Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 1 of 207
HSE MANUAL
FOR
CONSTRUCTION AND PRECOMMISSIONING
Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96 File code: Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 2 of 207
TABLE OF CONTENTS
2. HSE PROCEDURES 4
ANNEX XV – NOISE 79
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 3 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 4 of 207
The purpose of this Project HSE Manual for Construction, here following referenced
as “HSE Manual”, is to provide the Contractor’s Construction Organisation and all
parties involved in the construction and pre-commissioning works at site, namely
Sub-contractors and Vendors, with the safe working practices to be applied during
the construction activities for the NGL-4 Project.
The HSE Manual, combined with the HSE Plan for construction and with the Project
HSE Requirements, forms the complete Project HSE Programme for the evaluation,
control and management of all industrial and occupational Health, Safety and
Environmental risks during construction of the NGL-4 Project.
In addition to the Requirements described in this Manual, the full requirements of
the Qatar Law and of QGPC Procedures in HSE matter, as applicable to the
construction and precommissioning activities of this Project, shall be complied with.
If the contents of this HSE Manual are in conflict with Qatar Law and of QGPC
Safety Procedure, Qatar Law and QGPC Safety Procedure shall govern.
The HSE Manual shall be included as integral part of Sub-contractors and Vendors
contracts.
2. HSE PROCEDURES
The following HSE working practices are included in this HSE Manual in annexes.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 5 of 207
1A
Dust Annex XXVII
HSE Meetings Annex XXVIII
Hazard Analysis and Control Programme Annex XXIX
Accident Investigation and Reporting Procedure Annex XXX
The following shall be prepared by HSM at Site, in consultation with QGPC Site
Safety Division and other involved QGPC Site Departments:
Emergency Response Plan (relevant to each work site)
Work permit procedure . (relevant to each work site)
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 6 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 7 of 207
The purpose of this procedure is to outline the requirements for managing and
controlling lifting and heavy lifting operations during the construction of the NGL-4
Project.
This procedure applies to all operations involving the use of cranes and other lifting
equipment used for lifting materials. The general requirements for this procedure
apply to all operations irrespective of weight and complexity of arrangements,
though for lifts that are programmed to go over live process areas and in the vicinity
of other potentially hazardous areas, the requirements need to be reviewed and
assessed for applicability.
Heavy lifting operations and any other lifting operation shall be authorised by
1A Contractor’s Construction Manager after checking the Rigging Study prepared and
submitted by Subcontractor. Implementation of the Rigging Study and overall
control of lifting operation shall be responsibility of the Appointed Person.
2.0 DEFINITIONS
Rigging Study: a work method statement detailing the sequence of work, the
weights involved, equipment to be used and persons
employed.
British Standard 7121: the standard to be consulted in respect of this procedure for
detailed responsibilities and planning of lifting operations.
3.0 INSTRUCTIONS
Accidents involving the failure and damage of lifting equipment are frequent on
construction sites and usually very severe when they do occur.
Causation factors leading to such accidents include:
Operator error;
Inadequate inspections and maintenance of equipment;
Failure to plan the operation and take precautions against overhead power lines,
poor ground conditions and other obstructions;
Overloading and misuse of equipment;
environmental hazard conditions (high wind, inadequate ground compaction)
3.1 Cranes
The arrangements for the safe and efficient management of crane operations set
out in this procedure and as required by safe operating procedures, must be
adhered to in respect of all cranes brought to site.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 8 of 207
3.1.2 Banksmen/Riggers
Banksmen/riggers must be trained and competent for the task, specifically they will:
Assessment and planning of lifts with regard to the selection of cranes, lifting
gear, equipment, instruction and supervision;
Ensure that the equipment selected has been adequately inspected and
maintained;
Ensuring that an effective procedure is in place for reporting defects, taking into
account remedial actions;
Taking responsibility for the organisation and control of lifting operations;
Stopping any unsafe operation and to report any incidents;
Identify the monthly colour code of the lifting equipment (for inspection
purposes).
Cranes brought to site will be load tested and thoroughly examined before use.
Crane operators shall check their cranes daily for oil, hydraulic oil, leaks, water etc.
Cranes having their configuration changed, dismantled and re-erected will also be
tested.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 9 of 207
All the cranes operating on site must have a third party inspection certificate (valid)
and a manufacturer’s operating manual. All lifting equipment certificates must be
authorised by the QGPC QA Department (SQE), before any lifting commences.
QGPC form (LEOR01) will be used for this purpose.
The crane manufacturers manual will be adhered to for ongoing maintenance.
No part of a crane which is subject to lifting stresses shall be altered, welded or
changed in any way without reference to the crane manufacturers procedures.
3.2.4 Outriggers
Outriggers must be used as specified by the manufacturer of the crane.
Sound timber packing or metal plates shall be positioned under each outrigger pad
to distribute the load. They must be 50% larger than the crane’s outrigger pad).
Outriggers must be properly set and locked where locking devices are provided.
The operator must ensure that the pad of each outrigger is positioned correctly
before lifting a load.
Note: the practice of extending those outriggers on the side of the crane where the
lift is taking place is expressly forbidden.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 10 of 207
3.2.8 Excavators
Excavators will only be used for lifting subject to the following:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 11 of 207
February “ Yellow
green 2
March “ Yellow 3
blue
May “ Orange 5
Green
June “ Orange 6
Blue
August “ White 8
Green
September “ White 9
Blue
November “ Brown 11
Green
December “ Brown 12
Blue
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 12 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 13 of 207
The purpose of this procedure is to highlight the fire hazards, precautions and
suppression facilities required for the NGL-4 Project.
The procedure must be applied to all facilities including workshops, offices,
temporary accommodation and construction areas.
2.0 INSTRUCTIONS
The following instructions apply to the precaution and arrangements necessary for
the protection of life and property on the project.
2.1 Responsibilities
to ensure that the workings of this procedure are known and followed by the
personnel with specified duties;
To assist with the development of the written emergency plans;
To regularly monitor the application of this procedure;
To provide whatever training is required for fire teams and fire wardens;
To ensure that fire detection systems provided are adequate and that regular and
routine maintenance schedules are being followed;
To provide personnel tasked with checking and maintaining fire extinguishers.
A written emergency plan encompassing all areas under his control and
supervision, is prepared;
That an appropriate number of office staff are assigned with the responsibility to
act as fire wardens, with the duties of marshalling and controlling the evacuation of
premises. There shall be a minimum number of two marshals for each muster point.
That office staff (in particular new starts) are briefed and kept updated on fire and
emergency response procedures, including muster points;
Maintenance of an inventory of flammable materials e.g. photocopier fluids, and
control of the usage to the minimum required;
Provision of lidded refuse containers for the safe disposal of aerosols which have
contained flammable materials;
Ensuring that a clean desk policy is being adhered to and that materials are not
allowed to accumulate by regular housekeeping, and checks of the offices at the
close of business;
Daily checks of the office to ensure that walkways are not obstructed, carpet and
other fittings are secure, fire doors kept closed and that the means of escape are
being maintained;
Provision of metal filing cabinets for documents, stationary and other potentially
flammable items;
Liaise with the Contractor electrical/instrumentation department for the inspection,
testing and servicing of fire alarms, smoke detection units etc;
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 14 of 207
Kitchen areas are a particular location for fire hazards and shall be monitored to
ensure that electrical fittings are being turned off after use and do not present a fire
hazard;
Clear glass doors shall have the direction of opening e.g. Push/pull and a warning
strip placed to prevent personnel running into them;
Training in the use of fire extinguishers shall be given and signs displayed
highlighting the emergency procedures.
Liaison will also take place with the HSE staff for regular audits and inspections of
the office and surrounding areas including muster points, external walkways etc.
Specifically:
Ensure that personnel are informed not to interfere with fire detection equipment;
That a ‘NO SMOKING’ policy applies in the bedroom areas;
Ensure that night security guards regular patrol the camp areas and ensure that
fire has not broken out, security lights are operable and identify any other potential
area of risk.
The Warehouse Superintendent shall ensure that the following control measures
are in place:
Workshops are maintained in a neat and tidy manner and that waste oil, rags and
other flammable materials are removed at the end of each shift or as necessary.
That warehouse personnel are instructed on the use of fire extinguishers, raising
the alarm and fire hazards in the work place.
Battery recharging will be conducted in well ventilated areas, with no smoking
signs and fire extinguishers in place.
Areas around pedestal grinders and other hot work type activities are kept free of
combustibles.
Welding and burning shall be screened and controlled to prevent fire risk and
exposure to personnel.
That flammable liquids such as; gasoline, diesel etc. are not used for cleaning
purposes.
Provision of adequate storage areas that are located in places where exits,
passageways and stairways are not adversely affected.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 15 of 207
Particular care will be taken when carrying out hot work operations in locations
where combustibles may be present. This will include precautions such as ;
inspection of the surrounding area, removal of any combustible materials, protection
by fire blankets and provision of fire extinguishers.
Compressed gas cylinders shall be closed when not in use, stored and used in an
upright position, have their protective caps fitted when moving and transporting
them(unless by cylinder trolleys).
Compressed gas cylinders shall be kept clear of electrical equipment and cabling
where they may become part of an electrical circuit.
Gas cylinders shall not be taken into confined spaces, and feed hoses and nozzles
when used in confined spaces shall be removed when not in use.
Oxygen cylinders shall be kept free of oil and grease.
Valve wrenches shall be left in position on the valve stem at all times when the
cylinder is in use.
Fuel gas and oxygen hoses shall be clearly distinguishable, in good condition and
secured properly. (Wire is not permitted)
Cylinders shall be fitted with flash back arrestors.
Fire extinguishers shall be available before hot work commences and persons
trained in their correct use.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 16 of 207
Storage of flammable and combustible liquids and gases shall meet NFPA 30 sect.4-8.
Area shall be posted with its contents and posted with signs “No Smoking” or “No Open
Flames”.
No source of ignition shall be allowed within 15 meters of the storage area.
Minimum of two Dry Powder fire extinguishers shall be available at the storage area.
Area shall be well ventilated.
Area shall be secured and only authorized personnel allowed access.
If electrical system is required it must meet requirements for hazardous locations in
accordance with the National Electrical Code.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 17 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 18 of 207
The purpose of this procedure is to outline the requirements for managing and
controlling housekeeping operations during the construction of the NGL-4 Project.
This procedure applies to all locations used by the Contractor and Subcontractors,
be they offices, laboratories, workshops, sites or pipelines.
2.0 DEFINITIONS
3.0 RESPONSIBILITIES
Subcontractors, including their sub subcontractors are wholly responsible for the
maintenance of site housekeeping, specifically they will:
Assign responsibility within their organisation for the control and elimination of
waste material.
Monitor the arrangements in place for controlling housekeeping, for effectiveness.
4.0 INSTRUCTIONS
These instructions shall apply equally to office, workshop, site or desert locations
used by consortium personnel or their contractors during the course of the project.
All emergency exits passageways, exits, firedoors, break-glass alarm points, fire
fighting equipment, first aid stations, and other emergency stations shall be kept
clean, unobstructed and in good working order.
All workplaces, accesses and means of escape shall be maintained clear of debris
waste and other rubbish, which shall be disposed of in segregated containers for
disposal.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 19 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 20 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 21 of 207
The purpose of this procedure is to outline the requirements for the effective use of
safety signs on the NGL-4 Project.
This procedure applies to all activities during the construction and pre-
commissioning.
2.0 DEFINITIONS
Prohibition
Warning
Safe conditions
Fire
3.0 REFERENCE
The content of this procedure are in accordance with British Standard 5378.
4.0 RESPONSIBILITIES
Ensuring that Supervisor and Subcontractor management are familiar with this
procedure.
That signs and barriers are ordered in accordance with this procedure.
Monitoring site conditions to ensure that signs and barriers are being erected as
appropriate to the conditions.
Liaison with the commissioning team prior to start up on the requirements and
ordering of signs, warning tape, tags and barriers.
Identifying and ordering sufficient signs and barriers to control their areas of work
Ensuring that signs and barriers are erected in accordance with this procedure.
Provision of instruction as required.
Ensuring that adequate barriers and signs are provided around areas where
hazards may exist.
5.0 INSTRUCTIONS
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 22 of 207
These instructions shall apply equally to office, workshop, site or desert locations
used by Contractor and Subcontractors personnel or their during the course of the
project.
