAILS, INSTALLATION
REQUIREMENTS.
PAR 20 LED 9 WATT 083BT ARGOS LED WAVES WARM WHITE, WIDE, E26/27
5 PROGRESS 6" PG-P86-TG RECESSED PAR20 LED -- USE OPEN IC TRIM - PG-P8073WL-28

G24Q- LIGHTBULBUS
12,000 HOURS, 27K ALICO SILO WHITE
FLOURESCENT 26 WATTS PREMIUM 6 PENDANT PAR 20 LED -- B/PENDANT @ 6'-6" A.F.F.
R 3 A #PS4500-10-16

RIFLETTA VANITY LIGHT 2G11 MOUNT CENTERED ABOVE WINDOW AND RECESS IN
2G11 FLUORESCENT 36 WATT PL 36 PLL 4PIN BULBORAMA BULBORAMA PL36 11
30K/2G 4 PIN SUPRA LIFE COMPACT 7 WALL 0'-3"
SKU: HK-90832 FLOURESCENT WALL AS REQUIRED.

Q
PHILIPS COLOR KINETICS USE PDS 60ca 24 POWER/CONTROLLERS FOR EACH
8 CLEAR FLAT 2700K WALL INTERNAL -- STRAND. REFER TO ELECTRICAL ELEVATION FOR
#500-000007-03 MOUNTING LOCATIONS
9 BEDROOM DESK LIGHT
METEOR LED GROUND
P 10
LIGHT #SH220C
RECESSED GROUND EXTERIOR INTERNAL 0'-2.56000" DECK LIGHTING

N DESIGNER:
UNIVERSITY OF ILLINOIS
A1 GABLE HOME TEAM
E-201 611 LOREDO TAFT DR.
M 008 008
CHAMPAIGN, IL 61820

SEALS:

L
REFERENCE KEYNOTES
006 006
006
DIVISION 26 - ELECTRICAL

K PROJECT:
26 51 00 - INTERIOR LIGHTING
US DEPT. OF ENERGY
26 51 00 - INTERIOR LIGHTING
002 001 001 SOLAR DECATHLON
002
OCTOBER 1-21 2009
26 56 00 - EXTERIOR LIGHTING
J NREL & DOE

L
L 003 004 26 56 33 - GROUND MOUNTED WALKWAY LIGHTING
003 002 002
007
W
ISSUANCE:
005
001
26 51 00 BID DOCUMENTS
26 56 00.A5
H 001 #01 01/15/2009 JJS

005
DOE REVIEW
#02 04/16/2009 JJS
G
008
CONSTRUCTION DOCS
008 #03 06/01/2009 JJS
F

K1
E-201

E
INFORMATION:
SHEET KEYNOTES PROJECT NAME
UIUC_SD_2009
D METAL RAMP ENCLOSURE WITH A MAXIMUM VERTICAL
1
CHANGE OF 21" AND A MAXIMUM SLOPE OF 1:20. DRAWING LOCATION
SLOPED WALKWAY WITH A MAXIMUM RISE/RUN OF 1:20. E-102 LIGHTING PLAN.DWG
2 LENGHT OF WALKWAY TO BE ADJUSTED ON SITE TO MEET
MAXIMUM RISE/RUN REQUIREMENT. DRAWN BY
C THE BATHROOM WILL NOT BE A DESTINATION DURING PUBLIC JJS
TOURS, HOWEVER, AND VISITORS WILL SIMPLY BE INVITED TO
3 LOOK INSIDE. A TEMPORARY BARRIER, SUCH AS A LIGHT CHECKED BY
ROPE, WILL BE USED TO DISCOURAGE VISITORS FROM
SD
ENTERING THE BATHROOM.

B SHEET:
LIGHTING PLAN
0 1'-4" 2'-8" 5'-4"
LIGHTING PLAN

E-102
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
BREAKER SCHEDULE GENERAL SHEET NOTES
MARK VOLTAG Calculated Load

GABLE HOME
LOCATION DESCRIPTION NOTES
E (VA) 1 ALL INSTALLATION PER NEC 2008

T 1 EAST 120V EAST & SOUTH EXTERIOR OUTLETS, EXTERIOR LIGHTING 766

2 EAST 120V LIVING, KITCHEN, EAST ENTRANCE LIGHTING 194 2


ALL BRANCH CIRCUITS GO TO "AC BREAKER PANEL" IN
ELECTRICAL CLOSET
3 EAST 120V ENTERTAINMENT OUTLETS 540
AFCI BREAKER
PROTECTED CIRCUIT
S ALL BEDROOM OUTLETS AND LIGHTS SHALL BE PROTECTED
4 EAST 120V LIVING, DINING OUTLETS 900
AFCI BREAKER 3
BY AFCI BREAKERS
PROTECTED CIRCUIT
5 KITCHEN 120V EXHAUST FAN 180 4
ALL SMOKE ALARMS TO BE INSTALLED IN ACCORDANCE WITH
NFPA72. FOLLOW MANUFACTURER'S REQUIREMENTS FOR
INSTALLATION. THEY SHALL BE INTERCONNECTED
R 6 KITCHEN 240V INDUCTION STOVE 3600
U.N.O. ALL RECEPTACLES TO BE INSTALLED AT 18" A.F.F. TO
7 KITCHEN 120V SMALL APPLIANCE CIRCUIT 1 1500
5
CENTERLINE IN A HORIZONTAL FASHION.

8 KITCHEN 120V DISHWASHER 730


6
U.N.O. ALL SWITCHES TO BE LOCATED AT 48" A.F.F. TO
Q CENTERLINE OF FIXTURE
9 KITCHEN 120V SMALL APPLIANCE CIRCUITE TWO W/ REFRIGERATOR 1500
8
WHILE ON NATIONAL MALL, ORGANIZER SHALL LOCK OUT &
20 10 KITCHEN 120V OVEN 1800 7 TAG OUT METER HOUSING UNTIL FINAL APPROVAL IS
MECHANICAL GRANTED

P
LOFT 11 UTILITY 120V WASHING MACHINE AND DRYER 1500
15 AREA 8 REFER TO BRANC CIRCUIT SCHEDULES FOR FINAL WIRING
12 UTILITY 120V WATER HEATER 1320
TAMPER RESISTANT RECEPTACLES MUST BE USED IN ALL
13 BATHROOM 120V BATHROOM LIGHTING AND OUTLET 198
9
LOCATIONS.

N 14 UTILITY 120V ELECTRICAL CLOSET OUTLET AND HALLWAY LIGHTING 198 REFERENCE KEYNOTES DESIGNER:
UNIVERSITY OF ILLINOIS
15 BEDROOM 120V BEDROOM POWER AND LIGHTING 1136
AFCI BREAKER
GABLE HOME TEAM
PROTECTED CIRCUIT
611 LOREDO TAFT DR.
M 16 WEST
120V WEST END EXTERIOR LIGHTING AND GFCI OUTLETS 200 CHAMPAIGN, IL 61820
EXTERIOR
17 WEST
120V WEST END WATER PUMP POWER 559 SEALS:
EXTERIOR
18 LOFT 240V MECHANICAL SPACE / UNIT OUTLET 3256
L
19 LOFT 120V MECHANICAL SPACE / UNIT OUTLET 180

MECHCANICAL LOFT AC PLAN


0 1'-4" 2'-8" 5'-4"
20 SMOKE 120V SMOKE ALARMS N/A
K1
K
SCALE: 3/8" = 1'-0" PROJECT:
SCALE: 3/8" = 1'-0"
US DEPT. OF ENERGY
SOLAR DECATHLON
1'-6" 11'-0" 2'-6" 2'-0" 8'-0"
OCTOBER 1-21 2009
J
ET

5
? 783" 7'-9"
11
5'-016" 5'-10" 3'-081" 1'-521" NREL & DOE
4 3 1
2
7 16
ISSUANCE:
TV

@ 48" AFF 1 GFCI

@ 83"
BID DOCUMENTS
15
1'-11"

#01 01/15/2009 JJS


H
SHEET KEYNOTES
AFF
15 15

2'-0"
11

TV
ET
@ 83"
1'-6"

3'-10" 3 3 1
15 3
AFF
@ 78" AFF @ 48" AFF 8 @ 48" AFF @ 74" AFF 3
12
@ 30" AFF GFCI
HARDWIRE CONNECTION @ 18" A.F.F. FOR OWNER INSTALLATION OF
@ 30" AFF @ 30" AFF @ 30" AFF
7 5
DOE REVIEW
GFCI
6
TV

@ 6" AFF 9 9 1
17 9 ROPE LED LIGHTING
14 8
JJS
2 #02 04/16/2009
ET

ET 2
3'-641" 3'-641"

E.Q.
6'-10" ELECTRIC METER HOUSING AT 65" ABOVE GRADE (48" A.F.F.) TO
G 2 1
6"

2 ACCEPT A STANDARD, 4-JAW, RINGLESS ROUND, UTILITY GRADE


2 SOCKET METER FOR USE WITH 240/120 V SERVICE.
CONSTRUCTION DOCS
E.Q.

E.Q. 3'-6" E.Q.

