Vol12.10.01 ©2012 Conspectus Inc.
Page 1 of 2
If the measurements are delayed, Maximum Gap Very flat floors are usually restricted
Floor Surface to high-end industrial applications
shrinkage, curling, and other factors 90% 100%
Classification where high speed fork trucks and
outside the concrete contractor's Compliance Compliance
control can influence the results. other high-production equipment are
Conventional 1/2 inch 3/4 inch used.
Levelness tolerances apply only to
slabs-on-grade and suspended slabs Moderately Super flat floors are appropriate for
3/8 inch 5/8 inch
that are shored when tested. Flat very limited applications with random
Levelness tolerances do not apply to Flat 1/4 inch 3/8 inch traffic such as television production
sloped or cambered floors. studios to minimize camera vibration.
Very Flat N/A N/A
ACI 117 sets the Minimum Local
values at 60% of the Specified Overall Super Flat N/A N/A Specification Tip
values, unless specified otherwise. The familiar 1/8 inch in 10 feet
The Minimum Local values are the tolerance is not an option with ACI Select the method: F-Number or
minimum tolerances for the floor to be 117. This may present difficulties for manual straightedge. Reference ACI
usable. Defects exceeding the specifying slab tolerances for applied 117 for tolerance compliance.
Minimum Local values normally floor finishes, such as wood strip Allen Face provides an F-Number
require grinding, filling, or replacement flooring. Some floor finish sample specification. Include the
to correct the defect. manufacturers require more stringent minimum Specified Overall and the
For a slab to be acceptable, the tolerances than can be tested using Minimum Local values for both
cumulative Overall Values for the the straightedge method. Consult the flatness and levelness.
entire slab must meet or exceed the finish flooring manufacturer's For the manual straightedge method,
Specified Overall values, and all instructions for acceptable substrate specify the maximum gap for 90% and
locations must meet or exceed the surfaces. 100% compliance.
Minimum Local values.
Floor Classifications
Straightedge Method
The floor classifications above are for
In the June 2010 edition of ACI 117, random traffic patterns. More stringent
the straightedge method description tolerances require additional
was greatly expanded. Now the straightening operations, time, and
standard establishes a procedure for cost to ensure compliance. Very flat
measuring flatness with a and super flat floors require
straightedge. Note that levelness specialized equipment and specially
cannot be determined with a trained mechanics to achieve the Add Your Comments
straightedge. ACI 117 sets minimum results. We invite your comments. Visit our blog
sampling requirements to help ensure Conventional floors are not suitable and add your comments.
a statistically representative set of for applied finishes. These floors are
measurements. One sample must be used for utility spaces and are usually Like it? Share it!
taken for every 100 sf of floor area. left exposed. Tweet or Email your friends
Samples must be taken parallel, Moderately flat floors are suitable for
perpendicular, or at a 45 degree angle carpeted finishes in commercial
to the longest construction joint of the The information contained in this document
buildings and low speed vehicular
test area. is offered for educational purposes, only,
traffic in industrial buildings.
The following chart shows the and not as technical advice suitable for any
Flat floors are suitable for thin set
maximum gap between the floor particular project or specific condition.
ceramic tile, vinyl tile and similar
surface and the bottom of the 10 foot Technical consulting is unique to the facts
finishes and for conventional fork
straightedge. Note that of a particular condition, and Conspectus
truck traffic in warehouses. Flat floor
90% of the samples must not exceed recommends that a specialist be consulted
classification is the most stringent
column 2 and 100% of the samples to determine solutions for each specific
tolerance that should be expected for
must not exceed column 3 of the table condition.
suspended slabs.