All emergency exits passageways, fire doors first aid stations, eye wash stations
emergency muster point shall be highlighted with safety condition signs.
Warning signs shall be erected and displayed for fire hazards, electrical
equipment, openings, overhead working, noisy areas, and other hazards
Mandatory signs shall be provided for enforcing the use of personal protective
clothing and equipment and providing specific instructions appropriate to the task or
condition.
Prohibition signs will be displayed for restricting access or entry, no smoking
areas, no parking, and any other unauthorised acts.
Fire signs shall be provided at areas where fire equipment has been sited e.g. fire
extinguishers, fire Points, fire blankets etc.
Barriers and warning tape will be provided as appropriate, only fixed and solid
barriers will be used for edge protection on excavations, floor openings and
penetrations.
5.1 Specifications
Where practicable fencing and signs will be erected to contain construction areas
with the following signs erected:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 23 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 24 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 25 of 207
The purpose of this procedure is to outline the requirements for managing and
controlling the use of plant and equipment during the construction of the NGL-4
Project.
This procedure applies to all plant and equipment used by the Contractor and
Subcontractors.
2.0 DEFINITIONS
Dump trucks, scrapers, graders and other items of earth moving equipment.
Pavers
Drilling rigs and augers
Water pumps
Welding transformers, compressors and generators.
Side booms and other specialised lifting equipment.
3.0 RESPONSIBILITIES
That suitable arrangements are in place to ensure that plant and equipment
brought to site is to a high standard.
That arrangements are in place for ongoing systems of maintenance.
Shall employ the services of a plant superintendent to carry out and administer this
procedure.
Shall satisfy himself that arrangements in place are working effectively.
That arrangements are in place and implemented for the issue of certificates for
plant and equipment brought to site.
Shall ensure that Subcontractors are employing only operators and drivers who
are competent and authorised to operate the plant and equipment they are
assigned to.
Shall ensure that a register of all plant and equipment is kept on site.
Shall review the equipment schedule with the Subcontractors and satisfy himself
that the right equipment is being brought to site.
Subcontractors:
Subcontractors including their sub subcontractors are wholly responsible for the
provision and maintenance of plant and equipment brought to site, specifically they
will:
Assign responsibility within their organisation for the control and maintenance of
their equipment.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 26 of 207
Provide third party certificates of competence for their operators and ensure that
only persons competent are employed on site.
4.0 INSTRUCTIONS
These instructions provide general considerations for the control and use of plant
and equipment used on site.
All drivers, operators and banksmen of mechanical plant and equipment must be
competent to perform their duties. Competency will be assessed by experience,
training and where necessary by testing by a third party.
The carrying of passengers on vehicles, other than in seating provided, is strictly
prohibited.
Personnel working in the vicinity of heavy earth moving plant and equipment shall
wear conspicuity vests.,
Plant and equipment shall be checked daily for oil leaks and spillage's. Any
evidence that suggests a hydraulic leak is happening shall cause that equipment to
be withdrawn from service.
Refuelling operations shall take place under the following conditions:
- No smoking rules will apply
- Any spillage's will be immediately dealt with
- Bunded trays will be placed under portable equipment to contain any leaks
or spillage's.
- Discharge nozzles on fuel bowsers will be fitted with an automatic shut off
valve.
Any maintenance that takes place on any piece of plant and equipment will be in
accordance with the following guidelines:
- Replacement wheels and tyres will be inflated using a tyre cage.
- Timber supports will be utilised when jacking up a piece of heavy
equipment, when working on the hydraulic rams of tipper trucks or other
circumstances where an individual places himself in an area of potential
hazard.
- Burning, cutting and grinding on pieces of plant and equipment will be
carried out under strict controls, with the area clear of flammable materials
and fire extinguisher provided.
- Guards taken from moving parts will be replaced on completion of the task.
- Vehicles will be taken out of the workshops when being tested.
Every precaution shall be taken when parking or stopping a vehicle to ensure that
uncontrolled movement is prevented, this will include engaging the hand brake,
consideration of ground conditions and switching the engine off when unattended.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 27 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 28 of 207
This procedure has been developed to ensure that all site personnel on the NGL-4
Project are provided with, and wear or hold, the appropriate Personal Protective
Equipment (PPE) to protect themselves against work related hazards which may
endanger their health and safety.
This procedure applies to all personnel employed by the Contractor including all of
their Sub-contractors on the NGL-4 Project.
2.0 DEFINITIONS
3.0 INSTRUCTIONS
The risks posed in any particular work activity shall be assessed, and adequate
PPE selected in accordance with the following criteria:
gives protection against risk(s) without in itself leading to any increased risk
is suitable for the personnel involved in the work including correct fitting
is compatible with the work activity
complies with a recognised national or international standard of design or
construction (i.e. BS/ANSI/DIN/ISO/NIOSH)
Only PPE approved by the contractor HSE Construction Dept. is suitable for the
Project.
All employees shall be provided with the necessary PPE, as defined above, for their
particular work activity. They shall also be provided with the necessary instruction
and training in its correct use. PPE and the necessary training courses shall be
supplied to the employee by or on behalf of the employer.
All employees shall be held responsible for the proper care and use of any PPE
supplied to them. Employers shall replace, free of charge to the employee, any
PPE which becomes deficient in any way through normal work usage or wear and
tear, such that at all times the worker has adequate protection. Normal wear and
tear shall include the period of effective use specified by the manufacturer and
requirements of basic hygiene standards.
Supervisors of any worksite shall be responsible for ensuring that all personnel on
site are trained in the use of, provided with, and wearing all PPE required for the
particular activity and environment of the work. Personnel not properly equipped,
for whatever reason, shall not start or continue working.
All employees shall wear the appropriate PPE supplied to them at all times while
working at their assigned tasks. Supervisors shall apply disciplinary action in
accordance with Contractor procedures to any employee who fails to comply.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 29 of 207
whenever notices are displayed stating that such PPE shall be worn. Such notices
shall be in English and Arabic. Visual signs shall also be displayed (outline drawing
of hard-hat/boots etc)
any production facility, inclusive of power plants and gathering stations
all well locations inclusive of locations in preparation, drilling, production and
workover phases
all construction sites inclusive of construction repairs to existing buildings
all abrasive blasting operations
during all excavation work, inclusive of digging trenches, when working near
excavating equipment, or any work where the depth of excavation is such that
material could fall into the excavation
during pipeline operations
working with any machinery or equipment where a significant hazard of projection
of debris exists (e.g. using portable power saws, heavy cutting machinery, etc.)
welders when actually welding and cutting, where the necessary eye shield or heat
protective cap prevents its use, are not required to wear a hard-hat
Face/Head protection scarves are only allowed if specially designed and worn in
such a way that there is no impairment of the wearer’s vision.
Safety glasses with side shields shall be worn by all personnel while on the
construction sites (100% eye protection).
Work situations may occur that require additional protection such as a full face
shield etc.; these situations include but are not limited to:
Grinding
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 30 of 207
When working during the hours of daylight, employees should be provided with
sunglasses having a tint of 1.25 to 2 density. When working during the hours of
darkness, safety glasses shall be clear except for welders and fitters and their
helpers.
Contact lenses are not approved for wear on the construction site.
In general eye and face protection shall be issued on a personal basis, exception to
this would be in case of fixed grinding, drilling or other rotating machines used by
multiple users in a workshop. Personnel who require prescription glasses shall
either be provided with corrective safety lenses or the type of safety glasses that fit
over prescription glasses.
Respiratory Protective Equipment shall be available to all persons who are exposed
to any situation in which there is a possibility of the atmosphere being or becoming
deficient in oxygen or containing any harmful substance, whether particle, dust mist,
vapour or gas including:
Hearing protection shall be made available to all workers exposed to noise levels of
85 dB(A) or above.
The selection of type of protection shall be in accordance with the type of noise
hazard and the work being performed.
Protective devices shall be in conformance with BS 6344 “Industrial Hearing
Protectors” or equivalent.
In all work environments where the noise level is at or above 85 dB(A), prominent
signs in English and Arabic shall be displayed indicating the need for ear protection.
A visual sign in the form of a line drawing of ear muffs shall also be displayed.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 31 of 207
Adequate hand and arm protection shall be available for all manual labour. The
type of protection worn shall be selected according to the hazard to be protected
against. These include but not limited to:
Hand and arm protection shall conform, where applicable, to a recognised national
or international standard such as:
Hand and arm protective devices shall be regularly inspected and replaced when
physically damaged, or contaminated by substances (such as greases, paints,
drilling fluids or chemicals) which might impair their effectiveness or safety.
Adequate body protection such as special suits, aprons, leggings, etc., shall be
provided for any work which involves hazards, above.
Specific and adequate body protection shall be supplied for all work activities which
present these hazards, including but not limited to:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 32 of 207
Safety harnesses and lifelines shall be provided, worn and properly secured in all
work situations where any of the following dangers exist:
working on scaffolding
work on any high structure, whether in construction or maintenance, including
petroleum processing plants, drilling rigs, storage tanks, etc.
work over water
rescue work, in firefighting, from high structures and from hazardous atmospheres
Safety belts shall not be used, only full body safety harnesses shall be used.
All such safety harnesses and lifelines shall be manufactured and inspected in
conformance to a recognised national or international standard such as:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 33 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 34 of 207
The purpose of this procedure is to outline the requirements for Road and Transport
Safety during the construction of the NGL-4 Project.
It is a fact that roads are statistically one of the more hazardous areas in which we
normally operate. It is beyond doubt that ‘Journey’ is the agency which has the
highest contribution both in frequency and severity.
Accordingly, Contractor believes that from economic development point of view, we
must maintain the efficiency of the Road Safety Management System by introducing
a programme of continuous control measures and maintenance.
The procedure applies to all operations utilising road or off road transportation,
applicable to all Contractor personnel and Subcontractors working on the NGL-4
Project
2.0 DEFINITIONS
3.0 RESPONSIBILITIES
Contractor shall ensure that all vehicles shall be of adequate capacity and of a
design suitable for the work to which they are allocated.
Contractor shall appoint a Personnel as an Authorised person who shall assume the
following duties:
Give overall direction and take responsibility for the application of this procedure.
Shall check the records at least once a month to verify that the system is working.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 35 of 207
Take responsibility for the vehicle, the load and passengers being carried
Understanding of the travel arrangements and journey plan.
At the destination to notify of his arrival.
Checking of the vehicle prior to start of the journey.
Notification of any difficulties or problems encountered en-route.
Ensuring that all personnel in the vehicle are wearing seat belts.
Drivers shall not pick up unauthorised persons.
4.0 INSTRUCTIONS
All personnel who intend to drive in Qatar must hold an appropriate and valid driving
licence for the vehicles, plant or equipment to be driven.
The following general guidelines apply to the qualifications and requirements for
driving on the project.:
Professional drivers shall undergo a medical examination and be certified fit before
taking up a drivers job. Subsequently they shall receive a bi-annual medical and
eyesight examination by a qualified doctor.
Contractor personnel shall not drive on graded roads during the hours of
darkness, except under the following circumstances:
- In response to an emergency.
- For operational purposes, only if prior approval has been obtained from the
Resident Manager.
Maximum driving time must be 10 hours in a 12 hours shift period.
After 3 hours driving a minimum of 15 minutes rest is needed.
All vehicle movements shall be recorded in a register stating the vehicle type,
registration number, drivers name, number of passengers, Route details and
planned stops.
4.2 Transportation
All vehicle convoy movements/major loads etc. shall be co-ordinated with the
Company HSE Department and the requirements of their procedures shall be
complied with.
All drivers must attend an induction course before being allowed to operate or drive
on company business.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 36 of 207
1 You have given the control room at HQ office, Administration Dept. or your
Section Head these details:
a Date and Time of departure
b Name of Driver and Passengers
c Vehicle type, registration and colour
d The route and destination of the journey
e Estimated time arrival at your destination
2 The vehicle must be in good condition throughout and before proceeding check
that:
a Your vehicle is four wheel drive & well provided for desert trip
b Good oil level
c Full fuel tank
d Good radiator water level
e Tyres in good condition (2 mm of minimum tread on tyre) and of proper air
pressure
Bear in mind that soft sand tyre pressure should be reduced to around 15 psi.
