Sie sind auf Seite 1von 30

S

SWIMMING POOL CALCULATION

Filtration Heat-Chill Pump Pipe Sizing

Pump TDH Heat Exchanger Bathers Load

Chem Dosing Pump Pool Heater Pool Lightin


bkit

Chemical Tank Surge Tank Control Pane

References
CREATED BY: JONATHAN VILLORENTE
ATION EMCO ENGINEERING EMIRATES, LLC

Pipe Sizing PROJECT INFORMATION:

PROJECT:
Bathers Load
CLIENT:

CONSULTANT:

Pool Lightings MAIN CONTRACTOR:

SUB CONTRACTOR:
Control Panel SWIMMING POOL:

TYPE OF POOL:
O ENGINEERING EMIRATES, LLC
NFORMATION:

VILLA 66

ARABTEC

EWT

SWIMMING POOL

SKIMMER SYSTEM
Issued Date: 22-Apr-2018

PROJECT: VILLA 66
SWIMMING POOL

POOL INFORMATION
Type: SKIMMER SYSTEM Shallow: 0.65 meter
Shape: Rectangular Deep: 1.60 meters Tot. Vol: 186.00 m3
Length: 20.00 meters Average: 1.13 meters T.O. 5.00 hrs
Width: 7.00 meters Area: 140.00 m2 Flow Rate: 38.00 m3/hr

Max Velocity inside pipes:


Skimmer: v(sk) 1.00 m/sec
Suction: v(s) 1.00 m/sec
Discharge: v(d) 1.50 m/sec
Max filtration velocity: v(f) 40.00 m3/Hr/m2

A.) SAND FILTER SELECTION:


Equation:

Number of filters to be used: n: 2 unit


Total filtering capacity: Q=V/T: 19.00 m3/Hr
Maximum filtration velocity: v(f): 40.00 m3/Hr/m2
Filtration area: Af=Q/v(f): 0.48 m2
Filter Diameter: D: 777.68 mm

So, the Filter Diameter 900.00 mm ACCEPTABLE

B.) FILTER PUMP SELECTION:


Number of pump to be used: n: 1 unit
Required flow: Q=V/T: 38.00 m3/Hr
Pressure loss calculation:
*thru equipments: m
*thru pipe, valve and fitting: m
*distance of elevation: m
The total pressure loss will be: m
*For safety, the head required for the pump shall be 10% more:
Total Head: 0.00 m Head
The pump required: 38.00 m3/Hr @ 0.00 m Head
Pump Specification is: 38.00 m3/Hr @ 15.00 m Head ACCEPTABLE

PAGE 4 OF 30
C.) MAIN DRAIN SELECTION:

Required flow: Q=V/T: 38.00 m3/Hr


Flow thru main drain: 100 % Q R: 38.00 m3/Hr
Since the Max flow of 1 main drain: Qm: 83.00 m3/Hr
The total required no. of main drain: n=QR/QM: 0.46 units
Required qty. of Main Drain: 3 unit ACCEPTABLE

D.) SKIMMER SELECTION:

Required flow: Q=V/T: 38.00 m3/Hr


Flow thru skimmer: 80 % QM: 30.40 m3/Hr
Since the Maximum flow of 1 skimm QG: 7.00 m3/Hr
Required qty. of Skimmer Drain: n=QR/QG: 4.34 units
*But,for more efficiency during water collection;
another suction gutter is to be added also,so: 5.00

Required qty. of Skimmer Drain: 6 units ACCEPTABLE

E.) INLET FITTING SELECTION:

Required flow: Q=V/T: 38.00 m3/Hr


Based on the normal flow of 1 inlet: QI: 4.50 m3/Hr
The total required no. of inlet fitting: n=Q/QI: 8.44 unit

So, total required no. inlet fitting: 12 unit ACCEPTABLE

PAGE 5 OF 30
F.) PIPE SIZING:

Equation:

Required flow: Q=V/T: 38.00 m3/Hr


Area of pipe:S=(3.1416*D2)/4 S: m2
Velocity of water: v: m/sec
Diameter of pipe: D: mm
Q=S * v

SUCTION FROM MAIN DRAIN TO PUMP:

Number of pipe lines n: 1 pipe line


Required flow: Q=V/T: 38.00 m3/Hr
Flow thru skimmer: 60 % Q R: 22.80 m3/Hr
Water velocity (suction): v(s) 1.50 m/sec
Pipe diameter: 100 % D: 73.32 mm
So, pipe selected shall be: D: 90.00 mm ACCEPTABLE

SUCTION FROM SKIMMER TO PUMP:

Number of pipe lines n: 1 pipe line


Required flow: Q=V/T: 38.00 m3/Hr
Flow thru gutter drain: 40 % Q R: 15.20 m3/Hr
Water velocity (suction): v(s) 1.50 m/sec
Pipe diameter: 100 % D: 59.87 mm
So, pipe selected shall be: D: 90.00 mm ACCEPTABLE

DISCHARGE FROM PUMP TO INLET:

Number of pipe lines n: 1 pipe line


Required flow: Q=V/T: 38.00 m3/Hr
Water velocity (discharge): v(d) 2.50 m/sec As per site: 5m/s
Pipe diameter: D: 73.32 mm
So, pipe selected shall be: D: 63.00 mm NOT ACCEPTABLE

PAGE 6 OF 30
EMCO ENGINEERING INC, EMIRATES, LLC
Water and Wastewater Treatment System
P.O. Box 38473, Dubai, United Arab Emirates

Tel. No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

PROJECT: VILLA 66
SWIMMING POOL

TOTAL DYNAMIC HEAD CALCULATION

Total Losses (Main Drain Line ) Total Losses ( Inlet Line  )
Major losses  QTY Each Total H Major losses  QTY Each
Main line  1.00 0.000 0.000 Main line  1.00 1.029
Branches  3.00 0.000 0.000 Branches  6.00 0.061
Total Losses 0.000 Total Losses
Minor Losses   Minor Losses  

Suction 0.000 Discharge 0.558

Total Losses Minor +  Total Losses Minor + 
0.000 1.953
Major Major

The Total Losses in the System  1.95

Static Head 1.62

Pressure Drop (filters) 3.00
Pressure Drop (Heater or Heat Exchanger) 3.00
Total 9.57
10% Safety Factor 0.96
Calculated Head 10.53
Selected Pump Head 15.00
GINEERING INC, EMIRATES, LLC
er and Wastewater Treatment System
Box 38473, Dubai, United Arab Emirates

No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

DYNAMIC HEAD CALCULATION

Total Losses ( Inlet Line  )
Total H
1.029
0.366
1.395
Minor Losses  

0.558

1.953

1.95

1.62

3.00
3.00
9.57
0.96
10.53
15.00
EMCO ENGINEERING INC, EMIRATES, LLC
Water and Wastewater Treatment System
P.O. Box 38473, Dubai, United Arab Emirates

Tel. No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

SWIMMING POOL

SUCTION

Hazen­williams Equation  
h=6.819L(V/C)1.852 (1/D)1.167
l = length of pipe (m) 35.000
c = Hazen­Williams roughness constant  130.000
dh = inside or hydraulic diameter (mm) 83.300
v = Average flow velocity (m/s) 0.000
Total head losses from the pipes (h) = 0.000

l = length of pipe (m) 1.500


c = Hazen­Williams roughness constant  130.000
dh = inside or hydraulic diameter (mm) 58.300
v = Average flow velocity (m/s) 0.000
Total head losses from the pipes (h) = 0.000