EQ
10
E1 A1 ?

E.Q.
6
20 E-501
20 @ 120"
3 AC DISCONNECT AT 65" ABOVE GRADE (48" A.F.F.) #03 06/01/2009 JJS
10
E.Q.

IN
EQ
E-502
14 1
AFF
2
IN

F
CEILING
15
CEILING
HARDWIRE WHIP TO OUTLET IN BEDROOM FOR USE IN COMPETITION
17 2
EQ

10"
IN
13 4 ONLY. AFTER THE COMPETITION, ALL WIRES TO BE REMOVED AND

L
8"

CEILING
2 OUTLET TO BE REMOVED AND COVERED.
2IN
6"
1'-0"

@ 114" AFF
L
15 15 15 15 13
EQ

@ 114" AFF @ 120"

16
CEILING
W AFF
5 PHONE LINE BUILDING CONNECTION @ 48" A.F.F.

E.Q.
E 9 EXPOSED GALVANIZED CONDUIT. RUN AT RIGHT ANGLES TO
2'-0"

6 BUILDING. COORDINATION PLACEMENT WITH ARCHITECT PRIOR TO


6"

INSTALLATION. INFORMATION:

E.Q.
ET
2'-6" EQ 3'-0" EQ 7 CAT 5 CABLE BUILDING CONNECTION POINT. LOCATED AT 48" A.F.F. PROJECT NAME
2'-085"

UIUC_SD_2009
D 10 4 E.Q. E.Q. 8 2 CONDUCTOR 16-18 GAUGE WIRE TO CONNECT HEAT PUMP ABOVE
4
15 15 4 4
WATER HEATER TO MECHANICAL UNITS. PROVIDE WIRE PROTRUDING
DRAWING LOCATION
4 FROM WALL.
9 E-103 AC CIRCUIT PLAN.DWG
INSTALL OWNER PROVIDED JUNCTION BOX FOR DATA MONITORING
EQUIPMENT AND PROVIDE 1" CONDUIT BETWEEN JB AND MAIN PANEL DRAWN BY
C 1 GFCI 10 INSTALL EHTERNET CABLE & OWNER PROVIDED USB CABLE BETWEEN CM
A10 1 1 SOUTHWEST CABINET & JUNCTION BOX AND BETWEEN BEDROOM
E0502
GFCI
13'-0" DESK AND JUCTION BOX CHECKED BY
17'-0" SD

B SHEET:
AC CIRCUIT PLAN
0 1'-4" 2'-8" 5'-4"
AC CIRCUIT PLAN

E-103
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
REFER TO AC LAYOUT FOR EXACT PLACEMENT OF OUTLETS
1

GABLE HOME
AND FIXTURES
REFER TO A-SERIES DRAWINGS FOR WALL AND MILLWORK
2
DETAILS
T DO NOT SCALE DRAWINGS. COORDINATE PLACEMENT OF
3 OUTLETS WITH ARCHITECT AND OWNER PRIOR TO
INSTALLATION
THIS DRAWING PROVIDED FOR REFERENCE ONLY. EXACT
PLACEMENT OF EACH LIGHT AND ASSOCIATED NODE TO BE
DETERMINED BY PLACEMENT OF SIDING ON HOUSE PER
4
S ARCHITECTURAL SERIES, PER OWNER'S PREFERENCE WITH
REAGARD TO HEIGHT AND LIGHT FALLOFF AND TO MEET
MANUFACTURER'S SPECIFICATIONS
5 REFER TO E-104 FOR FIXTURE SCHEDULE

26 56 00.A5

008
N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

L
REFERENCE KEYNOTES
0 1'-4" 2'-8" 5'-4"
DIVISION 26 - ELECTRICAL
SOUTH LIGHTING ELEVATION
K1
K
SCALE: 3/8" = 1'-0" PROJECT:
SCALE: 3/8" = 1'-0" 26 56 00 - EXTERIOR LIGHTING
US DEPT. OF ENERGY
26 56 00.A5 - SURFACE MOUNTED EXTERIOR LIGHT
SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E 008
26 56 00.A5

INFORMATION:
SHEET KEYNOTES PROJECT NAME
UIUC_SD_2009
D
NOT USED DRAWING LOCATION
E-201 EXTERIOR LIGHTING
ELEVATION.DWG
26 56 00.A5
DRAWN BY
C HH
008
CHECKED BY
SD

B SHEET:
EXTERIOR LIGHTING
0 1'-4" 2'-8" 5'-4" ELEVATION
NORTH LIGHTING ELEVATION

E-201
A1
A
SCALE: 3/8" = 1'-0"

SCALE: 3/8" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
REFER TO "GRID INTERCONNECTION PROCESS" FOR DETAILED
1 INFORMATION. ORGANIZER SUPPILED INFORMATION TO
T SUPERCEED INFORMATION SHOWN HERE.

2 DO NOT SCALE DRAWINGS

ORGANIZERS SHALL SUPPLY 150A, 240/120V, 60 HZ,


3
SINGLE-PHASE SERVICE. CABLES SHALL BE GROUND LAID.
S
TERMINAL BOX SHALL BE OUTDOOR RATED JUNCTION BOX
4
MEASURING 12"X15"X6"

TERMINAL BOX MOUNTING PANEL SHALL BE LESS THAN 6"


R 5 FROM A SIGNIFICANT SITE COMPONENT TO PREVENT ACCESS
BEHIND THE PANEL.

ALL EXPOSED WOOD SURFACES TO BE PAINTED TO MATCH


6
SIDING. SEE A-SERIES.

Q WHEN PLACED ON HOME, TEAM SHALL PROVIDE EASILY


7 REMOVED COVERS (SIDING PANELS) TO CONCEAL THE
EQUIPMENT.

P TEAMS SHALL BE RESPONSIBLE FOR MOUNTING TERMINAL


26 09 13.A1 BOX AND INSTALLING MOUNTING PANEL. TEAMS SHALL MAKE
ALL CONDUIT CONNECTIONS FROM METER HOUSING TO
8 BOTTOM OF THE TERMINAL BOX. TEAMS SHALL PULL THE
WIRE FROM THE METER HOUSING TO THE TERMINAL BOX
AND LEAVE 3FT OF WIRE INSIDE THE TERMINAL BOX.
N 4 ORGANIZER TO SUPPLY TERMINAL BOX. DESIGNER:
UNIVERSITY OF ILLINOIS
001 9 ALL WIRING TO COMPLY WITH THE N.E.C. GABLE HOME TEAM
MOUNTING PANEL SHALL BE INSTALLED PRIOR TO 10 A.M. ON 611 LOREDO TAFT DR.
10
M DAY 2. CHAMPAIGN, IL 61820
ALL WORK ON MOUNTING PANL TO BE COMPLETED BY THE
ORGANIZERS EXCEPT INSTALLING THE MOUNTING PANEL,
4 11
MOUNTING THE TERMINAL BOX AND PULLING THE WIRES SEALS:
FROM THE TEAMS METER HOUSING

L 26 24 00.A3
001
27 20 00.A2
PROJECT:
K REFERENCE KEYNOTES US DEPT. OF ENERGY
SOLAR DECATHLON
DIVISION 26 - ELECTRICAL
OCTOBER 1-21 2009
J NREL & DOE
26 09 00 - INSTRUMENTATION AND CONTROL FOR ELECTRICAL SYSTEMS
26 09 13.A1 - TERMINAL BOX
ISSUANCE:
BID DOCUMENTS
H
26 24 00 - SWITCHBOARDS AND PANELBOARDS
#01 01/15/2009 JJS
3 26 24 00.A3 - SQUARE D SERVICE PAK10C-1

DIVISION 27 - COMMUNICATIONS
DOE REVIEW
#02 04/16/2009 JJS
G 27 20 00 - DATA COMMUNICATIONS
27 20 00.A2 - DATA LOGGER BOX CONSTRUCTION DOCS
#03 06/01/2009 JJS
F
SHEET KEYNOTES
FROM TEAMS METER HOUSING INTO THE BOTTOM OF THE
1
TERMINAL BOX

2 ORGANIZERS SERVICE LATERAL FROM THE UTILITY


E
3 AC POWER FROM CAMPBELL DATALOGGER
INFORMATION:
PROJECT NAME
1 4 SIGNAL OUT

D 2 UIUC_SD_2009

DRAWING LOCATION
E-501 GRID INTERCONNECTION.DWG

N L1 L2 DRAWN BY
C JJ

CHECKED BY
N L1 L2 SD

B SHEET:
GRID
INTERCONNECTION
GRID INTERCONNECTION DIAGRAM

E-501
A1
A
SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
T

3'-6"