Keep strictly to your planned route using recognised tracks observing markers
and any other landmarks on the way
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 37 of 207
b Hand lamp
c Fire extinguisher
d Tool kit
e Spare fan belt
f Foot pump
g Area map
h Radio
I First aid kit
j Shovel
k Few pair of gloves
l Drinking water (1/2 Gallon/person Minimum)
m Desert survival kit complete with hand held flares, compass and insulated blanket
(Where Available)
Always keep to recognise tracks and should you become lost follow your own tyre
tracks back to know landmark.
Above all in the event that your vehicle does break down never attempt to reach any
location by foot, always stay with the vehicle until help arrives.
During adverse weather conditions pull the vehicle over until the conditions improve.
All cars and small trucks shall have a 2 Kg ABC fire extinguisher.
All equipment and internal combustion engines shall have a 6 Kg ABC fire
extinguisher.
Bi-directional equipments shall have an available alarm, that can be heard above
surrounding noise.
Speed limit for all vehicles and equipment on site is 20 Kph.
Equipment operators shall have a Qatari license for agriculture and construction
equipment which specifies the type of equipment they can operate.
All glass shall be free of cracks and distortions.
Fork lifts, cranes and other equipment operator shall receive additional training in
accordance with QGPC requirements.
All equipment shall be as originally manufactured, only manufacturer approved
modifications may be made.
All equipment must comply with Qatari Safety Requirements.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 38 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 39 of 207
Checking Authority:
Name:
Date:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 40 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 41 of 207
To outline and define and H2S monitoring and control programme that complies with
the requirements of Contractor and safeguards personnel working on the NGL-4
Project.
This procedure will apply to all personnel working in areas where H2S is present or
who are performing work with H2S.
2.0 DEFINITIONS
Occupational Exposure Standards (OES’s) - the limit at which there are no adverse
effects to health.
Short Term Exposure Limits (STEL’s) - the limits at which a short term exposure of
ten minutes are allowed without affecting the health of the individual.
4.0 RESPONSIBILITIES
Ensuring that Supervision and Subcontractor management are familiar with this
procedure.
That any work carried out where the presence of H 2S may occur is covered by this
procedure or any specific procedure.
Monitoring site conditions and ensuring that persons who may be affected by this
procedure are aware of the hazards and precautions to be taken.
Arrange for the necessary training of personnel for testing, calibration and maintenance
of records.
Updating this procedure as necessary.
ensuring that, when working in areas affected by the presence of H 2S, the Company site
representative has been consulted and that he is satisfied that all necessary precautions
are in place.
planning the work, as far as practicable, to include contingency plans and arrangements.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 42 of 207
to provide sufficient signs, barriers and flashing lights as appropriate to the area covered.
provision of instruction with regard to the hazards and arrangements in place.
5.0 INSTRUCTIONS
Prior to any work being carried out an analysis shall be carried out to determine the
levels of H2S present in the area.
All work will be covered by the permit to work system which will state the frequency
of further tests.
Instruction in the wearing and use of escape sets shall be emphasised in the task
team briefing.
H2S is an explosive gas and all electrical equipment provided shall be low voltage
and intrinsically safe.
Wind socks shall be positioned in conspicuous locations to indicate the direction
and strength of the wind.
The time weighted average for H2S shall be 10 parts per million (ppm), with a short
term exposure limit of 15 parts per million (ppm) for a maximum of 10 minutes
duration. Portable monitoring devices provided, either personal or for an area, shall
be calibrated to alarm at 10 ppm.
1A
5.2 Acetilene, LPG and other Flammable Gasses
Prior to any use of flammable gasses .an analysis shall be carried out to ensure
that all equipment is in good conditions, that there is adequate ventilation, and
that fire fighting is at hand.
Flammable gasses that are used in confined space must have constant gas
detection meter in case of leak.
Flammable gasses can either be heavier than air or lighter than air, so that all
areas that could trap gasses must be checked.
MSDS should be on site and safety talks given on all types of gasses to be used
on the project.
Flammable gasses can also act as suffocating gas in very high concentration.
Even small amount of any gas should not be inhaled if possible.
Evacuation should always be up wind if possible or cross wind depending on the
situation.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 43 of 207
Prior to use of any suffocating gasses an analysis shall be carried out to ensure
that all equipment is in good conditions, that there is adequate ventilation, and
that fire fighting is at hand.
Suffocating gasses are used for welding operations, displacing oxygen in
vessels etc.
Suffocating gasses can be explosive danger in extremely high heat.
Suffocating gasses can either be heavier than air or lighter.
Many suffocating gasses are colourless, odourless and tasteless, making them
extremely dangerous.
MSDS should be on site and received before any use of a suffocating gas.
Evacuation of an area should always be up wind or cross wind depending on
situation.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 44 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 45 of 207
The purpose of this procedure is to outline the steps to be taken for evacuating
personnel from the NGL-4 Project.
The scope of this procedure is intended to give an initial guide for emergency in the
temporary camps but will be reviewed and enhanced at site and will include SOS
medical services.
Emergency procedures for the work sites shall be developed on site by the Site
HSE Manager.
In each of the Contractor areas the Site HSE Manager is setting up a local
Emergency Response Centre in a local office. Each office will have telephone
communication with the site office. Each Emergency Response Centre is to be
clearly labelled as such.
The Incident Controller will set up his headquarters in the nearest Emergency
Response Centre to the scene of the emergency and control his team from there.
3.1 Introduction
Any emergency occurring at a Camp may cause serious injuries, loss of life, and
extensive damage to property. These situations may demand adequate rescue and
relief measures to handle such events quickly and effectively. The objective of this
procedure is to reduce the severity of loss and handle the situation in the best
possible ways. It must be clearly understood that it is not a substitutes for
maintaining good standards of health and safety requirements.
It is therefore necessary to ensure that all Camp residents know what they have to
do in the event of an emergency. Through this procedure the responsibilities and
duties of the key personnel and of every individual shall be made clear. Testing of
the system will be carried out by practical training and a programme of regular drills
and exercises.
The Procedure, in addition to the duties and responsibilities of the key personnel
and individuals, shall describe the system of Evacuation, Fire fighting, Rescuing,
Searching and Tackling other type of emergencies. It shall also indicate the
availability of facilities such as location of fire fighting equipment, assembly points,
exits and access routes and the procedure to take help from any outside agency in
case of need.
3.2 Planning
The basic and essential features of any emergency procedure is to analyse and
plan for the potential risks. This includes:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 46 of 207
Assessment of the risk by analysing the size and nature of the hazards foreseen
and the probability of their occurrence. The events can be;
- Fire hazard causing serious burns to the personnel or resulting in collapse of
structures.
- Gas leakage's causing toxic and fire hazards.
- Electrical or electric shocks.
- Medical emergency .
Liaison with local emergency services and authorities.
Procedures
- Raising the alarm.
- Communications both within and outside.
Appointment of key personnel and specifying their duties and responsibility;
- Incident Controller
- Fire fighting crew
- Search party with its leader
- First-Aiders
Training and Rehearsal
- Review and updating
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 47 of 207
Ensure that adequate personnel resource are provided for the administration of
this procedure, and shall appoint persons as indicated below.
Ensure that training is given to all personnel assigned duties under this
procedure.
Ensure that the arrangements for medical cover are known and understood.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 48 of 207
As soon as the evacuation alarm is sounded, they will check all areas to confirm
that all the employees have left the premises, if they find a victim they shall
inform the leader of the rescue team.
The leader of the search team shall assist the Incident Controller by maintaining
a muster count and keep a record of all employees present. In the event of a 'no-
show' they will alert the fire fighting party and rescue teams.
All clear signals shall be sounded by the Incident Controller following a thorough
examination of the area, initiated by the Incident Controller and other team leaders.
The resident manager & field hse supervisor shall visit all locations to ensure that
the duties assigned to the responsible parties are understood and adhered to.
Exercises in each facilities shall be conducted at least once a month and the
observation shall be recorded. The report should be forwarded to the HSE
Department and any remedial actions required shall be identified.
The emergency procedure shall be updated from time to time depending on the
observation made.
Training shall be conducted on regular basis for the teams involved in the
emergency procedures.
Area plot plans shall be sited in conspicuous locations for the attention of each
employee. This layout plan shall clearly mark the Alarm and Fire points in the
camp and in the Industrial Yard.
The location of the fire fighting equipment shall be also very clearly marked on
this plan.
Hand operated sirens shall be installed and used in case of an emergency in the
camp.
The Site HSE Manager is responsible for ensuring that provisions are in place for
emergency response, including:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 49 of 207
Muster points
Arrangements, through site management for the resources for conducting head
counts.
Identification and Mobilisation of emergency response teams.
Training of emergency response teams.
Setting up drills and exercises in co-ordination with emergency services.
Procurement of fire and medical equipment.
In the event of any emergency the Site HSE Manager or a member of the HSE
department shall take the following actions:
Evaluate the scale of the incident and decide whether additional resources are
required to adequately deal with it.
Liaison with Site supervision for withdrawing any permits.
Give direction to the site emergency response teams
Liaise with site supervision for the mobilisation of any plant and equipment
necessary for dealing with the emergency.
Make safe the area by siting barriers or other means of preventing unauthorised
access.
Prepare a full report.
The Resident Manager shall support this procedure in the following manner:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 50 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 51 of 207
The purpose of this procedure is to outline the requirements for managing and
controlling the waste management systems to be applied during the construction of
the NGL-4 Project.
This procedure applies to all locations and accommodation utilised by the
Contractor or their Subcontractors.
2.0 DEFINITIONS
Aqueous waste All untreated effluent such as sewerage, detergent and other
contaminated water.
Hazardous waste includes chemical waste either liquid or solid that may
present a risk of personal injury or impact to the
environment, including oils, grease and other hydrocarbon
based materials.
Solid Waste includes domestic waste, concrete, soil, redundant scrap etc.
3.0 RESPONSIBILITIES
3.2 Subcontractors
Assign responsibility within their organisation for the control and elimination of
waste material.
Monitor and maintain an audit trail of the arrangements in place for controlling waste
management.
4.0 INSTRUCTIONS
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 52 of 207
Aqueous waste will be connected to sewerage treatment plants via closed drains
(where existing).
Domestic solid waste from the camps and accommodation will be stored in
predetermined collection points prior to their removal and disposal by the appointed
contractor.
Timber and other scrap material with a commercial value shall be separated and
stored in segregated areas prior to removal.
Oil and other lubricants shall be collected in drums and disposed of in accordance
with Contractor instructions.
Batteries shall be drained and flushed before disposal, and the residual acid
diluted and neutralised shall be discharged into the sewerage plant.
Sharps containers will be provided in the medical facilities (for syringes, suturing
kits and needles) and also clearly identified bagging for infectious or contaminated
dressings, these will be removed and incinerated.
Adequate drainage and sewerage facilities, designed and installed in accordance
with Contractor specifications.
Siting and provision of concrete wash areas and disposal area.
Identification of disposal pits for non contaminated materials such as spoil.
Appointment of approved contractor for the removal of hazardous and solid waste
to existing incineration and landfill areas.
Compilation of logs and registers (see below) to control the waste flow.
Specific waste management criteria to be applied during the NGL-4 Project are
1A defined in the specification Nr. 00-ZA-E-85050 "Project Health, Safety and
Environmental Requirements" (PHSER), Part II Environmental Requirements -
Construction, Precommissioning & Commissioning.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 53 of 207
WASTE LOG
(Non-hazardous Waste)
Area: ...............................................................
Waste Custodian Tel. No.: ...............................................................
Contractor Tel. No.: ...............................................................
Origin of Waste: ...............................................................
Qty. of
Waste Unit Date Time Vehicle Disposal
Name of Waste Stream (No./Kg.) Despatched Despatched Number Point Remarks
AQUEOUS WASTE
Sewage Effluent - Untreated
Hydrotest Water
Sewage Sludge
SOLID WASTE
Domestic Refuse
Industrial Refuse
GASEOUS WASTE
Exhaust Stack
Refrigerant
Fire Fighting Agent
FUGITIVE GASES
Any other Waste
Signature: ............................................
Name: ............................................
Designation: ............................................
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 54 of 207
WASTE LOG
(Hazardous Waste)
Area: ...............................................................
Waste Custodian Tel. No.: ...............................................................
Contractor Tel. No.: ...............................................................
Origin of Waste: ...............................................................