Minor Losses
K FACTOR
50 63 75 90 110 160 200
1 1/2 2 2 1/2 3 4 6 8
Elbow 90 2
Elbow 45
Tee Line 1
Tee Branch 1 2
Gate Valve 2
Check Valve
Friction factor K = 4.03
Ʃh=ƩK(V2/2g)
Total Minor head loss (Meters) 0
Average Suction Velocity (m/sec) 0.000
SUCTION
EMCO ENGINEERING INC, EMIRATES, LLC
Water and Wastewater Treatment System
P.O. Box 38473, Dubai, United Arab Emirates

Tel. No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

SWIMMING POOL

DISCHARGE

Hazen­williams Equation  
h=6.819L(V/C)1.852 (1/D)1.167
l = length of pipe (m) 40.000 MM
c = Hazen­Williams roughness constant  130.000 INCHES
dh = inside or hydraulic diameter (mm) 68.500 ###
v = Average flow velocity (m/s) 1.180 ###
Total head losses from the pipes (h) = 1.029 ###
###
l = length of pipe (m) 1.500 ###
c = Hazen­Williams roughness constant  130.000 ###
dh = inside or hydraulic diameter (mm) 46.300
v = Average flow velocity (m/s) 1.180
Total head losses from the pipes (h) = 0.061 Elbow 90
Elbow 45

Tee Line
Minor Losses Tee Branch
K FACTOR Gate Valve
50 63 75 90 110 160 200 Check Valv
1 1/2 2 2 1/2 3 4 6 8 TOTAL K
Elbow 90 2 3
Elbow 45
Tee Line
Tee Branch 2 2
Gate Valve 2
Check Valve 1
Friction factor K = 7.87
Ʃh=ƩK(V2/2g)
Total Minor head loss (Meters) 0.558258
Average Discharge Velocity (m/sec) 1.180
EMCO ENGINEERING INC, EMIRATES, LLC
Water and Wastewater Treatment System
P.O. Box 38473, Dubai, United Arab Emirates
Tel. No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

Issued Date: 22-Apr-2018

PROJECT: VILLA 66
SWIMMING POOL

1.0 CHLORINE DOSING PUMP SELECTION

SWP Volume Flow Rate v 38.00 m3/hr


Time of Treatment: t 24.00 hr/day
Treatment Dose: Cl-d(2ppm) 2.00 g/m3
Chlorine Solubility: Sol. 0.25 lb/gal

Amount of Chlorine Required: 1,824.00 g/day


1.82 kg/day
4.01 lb/day

Dosing Pump Capacity: 16.05 gpd


2.53 l/hr
Required Dosing Pump 2.00 l/hr
Use: 2.00 l/hr 1 No

Chemical Tank Required: 48.00 Liters


Use: 100.00 Liters 1 No

2.0 HYDRO CHLORIC ACID DOSING PUMP SELECTION

SWP Volume Flow Rate v 38.00 m3/hr


Time of Treatment: t 24.00 hr/day
Treatment Dose: pH-d(2ppm) 2.00 g/m3
Chlorine Solubility: Sol. 0.35 lb/gal

Amount of Chlorine Required: 1,824.00 g/day


1.82 kg/day
4.01 lb/day

Dosing Pump Capacity: 11.47 gpd


1.81 l/hr
Required Dosing Pump 2.00 l/hr
Use: 2.00 l/hr 1 No

Chemical Tank Required: 48.00 Liters


Use: 100.00 Liters 1 No
EMCO ENGINEERING INC, EMIRATES, LLC
Water and Wastewater Treatment System
P.O. Box 38473, Dubai, United Arab Emirates
Tel. No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

BATHERS LOAD
NOT APPLICABLE FOR SKIMMER TYPE
Area of Pool with depth < 1.0m: 0 m2 Bathers: 0 Persons
Area of Pool with depth 1.0 to 1.5m: 55.8 m2 Bathers: 21 Persons
Area of Pool with depth > 1.5m: 0.00 m2 Bathers: 0 Persons
Total Area (m2) Wrong Area Total: 21 Persons