6"
R
22 05 25.A1

22 11 13.A1
Q 26 30 00.D1

3'-0"
3
P
3'-0"

33 75 00.A1
N DESIGNER:
A1
E-605 33 75 00.A2
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
1 2 611 LOREDO TAFT DR.
M
4" 1'-7" 1'-2" REFERENCE KEYNOTES CHAMPAIGN, IL 61820
3'-6"
SEALS:
DIVISION 26 - ELECTRICAL

L
26 05 00 - COMMON WORK RESULTS FOR ELECTRICAL
06 18 00.02 - 3/4" LAMINATED BAMBOO

K
26 24 00 - SWITCHBOARDS AND PANELBOARDS PROJECT:
22 05 25.A1 - MAIN SHUTOFF VALVE
US DEPT. OF ENERGY
0 6" 1' 2'
26 30 00 - FACILITY ELECTRICAL POWER GENERATING AND STORING
SOLAR DECATHLON
E1
ELECTRICAL CLOSET ENLARGED PLAN
A5
ELECTRICAL WIRING DIAGRAM EQUIPMENT OCTOBER 1-21 2009
J SCALE: 1" = 1'-0" SCALE: NTS
26 30 00.D1 - JUNCTION BOX NREL & DOE
SCALE: 1" = 1'-0"
DIVISION 33 - UTILITIES
ISSUANCE:
BID DOCUMENTS
H 33 71 00 - ELECTRICAL UTILITY TRANSMISSION AND DISTRIBUTION #01 01/15/2009 JJS
11 31 13.A1 - DISHWASHER
2'-081"

08 84 00.A1
DOE REVIEW
22 11 13.A1 33 75 00 - HIGH-VOLTAGE SWITCHGEAR AND PROTECTION DEVICES
#02 04/16/2009 JJS
G
2'-6"

11 31 23.A1 - WASHER/DRYER
22 05 25.A1 33 75 00.A1 - AC DISCONNECT
CONSTRUCTION DOCS
33 75 00.A2 - DC DISCONNECT
#03 06/01/2009 JJS
F DIVISION 48 - ELECTRICAL POWER GENERATION

48 19 00 - ELECTRICAL POWER CONTROL EQUIPMENT


6" MIN

33 75 00.A2
22 11 13.A1 - WATER PUMP
7'-0"

E
INFORMATION:
06 18 00.02 PROJECT NAME
2'-081"

SHEET KEYNOTES
UIUC_SD_2009
D 26 24 16.A2
11 31 13.A1
DRAWING LOCATION
1 WORK AREA - MIN 30" IN FRONT, 36" DEEP, 72" HEIGHT CLEAR E-502 ELECTRICAL CLOSET
22 11 13.A1 DETAILS.DWG

11 31 23.A1
DRAWN BY
2 ELECTRICAL CLOSET BEYOND
C JJS

3 UNCONDITIONED PLENUM CHECKED BY


10"

26 30 00.D1 SD

B 33 75 00.A2 SHEET:
6"

ELECTRICAL
0 6" 1' 2' CLOSET DETAILS
ELECTRICAL CLOSET ELEVATION ELECTRICAL CLOSET SECTION

E-502
A1 A10
A
SCALE: 1" = 1'-0" SCALE: NTS

SCALE: 1" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
COMPUTER CONTROL SYSTEM GENERAL SHEET NOTES
1 System Overview

GABLE HOME
The home automation system for the Gable house is comprised of two main components:
monitoring and control. The monitoring system is designed to monitor the power 1 ALL INSTALLATION PER NEC 2008
consumption (both active and reactive) throughout the house at the circuit breaker, by circuit
T while also gathering temperature and humidity data from 3 interior sensors and 1 ambient
sensor. The control system is designed to control the HVAC system, the lights throughout the THIS DRAWING FOR REFERENCE AND COORDINATION ONLY.
house and a select number of receptacles. The system will be interconnected using a 2 ALL INSTALLATIONS TO MEET NEC 2008. REFER TO VARIOUS
centralized computer. A block diagram of the overall system is shown in Figure 1. SHEETS, THIS SERIES FOR CONNECTION DETAILS

2 Main Subsystems
S 3
REFER TO POWER PLAN FOR CONTROLLING SPECIFICATION
2.1 Power Monitoring REFERENCE NUMBERS AND INFORMATION
As mentioned above, the power monitoring system gathers data from the main breaker
panel, from each breaker in the panel. Using this method, the power usage for each circuit
throughout the house will be monitored and logged which can then be grouped into sections
roughly approximating the usage of each room in the house.
R The power will be monitoring the current in each breaker and the voltage from each of the
main lines. The current will be monitored using split core current transformers (2a-z)

REFERENCE KEYNOTES
connected within the main panel as shown in Figure 2.

The signal wires from each of these sensors will pass through a conduit connecting the main
Q panel to a small NEMA enclosure (25) under the secondary panel in the electrical closet.
These signals will first pass through conditioning circuits (6a-z), illustrated in Figure 3, each
containing a resistor (3) and a capacitor (5) that serve to create a voltage from the signal NONE USED
current and filter out noise, respectively.

FIGURE 1: CONTROL/MONITORING SYSTEM BLOCK DIAGRAM After being conditioned, the signals will be acquired using a 32-input DAQ (1) as illustrated
M1 in Figure 4. The DAQ is housed in (25) and is connected to the computer (18) using a 16'
P
SCALE: NTS
USB A-B cable (26) running under the house. The data will be interpreted and logged usin
Labview running in real time. Labview running in real time.

Unlike the current throughout the house, the voltage will remain constant among circuits
FIGURE 2: MAIN BREAKER PANEL SCHEMATIC WITH CURRENT SENSORS and thus it is only necessary to measure each of the main lines. Measuring both lines allows
N8 for the 240 Vac voltage to monitored as well. The voltage used for monitoring will be taken
N DESIGNER:
SCALE: NTS
from two additional circuit breakers as shown in Figure 2. These circuits will be routed to
(25) where the voltage conditioning circuits (7a-b), Figure 5, will be used to prepare the the
signals before passing them to (1).
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
The voltage conditioning circuit consists of a small power transformer (4) which steps the
voltage down to 10 Vrms. After (4), the voltage is stepped down yet again using a voltage
611 LOREDO TAFT DR.
M divider consisting of three 1k resistors (3) to ensure that the peak-to-peak voltage remains CHAMPAIGN, IL 61820
within the input range of (1). The voltage is then passed through a capacitor (5) for filtering
and finally two zener diodes (24) to ensure the voltage does not exceed 10V.
Once the data has been acquired using (1) LabView will be used to compute the active SEALS:
power, reactive power, power factor, etc. which can be viewed in real time or logged for later
viewing.
L
2.2 HVAC Control

The HVAC system requires a complex algorithm warranting the use of a second DAQ (8).
As mentioned above, the temperature and humidity will be measured in 4 discrete locations
using (13a-d) and (14a-d), respectively. With (13a-d) and (14a-d), (8) will control 7 main
K components through the use of relays and the analog outputs of (8). A block diagram of the PROJECT:
HVAC control is shown in Figure 6.
US DEPT. OF ENERGY
The components requiring control range in supply voltages and as thus the relays used to
control them. All relays are controlled with the digital outputs of (8). Three components
SHEET KEYNOTES SOLAR DECATHLON
require 24 Vdc and supplied by (9) and controlled by solid state relays rated for 40Vdc (10ac). OCTOBER 1-21 2009
J Two components require 120 Vac are controlled using solid state relays rated for 120Vac
(11a-b). One component requires 240 Vac is controlled by a solid state relay rated for 240Vac
NONE USED
NREL & DOE
(12). Two additional components require proportional 0-5Vdc and 0-10Vdc and will be
controlled using the analog outputs of (8). In addition to using temperature and humidity ISSUANCE:
information, the HVAC system can make use of magnetic door sensors (24a-b) placed at the
HVAC CONTROL SYSTEM & BLOCK DIAGRAM doorframe of each of the main doors to make adjustments if a door is left open.
BID DOCUMENTS
N8
H
SCALE: NTS
#01 01/15/2009 JJS
2.3 Receptacle and Lighting Control