Qty. of
Waste Date Time Consign- Date of
Name of Waste Unit Despatched Despatched Ment Note Vehicle Disposal Waste
Stream (No./Kg.) No. No. Point Recd. Remarks
Waste Chemicals
Waste Lubricant
Oily Sand
Tank & Other
Sludge
Batteries
Tyres
Oil Drums (empty)
Asbestos (Brake
Lining)
Clinical Waste
Signature: ............................................
Name: ............................................
Designation: ............................................
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 55 of 207
Waste Details
Waste Originator
Signature: ...............................................
Waste Transporter
Signature: .............................................
Distribution: White Copy: Originator Blue Copy: Disposal Site Yellow Copy: Return to Originator
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 56 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 57 of 207
This procedure has been developed to provide a system for recording and
controlling the use of all hazardous materials introduced on site. The format of the
proforma is complementary to the requirements of the United Kingdom, Control of
Substances Hazardous to Health Regulations 1988 (COSHH) though it can be
applied to any International Project. For ease of reference this procedure has been
called ‘COSHH Assessment’.
The procedure musr be applied for all materials being introduced to the project
where their use could be considered as potentially hazardous without the correct
control measures in place.
2.0 DEFINITION
3.1 Administration
Application of this procedure for carrying out COSSH assessments shall be the
responsibility of the Supervisor and/or Subcontractor organisation as required by
the material to be used. Advice may be sought from the Site HSE Manager and the
Contractor organisation who maintain a ‘Toxic Materials Manual’ which may be used
as a reference.
Subcontractors and vendors who introduce a material onto the project shall provide:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 58 of 207
Details of the delivery will be provided to the Field HSE Supervisor who shall co-
ordinate with the Task Supervisor/Subcontractor concerned to initiate the
assessment on the COSHH form (see below).
Prior to the use of any substance classified as hazardous all precautions including:
- First aid equipment
- Fire fighting equipment
- Protective clothing
- Absorbent sand or other material necessary to contain spillages
- Changing rooms or other welfare facility
- Minimisation of the amount to be used (minimum required )
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 59 of 207
This sheet shall be completed by the Site HSE Manager. Monitoring of work being
undertaken shall be conducted to establish actual levels of emissions. The nominal
protection factor of any respiratory equipment shall be considered, to ascertain
whether exposure exceeds the occupational exposure standards, or maximum
exposure level.
In the event that levels of exposure may possibly be exceeded then a Health
Surveillance Programme. (Where the material presents a hazard to health that
leads to an identifiable occupational related disease or similar adverse health
effect.)
The Health Surveillance Programme shall provide the following information:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 60 of 207
COSHH Assessment
Date:________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Yes No
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 61 of 207
7) Possible exposures:
Inhalation
Ingestion
Injection
Absorption
Yes No
8) Can exposure be reduce by amending current working practices
If the answer is Yes then How?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Is training adequate?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 62 of 207
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
12) Recommendations:
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Date: _____________
Date: _____________
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 63 of 207
Yes No
1) Will exposure levels exceed those listed in EH40 Irving SAX etc.
Yes No
4) If so when
____________________________________________________________
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 64 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 65 of 207
This procedure has been developed to ensure that all site personnel who will, or
may, work at heights, do so in a safe manner.
This procedure applies to all personnel employed by Contractor and all of their sub-
contractors on the NGL-4 Project.
2.0 DEFINITIONS
High structures refer to any permanent or temporary above ground structure used
by personnel for any purpose during the course of the construction works.
3.0 INSTRUCTIONS
3.1 Personnel
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 66 of 207
The integrity of the high structure shall be such that the required operations can be
performed safely. This includes, but is not limited to: the loading of the structure e.g.
men, equipment and materials; the environmental conditions; the forces imposed
upon it by any means of access which is connected to it; and the forces imposed
upon it by any lifting or winching operations in which the high structure serves as an
anchor point, counterweight or tie point.
Before work commences, the supervisor in charge of the work shall ensure:
Personnel shall not be permitted to climb whilst carrying tools or equipment, the
only exception being tools carried in a waist belt designed specifically for the
purpose. Where necessary, tools shall be hauled up and lowered in a suitable
container, using a handling of suitable size and condition.
Electrical, pneumatic and hydraulic tools shall not be hauled up or lowered by their
power lines.
All lifting operations hall be controlled by a banksman who shall ensure that safe
lifting practice are used at all times.
During lifting operations, no person shall be positioned beneath the load, hoist or jib.
Similarly, loads shall not be slewed over the heads of personnel.
Where practicable, personnel shall not be assigned to work directly below the
overhead work positions or other persons. Where this is unavoidable, suitable
precautions shall be taken.
All personnel shall be tied off when not moving about the structure.
Tools, equipment shall not be left lying around the structure. They shall be kept in
such a location that they do not represent a tripping hazard and cannot fall or be
knocked from the structure.
Where no catchment means is located below the workplace, safety lines shall be
attached to tools and similar equipment.
All overhead work shall cease when wind speed reaches 40 km/h. The only
exception being such work which is intended to render the high structure or its
means of access safe.
Any overhead work which, it is claimed, must be carried out during the hours of
darkness, shall be subject to written authorisation (work permit) from the Resident
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 67 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 68 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 69 of 207
Temporary electrics can be classed as one of the most potentially dangerous areas
of risk that exists on a construction site, and it is important that an adequate
procedure is in place.
The purpose of this procedure is to provide the necessary methods for controlling
the use of temporary electrics on site.
The procedure applies to all construction site temporary electrics including site
distribution systems, power tools, welding transformers, lighting, power generation
and any other piece of electrical equipment not required for the permanent works.
2.0 RESPONSIBILITIES
Will ensure that this procedure is applied for the execution of the construction
works.
Will give ownership of this procedure to the Electrical Work Superintendent on site
and satisfy himself that arrangements are in place for its effective implementation.
Will carry out regular audits (minimum monthly) of the temporary electrics on site
to ensure compliance.
Will evaluate the effectiveness of this procedure and change amend as he feels
necessary to achieve its purpose.
Will provide direction and guidance to the person(s) assigned for checking and
approving temporary electrics on site.
To bring to the attention of the Construction manager any instances of continual
violations.
2.4 Subcontractors
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 70 of 207
3.0 STANDARDS
3.2 Distribution
Distribution boards shall have Earth Leakage breakers or residual current devices
fitted.
Terminal points will be in an enclosure with feed and outlet cables channelled
through the enclosure via rubber/plastic grommets.
Distribution panels will be kept locked with marked “danger high voltage” and the
keys held by authorised personnel only
Cables shall be of a size and rating suitable for purpose.
Earthing will be fitted to all distribution boards and metal support frames.
Splicing of cables will not be allowed, cables will be extended or repaired using the
correct fittings.
Domestic standard cables and fittings will not be allowed on site, all cables shall
be to a construction standard and resistant to damage/wear and tear.
Particular attention will be given to cable management to ensure that cables are
routed in a manner that does not create an obstruction or trip hazard. The method of
such routing shall be in a manner that does not damage or effect the integrity of the
cable.
Main isolation points will be provided in conspicuous and accessible places in
workshop/fabrication areas. Machinery shall also have isolation points provided
adjacent to the equipment.
Cable connections will be by Industrial explosion proof fittings.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 71 of 207
Where temporary lights are used in confined spaces or hazardous locations they
will be intrinsically safe and low voltage i.e. 12, 24, 48 volts etc.
Employees working on high voltage shall either have the appropriate gloves or
slaves rated for that voltages.
Employees shall stand on a or use as a drape an insulated blanket rated for the
required voltage.
P.P.E. used by all employees working on high or low voltage shall confirm to
NEC/ANSI standard or their equivalent.
Employees working on high voltage shall always be paired, and never work
alone.
Snamprogetti standard site tag-out lock-out procedure will be used in the green field area.
QGPC tag-out lock-out procedures shall be used in operating plants and where tie-ins
take place.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 72 of 207
DATE : _______________
Connections Condition
Terminations Double Insulated
Condition Sockets and Fittings
Capacity & Ratings
Routings / Cable Management
EARTHING FITTINGS
A = Acceptable
UA = Unacceptable
Comments :
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 73 of 207
THE EQUIPMENT DETAILED BELOW HAS BEEN CHECKED AND IS CERTIFIED SAFE FOR USE
____________________________________________________________
____________________________________________________________
____________________________________________________________
____________________________________________________________
____________________________________________________________
Any interference with this equipment will negate this tag. Any alternations required must be notified in
advance to the undersigned.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 74 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 75 of 207
1.0 PURPOSE
The purpose of this procedure is to define the actions that are required to control
civil works involving excavation activities.
This procedure applies to all work involving the removal of earth for the purpose of
trenching, boreholes and creating any below grade area required as a working
place for civil activities.
2.0 RESPONSIBILITIES
The Civil Work Superintendent in charge of the work shall carry out the following
activities:
Prior to any excavation being dug, carry out a prior survey of the area to establish
the presence of any underground utilities.
Establish ground conditions, e.g. the type of ground involved, clay, sand etc. and
compaction qualities and water table .
Identify the presence of any overhead lines and other obstructions.
Identify the need for any permits that are required in the area and arrange for
them.
Brief the Subcontractor carrying out the work of any adjacent operations that may
impact on the work, the presence of overhead and underground utilities.
2.2 Subcontractors
Briefing personnel doing the work on the safe working practices required.
Application of any work permits that are provided.
Provision of equipment that is capable of carrying out the work safely, has been
maintained and is certified for use on the project.
Provision of adequate barriers, flashing lights and signs for the work.
Programme the work to ensure that any trenches that go across roads are done so
in a manner that maintains access.
Notify the Civil Work Superintendent of any unmarked utilities found.
3.0 INSTRUCTION
3.1 Preparation
Before any excavation work is carried out the following procedures and actions will
be carried out according to the EXCAVATION PERMIT:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 76 of 207
During the process of earth removal the following safe working procedures will be
followed:
3.3 Support
The manner of side and structural support may be of the following types:
3.4 Completion
The following general considerations will be applied for the purpose of this
procedure:
Dewatering equipment shall be sited in locations that avoid creating trip hazards.
Electric pumps used for dewatering shall be covered by the temporary electric
procedure and shall only be worked on by authorised persons.
Where numerous electric dewatering pumps are in use, a numbering system shall
be employed that identifies the panel and distribution points.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 77 of 207
3.6 Backfill
Backfill operations shall be carried out in accordance with the following guidelines:
Backstops will be provided for vehicles dumping material to prevent them over
running the edge.
Consideration will be given to the specification for compaction qualities, need for
tile markers and tiles and other protection measures necessary for the protection of
equipment.
Redundant spoil not backfilled will be removed to an area identified in advance.
A safe system of work will be identified and implemented for the removal of timber
supports, steel sheeting and piles. Consideration will include provision of lifting
appliances suitable to take the load of embedded sheet piles without damage.
The Contractor Superintendent will ensure that new facilities are clearly reflected
in the as-built drawings.
1A 3.7 Trenching
All trenches shall be by QGPC excavation permit only, initiated through the appropriate
department and in some cases M.I.C. and the municipality.
Spoils from trenches shall at least be back one and a half times the depth of the trench.
Any trench deeper than one meter must have a QGPC confined space entry permit.
Should explosives be required the Qatari law shall be followed for use, handling and
storage of explosives.
All trenches and crossings shall be appropriately flagged, barricaded and marked in
Arabic and in English.
Appropriate fire prevention measures shall be taken with the removal of trash on a daily
basis and all hot work that will take place shall have adequate fire extinguisher.
All trenches shall have angles of repose of 30° to 45° depending on the type of soil and
depth of trench.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 78 of 207
Where the trench will be more than one meter in depth, sufficient areas will be provided at
appropriate intervals.
Vehicles and equipment shall be inspected by and comply with Qatari law and QGPC
standards.
All employees working on pipe line operations shall have required H 2S / BA training, H2S
is heavier than air and could settle in trench.
During trenching operation all unmarked pipe lines and utilities shall be reported to the
QGPC representative.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 79 of 207
ANNEX XV – NOISE
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 80 of 207
The purpose of this procedure is to outline the hazards associated with noise and
the preventative measures to be taken to reduce risk to health.
It covers all areas where the work is being carried out and includes consideration for
adjacent populated areas.
2.0 DEFINITIONS
Noise is defined as unwanted sound, which at certain volume levels may cause
irreparable damage to hearing.