Instantaneous Bathing Load: 35.70 m3/hr


Turnover Period: 5.21 Hrs INPUT AREAS ARE WRONG
EMCO ENGINEERING INC, EMIRATES, LLC
Water and Wastewater Treatment System
P.O. Box 38473, Dubai, United Arab Emirates
Tel. No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

PROJECT: VILLA 66
SWIMMING POOL
BALANCING TANK (NOT APPLICABLE FOR SKIMMER SYSTEM)

Type of Pool: Private Pool


Area of Pool: 140.00 m2

As per Spata – Swimming Pool and Allied Trade Association

Commercial Pool with excessive activities: 75-100 Liters


Commercial Pool with play/ water feature: 50-75 Liters
Commercial Pool (swimming only): 25-50 Liters
Private Pool:
15-25 Liters

Formula for Base Capacity:

Pool Area x Factor

Base Capacity: 3.50 m3


Add'l Surge Capacity: 3.50 m3
Plus Safety Capacity: 3.50 m3
Calculated Size: 10.50 m3
Use: 17.00 m3

Dimensions:
Length: 3.00 meters
Width: 3.00 meters WRONG DIMENSIONS
Height: 2.00 meters
EMCO ENGINEERING INC, EMIRATES, LLC
Water and Wastewater Treatment System
P.O. Box 38473, Dubai, United Arab Emirates
Tel. No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

HEAT EXCHANGER CALCULATION


PROJECT: VILLA 66
LOCATION: SWIMMING POOL

CALCULATION FOR COOLING


SELECTION DATA:
POOL VOLUME 186,000.0 LITTERS
TURNOVER PERIOD 5.00 HRS
SPECIFIC HEAT OF WATER (Cp) 1.0
ROOM TEMPERATURE 46.0 °C
INITIAL POOL TEMPERATURE (t1) 38.0 °C
REQUIRED POOL TEMPERATURE (t2) 28.0 °C
TEMPARATURE DIFFERENCE (t2-t1) 10.0 °C
INITIAL COOLING DOWN PERIOD 24.0 HRS

REQUIRED HEATING LOAD (KW):


HEAT ENERGY REQUIRED TO HAVE THE REQUIRED TEMPERATURE

VOLUME x SPEC. HEAT OF WATER x DIFFERENCE IN TEMPEARATURE

### KW = 1,860,000.0

HEAT EXCHANGER HAS TO OPERATE CONTINOUSLY FOR 24 HRS TO ACHIEVE


THE REQUIRED WATER TEMPERATURE.

THEREFORE, HEATING LOAD (Kcal/hr)

= 186.0 x 1000 x ( 28.0 - 38.0 ) x 1.0


24.0

HEATING LOAD = 77,500 Kcal/hr

CONSIDER MAXIMUM ENERGY LOSS ASSUMED ON DAILY BASIS AS 25% (SAFETY FACTOR)

HEAT ENERGY LOSS @ 25%


= 77,500 x 25%

TOT. HEATING LOAD = 96,875 Kcal/hr or 112.65 KW

HENCE THE SELECTION


ETNA - 50 HEAT EXCHANGER - POWER: 50,000 Kcal/hr or 58 KW
QTY: 1 No.
EMCO ENGINEERING INC, EMIRATES, LLC
Water and Wastewater Treatment System
P.O. Box 38473, Dubai, United Arab Emirates
Tel. No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

SWIMMING POOL HEATING & COOLING CALCULATION


PROJECT: VILLA 66
SWIMMING POOL

Conditions and requirements


Pool dimensions Ambient conditions:
L= length 20.00 [m] T1= desired pool temperature
W= width 7.00 [m] T2= initial water temperature
Ds= shallow-end depth 0.65 [m] T3= max/min aver. amb. temp.
Dd= deep-end depth 1.60 [m] ΔT1= daily pool temp raise/drop
AD= average depth 1.13 [m] ΔT2= dif between |T1-T2|
A= Area of pool 140.0 [m²] ΔT3= dif between |T1-T3|
VS Surge Volume 3.0 [m³]
V= Volume of pool 186.00 [m³]