All lights throughout the house will be controlled using insteon compatible on/off switches
(16a-i) which are controlled over the powerline via (17). Additionally five outlets throughout DOE REVIEW
G1
FIGURE 4: CURRENT/VOLTAGE CONDITIONERS AND DAQ the house will be controlled in a similar manner using (15a-e). The controllable switches
#02 04/16/2009 JJS
allow for devices such as free standing lamps to be controlled via (17). (17) is a centralized
G
SCALE: NTS
controller that allows for control of (16a-i) and (15a-e) over the powerline using any internet
connected device such as (18) or (23). An iPod Touch (23) has been proposed to allow for
wireless control throughout the house. CONSTRUCTION DOCS
2.4 Centralized Control and Monitoring #03 06/01/2009 JJS
F As mentioned in the previous sections, a computer will gather data, control the HVAC and
allow for the control of lights and select receptacles throughout the house. (1) and (8) will be
connected to (18) via USB while (17) will connect using an intermediate wireless router (22).
The wireless capabilities of (22) will allow (23) to access information and control
components of the house in any room. In addition to (23), a 19” touchscreen monitor (19)
FIGURE 3: CURRENT CONDITIONING CIRCUIT
E9 will be mounted in the wall to provide visual information and control of the house. (19) will
E
SCALE: NTS
be connected to (18) via DVI-D (27), for graphics, and USB (28), for touch control, which
will both be routed through the wall. In addition to connecting (18), (23) and (17), (22) will
allow other ethernet connected devices, such as the office computer, throughout the house to
be on the same network.
INFORMATION:
PROJECT NAME
Beyond the above described components and systems, a wireless camera (20) will be used
UIUC_SD_2009
D to monitor activity near the main door ( not sure about this ). Finally, a smart strip (21), will
be used to completely turn off power to ancillary devices when a main device is turned off.
For instance, if the TV is connected as the main device, all other home entertainment
DRAWING LOCATION
components will be have the power disconnected when the TV is turned off. This will help E-602 COMPUTER CONTROL
minimize losses accumulating when devices draw a small amount of power even when SYSTEM.DWG
powered down. DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
COMPUTER
CONTROL SYSTEM
FIGURE 6: PRODUCTS USED FIGURE 5: VOLTAGE CONDITIONING CIRCUIT

E-602
A1 N8
A
SCALE: NTS SCALE: NTS

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL EXHIBITION NOTES
THE ILLINOIS SOLAR DECATHLON SHALL COMPLY WITH RULE

GABLE HOME
10-2. EVENT SPONSOR RECOGNITION. IN ALL
COMMUNICATION MATERIALS, THE TEAM SHAL REFER TO THE
1
PROJECT AS THE U.S. DEPARTMENT OF ENERGY SOLAR
T DECATHLON. WHERE REQUIRED, THE TEAM SHALL CREDIT
THE DOE, NREL AND OTHER EVENT SPONSORS.
IN ACCORDANCE WITH 10-3. TEAM SPONSOR RECOGNITION,
WHENEVER THE ILLINOIS TEAM USES TEAM SPONSOR LOGOS
2 IT WILL BE ACCOMPANIED WITH THE SOLAR DECATHLON
TEXT AND LOGO THAT IS AT LEAST THREE TIMES THE SIZE OF
S THE SCHOOL SPONSOR.

ALL COMMUNICATION AND PRODUCTS WILL SERVE A PRIMARY


3 PURPOSE OF EDUCATION AND PERFORMANCE AND WILL NOT
SERVE AS ADVERTISING FOR THE SPONSOR.

THE TEAM SHALL NOT DEVOTE MORE THAN 20% OR 1 MINUTE


R 4 OF ANY POTENTIAL MEDIA PRESENTATION TO RECOGNITION
OF TEAM SPONSORS

DECATHLETE TOUR GUIDE OVERVIEW


Q THE LAYOUT OF THE HOME HAS BEEN DESIGNED TO ENABLE AN EFFICIENT AND
PRACTICAL FLOW THROUGHOUT THE ENTIRE SPACE AND CONSEQUENTLY, THE
TEAM WILL NOT REQUIRE GUIDED OR FORMALIZED TOURS. THE PRIMARY
FUNCTION OF ILLINOIS TOUR GUIDES WILL BE TO COAX VISITORS IN THE RIGHT
DIRECTION THROUGHOUT THE HOME AND ANSWER ANY QUESTIONS THAT
ARISE. VARIOUS EDUCATIONAL SIGNS WILL BE LOCATED THROUGHOUT THE
P HOME AND A SELF-GUIDED AUDIO TOUR WILL BE AVALIABLE THROUGH AN
IPHONE APPICATION OR TOLL FREE PHONE NUMBER.

EACH TOUR GUIDE, HOWEVER, WILL HAVE CERTAIN AREAS OF EXPERTISE AND
WILL EXPECT TO ANSWER QUESTIONS ON THE FOLLOWING TOPICS.

1) TOUR GUIDE ONE WILL DESCRIBE THE EXTERIOR OF OUR HOME, INCLUDING
N OUR RECLAIMED SIDING, SALVAGED DECKING, PASSIVE HOUSE FEATURES, DESIGNER:
STANDING SEAM METAL ROOFING, HISTORICALLY SIGNIFICANT DESIGN AND
BASIC FOUNDATION SYSTEM. UNIVERSITY OF ILLINOIS
2) TOUR GUIDE TWO WILL BE STATIONED INSIDE THE PORCH AREA AND WILL
GABLE HOME TEAM
TALK ABOUT THE LAMBOO STRUCTURAL RIB SYSTEM, THE INSULATION, 611 LOREDO TAFT DR.
HIGH-EFFICIENCY WINDOWS & DOORS AND CONSTRUCTION METHOD.
M CHAMPAIGN, IL 61820
3) TOUR GUIDE WILL THREE WILL BE STATIONED INSIDE THE LIVING ROOM AND
WILL TALK ABOUT THE MODULAR HOME CONSTRUCTION METHOD, PASSIVE
HOUSE DESIGN, INTERIOR FINISHES & APPLIANCES. SEALS:
4) TOUR GUIDE WILL BE LOCATED INSIDE THE KITCHEN, NEAR THE BATHROOM &
L MECHANCAL SPACES AND WILL POINT OUT THE ELECTRICAL SYSTEMS,
MECHANICAL DESIGN, HOME CONTROL SYSTEM, & BATHROOM FINSIHES.

5) IN THE BEDROOM, VISITORS WILL LEARN ABOUT FURNITURE DESIGN,


MECHANICAL SYSTEMS, FINISHES, AND WILL BE ABLE TO ASK ANY QUESTIONS
THEY MAY HAVE ABOUT THE INTERIOR OF THE HOME.

K 6) ONCE OUTSIDE, A DECATHLETE WILL DESCRIBE THE LANDSCAPING, PROJECT:


PHOTOVOLTAIC SYSTEM, RECLAIMED MATERIALS, ROOFING CHOICE, SHADING
DEVICES. US DEPT. OF ENERGY
ADDITIONAL TEAM MEMBERS WILL ALSO BE LOCATED ALONG THE BACK DECK
SOLAR DECATHLON
TO ANSWER QUESTIONS AND TALK WITH VISITORS AS THEY ARE LEAVING THE OCTOBER 1-21 2009
HOME.
J NREL & DOE
THROUGHOUT THE TOUR, WE WILL EMPHASIZE A LOOSE AND OPEN JOURNEY
RATHER THAN A STRICT PHASE BY PHASE TOUR.
ISSUANCE:
BID DOCUMENTS
STRUCTURES, SIGNAGE, PROPS & DEMONSTRATION ITEMS
H #01 01/15/2009 JJS
THE ILLINOIS SOLAR DECATHLON TEAM PLANS TO UTILIZE THE DESIGN AND
CONSTRUCTION OF THE HOUSE AS THE CENTERPIECE OF ALL PUBLIC EVENT
DEMONSTRATIONS AND TOURS BUT WILL SUPPLEMENT AS REQUIRED TO
PROVIDE A COMPLETE AND THOUROUGH UNDERSTANDING OF THE ENTIRE DOE REVIEW
HOUSE.
#02 04/16/2009 JJS
G THE TEAM ALSO PLANS TO USE A FREE IPHONE APPLICATION & TOLL-FREE
PHONE NUMBER TO PROVIDE VISITORS WITH INTERACTIVE AUDIO TOURS OF
THE HOME IF THEY CHOOSE TO VISIT WITHOUT THE ASSISTANCE OF ILLINOIS
DECATHLETES.
CONSTRUCTION DOCS
ONCE REACHING THE HOUSE, EACH VISITOR WILL BE PROVIDED WITH A
#03 06/01/2009 JJS
THREE-FOLD HANDOUT THAT SERVES AS AN EDUCATIONAL TOOL TO DESCRIBE
F THE HOUSE, DIRECT VISITORS TO OUR WEBSITE & CONTACT INFORMATION. THE
DESIGN CAN BE SEEN ON SHEET X-511.

INSIDE THE HOUSE, OUR SHED AREA WILL SERVE AS THE FIRST DEMONSTRATION
ITEM. DISPLYAING AN EXPOSED LAMBOO STRUCTURAL SYSTEM, RELCAIMED
WOOD SIDING, DECKING, STRUCTURAL PURLINS AND INSULATION, VISITORS
WILL BEGIN TO LEARN ABOUT OUR WALL CONSTRUCTION AND THE
E IMPLICATIONS IT HAS FOR FUTURE RESIDENTIAL DESIGN.