Frequency is the pitch measured in Hertz, calculated from the rate of pressure
fluctuations of sound waves
dB refers to a unit of sound pressure fed into an electronic weighting network and
providing an approximate sound level calculated over the total frequencies.
dB (A) refers to the characteristics of sound which are filtered to replicate the noise
heard by the human ear.
Attenuation is the reduction of noise achieved by hearing protection, each type of
ear protector should have attenuation tables which illustrate the noise reduction at
different frequencies. e.g. 30 dB(A) at 5,000 Hz.
3.0 RESPONSIBILITIES
Supervision when planning the work shall take into account the anticipated `noise
levels that persons under their control may be exposed to.
Where any concerns exist shall consult with the HSE department and arrange for
a noise analysis to take place.
Will provide adequate and suitable hearing protection for the work being
performed recognising the attenuation factors of different ear protectors.
4.0 INSTRUCTIONS
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 81 of 207
4.1 General
The phenomena of noise induced hearing loss has only, relatively speaking, been
recently analysed and understood. The causation factors of working in industries
where high levels of noise are generated are now clearly understood, and the long
term consequences created from working in such high risk environments placing
greater levels of care on employing companies.
The physiological damage of working in environments where high levels of noise
exists, can be simply explained as the damage caused to the fine hairs in the
Cochlea, part of the hearing mechanism sited in the inner ear. These hairs are
joined to nerves transmitting the sensation of hearing to the brain, prolonged
exposure to high levels of noise will result in auditory fatigue and eventual failure of
function for those fine hairs. This may result in temporary deafness called a
'Temporary Threshold Shift' or permanent deafness which includes the occupational
illness of 'Noise Induced Hearing loss'.
4.2 Action
The action point for noise on the NGL-4 Project is 85 dB(A), noise levels 85 dB(A)
and over will require the provision of signs, mandatory hearing protection and an
analysis of the noise emissions.
Under foreseeable working conditions, no person shall be exposed to steady
noise levels above 120 dB (A) irrespective of duration, or to impulse noise levels
above 135 dB (A), with or without hearing protection.
Instances where personnel are exposed to high levels of noise will require
screening to assess if any impairment has occurred.
In areas where noise may interfere with communications, suitable alternative
arrangements shall be in place for alerting the work parties in the event of an
emergency
Overleap is a table with approximate noise values associated with construction
equipment, and noise limitations and requirements.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 82 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 83 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 84 of 207
This procedure establishes safety and health guidance to prevent injury and
suffering from the effects of heat stress to personnel.
This procedure applies to all personnel, including subcontractors and visitors to the
project.
2.0 DEFINITIONS
Heat stress is usually the result of work being performed at elevated temperatures.
Contributory factors may also include a decrease of natural body ventilation by
protective clothing e.g. chemical & impervious suits.
3.0 RESPONSIBILITIES
Heat stroke is an acute and dangerous reaction to heat stress caused by a failure of
the heat regulating mechanisms of the body, e.g. a break down of the employee's
temperature control system that causes sweating. Body temperature rises so high
that brain damage and death will result if the person is not cooled quickly.
Symptoms: red, hot, dry skin, although the person may have been sweating earlier;
nausea; dizziness; confusion; extremely high blood pressure, rapid respiratory and
pulse rate; unconsciousness or coma.
Actions: Casualty must be cooled down and Medical aid sought immediately with
the person transported to the site medical facilities.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 85 of 207
Heat cramps are caused by perspiration that is not balanced by adequate fluid
intake. Heat cramps are often the first sign of a condition that can lead to heat
stroke.
Symptoms: acute painful spasms of voluntary muscles; e.g., abdomen and
extremities.
Heat rash is caused by continuous exposure to heat and humid air and aggravated
by chafing clothes. The condition decreases ability to tolerate heat.
Symptoms: mild red rash, especially in areas of the body in contact with protective
gear.
5.5 Actions
Employees must have access to cool potable water at their place of work. Water
coolers and cups will be provided for all crews.
Shaded areas will be provided for rest periods and instructions given to workers that
resting adjacent to, or under plant and equipment is strictly prohibited.
First Aid equipment provided on site will include treatment for dehydration e.g.
electrolytes.
Posters will be showed to the crew and safety talks will be developed.
All of the above heat stress conditions must be reported to the medical centre and
treated as soon as possible, medical staff will send regular communiqués on the
subject of heat stress and inform management of any concerns.
The contents of this procedure will be communicated and emphasised to site
supervision during training sessions and at the contractors regular safety meetings.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 86 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 87 of 207
The general philosophy on the project is to eliminate, where possible, any work that
continues into the hours of darkness. With this in mind the purpose of this
procedure is to outline the requirements and responsibilities for any work or activity
that falls outside this general philosophy, whether programmed or otherwise.
This procedure will typically apply to activities such as concrete pours, mechanical
works, test runs and other activities experienced during the construction and
commissioning phases of the project.
2.0 DEFINITIONS
Lumen is the unit used to describe the amount of light emitted by a source or
received on a surface.
Lux is equivalent to one lumen per square metre (Lx = Lumen/m2).
3.0 RESPONSIBILITIES
Ensuring that Supervisors and Subcontractor management are familiar with this
procedure.
That any work carried out during the night are covered by this procedure.
Monitoring site conditions and measuring the lighting provided to ensure it falls
within the requirements of this procedure.
When occasions occur that require working into the hours of darkness the
responsible Supervisor will ensure that the Resident Manager has been informed
and that he is satisfied that all necessary precautions are in place.
Plan the work as far as practicable to eliminate the need for night working, but
have contingency plans and arrangements in place to carry out the work safely, if
necessary.
For activities such as radiography they will ensure that signs, barriers and flashing
lights are provided as well as adequate lighting.
Provision of instruction particularly with regard to the movement of vehicles
(concrete trucks, cranes) within the areas of work.
Ensuring that adequate barriers are provided around areas where hazards may
exist, and that such hazards are clearly lit.
Ensure that lighting provided is adequate (minimum of 200 lux) and that personnel
are not working in shadow.
4.0 INSTRUCTIONS
All points of exit, pathways and muster points shall be clearly illuminated.
Ladder accesses and egress shall be clearly illuminated
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 88 of 207
Lighting equipment provided shall be 110 volts, and checked in accordance with
the procedure for temporary electrics.
Where bayonet type light bulbs are used as stringers for illuminating passageways
and stairways, they shall be protected by cages. Lights provided for this purpose
shall be sited to avoid glare and spaced to provide adequate light for the areas
covered.
The illumination shall be measured prior to the work being carried out by a light
meter, calibrated in Lux.
Tower lighting shall be sited in a manner that illuminates all parts of the area where
the work is taking place.
Lighting provided in confined spaces shall be in accordance with Contractor
specifications.
Generators provided shall be checked prior to use to ensure they meet the
requirements of the Plant and Equipment procedure.
Cables employed for the purpose of temporary lighting shall be routed to ensure
that they do not present a trip hazard or other obstruction.
Lighting poles and other metal parts shall be earthed and the circuit fitted with
residual current devices.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 89 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 90 of 207
The purpose of this procedure is to outline the requirements for managing and
controlling operations involving the use of welding and burning equipment during
the construction of the NGL-4 Project.
The main hazards likely to be encountered during welding and burning processes
can be identified as follows:
Any of the above can lead to lost time injuries, occupational illnesses and in some
cases fatal injury, and it is therefore imperative to ensure that arrangements are in
place to control those activities and operations, covered by this procedure.
This procedure applies to all activities conducted by the Contractor and their
subcontractors involving the use of welding plant and fuel/oxygen gas cylinders.
2.0 DEFINITIONS
Gas welding: the use of Oxygen and acetylene gases to fuse metal.
Arc welding, the use of electricity to fuse together, as per the following:
- Manual metal arc (MMA), using flux covered electrodes.
- Tungsten Inert gas (TIG), a gas shielded non-consumable electrode process.
- Metal Inert gas (MIG) a gas shielded consumable electrode process.
Cutting processes where an air/arc or oxygen/fuel gas is used to melt or cut away
metal.
3.0 RESPONSIBILITIES
That suitable arrangements are in place to ensure that plant and equipment
brought to site for welding and burning operations is to a high standard.
That arrangements are in place for ongoing systems of maintenance.
Shall satisfy himself that arrangements in place are working effectively.
Personnel using the equipment are trained and competent for the tasks they are
set.
That arrangements are in place for checking the equipment brought to site by
Subcontractors.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 91 of 207
Shall ensure that Subcontractors are employing only welders, platers and
mechanics who are competent and authorised to operate the plant and equipment
they are assigned to.
Shall ensure that a register of all welding plant and equipment is kept on site.
Shall review the arrangements put in place by the Subcontractors, and satisfy
himself that the equipment being brought to site, is to the right specification.
3.2 Subcontractors
Subcontractors including their sub subcontractors are wholly responsible for the
provision and maintenance of any plant and equipment brought to site, specifically
they will:
4.0 INSTRUCTIONS
These instructions provide general considerations for the control and use of welding
and burning plant and equipment used on site.
All users of such plant and equipment must be competent to perform their duties.
Competency will be assessed by experience, training and where necessary by
testing.
A permit to work will be issued for all hot work activities relevant to this procedure.
Personnel working below or in the vicinity of hot work activities shall be protected
by screen and barriers.
Plant and equipment used in welding and burning operations shall be checked by
the user daily for leaks and general condition. Leaks and any other equipment
deficiencies shall result in the equipment being withdrawn from service until it has
been rectified and made safe.
The earth return from the welding set shall be placed as near to the job as
possible.
Confined spaces where oxygen enrichment may occur shall be checked regularly,
any equipment used in the welding and burning process shall be removed from
confined space when not in use.
Where there are wet or damp conditions the requirements specified in British
Standard 638 shall be observed for low voltage DC systems, whenever possible.
Welding processes on materials such as stainless steel, zinc galvanised, lead
coated and cadmium plated steel for example produce fumes and gases such as
ozone, nitrous fumes and other by-products that are injurious to health. In these
circumstances attention shall be made for the ventilation and reduction of such
emissions produced by the process.
Generators shall be sited so that risks created from gases and noise are
minimised and kept to a minimum.
Cables run from welding transformers shall be routed in a manner that prevents
trip hazards and damage to them..
All mechanical guards shall be in position and a safe means to start the engine.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 92 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 93 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 94 of 207
2.0 REFERENCES
“The ionising radiation’s regulations 1985” - HMSO (SI 1985 No. 1333)
“The protection of persons against ionising radiation arising from any work activity”
- U.K. Health & Safety Executive.
3.0 RESPONSIBILITIES
Ensure that all personnel, of both Company and Contractor, are fully informed of
the hazards and procedures for safe handling of all hazardous materials which they
may encounter in their work.
That adequate arrangements exist on site for the receipt and storage of
radioactive sources.
Each Subcontractor who utilises hazardous, toxic or corrosive materials shall
maintain a complete set of Material Safety Data Sheets on all such materials he
uses and shall make available to Contractor these data sheets for all such material
used in fulfilment of his contracted work. Data sheets contain, as a minimum, the
following information:
- Generic or Trade name and supplier
- Chemical name
- Appearance and physical properties
- Usage
- Important characteristic (incompatibilities)
- Threshold limit value (TLV)
- Safety hazards and precautions
- Fire extinguishing agents and fire-fighting precautions
- Health hazards, personal protection and First Aid precautions
- Environmental hazards, precautions, spillage mitigation
- Disposal options
- Storage, packaging and labelling
To approve each and every use of Radioactive sources.
Shall ensure that all third party suppliers shall also comply with these
requirements.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 95 of 207
The Site HSE Manager has the following responsibilities that may be delegated to
the Assistants of the Site HSE Coordinators:
To check all barriers, lights and signs prior to winding out of the source.
To check the amount of radiation at the barriers <7.5 µSV (microsievert)
To ensure that Subcontractors are observing the site safety requirements with
regard to storage, transportation and recording of data on Radiation Safety Logs.
Overall responsibility for the supervision of the Subcontractor with particular regard
to the allocation of work.
Ensure that all parties are informed in advance of activities involving radioactive
sources.
To brief the contractor on the safe working rules on site.
To issue a permit to work.
Shall ensure that all personnel performing the work and handling the radioactive
materials are trained in these procedures.
Monitoring of all work sites where ionising radiation’s are utilised, to ensure the
work is carried out in accordance with these regulations.
Formulation of local rules and contingency plans to ensure safe working practices
and adequate emergency response.