Wind velocity ASTRAL specified requirements:


w = 5~8km/h multip. factor 1 θ1= 24 [h] initial heating-up/coolin
w = 8~16km/h multip. factor 1.25 θ2= 16 [h] daily running hours (1
w = ≥ 16km/h multip. factor 2

Heating & cooling capacity requirements


Cooling Capacity : SUMMER Heating Capacity : WINTER
Initial cool down Initial heating up

q1= 89.94 kW q1= 143.90 kW


Daily heat gai ( from amb. Air & radiant energy) Daily heat loss ( from the surface)

q2= 5.04 kW q2= 50.40 kW


I= 14.18 kW/m²
Total Cooling Loads Total Heat Losses
Qcooling = 89.94 kW Qheating = 143.90

q1 = V*ρ*ΔT1/860*θ q2 = U*A*ΔT3/2
q1 = ( ρ*cp*V*ΔT2)/3600*θ q2 = heat loss/gain from pool surface
q1 = Pool heat up/cool down rate [KW] U= surface heat transfer c
ρ= density of water @ 998kg/m3 Uheating @
cp = specific heat of water @ 4.18 [kJ/kgK] Ucooling @
v= pool volume [m3] A = pool surface area [m2]
ΔT1 = daily pool temperature drop / raise [K] ΔT3 = pool temp.-ambient tem
ΔT2 = desired temp. of water - initial temp. of pool [K] ̽̽ = as q2 is calculated for peak
θ= pool heat up time [h] respective seasons, the surface l
1/2 on daily basis and the total h
I = [(E*A)/θ2]*0.25 (Applicable for Heat & Chill Pumps and Chillers) of the initial heat / cooling value
I = Radiant energy (refer ASHRAE application chapte

E= Solar daily heat gain on the horizontal surface (ASHRAE Fundamentals Chapter
24° north altitude, month of August E = 6.484 KW/m2 (Consider 6 hrs of sunn
S, LLC

Issued Date: 22-Apr-2018

ULATION

summer winter
28 [°C] 28 [°C]
38 [°C] 12 [°C]
46 [°C] 16 [°C]
[K] [K]
10 [K] 16 [K]
18 [K] 12 [K]

al heating-up/cooling-down period
y running hours (12~max.16h)

Model Selected
CAP. TOTAL

Heating 72 72 KW
Cooling 58 58 KW

Qty 1

kW

n from pool surface [KW]


ace heat transfer coefficient
0.060 [KW/m2]
0.004 [KW/m2]
ace area [m2]
l temp.-ambient temp. [K]
alculated for peak temperatures during the
asons, the surface loss is considered as
asis and the total heat losses as the sum
eat / cooling value & daily energy loss.
E application chapter 48.19)

damentals Chapter 26.30)


nsider 6 hrs of sunny days on an average)
EMCO ENGINEERING INC, EMIRATES, LLC
Water and Wastewater Treatment System
P.O. Box 38473, Dubai, United Arab Emirates
Tel. No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

PROJECT: VILLA 66
SWIMMING POOL

HEATER POWER CALCULATION


SELECTION DATA:
POOL VOLUME 186.00 Cubic Meters
INITIAL TEMPERATURE OF THE POOL 12.00 ºC
STANDARD REQUIRED POOL TEMPERATURE 28.00 ºC
DIFFERENCE IN TEMPERATURE 16.00 ºC
AIR TEMPERATURE 16.00 ºC
TYPE OF POOL INDOOR POOL TEMP. < AIR TEMP.
INITIAL HEATING UP PERIOD 24.00 Hours

Gallons = 40,920.0
Allowing 1kW per 1,000 Gal. the theoretical heater power would be: 40.9 kW in 24 hrs
Multiply by 0.75 to allow for temperature differential: 30.7 kW

1 KW of heater power for every 1,000 gallons of volume will result in a temperature rise of
4.4ºC in 24 hours

FACTOR: = DIFFERENCE IN TEMPERATURE / 4.4


= 3.64
= 3.64 x 30.7 KW
= 111.60 KW

QUANTITY: 1 No.