IIN THE LIVING ROOM, OUR 51" TELEVISION WILL HIGHLIGHT IMAGES OF THE
ILLINOIS SOLAR DECATHLON TEAM, THE CONSTRUCTION SEQUENCE AND
INFORMATION:
GENERAL PROJECT INFORMATION. THE TEAM WILL ALSO AN EXHIBIT A SCALE PROJECT NAME
MODEL OF THE HOME WITH EXPOSED EDUCATIONAL ELEMENTS ON THE DINING
UIUC_SD_2009
D ROOM TABLE.

IN THE HALLWAY, THERE WILL BE A TOUCHSCREEN HOME AUTOMATION SYSTEM DRAWING LOCATION
WITH INTERACTIVE LIGHT CONTROLS, MECHANICAL, ENERGY USE, ETC.
X-001 SYMBOLS AND NOTES.DWG
THE BEDROOM WILL HAVE A HOME-COMPUTER WITH HOME UPDATES,
INFORMATION AND MODELING EXHIBITS. THERE WILL ALSO BE EXPLINATIONS
DRAWN BY
C OF SOME OF THE INTERIOR FINISHES. JJS

OUTSIDE, WE WILL HAVE EXPLINATIONS OF THE HERB GARDEN, LANDSCAPING,


RECLAIMED MATERIALS, ROOFING & PHOTOVOLTAICS.
CHECKED BY
--=
OVERALL, WE WILL TRY TO USE THE HOME ITSELF IN COLLABORATION WITH
SIGNAGE AND DISPLAYS TO TEACH THE PUBLIC ABOUT THE BENEFITS OF OUR
B DESIGN. THIS SHOULD ALLOW FOR A SMOOTH AND TIMELY MOVEMENT SHEET:
THROUGH THE HOME, MINIMIZING QUEUES AND MAXIMIZING THE
EDUCATIONAL POTENTIAL OF THE HOUSE. SYMBOLS AND
NOTES

X-001
A

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL COORIDORS / PASSAGEWAYS MEET ANSI 117.1 AND THE

GABLE HOME
ILLINOIS ACCESSIBILITY CODE. BEFORE CONSTRUCTION,
1
CONTRACTOR TO VERIFY CONFORMANCE WITH LOCAL CODE
REQUIREMENTS.
T
FOR THE TOUR, THE BATHROOM WILL BE OPEN FOR VIEWING
2
BUT THE TOUR WILL NOT ENTER THE BATHROOM.

S 3
ALL SURFACES HAVE A MAXIMUM SLOPE OF 1:20 THEREFORE
NO RAILING IS REQUIRED.

6'-0" FINISHED FLOOR HEIGHT SHALL BE 1'-5". GIVEN A HEIGHT


4
LESS THAN 30" ABOVE GRADE, NO RAILING IS REQUIRED.
R
5 VERTICAL CHANGES IN LEVEL SHALL BE 21"MAXIMUM

6 MAXIMUM SPACING BETWEEN DECKING MEMEBERS SHALL BE 21"


Q
1 2

ALL SIGNAGE ON NATIONAL MALL SITE SHALL HAVE A


7
MINIMUM CHARACTER HEIGHT OF 3"
H12
P H1

4'-0"
X-401
X-401

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
5'-934"
SEALS:

3
A1
PROJECT:
K
REFERENCE KEYNOTES
X-401

US DEPT. OF ENERGY
SOLAR DECATHLON
NONE USED
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
5'-934"

BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
4'-0"

CONSTRUCTION DOCS
#03 06/01/2009 JJS
F 1 2

E
INFORMATION:
SHEET KEYNOTES PROJECT NAME
UIUC_SD_2009
D METAL RAMP ENCLOSURE WITH A MAXIMUM VERTICAL
1
CHANGE OF 21" AND A MAXIMUM SLOPE OF 1:20. DRAWING LOCATION
SLOPED WALKWAY WITH A MAXIMUM RISE/RUN OF 1:20. X-101 ADA ACCESSIBILITY.DWG
2 LENGHT OF WALKWAY TO BE ADJUSTED ON SITE TO MEET
MAXIMUM RISE/RUN REQUIREMENT. DRAWN BY
C THE BATHROOM WILL NOT BE A DESTINATION DURING PUBLIC JJS
TOURS, HOWEVER, AND VISITORS WILL SIMPLY BE INVITED TO
3 LOOK INSIDE. A TEMPORARY BARRIER, SUCH AS A LIGHT CHECKED BY
ROPE, WILL BE USED TO DISCOURAGE VISITORS FROM
--
ENTERING THE BATHROOM.

B SHEET:
TOUR ROUTE AND
0 2' 4' 8' ADA ACCESSIBILITY
TOUR ROUTE & ADA ACCESSIBILITY PLAN

X-101
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES

GABLE HOME
THE TOUR ROUTE SHALL BE ADA ACCESSIBLE - SEE X-401 FOR
1
COMPLIANCE.

T
ALL SIGNAGE SHALL BE IN CONFORMANCE WITH THE SOLAR
DECATHLON BUILDING CODE 2009 AND THE NATIONAL PART
2
SERVICE RULES. ALL SIGNAGE SHALL MEED ACCESSIBILITY
GUIDELINES.

ALL SURFACES WILL HAVE A MAXIMUM SLOPE OF 1:20 AND


S 3 WILL BE <30 ABOVE GRADE, THEREFORE NO RAILING IS
REQUIRED.

THE TOILET SHALL BE TAPED SHUT AND MARKED WITH A SIGN


4 DURING ALL PARTS OF THE COMPETITION, PREVENTING ANY
6'-0"
ACCIDENTAL USE FROM OCCURING
R

P
REFERENCE KEYNOTES
NONE USED

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M
6 3 2
SHEET KEYNOTES CHAMPAIGN, IL 61820

1 NOT USED
SEALS:

L 2 HOME CONSTRUCTION & STRUCTURAL SIGNAGE


3
5 5
LIVING ROOM & 3 42" TV W/ CONSTRUCTION VIDEO & SLIDESHOW
KITCHEN

4 SCALE MODELS ON DINING ROOM TABLE


K PROJECT:
4 2
5 TOUCHSCREEN HOME CONTROL SYSTEM US DEPT. OF ENERGY
4
SOLAR DECATHLON
6 COMPUTER & FINISH CHOICE SIGNAGE
OCTOBER 1-21 2009
J 7 LANDSCAPING & DECKING EDUCATIONAL SIGNAGE NREL & DOE

7 ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
6
#02 04/16/2009 JJS
G
DECATHLETE NOTES
CONSTRUCTION DOCS
DESIGN THEORY, TEAM COORDINATION, TIMELINE, PASSIVE
1 DESIGN METHODS, FOUNDATIONS, RECLAIMED SIDING, ROOFING #03 06/01/2009 JJS
CHOICE, & DECKING
F
2
STRUCTURE, DOORS, WINDOWS, COLORS, INSULATION

3
INTERIOR FINISHES, APPLIANCES, METHODS

E
4
ELECTRICAL, MECHANICAL, HOME CONTROL, BATHROOM
INFORMATION:
5 PROJECT NAME
ENERGY ANALYSIS, FINISHES, FURNITURE
UIUC_SD_2009
D
6
PHOTOVOLTAICS, ROOFING, SIDING, DECKING DRAWING LOCATION
X-102 PUBLIC EXHIBIT PLANS.DWG

DRAWN BY
C JJS

CHECKED BY
--

B SHEET:
PUBLIC EXHIBIT
0 2' 4' 8' PLANS
TOUR ROUTE OVERVIEW

X-102
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL COORIDORS / PASSAGEWAYS MEET ANSI 117.1 AND THE

GABLE HOME
ILLINOIS ACCESSIBLE CODE. BEFORE CONSTRUCTION,
1
CONTRACTOR TO VERIFY CONFORMANCE WITH LOCAL CODE
REQUIREMENTS GIVEN FINAL FUNCTION OF BUILDING.
T
THE BATHROOM WILL BE OPEN FOR VIEWING BY THE PUBLIC
2 DURING THE EVENT IN WASHINGTON D.C., BUT WILL NOT
5'-241"
ALLOW PEOPLE TO ENTER.