Training and monitoring of all workers exposed to ionising radiation, to ensure they
perform their assigned work without endangering themselves, fellow workers and
the environment.
Implementation of adequate dosimetry control, as defined in these regulations, for
the work being performed and maintenance of adequate records thereof.
Organisation of comprehensive medical screening, as defined in these regulations,
of all workers exposed to ionising radiation and maintenance of adequate medical
records.
Implementation of a comprehensive system of movement control of all sources of
ionising radiation imported into Qatar, such that their location is know at all times.
Ensuring that all sources of ionising radiation are stored and transported in
accordance with these regulations, such that they do not present a danger to the
population, animal life or the environment of Qatar.
Investigation and reporting of all incidents involving over-exposure to ionising
radiation.
Investigation and reporting of all incidents involving the loss (even temporary) of a
source of ionising radiation.
While the permanent presence of the RPS is not required at the work site, he shall
be available at all times through a call-out system (pager or contact phone) to deal
with any abnormal situation which may occur. It is advisable to appoint a deputy
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 96 of 207
RPS to be present at all times at the work site and who shall report directly to the
Operational Base RPS.
Prior to entering site the contractor will provide the following information:
Certificate containing source details including decay table, serial number, type and
half life.
Transportation details with source container serial number and certificate.
Wind out equipment certification.
Calibrated, tested and certified monitoring equipment.
Sufficient barriers, signs and warning lights.
Emergency handling equipment and working rules.
Nomination of competent supervisor.
Medical and Dosimetric check register for all nominated personnel.
Training records and certificates for all nominated personnel.
4.0 INSTRUCTION
Application will initially be made to the Welding Supervisor 24 hours in advance for
carrying out radiographical operations. He will review and authorise any work as
necessary on the proforma here below. This proforma is a pre-requisite to the
issuance of a permit to work for the activity.
Authorisation will be contingent on the following:
- Exact Location
- Start and finish time
- Adjacent Operations
When authorisation has been granted the Welding Supervisor/Inspector /QAS will
notify all contractors giving them at least 12 hours notification.
Contractor will sign the proforma in Attachment 1 confirming that he understands
all precautions to be observed prior to commencement of radiography.
Contractor will barrier off the area and check to ensure that all personnel have
been vacated from inside the barriers.
A wind out test may be required at the discretion of the Field HSE Supervisor to
ensure that barriers have been erected at a safe distance.
When all the above has been carried out radiography may proceed.
On completion of the work the contractor will return the source to its storage area
and remove all barriers and equipment.
The Radiography Application will be returned to the Welding Supervisor/Inspector
who will keep a file of all Radiography Applications.
All contractors involved in the use of ionising radiation’s shall prepare formal
contingency plans to deal with any emergency which might arise from the storage,
transportation or use of ionising radiation.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 97 of 207
Such plans shall include. but not be limited to dealing with the following
emergencies:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 98 of 207
RADIOGRAPHY APPLICATION
TYPE ____________________________________________________________________
Cl ____________________________________________________________________
DATE ______________________________________________________________________
AUTHORISATION
DATE ______________________________________________________________________
TIME ______________________________________________________________________
___________________________________________________________________________
---------------------------------------------------------------------------------------------------------------------
I CERTIFY THAT ALL BARRIERS AND WARNING SIGNS HAVE BEEN ERECTED AND THAT
OTHER CONDITIONS AND LIMITATIONS ARE BEING OBSERVED AND THAT IT IS SAFE TO
COMMENCE THE WORK SIGNED
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 99 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 100 of 207
To set standards to which scaffolds will be erected using sound materials and to set
further standards for their safe use and inspection at specific periods. Further
reference to the content of this procedure may be found in British Standard 5973 :
1990, Code of Practice for Access and Working Scaffolds and Special Scaffold
Structures in Steel.
The procedure has to be used as a guideline for all scaffolding erected for the NGL-
4 Project.
2.0 DEFINITIONS
Unit formwork, Kwickstage, All Round or other types of purpose made frames or
units.
Tube & Fittings : Individual tubes, of varying lengths, held together by individual
couplers.
2.1 Glossary
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 101 of 207
Lift: the assembly of ledgers, transoms and board bearers forming each horizontal
level of a scaffold.
Needle Transom: a transom extended from a scaffold.
Node Point: common point where ledgers, standards and transoms are fixed.
Puncheon: a vertical tube secured at its lower end, with a load bearing coupler, to a
horizontal tube. The load is not transmitted directly into the ground or into a base
plate.
Raker: an inclined load bearing tube.
Scafftag: a tag strategically displayed, normally at the access point to every scaffold
which indicates that the scaffold has been inspected within the previous seven (7)
days and is Safe to use..
Sleeve Coupler: a fitting which fits over a scaffold tube and is used to join one tube
to another, end to end.
Sole Plate: a timber (normally a short scaffold board) used to spread the load from
the base plate over an extended area.
Spigot (Joint Pin): a fitting which fits inside a scaffold tube and is used to join one
tube to another, end to end.
Standard: a vertical tube used to transmit the load to ground or ground level.
Stop End: a guard-rail placed across the end of a scaffold, or used to isolate
unboarded parts.
Tie: a tube used to tie a scaffold into a secure anchorage.
Toeboard: a board positioned along the edge of a platform to prevent persons, tools
and materials falling from the platform.
Transom: a tube connecting the outer standards to the inner standards. It spans
across ledgers and forms the working platform.
Unit Beam: a purpose made lattice beam incorporated into a scaffold structure to
form a bridge where an extended opening between standards is necessary.
Working Platform: the boarded out deck from which work is carried out.
3.0 INSTRUCTIONS
3.1 Materials
Tubes, units, frames, etc. shall be straight to the eye and shall be free of cracks,
splits, excessive corrosion or other defects. The ends shall be cut square with the
axis of the tube.
Any tube, unit or frame requiring a high degree of maintenance such as wire
brushing or scraping shall be replaced.
No tube, unit or frame will be painted. The only acceptable coating will be
galvanising and zinc primer.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 102 of 207
There shall be no cut outs (checks), burns, oil stains or projecting nails.
Boards shall not be painted or treated in any other way which may conceal
defects. They may be fireproofed using an approved flame retardent material.
Boards which are broken or excessively worn are not acceptable.
Boards shall be square cut and bound with a hoop iron.
3.1.2 Couplers
Any coupler found to be broken or damaged or found to have rusty or damaged
threads will be discarded.
Couplers will be sorted by type. They will be kept clean and lightly oiled to prevent
rust.
All scaffolding material will be of sound construction and adequate strength and will
be manufactured, constructed and maintained to international standards suitable for
the Project.
3.2.1 Foundations
The foundations shall as far as possible be level and adequate to carry the load
imposed.
Base plates shall be placed under every standard irrespective of the foundation
surface.
Sole plates shall be placed under every base plate where the foundation is other
than concrete or metal plate decking. This rule shall apply to open deck grating.
Sole plates, where required, shall be placed underneath the base plates on two
adjacent standards, normally at right angles to the face of the scaffold. The sole
plate will extent 600mm either side of two adjacent standards which it supports.
Under no circumstances will scaffolds be undermined by carrying out any
excavation within 1 metre of the foundations being concrete and 2 metres on soft
ground.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 103 of 207
TABLE 1
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 104 of 207
IMPORTANT NOTE
Right angle couplers (doubles or 90’s) are the only fitting suitable as load bearing.
Swivel couplers are not acceptable in a load bearing capacity.
3.2.4 Transoms
Transoms should, whenever possible, be secured to standards using right angle
couplers. They may however, be laid across ledgers and secured with putlog clips
provided that they are not more than 300 mm from each pair of standards. A
transom must not extend more than 50 mm past the right angle coupler/ putlog clip.
Tie-in’s (Independent Scaffolds)
Tie-in must be fixed at every second lift and every second standard.
Where a scaffold has been sheeted out with tarpaulins, consideration will be given
to additional wind loading and the insertion of additional ties.
All ties will be positive two way ties, i.e. they will prevent movement of the scaffold
either into or away from the building.
All tie-in’s must be secured as near to the node point as is possible (where
standards and ledgers intersect). Only load bearing couplers will be acceptable.
The anchorage point to which a tie is secured must be of sufficient strength to
withstand the load imposed upon it. Under no circumstances will guard-rails be
used as an anchorage point for ties.
As a general rule, ties must always be inserted. Where this is not possible, the
following alternative actions may be taken.
On small scaffolds not extending above three lifts, the stability of the scaffold can
be achieved by rakers. The raker will be secured with right angle couplers to the
ledger at the second lift. The load in the raker will be distributed through a base
plate or if required a soleboard. The foot of the raker will be tied back to the main
scaffold. Rakers will be inserted at the same standard spacing as ties.
No Raker shall extend more than 3 metres without being tied back at its mid point.
3.2.5 Braces
All scaffolds will be braced in both directions. Braces, whether facade or ledger to
ledger, will extend to the full height of the structure.
Facade braces will be repeated at a maximum distance of every 10 metres.
Ledger to ledger bracing will be repeated at every alternate set of standards.
Joints in facade braces will be made with sleeve couplers, spigots are not
acceptable.
Where braces are fixed to transoms, the transom itself must be fixed with right
angle couplers.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 105 of 207
Working platforms will normally be five boards wide but may be reduced to two
boards where the scaffold has been erected for inspection or access purposes only.
All working platforms will be close boarded with boards butted together end to end.
Boards will either be cut to fit around standards, pipe penetrations etc., or have the
gaps filled in with the use of suitable fixed wooden boarding i.e. ply wood.
Each individual board will be securely lashed.
Guard-rails will be fixed to the inside of the standards on all working platforms to a
height of between 1.1 metres (minimum) and 1.5 metres (maximum). The space
between the top of the toeboard and the underside of the guard-rail will not exceed
690 mm.
An intermediate guard-rail will be fixed to the inside of standards in every instance.
Toeboards including stop end boards will be fitted to all working platforms. The
minimum height will be 150 mm.
If materials are to be stacked above the height of the toeboard, a suitable barrier
(brick guards) will be erected.
Ladder access openings will not be more than 500 mm wide (2 boards) and will be
as short as possible in the other direction.
The maximum span of any board forming the working platform will be 1.2 metres.
The minimum overhang of any board will not be less than 50 mm and the
maximum overhang will not exceed 150 mm.
No more than 2 boards width will be supported on needle transoms unless the
transoms are fixed with right angle coupler and ‘picked up’.
3.2.8 Ladders
Ladders will project beyond working platforms or ladder access platforms by a
minimum distance of 1.05 metres (five rungs).
Ladders will be based on a sound footing. They will be lashed or secured by a
proprietary clamp at both the foot and near the top.
The angle at which the ladder is set will (with the exception of scaffold towers) be
75 or 300 mm out for every 1.2 metres of vertical length.
Long ladders will be supported and lashed at their mid point to remove any
bounce.
Ladders shall be constructed of aluminium or wood. Only properly constructed and
manufactured ladders shall be used. ‘Home made’ ladders are strictly forbidden.
All ladders will be of good repair and sound construction. They will be checked for
damage, faults and wear & tear, by the Approved Scaffolding Supervisor, before
use.
Metal tie rods will be in place.
Ladders may be on the outside of a scaffold for the first two lifts, above ground
level. In every other instance, the ladder run will be internal to the scaffold.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 106 of 207
Where it is likely that material may fall from a building or a scaffold and where
people are working in, or passing in close proximity to the structure, a protective fan
will be erected.
Protective fans will not be used to store scaffolding or other materials.
The protective fan shall not be more than 5 metres above ground level, shall be at
least 2 metres wide and at an angle not exceeding 20.
3.2.12 Scafftag
Scafftag is a system of inspection whereby a weather proofed plasticised tag is
placed at all access points of a scaffold. Information on the tag will include the date
built, safe working load, initial inspectors name and signature and company. The
tag (generally green)indicates that the scaffold is “Safe to Use”.
Within a period not exceeding 7 days, the scaffold will be re-inspected by a
competent person (scaffolding supervisor) and a signature and date placed upon
the tag. Where a scaffold does not meet safety standards the tag will be removed
and a prohibition notice placed at the access to inform personnel not to use.
A separate record of all scaffold inspections will be kept in an approved scaffold
register.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 107 of 207
This consists of two rows of standards running parallel to a building joined together
with ledgers and transoms and adequately braced in two directions. In all respects
they will comply with the general requirements as specified in Section 4 of this
procedure.