MINIMUM HEATER POWER: 111.60 kW in 24.0 hrs

USE: 60.00 kW 1 No.


SWIMMING POOL
Required Flow Rate
38.00 m3/hr Velocity (m/s) 1.5 No. of Main Pipe: 1
per Line:
Flow Rate of Fitting CLASS 5 - Quantity of Fittings
3.17 m3/hr uPVC Class 12
(m3/hr) 16 BARS per line:
Pipe Sizing formula (SI)
INLET PIPES
M3/h M3/S D(mm) OD D2 (m) PI/4 A(M2) V(M/S)
1 3.17 0.001 46.3 50 0.002 0.785 0.002 0.522
2 6.33 0.002 46.3 50 0.002 0.785 0.002 1.045
3 9.50 0.003 46.3 50 0.002 0.785 0.002 1.567
4 12.67 0.004 58.3 63 0.003 0.785 0.003 1.318
5 15.83 0.004 68.5 75 0.005 0.785 0.004 1.193
6 19.00 0.005 68.5 75 0.005 0.785 0.004 1.432

AVE 1.180
SWIMMING POOL

Required Flow Rate


15.20 m3/hr Velocity (m/s) 0.5 No. of Main Pipe: 1
per Line:
Flow Rate of Fitting CLASS 5 - Quantity of Fittings
2.53 m3/hr uPVC Class 6
(m3/hr) 16 BARS per line:
Pipe Sizing formula (SI)
GUTTER/SKIMMER PIPES
M3/h M3/S D(mm) OD D2 (m) PI/4 A(M2) V(M/S)
1 2.53 0.001 58.3 63 0.003 0.785 0.003 0.264
2 5.07 0.001 83.3 90 0.007 0.785 0.005 0.258
3 7.60 0.002 83.3 91 0.007 0.785 0.005 0.387
SWIMMING POOL

Required Flow Rate


22.80 m3/hr Velocity (m/s) 1.0 No. of Main Pipe: 1
per Line:
Flow Rate of Fitting CLASS 5 - Quantity of Fittings
7.60 m3/hr uPVC Class 3
(m3/hr) 16 BARS per line:
Pipe Sizing formula (SI)
MAIN DRAIN PIPES
M /h
3
M /S
3
D(mm) OD D2 (m) PI/4 A(M2) V(M/S)
1 7.60 0.002 58.3 63 0.003 0.785 0.003 0.791
2 15.20 0.004 68.5 75 0.005 0.785 0.004 1.146
3 22.80 0.006 83.3 90 0.007 0.785 0.005 1.162
EMCO ENGINEERING INC, EMIRATES, LLC
Water and Wastewater Treatment System
P.O. Box 38473, Dubai, United Arab Emirates
Tel. No.: +971(4) 341-6264 / Fax No.: +971(4) 341-6265

PROJECT: GATE DISTRICT TOWERS 3 TO 8


KIDS POOL 1
UNDER WATER LIGHTS

Area of Pool: 140.00 m2


1506.18 f2
Pool Type: Outdoor Commercial

As per Spata – Swimming Pool and Allied Trade Association

Recommended Watts per Ft2


Pool Type Comercial Residential
Indoors 1.5 1
Outdoor 1 0.75

No. of fixture = Area(f2)xRecommended Watts per f2 Indoor Comm


Watts per fixture Indoor Reside
Outdoor Com
Outdoor Resi
Calculated Recommendation
For 300 Watts: 5.02 Nos. 6.0 Nos.
For 100 Watts: 15.06 Nos. 16.0 Nos.
For 50 Watts: 30.12 Nos. 31.0 Nos.

Das könnte Ihnen auch gefallen