S 3
ALL SURFACES TO HAVE A MAXIMUM SLOPE OF 1:20
THEREFORE NO RAILING IS REQUIRED.
3'-483"

FINISHED FLOOR HEIGHT SHAL BE APPROX. 1'-5". GIVEN A


4 HEIGHT LESS THAN 30" ABOVE GRADE, NO RAILING IS
REQUIRED.
R
5 VERTICAL CHANGES IN FLOOR SURFACES SHAL BE 21"MAXIMUM

1
6 MAXIMUM SPACING BETWEEN DECKING MEMBERS SHALL BE 2"
Q 4'-0"
4'-0"

ALL SIGNAGE ON THE NATIONAL MALL SITE SHALL HAVE A


7
MINIMUM CHARACTER HEIGHT OF 3"

3'-0"
3'-0"

2
N 2 DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
1
M CHAMPAIGN, IL 61820

2'-0"
5
SEALS:
3'-0"

L
4'-0"

PROJECT:
K
REFERENCE KEYNOTES US DEPT. OF ENERGY
5'-0"
SOLAR DECATHLON
NONE USED
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
0 8" 1'-4" 2'-8" 0 8" 1'-4" 2'-8"
ENTRY CLEARANCES SCALE: 3/4" = 1'-0" BID DOCUMENTS
H1 H12
H
SCALE: 3/4" = 1'-0" EXIT CLEARANCES
#01 01/15/2009 JJS
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"

DOE REVIEW
#02 04/16/2009 JJS
G
SHEET KEYNOTES
HINGED SIDE APPROACH, PULL SIDE - SWINGING DOOR
CONSTRUCTION DOCS
1
X MIN = 36" & Y MIN = 60" #03 06/01/2009 JJS
FRONT APPROACH, PUSH SIDE, SWINGING DOOR
2
F X = 0 (NO CLOSER) & Y = 48" MIN
4'-0" FRONT APPROACH, OPENING
3
X = 2'-8" MIN & Y = 48" MIN
FRONT APPROACH, SLIDING DOOR
4
X = 2'-8" MIN, Y = 48" MIN
E 5
LATCH SIDE APPROACH, PULL SIDE - SWINGING DOOR
X = 24" MIN & Y = 48" MIN
INFORMATION:
PROJECT NAME
3'-121"

UIUC_SD_2009
D
3'-221"
2'-10"

2'-10"

2'-10"

2'-10"
DRAWING LOCATION
X-401 ADA PLAN DETAILS.DWG

DRAWN BY
3 2
C 4
4
JJS

CHECKED BY
--

3'-3" SHEET:
B
4'-0"
ADA PLAN DETAILS
0 8" 1'-4" 2'-8"
HALLWAY CLEARANCES

X-401
A1
A
SCALE: 3/4" = 1'-0"

SCALE: 3/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL SIGANGE WILL BE TEMPORARY IN NATURE AND PROVIDED

GABLE HOME
FOR EDUCATION PURPOSES AND WILL NOT DIRECT
1
INDIVIDUALS AS TO THE EMERGENCY OPERATION OF THE
HOUSE, REMAINING EXEMPT FROM ADA SIGNAGE GUIDELINES
T
ALL SIGNAGE SHOWN IS PROVIDED AS A SCHEMATIC FOR
FINAL DISPLAY IN THE COMPETITION. DETAILS MAY BE
2 UPDATED, LINEWEIGHTS MAY CHANGE, ETC. BUT THE LAYOUT
IN GENERAL AND THE PURPOSE OF EACH SIGN WILL NOT
CHANGE
S
ALL SIGNS TO BE CONSTRUCTED OF FOAM CORE WITH A
3
PHOTO-PLOT FULL COLOR PRINT APPLIED TO THE SURFACE

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

PROJECT:
K
REFERENCE KEYNOTES US DEPT. OF ENERGY
SOLAR DECATHLON
NONE USED
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
SHEET KEYNOTES
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
X-501 PUBLIC EXHIBIT DETAILS.DWG

DRAWN BY
C JJS

CHECKED BY
--

B SHEET:
PUBLIC EXHIBIT
0 1" 2" 4" 0 1" 2" 4" DETAILS
CONSTRUCTION SIGNAGE DECKING SIGNAGE

X-501
A1 A1
A
SCALE: 6" = 1'-0" SCALE: 6" = 1'-0"

SCALE: 6" = 1'-0" SCALE: 6" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL SIGANGE WILL BE TEMPORARY IN NATURE AND PROVIDED

GABLE HOME
FOR EDUCATION PURPOSES AND WILL NOT DIRECT
1
INDIVIDUALS AS TO THE EMERGENCY OPERATION OF THE
HOUSE, REMAINING EXEMPT FROM ADA SIGNAGE GUIDELINES
T
ALL SIGNAGE SHOWN IS PROVIDED AS A SCHEMATIC FOR
FINAL DISPLAY IN THE COMPETITION. DETAILS MAY BE
2 UPDATED, LINEWEIGHTS MAY CHANGE, ETC. BUT THE LAYOUT
IN GENERAL AND THE PURPOSE OF EACH SIGN WILL NOT
CHANGE
S
ALL SIGNS TO BE CONSTRUCTED OF FOAM CORE WITH A
3
PHOTO-PLOT FULL COLOR PRINT APPLIED TO THE SURFACE

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

PROJECT:
K
REFERENCE KEYNOTES US DEPT. OF ENERGY
SOLAR DECATHLON
NONE USED
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
SHEET KEYNOTES
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
X-502 PUBLIC EXHIBIT DETAILS.DWG

DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
PUBLIC EXHIBIT
0 1" 2" 4" DETAILS
PLANTERS BOARD

X-502
A1
A
SCALE: 6" = 1'-0"

SCALE: 6" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
THE TEAM UNIFORM WILL BE USED BY ALL TEAM MEMBERS

GABLE HOME
PRESENT ON THE COMPETITION SITE OR ANY OTHER EVENT
1 ASSOCIATED WITH THE U.S. DEPARTMENT OF ENERGY SOLAR
DECATHLON. IT WILL BE USED AS A METHOD OF IDENTIFYING
T INDIVIDUALS ASSOCIATED WITH THE ILLINOIS EFFORT

IN ACCORDINACE WITH RULE 11-5, THE ILLINOIS TEAM


UNIFORMS ARE EXEMPT FROM RULES 10-2 AND 10-3 AND
2
SIMPLY REFER TO THE TEAM LOGO AND THE UNIVERSITY OF
ILLINOIS AS THE MOST PROMINENT ITEMS.

S
IN ACCORDANCE WITH RULE 11-5c TEAM SPONSORS WILL
3
APPEAR ONLY ON THE BACK OF THE TEAM UNIFORM

IN ACCORDANCE WITH 11-5d, THE ONLY INFORMATION ON


THE FRONT OF THE TEAM UNIFORM WILL BE THE TEAM LOGO
4
R AND NAME. WILL SHALL NOT INCLUDE ANY OTHER
INFORMATION

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

PROJECT:
K
REFERENCE KEYNOTES US DEPT. OF ENERGY
SOLAR DECATHLON
NONE USED
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
SHEET KEYNOTES
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
X-511 TEAM UNIFORM.DWG

DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
TEAM UNIFORM
0 1" 2" 4" 0 1" 2" 4"
LANDSCAPE SIGNAGE DECKING SIGNAGE

X-511
A1 A1
A
SCALE: 6" = 1'-0" SCALE: 6" = 1'-0"

SCALE: 6" = 1'-0" SCALE: 6" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
THE ILLINOIS SOLAR DECATHLON SHALL COMPLY WITH RULE

GABLE HOME
10-2. EVENT SPONSOR RECOGNITION. IN ALL
COMMUNICATION MATERIALS, THE TEAM SHAL REFER TO THE
1
PROJECT AS THE U.S. DEPARTMENT OF ENERGY SOLAR
T DECATHLON. WHERE REQUIRED, THE TEAM SHALL CREDIT
THE DOE, NREL AND OTHER EVENT SPONSORS.
IN ACCORDANCE WITH 10-3. TEAM SPONSOR RECOGNITION,
WHENEVER THE ILLINOIS TEAM USES TEAM SPONSOR LOGOS
2 IT WILL BE ACCOMPANIED WITH THE SOLAR DECATHLON
TEXT AND LOGO THAT IS AT LEAST THREE TIMES THE SIZE OF
S THE SCHOOL SPONSOR.

ALL COMMUNICATION AND PRODUCTS WILL SERVE A PRIMARY


3 PURPOSE OF EDUCATION AND PERFORMANCE AND WILL NOT
SERVE AS ADVERTISING FOR THE SPONSOR.

THE TEAM SHALL NOT DEVOTE MORE THAN 20% OR 1 MINUTE


R 4 OF ANY POTENTIAL MEDIA PRESENTATION TO RECOGNITION
OF TEAM SPONSORS

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

0 1/2" 1" 2"


BROCHURE BACK
K10
PROJECT:
K
REFERENCE KEYNOTES
SCALE: 6" = 1'-0"

SCALE: 1'-0" = 1'-0"


US DEPT. OF ENERGY
SOLAR DECATHLON
NONE USED
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
SHEET KEYNOTES
CONSTRUCTION DOCS
#03 06/01/2009 JJS
F

E
INFORMATION:
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
X-521 EVENT & TEAM SPONSOR
RECOGNITION.DWG
DRAWN BY
C JJS

CHECKED BY
MT

B SHEET:
TEAM HANDOUT

X-521
0 1/2" 1" 2"
A
BROCHURE FRONT
A10 SCALE: 6" = 1'-0"

SCALE: 1'-0" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
SITE OPERATION S PLAN

GABLE HOME
THE PURPOSE OF THIS PLAN IS TO FAMILIARIZE THE CONTRACTOR WITH A SUGGESTED CONSTRUCTION SEQUENCE
BUT SHALL NOT BE INTERPRETED AS DIRECTION OR REQUIREMENT SPECIFYING THE MEANS OR METHODS OF
T CONSTRUCTION. THE PROCESS DEPICTED HERE IS TO BE USED AS A GUIDE ONLY AND MAY DIFFER WHEN
CONSTRUCTED ON THE NATIONAL MALL OR ANY OTHER CONSTRUCTION SITE.