Independent tied scaffolds will not be erected to a height of more than 35 metres
without design calculations being submitted to the Engineering Department, by a
competent scaffold engineer.
Free standing towers may be fitted with castors or wheels for mobility or erected
as free standing towers. They support a single working platform only, which shall not
project beyond the base area. Access to the platform shall be by vertical ladder
lashed internal to the tower at one of the shortest sides.
The maximum loading will not exceed that for Light Duty Scaffolding, unless the
structure has been designed by a competent engineer and design calculation
submitted to the Engineering Department.
The smallest base dimension will be no less than 1.2 metres.
The height to base dimension ratio will be as follows:
- Mobile Towers :No more than three times the minimum base dimension.
- Stationary Towers: No more than three times the minimum base dimension.
Mobile towers will only be used and moved on firm and level surfaces.
Castors or wheels will be used which suit the size and loading of the tower. They
must be fixed to each extreme corner in the base of mobile towers and secured so
that they cannot fall out when tower is moved.
Castors and wheels will be marked with their safe working load. They will be fitted
with an effective brake which must be applied when the mobile tower is in use.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 108 of 207
Lift heights will not exceed 2.7 metres, with the lowest lift being fixed as near to the
base as possible. Transoms and ledgers will be secured using right angle couplers.
Ledger to ledger (dog leg braces), will be fixed to the full height of the tower on
every side.
Plan braces will be fixed at every alternate lift, using right angle couplers. The
bottom lift and the top lift will always be plan braced.
Under no circumstances will horizontal forces be applied at the level of the working
platform by pulling heavy cables or ropes.
Under no circumstances will mobile towers be moved with men or material on the
working platform.
In all other respects free standing towers will comply with the general requirements as
specified in this Section.
A grid platform of tubes and couplers suspended below load bearing beams,
structural members or other overhead structures.
In all instances, the Contractor Engineering Department will be consulted to
ensure the integrity and adequate strength of the suspension points.
Guard-rails will not be used as supports for slung scaffolds.
Hangers will not be spaced more than 2.5 metres in either directions.
Horizontal tubes used to support the hangers shall be secured to steelwork with
S.K. or gravlock fittings. These shall be used in pairs.
Vertical hanging tubes will be secured with right angle couplers. A check fitting will
be fixed to the hanging tube immediately above the securing right angle coupler, at
the suspension point and immediately underneath the right angle coupler securing
the ledger, at the working platform.
Adequate braces will be inserted to remove any sway in either direction.
In all other respects a hanging scaffold will comply with the general requirements
as specified in this section
Where a hanging scaffold is to consist of more than one lift, it will be designed
by a competent engineer and design calculations submitted to the Engineering
Department.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 109 of 207
Whenever possible, competent workmen erecting the scaffold will work from the
minimum of a three board run. It is not acceptable for scaffolders to be perched on
tubes, unless a fall arrest device is provided and secured to a suitable anchorage
point at all times.
Ladders will be properly lashed throughout the vertical height of a scaffold as it
progresses. Workmen, erecting the scaffold will use the ladders to gain access to
the working level.
Tubes or boards being used in the construction of the scaffold will be stored flat in
a neat and tidy manner. They will not be stacked vertically against the scaffold.
Loose tubes or boards will not be left on a scaffolding after its completion.
Where men are erecting a slung or cantilevered section or crawling around on a
pipe bridge or other structural steelwork they will, in all instances, where there is a
possibility of falling more than 2 metres, wear a full body safety harness and life line
which will be hooked off at all times.
Where a scaffold is left in an incomplete state, the bottom ladder will be removed
and a notice will be secured to the lower lift stating ‘Danger Incomplete Scaffold
Keep Off’.
Where one section of a working platform is incomplete, access may be gained to
the completed section provided that a stop end, preventing entry, is placed over the
working platform at guard-rail height. A notice stating ‘Danger Incomplete Scaffold
Keep Off’ will be secured to the stop end. This notice will be in the appropriate
languages.
Handballing will be the normal method of erecting a scaffold. Where, however, a
scaffold consists of a considerable number of lifts a gin wheel may be used,
provided the following requirements are met:
The gin wheel is accompanied by a valid certificate stating that it has been
examined by an approved Professional Engineer within the last six months.
The cantilevered tube to which the gin wheel is secured does not project more
than 760mm beyond the scaffold, unless it is adequately supported.
The cantilevered tube is secured to the inside and outside standard using right
angle couplers. Both standards to be diagonally braced.
The Fibre Rope which shall have a minimum diameter of 18mm will be checked
daily by the approved Scaffolding Supervisor and discarded if unfit for use.
The maximum load to be lifted by a Gin Wheel will not exceed 50 kg.
6.0 INSPECTION
All scaffolds will be inspected prior to use and at seven-day periods thereafter.
All scaffold inspections shall be recorded in a register.
scaffold planks/working platform will be inspected on weekly basis.
Scaffolds will be used for the purpose to which they have been erected. Under no
circumstances will they be overloaded.
Scaffold users will under no circumstances interfere with, modify or remove any
part of a scaffold (this includes scaffold boards). Interferences with a scaffold will
result in disciplinary action.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 110 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 111 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 112 of 207
The purpose of this procedure is to establish a safe and uniform procedure for the
issue of work permits to Subcontractors during the construction and pre-
commissioning activities of the NGL-4 Project.
For the construction activities as a consequence of their complexity, timing or
inherently hazardous nature, Subcontractors shall obtain written authorisation from
Contractor before any activities being undertaken.
The system herewith described is applicable within “green field areas” (GFA). When
performing work outside the GFAs (i.e. for tie-ins, etc.) and for the pipeline
construction activities, the QGPC Work Permit Procedure shall be followed.
2.0 DEFINITIONS
3.0 RESPONSIBILITIES
The Resident Manager will be responsible for ensuring the effective administration
of this procedure within site activities. The RM shall nominate personnel authorized
to issue the permits as “Permit Co-ordinator”.
The Co-ordinator, before its activities, will participate to a specific induction course.
The Co-ordinator must advise the RM of any irregularities or areas of concern in
order to investigate any necessary corrective action.
4.0 INSTRUCTIONS
4.1 General
A written permit to work system provides formal written procedure and formal
actions to ensure that potentially hazardous activities are carried out as safely as
possible.
The work permit is a written document which authorises persons to carry out the
work concerned, warns of possible dangers and clearly states the precautions to be
taken for the job to be carried out safely. The permit ensures that full consideration
is given to the hazards and risks, and that these are properly dealt with prior to
commencement of the work.
The work permit shall clearly specify the particular equipment and the construction
area involved, the extent of work allowed, the conditions to be observed and the
duration of the permit.
Permits will also be required of any works undertaken inside the existing facilities.
The QGPC Permit will be used and works will not commence until the Permits have
been fully authorized by the relevant Signatories.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 113 of 207
A Permit will also be required for any works within 15 meters of the existing facilities
perimeter fence line and when work is to be undertaken on or near any
equipment/pipelines (including underground) which are under the control of QGPC.
Permit Originator should inform QGPC Shift Controller prior to commencing any
work within 15 meters of existing installations.
Should any doubt exist as to the requirements for specific types of Permits HSE
should be consulted for advice.
4.2 Activities
The Subcontractors shall obtain specific authorization for execution of the following
activities:
Sub-contractors requiring permits must submit their request to the “Permit Co-
ordinator” one day prior to the work commencing.
Prior issuing the permit, the Co-ordinator should satisfy himself that the safety
conditions described in the permit are correctly applied.
If any conditions required by the work permit cannot be met, the permit is to be
withdrawn by the area superintendent and the work must not be allowed, until
remedial actions have been taken.
If the work extends beyond the stated validity period, then the permit is to be
returned to the area superintendent and the work suspended until the extension has
been authorized.
The area co-ordinator has the right at any time to stop the work if conditions change
or if the users are not complying with the precautions stated.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 114 of 207
Subcontractor :
Application reference :
Comments
Reviewed
Approved
Work may commence at : Permit expires at :
Work complete
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 115 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 116 of 207
The purpose of this procedure is to provide guidance during the construction of the
NGL-4 Project.
The procedure must be used by Subcontractors and Contractor supervision as
required by the work.
2.0 INSTRUCTIONS
All portable cylinders used for the storage and shipment of compressed gases shall
be constructed and maintained in accordance with the existing laws.
Subcontractors are to ensure that personnel involved with the handling and use of
cylinder gases are instructed in the hazards associated with the use of gases and
equipment. Particular attention should be given to the following guidelines when
instructing personnel in safe working.
2.1 Marking
Compressed gas cylinders shall be legibly marked, for the purpose of identifying the
gas content, with either the chemical or the trade name of the gas. Such marking
shall be by means or stenciling, stamping, or labelling, and shall not be readily
removable. Whenever practical, the marking shall be located on the shoulder of the
cylinder. This method conforms to the existing rules and laws.
type of gas
cylinder manufacturer’s name
date of manufacture
date of test
operating pressure
volume.
a) The contents of cylinders shall be clearly shown by the marking on the cylinder.
b) Cylinders not marked as tested or without standard valve fittings shall not be
used.
c) Cylinders being transported shall, where provision is made, have valve protection
caps fitted and shall be in upright position.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 117 of 207
- Shock
- Falling material
- Incandescent material.
r) In the event of fire, cylinders liable to be affected should have their outlet valve
closed and be immediately removed to a place of safety.
s) Cylinders shall not be allowed to come into contact with corrosive material.
t) Cylinders shall not be used as work supports, rollers, etc.
u) To avoid the possibility of explosive mixtures forming, cylinders shall not be left in
badly ventilated places.
v) Cylinders shall not be taken into basements or other underground locations
unless provision has been made for their quick removal in case of emergency.
w) Cylinder gases shall be used for their specified purpose only. The substitution of
oxygen for compressed air is highly dangerous and shall not be permitted under
any circumstance.
x) Valves shall be closed on empty cylinders.
2.4 Storing
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 118 of 207
a) Cylinder gases shall be stored in approved stores which shall comply with local
and statutory requirements. Authorisation shall be obtained from Employer
before storage is commenced, no-smoking will be a condition of authorisation.
b) Cylinders shall be stored in separated groups, according to their contents.
c) Empty and charged cylinders shall be stored separately.
d) Cylinders shall not be allowed to remain in badly ventilated areas, even when not
in use.
e) Cylinder gas stores shall always be equipped with a minimum number of two fire
extinguishers, each of at least 12 kg. capacity.
f) The location of all cylinders on site shall be recorded.
g) Cylinders shall be stored in an upright position and secured to prevent them from
falling.
h) To avoid the risk of explosion, fuel and combustible gases shall be stored in
separate locations.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 119 of 207
c) Never use copper or copper alloy fittings with acetylene, doing so will
cause the formation of copper acetylide which can be ignited by means of a slight
bump.
d) Cylinders should be completed emptied. A slight pressure should be maintained in
the cylinder to prevent the leakage of acetone.
e) Cylinder must not be stored in direct sunlight and must be covered to prevent high
temperature;
f) Should a cylinder heat up, the control valve should immediately be closed
and water applied until the cylinder is cool. When sufficiently cold the cylinder
should be removed to a safe place and the supplier contacted for advice.
f) acetylene cylinders shall not be exposed direct sun light.
g) Acetylene shall not be used at pressure greater than 15 P.S.I.
a) All hoses in welding and cutting operations shall be suitable for this
purpose and be of a construction and specification approved by the manufacturer of
the equipment.
b) Hoses should be examined before use and if found to be defective
replaced without delay.
c) Hoses used when a flashback occurs could sustain unseen internal
damage and shall therefore be replaced.
d) Since acetylene can form explosive compounds upon contact with copper
and copper alloys, the use of these materials shall not be permitted in hose lines.
e) All hose connections shall be made by the use of effective clips or crimps.
All fittings should be regularly checked to prevent leakage.
f) Hoses shall be maintained in a safe working condition and should not be
exposed to sources of heat, oil and/or grease.
g) Oxygen and fuel gas hoses shall not be interchanged.
Use only the correctly coloured hose with the appropriate gas.
h) Do not use oxygen to clean fuel lines or fuel gas to clean oxygen lines,
such practice can result in the formation of explosive gases.
i)Hoses should not be pulled. This action will result in leaking connections.
j)Do not allow sharp bends or kinks to form in hoses.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 120 of 207
k) Workers shall not work with hoses routed over their shoulders or between
their legs.
