Calculation Form
Project: Mai Beni Hydropower Project
Component: Surge tank
Subject: Hydraulic design
Closure Condition
Total closure from 100% to 0
3
Design Discharge 8.40 m /s
Headrace Tunnel
2
Length Lt 3497.13 m C/s Area Aht 3.46 m
Diameter Dt 2.10 m Wetted Perimeter Pht 6.60 m
Width W m Hydraulic Radius Rht 0.53 m
Height to spring level m Hydraulic Radius Rht 0.53 m
Manning's roughness coefficient 0.010 Flow velocity Vht 2.43 m/s
Frictional headloss hlt 4.99 m
Surge Shaft
Diameter 1 6.00 C/s Area As 28.27
2
Diameter Ds 6.00 m C/s Area As 28.27 m
Static water elevation 643.00 m
Calculations
1 . 1 fL
b b
2
0.93 s /m
2 gD
Headloss in the tunnel and headrace pipe
y o bVht
2
yo 5.49 m
Damping factor
2 gAs
m b m 0.043 /m
LAht
Transient Analysis
Q A
Dy 1 Dt ht Vi Dt Final discharge Q1
3
0.00 m /s
As As
yi 1 yi Dy
Maximum upsurge (12.56) m
DV
g
L
Dt y i 1 b V 2 Maximum upsurge elevation
Minimum downsurge elevation
655.56 masl
633.78 masl
(1.64)
Negative surge or upsurge (rising water surface)