THIS PLAN WILL OUTLINE THE FOLLOWING AREAS:

1. TRANSPORTATION
S
2. SITE ASSEMBLY SEQUENCE

3. SITE DISSASSEMBLY SEQUENCE

R 4. WASTE & RECYCLING MANAGEMENT

5. SPECIAL EQUIPMENT

Q TRANSPORTATION
THE ILLINOIS SOLAR DECATHLON HOUSE WILL BE TRANSPORTED ON THREE TRUCKS.

TRUCK ONE: 53' LOW-TRAILER WITH MAIN HOME MODULE MEASURING 13'-10" WIDE X 52'-3" LONG X 11'-10"
P 1
TALL. WHEN ON TRAILER, THE TOTAL HEIGHT WILL BE 14'-5.

TRUCK TWO: FLATBED 53' LONG TRAILER WITH ROOF CAP SECTIONS, DECKING MODULES, FOUNDATIONS & WATER
2
TANKS

TRUCK THREE: CLOSED BOX TRUCK - SIZE TO BE DETERMINED - HOLDING ALL REMAINING ITEMS INCLUDING BUT
N 3
NOT LIMITED TO:
DESIGNER:
UNIVERSITY OF ILLINOIS
4
IN ADDITION, A TRUCK WILL BE REQUIRED FOR THE COUNTERWEIGHTS REQUIRED FOR CRANE OPERATION GABLE HOME TEAM
THIS TRUCK WILL LEAVE THE MALL IMMEDIATELY AFTER DELIVERY
611 LOREDO TAFT DR.
M RECLAIMED WOOD SIDING CHAMPAIGN, IL 61820

STANDING SEAM METAL ROOFING SEALS:


SOLAR PANELS & S-5 CLIPS
L
FURNITURE

PLANTING MATERIALS

K PROJECT:
SCAFFOLDING
US DEPT. OF ENERGY
EXHIBITION MATERIALS SOLAR DECATHLON
OCTOBER 1-21 2009
J CONTROL SYSTEMS
NREL & DOE

SITE ASSEMBLY SEQUENCE ISSUANCE:


BID DOCUMENTS
H
THE TRUCKS WILL ARRIVVE IN THE ORDER DEPICTED ABOVE, WITH A BOOM-CRANE TO ARRIVE FOLLOWING THE
#01 01/15/2009 JJS
SECOND TRUCK. TEAM EXPECTS SOME DELAY WAITING FOR OTHER TEAMS TO PLACE TRUCKS AND FOR ROADWAY
12:00 AM TO BE CLEAR. DURING THIS TIME, THE TEAM SHALL INSPECT HOME FOR ANY DAMAGE DURING TRAVEL AND NOTE
AS REQUIRED. SELECT MEMEBERS OF THE TEAM WILL ALSO PLACE REQUIRED GROUND PROTECTIVE DEVICES ON
THE NATIONAL MALL IN PREPARATION FOR THE TRUCKS ARRIVAL ON THE MALL. DOE REVIEW
#02 04/16/2009 JJS
ILLINOIS SOLAR DECATHLON TEAM WILL LOCATED CORNER OF FOUNDATION ON NATIONAL MALL AND BEGIN
G 1:00 AM
PLACING FOUNDATIONS WITH PLYWOOD, FOAM AND SHIMS TO ASSURE A LEVEL RESTING SURFACE.

CONSTRUCTION DOCS
TEAM WILL PLACE FOUNDATIONS FOR THE MAIN HOME MODULE IN THE PROPER LOCATIONS AND ASSURE A LEVEL
1:30
PLANE FOR ACCEPTANCE OF THE MAIN HOME MODULE. #03 06/01/2009 JJS
HOMEWAY HOMES CONTRACTING CREW WILL WORK TO PLACE HOME ON FOUNDATIONS USING CRANE. THE
F ILLINOIS TEAM WILL NOT PERFORM ANY RIGGING, SETTING OR CRANE OPERATION ACTIVITIES. AS REQUIIRED, ALL
3:30 INDIVIDUALS PERFORMING THESE TASKS SHALL HOLD THE PROPER LISCENSES WITHIN WASHINGTON, D.C. AND BE
CAPABLE OF PERFORMING THE WORK AT HAND. DURING THIS TIME, THE ILLINOIS TEAMS WILL UNLOAD THE
SECOND TRUCK OF DECK MODULES, PV PANELS & OTHER FINISH MATERIALS.

4:30 CONSTRUCT SCAFFOLDING IN PREPARATION OF ROOF-CAP PLACEMENT AND ROOFING INSTALLATION.


E
HOMEWAY HOMES TO PLACE ROOF CAP MODULES ON MAIN HOME MODULE. FIRST AND SECOND TRUCK WILL
5:30
THEN LEAVE THE MALL. THIRD TRUCK WILL ARRIVE SHORTLY AFTERWARDS. INFORMATION:
PROJECT NAME
6:30 SECURE ROOF-CAP TO MAIN HOME MODULE UIUC_SD_2009
D
1:30 PM
BEGIN INSTALLING ROOFING ON NORTH SIDE OF BUILDING & BEGIN INSTALLING SOLAR PANELS ON SOUTH SIDE OF DRAWING LOCATION
BUILDING. SIDING PANEL INSTALLATION TO OCCUR ON THE EAST & WEST ENDS OF THE BUILDING.
O-001 SYMBOLS AND NOTES.DWG

7:30PM
FINALIZE ROOFING DETAILS (RIDGE CAP, ELECTRICAL CONNECTIONS, FINAL NORTH SECTION TO ENCLOSE DRAWN BY
ELECTRICAL ACCESS HATCH)
C JJS

9:30PM SITE CLEANUP, OVERTIME WORK PERIOD, ASSESSMENT OF PROGRESS. CHECKED BY


--
6:00 AM PLACE DECKING MODULES AND CONSTRUCT RAMPS

B SHEET:
SYMBOLS AND
NOTES

O-001
A

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
LOADING REPRESENTS A SUGGESTED METHOD OF LOADING.

GABLE HOME
EXACT PLACEMENT OF EACH ITEM TO BE COORDINATED WITH
1 SHIPPING COMPANIES SO THAT TRANSPORTATION
REQUIREMENTS ARE MET, LOADS ARE DISTRIBUTED AND
T CONSTRUCTION SEQUENCE IS OPTIMIZED.
CONTRACTOR TO DETERMINE APPLICABLE SHIPPING ROUTE
FROM CONSTRUCTION SITE TO NATIONAL MALL IN
2
WASHINGTON D.C. AND VERIFY WITH OWNER PRIOR TO
TRANSPORTATION
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL
S 3
NECESSARY PERMINTS AND TRANSPORTATION VEHICLES TO
MOVE TRUCKS FROM CONSTRUCTION LOCATION TO THE
NATIION MALL IN WASHINGTON D.C. AND BACK.
ALL ITEMS TO BE SECURED TO THE TRUCK PER REQUIREMENTS
SET FORTH BY THE DEPARTMENT OF TRANSPORTATION, THE
4
SHIPPING COMPANY AND ANY OTHER APPLICABLE LEGAL
R BODIES.

1 2 3 4 REFERENCE KEYNOTES
P
NONE USED

0 16' 32' 64' 0 16' 32' 64' 0 16' 32' 64' 0 16' 32' 64'
SITE PREPARATION VEHICLE ARRIVAL SET FOUNDATION MODULE PLACEMENT
N1 N6 N11 N16
N
SHEET KEYNOTES DESIGNER:
SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0"

SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0"
UNIVERSITY OF ILLINOIS
1 SITE PREPARATION
A. CLEAR SITE OF DEBRIS
GABLE HOME TEAM
B. LOCATE SOUTHEAST CORNER OF FOUNDATION
611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820
C. PREPARE FOR TRUCKS & CRANE

VEHICLE ARRIVAL
2
SEALS:
A. SURVEY SITE & PREPARE GEOFOAM
B. COORDINATE VEHICLE ARRIVAL
L 3 FOUNDATION PLACEMENT

A. PLACE GEOFOAM - CUT TO HEIGHT REQ'D.

B. PLACE CONCRETE FOUNDATIONS ON GEOFOAM

K
C: PREPARE MAIN MODULE FOR CRANE LIFT PROJECT:
D. UNLOAD TRUCK 2 - EXCEPT ROOF-CAPS US DEPT. OF ENERGY
4 HOME MODULE MOVE SOLAR DECATHLON
A. MOVE MAIN MODULE TO FOUNDATIONS OCTOBER 1-21 2009
J B. PREPARE ROOF-CAPS FOR MOVE NREL & DOE
5 ROOF CAP PLACEMENT
A. TRUCK 1 LEAVES ISSUANCE:
B. MOVE ROOF CAP PIECES TO HOME
BID DOCUMENTS
5 6 7 8 C. CONSTRUCT SCAFFOLDING TO SIDE
H #01 01/15/2009 JJS
6 SCAFFOLDING & ROOF-CAP CONNECTION

A. PLACE SCAFFOLDING NEXT TO BUILDING

0 16' 32' 64' 0 16' 32' 64' 0 16' 32' 64' 0 16' 32' 64' B. PREPARE TRUCK 2 & CRANE TO LEAVE DOE REVIEW
G1
PLACE ROOFCAP
G6
SCAFFOLDING
G11
ROOF INSTALLATION
G16
ROOF INSTALLATION C. UNLOAD TRUCK 3 #02 04/16/2009 JJS
G
SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0"
7 ROOFING INSTALLATION
SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" A. SECURE ROOF CAP ON N & SI

B. INSTALL STANDING SEAM ROOF ON SOUTH


CONSTRUCTION DOCS
8 ROOF INSTALLATION & SOLAR PANEL PREP
#03 06/01/2009 JJS
F A. INSTALL STANDING SEAM ROOF ON NORTH

B. START INSTALLING SOLAR PANELS


9 FINAL SOLAR PANELS & ROOFING
A. FINALIZE SOLAR PANEL INSTALLATION
D. MAKE ROOF ELECTRICAL CONNECTION
E C. COMPLETE NORTH STANDING SEEM ROOF

D. REMOVE SCAFFOLDING INFORMATION:


1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39

10 DECK FOUNDATIONS & SIDING PROJECT NAME


21 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
21 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40

A. INSTALL DECK FOUNDATIONS


21 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
21 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40

UIUC_SD_2009
D
11 DECKING & FINAL SIDING DRAWING LOCATION
A. INSTALL DECKING & RAMPS
O-101 ARRIVAL SEQUENCE.DWG
FINISH SITE & INTERIORS
12 DRAWN BY
A. INSTALL LANDSCAPING
C B. INSTALL EVENT DECKING
JJS

C. FINISH INTERIOR WORK CHECKED BY


--
9 10 11 12 REVERSE FOR DEPARTURE

B SHEET:
ARRIVAL SEQUENCE
0 16' 32' 64' 0 16' 32' 64' 0 16' 32' 64' 0 16' 32' 64'
SOLAR INSTALLATION DECK FOUNDATION DECK INSTALLATION FINAL SITEWORK

O-101
A1 A6 A11 A16
A
SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0"

SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
LOADING REPRESENTS A SUGGESTED METHOD OF LOADING.

GABLE HOME
EXACT PLACEMENT OF EACH ITEM TO BE COORDINATED WITH
1 SHIPPING COMPANIES SO THAT TRANSPORTATION
REQUIREMENTS ARE MET, LOADS ARE DISTRIBUTED AND
T CONSTRUCTION SEQUENCE IS OPTIMIZED.
CONTRACTOR TO DETERMINE APPLICABLE SHIPPING ROUTE
FROM CONSTRUCTION SITE TO NATIONAL MALL IN
2
WASHINGTON D.C. AND VERIFY WITH OWNER PRIOR TO
TRANSPORTATION
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL
S 3
NECESSARY PERMINTS AND TRANSPORTATION VEHICLES TO
MOVE TRUCKS FROM CONSTRUCTION LOCATION TO THE
NATIION MALL IN WASHINGTON D.C. AND BACK.
52'-3" ALL ITEMS TO BE SECURED TO THE TRUCK PER REQUIREMENTS
SET FORTH BY THE DEPARTMENT OF TRANSPORTATION, THE
4
SHIPPING COMPANY AND ANY OTHER APPLICABLE LEGAL
R BODIES.

Q
11'-1021"
14'-421"

OPENING TO
PORCH/ENTRY
N DESIGNER:
UNIVERSITY OF ILLINOIS
2'-6"

GABLE HOME TEAM


611 LOREDO TAFT DR.
M CHAMPAIGN, IL 61820

SEALS:

PROJECT:
K
REFERENCE KEYNOTES US DEPT. OF ENERGY
SOLAR DECATHLON
NONE USED
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
BID DOCUMENTS
H #01 01/15/2009 JJS

DOE REVIEW
#02 04/16/2009 JJS
G
SHEET KEYNOTES
8'-1078"

CONSTRUCTION DOCS
12'-058"

#03 06/01/2009 JJS


NONE USED
F
3'-134"

E
INFORMATION:
53'-0"
PROJECT NAME
UIUC_SD_2009
D
DRAWING LOCATION
O-102 TRUCK LOADING.DWG

DRAWN BY
C JJS

CHECKED BY
--

B SHEET:
TRUCK LOADING
0 2' 4' 8'
TRANSPORTATION DIGRAM

O-102
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
U
GENERAL SHEET NOTES
ALL EQUIPMENT, TANKS & TANKS THAT WILL CONTAIN

GABLE HOME
FLUIDES AT ANY POINT DURIN THE EVENT ARE OUTLINED ON
1.) THIS DRAWING. THE ILLINOIS SOLAR DECATHLON TEAM IS
NOT USING SOLAR HOT WATER OR THERMAL WATER
T STORAGE

ALL PRESSURIZED WATER SYSTEMS SHALL HAVE PROPER


2.) CONTAINMENT AND WILL BE EQUIPPED WITH AN OVERFLOW
PAN AND DRAIN BELOW THE UNIT.

A CONDENSATION PAN WITH DRAIN TUBING HAS BEEN


S 3.) PROVIDED FOR EACH HEAT EXCHANGER LOCATED WITHIN
THE HOUSE
THE THOILET, WHILE SHOWN, SHALL NOT BE PLUMBED OR
4.) FUNCTIONAL FOR THE EVENT AND WILL BE MARKED AS SUCH
WITH SIGNAGE TO PREVENT ANY ACCIDENTAL USE.

IN THE EVENT OF ANY SPILL, TEAM SHALL CONSULT THE


R 5.)
SAFETY PLAN AND CONTACT THE EVEN ORGANIZERS.

IN ALL CASES, THIS DOCUMENT IS SUPERCEDED BY THE


REQUIREMENTS SET FORTH BY THE NATIONAL PARKS SERVICE.
6.)
THIS DOCUMENT SERVES AS A SUPPLEMENT TO THESE
REQUIREMENTS.
Q

P D1
S-302

11

N DESIGNER:
UNIVERSITY OF ILLINOIS
GABLE HOME TEAM
611 LOREDO TAFT DR.
M 5 CHAMPAIGN, IL 61820
14 2
3 6 10 SEALS:
7
REFERENCE KEYNOTES
L
1
4 NONE USED

K
8
PROJECT:
1
US DEPT. OF ENERGY
3 SOLAR DECATHLON
OCTOBER 1-21 2009
J NREL & DOE
ISSUANCE:
SHEET KEYNOTES BID DOCUMENTS
JJS
H A1 #01 01/15/2009
S-302 1 CONDENSATION & OVERFLOW PAN FOR HEAT EXCHANGERS
13
2 DRIP PAN BENEATH WASHER/DRYER DOE REVIEW
#02 04/16/2009 JJS
3 WATER STORAGE TANK
G
D1 4 FLOOR DRAIN CONSTRUCTION DOCS
#03 06/01/2009 JJS
S-302

WATER HEATER W/ CONDENSATION PAN BENEATH. HEAT


5
EXCHANGER TO HAVE CONDENSATION DRAIN
F
6 SINK

7 LAVATORY

E 8 SHOWER

9
TOILET - SHALL NOT BE PLUMBED OR FUNCATIONAL FOR INFORMATION:
12
THE COMPETITION. PROJECT NAME
10 DISHWASHER UIUC_SD_2009
D
11 WATER PRESSURE PUMP - CLEAN & GRAY
DRAWING LOCATION
O-201 FLUID STORAGE &
CONTAINMENT.DWG
. 12 GAS GENERATOR W/ LIGHT KIT AND DRIP PAN BELOW
DRAWN BY
C . 13
WATER FILL LOCATION - 18" DIAMETER OPENING WITH JJS
REMOVABLE PLANTERS ABOVE
PRE-PUMP TANK TO HOLD WATER BEFORE SUMP PUMP KICKS
CHECKED BY
. 14
IN --

B SHEET:
FLUID STORAGE &
0 2' 4' 8' CONTAINMENT
SPILL CONTAINMENT PLAN

O-201
A1
A
SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Das könnte Ihnen auch gefallen