2.10 Torches
a) Operators and their assistants shall wear eye protection at all times when
welding and cutting.
b) Gloves, leggings, aprons and any other clothing provided for the protection
of personnel shall be worn.
c) Operators shall not wear oily and greasy clothing.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 121 of 207
All work of this description shall only be carried out in strict accordance with local
and statutory regulations.
Inspection, Codes and Standards shall comply with QGPC gas cylinder technical
regulation QGPC-Reg-Q-002 which also comply with Qatari national standard.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 122 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 123 of 207
The purpose of this procedure is to provide guidance during the construction of the
NGL-4 Project.
It must be used by Subcontractors and Contractor supervision as required by the
work.
2.0 INSTRUCTIONS
Cartridge operated fixing tools shall conform to the laws and regulations of the
country where the site is erected.
Operators must be over 18 years of age and properly trained in the safe operation
of the particular tool to be used.
Eye and head protection against flying splinters must always be worn.
Cartridges must be used only as specified by the manufacturer of the tool.
When not in use, cartridges must be in the charge of responsible person and kept in
a cool dry place.
Cartridges are to be used in limited numbers, only to those persons who have been
properly trained in the safe use of the tool.
Cartridges must not be carried loose in pockets. They must be kept in proper
containers which are marked with the powder of the cartridges therein.
Cartridge tools must be examined before use by the operator who must be
authorized in writing by his employer.
They must also be dismantled by a competent person and carefully examined every
seven days.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 124 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 125 of 207
The purpose of this procedure is to provide guidance during the construction of the
NGL-4 Project.
It must be used by Subcontractors and Contractor supervision as required by the
work.
The Procedure also impose requirements as to working space, condition of floors,
lighting and temperature in those factories or places, and to the training of persons
operating woodworking machines.
2.0 INSTRUCTIONS
- Any sawing machine designed to be fitted with one or more circular blades.
- Grooving machines.
- Any sawing machine designed to be fitted with a blade in the form of a continuous
band or strip.
- Chain sawing machines.
- Mortising machines.
- Planing machines.
- Vertical spindle moulding machines (including high speed routing machines).
- Multi-cutter moulding machines having two or more cutter spindles.
- Tenoning machines.
- Trenching machines.
- Automatic and semi-automatic lathes.
- Boring machines.
2.1 Guards
2.2 Controls
Every woodworking machine shall be provided with an efficient device for starting
and stopping the machine and be in such a position as to be readily and
conveniently operated by the person using the machine.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 126 of 207
There shall be clear and unobstructed space provided around every woodworking
machine so that work being done on the machine can be carried out without risk or
injury to persons employed.
2.4 Temperature
2.6 Training
a) Use and keep in proper adjustment the guards and devices provided.
b) Use the push sticks, spikes, push blocks, jigs, holders and backstops.
2.8 Lighting
The lighting, whether natural or artificial, for every woodworking machine shall be
sufficient and suitable for the purpose for which the machine is being used. The
means of artificial lighting shall be so placed or shaded as to prevent glare and so
that direct rays of light do not impinge on the operator while he is operating the
machine.
That part of the saw blade which is below the machine table shall be guarded to the
greatest extent that is practicable.
Every circular sawing machine shall be provided with a riving knife, securely fixed
below the machine table, behind and in a direct line with the saw blades and have a
smooth surface, be strong, rigid and easily adjustable and fulfil the following
conditions:
a) The edge of the knife nearer the saw blade shall form an arc of a circle
having a radius not exceeding the radius of the largest saw blade with which the
saw bench is designed to be used.
b) The knife shall be capable of being so adjusted that it is as close as
practicable to the saw blade, having regard to the nature of the work being done so
that, at the level of the machine table, the distance between the edge of the knife
nearer to the saw blade and the teeth of the saw blade does not exceed 12
millimetres.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 127 of 207
c) For a saw blade of a diameter of less than 600 millimetres, the knife shall
extend upwards from the machine table to a height above the machine table which
is not more than 25 millimetres below the highest point of the saw blade and for a
saw blade of a diameter of 600 millimetres or over, the knife shall extend upwards
from the machine table to a height of at least 225 millimetres above the machine
table.
d) In the case of a parallel plate saw blade, the knife shall be thicker than the
plate of the saw blade.
The part of the saw blade of every circular sawing machine which is above the
machine table shall be guarded with a strong and easily adjustable guard, to extend
from the top of the riving knife to a point above the upper surface of the material
being cut, which is as close as practicable to that surface or, where squared stock is
being fed, to the saw blade by hand to a point which is not more than 12 millimetres
above the upper surface of the material being cut. The guard shall have a flange of
adequate depth on each side of the saw blade and be kept so adjusted that the
flanges extend beyond the roots of the teeth of the saw blade. Where the guard is
fitted with and adjustable front extensions pieces, that extensions pieces shall have
along the whole of its length a flange of adequate depth on the side remote from the
fence and shall be kept so adjusted that the flange extends beyond the roots of the
teeth of the saw blade.
In the case of a circular sawing machine, the spindle of which is not capable of
being operated at more than one working speed, no saw blade shall be used for
dividing material into separate parts which has a diameter of less than sixteenths of
the diameter of the largest saw blade with which the saw bench is designed to be
used.
In the case of a circular sawing machine, which has arrangements for the spindle to
operate at more than on working speed, no saw blade shall be used for dividing
material into separate parts which has a diameter of less than sixteenths of the
diameter of the largest saw blade which can properly be used at the fastest working
speed of the spindle at that saw bench.
There shall be securely fixed to every circular sawing machine a notice specifying
the diameter to the smallest saw blade which may be used on that machine.
No circular sawing machine shall be used for cutting any rebate, tenon, mould or
groove unless that part of the saw blade or other cutter which is above the machine
table is effectively guarded.
No circular sawing machine shall be used for a ripping operation (other than ant
such operation involved in cutting a rebate, tenon, mould or groove) unless the
teeth of the saw blade project throughout the operation and through the upper
surface of the material being cut.
No circular sawing machine shall be used for cross cutting logs or branches unless
the material being cut is firmly held by a gripping device securely fixed to a travelling
table.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 128 of 207
Where any person (other than the operator) is employed at a circular sawing
machine in removing, while the saw blade is in motion, material which has been cut,
that person shall not stand elsewhere than at the delivery end of the machine.
Where a person (other than the operator) is removing material while a circular saw
is in motion, the machine table shall cover the machine’s whole width, so that the
distance between the end of the table and the up-running part of the blade is not
less than 1200 millimetres. This requirement shall not apply to moveable machines
with a blade of 450 millimetres or less, or to a circular sawing machine having a saw
bench in the form of a roller table or incorporating a travelling table which moves
during the cutting operation.
2.14 Cleaning
Floors shall be maintained in good and level condition, free from chips and other
loose material and not allowed be become slippery.
The blade of a sawing machine shall not be cleaned by hand while the blade is in
motion.
The workstation shall be mantained in an orderly manner to ensure no trip, slip or
hazardous fall.
The correct storage of plastics shall be implemented.
Disused woodworking material shall be disposed of in terms of the local regulations.
Every woodworking machine and every part thereof including cutters and cutter
blocks shall be of good construction, sound material and properly maintained.
Every woodworking machine, other than a machine which is held in the hand, shall
be securely fixed to a foundation floor, or to a substantial part of the structure of the
premises but where this is impracticable other arrangements shall be made to
ensure its stability.
Ensure an adequate supply of water and CO2 fire extinguishers are available at the
workstation.
A noise survey shall be carreid out at the workstation to ensure employees are not
exposed to harmful noise level. On completion of the noise survey the area shall be
demarcated as a noise zone. Applicable hearing proteciotn shall be provided where
engineering controls cannot be implemented.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 129 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 130 of 207
The purpose of this procedure is to provide guidance during the construction of the
NGL-4 Project.
It must be used by Subcontractors and Contractor supervision as required by the
work.
2.0 INSTRUCTIONS
Portable electric tools, when used in normal conditions, should be the 110 volts type
with single-phase supply from a double-wound transformer having the centre tap of
the secondary winding earthed so that the maximum voltage to earth is 55 volts.
Where more hazardous conditions exist, i.e., where men have to work within boilers
or metal tanks, the power supply, should be 50 volt single-phase from a double-
wound transformer having the centre tap of the secondary winding earthed so that
the maximum voltage to earth is only 25 volts.
All portable electric tools must have pressure release switch (dead man) in
operation.
All cables and plug and socket connectors must be maintained in good condition.
Cables must be effectively attached to the plug connectors by efficient cord grips to
relieve all strain on the flexible cable. Damaged cables should be replaced at once;
spliced cables are not allowed.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 131 of 207
Care must be taken prevent sleeves and other clothing from being wound around
drill. It is recommended that sleeves be rolled up above the elbow.
Telescopic or similar guarding must be used when operating a bench drill.
2.2.1 Hammers
Points of clinched nails should be turned up before drawing is attempted. When a
nail has been partly withdrawn, a small block must be placed under the head of the
hammer.
The head of the hammer should be firm, the haft not split, the face true and not
chipped.
Hammers with metal handles shall not be permitted.
2.2.2 Wrenches
For safety and efficiency the use of:
Socket spanners
Ring spanners
Tubular spanners
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 132 of 207
Open-end spanners
in that order are preferred to the use of wrenches. If wrenches must be used, select
the right size and type for each job. Do not extend the wrench handle with pipe or
other “cheater” as jaws will spread.
A wrench must never be used as a hammer.
Pipe or stilson wrenches should not be used as monkey wrenches.
Jaw corrugations on stilson wrenches must be kept sharp and clean, and handles
and adjusting screws (on all wrenches) must be kept in good condition.
Wrenches should always be placed on nuts with the jaw opening facing the direction
the handle will move. Pull do not push.
2.2.3 Screwdrivers
Do not use a screwdriver as a chisel, pry-bar, or for any other purpose than that
intended.
Keep tip ground properly, squared across, and with square rather than tapered
sides.
Select screwdriver to fit size of screw being driven. Do not grind to a fine point to fit
all sizes of screw heads.
Handles should fit shank tightly.
Keep shank directly over screw being driven. Do not lean on screwdriver, or push
with any more force than necessary to keep contact with screw. A screw properly
piloted and fitted will draw itself into proper position when turned.
Wood screws must not be hammered into place.
Use insulated handles for electrical works.
2.2.4 Files
Files should be equipped with handles of proper size for file tang.
Cut should be on forward pass of file. When teeth become clogged they may be
cleaned with a file card. Clogged teeth may cause a file to slip, thus exposing hands
to injury. The file may be tapped into the handle by striking the handle on a flat
surface. The handle must not be driven onto the file with a hammer.
When small objects are filed, they must be clamped securely, or a vice used.
Files must not be used for ply-bars, punches, etc., as file metal is usually very brittle
and will snap.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 133 of 207
If long pieces are being cut, a helper or a supporting bench should be used to
prevent pinching at the cut.
2.2.6 Pliers
Pliers should be used only when no other tool will do the job.
Never use pliers as wrenches.
Cutting pliers should be used only for cutting soft metals, never hardened metals or
as nail pullers.
Approved insulated pliers must be used for electrical work.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 134 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 135 of 207
The purpose of this procedure is to provide guidance during the construction of the
NGL-4 Project.
It must be used by Subcontractors and Contractor supervision as required by the
work.
2.0 INSTRUCTIONS
2.1 General
Selecting the correct wheel for the job is equally important for efficient production
and for safety. As a rough and ready rule, soft wheels are more suitable for hard
material, and hard wheels for soft material.
With wheels of unsuitable structure for the job, loading may result, i.e. the abrasive
wheel face becomes clogged with particles of the material being ground. A wheel
may also be too hard or too fine, resulting in “glazing”. The operator is then tempted
to press the workpiece too hard on the wheel, causing it to break. The best policy in
selecting grinding plant is to consult manufacturers of machines and abrasive
wheels, and not to experiment without competent advice.
Before mounting the wheel, check that the speed of the spindle does not exceed the
maximum permissible speed marked on the wheel.
It must be remembered that centrifugal force, the ultimate cause of wheel bursts,
increases non directly with speed, but as the square of the speed. The speed at
which the grinding wheel revolves, is, therefore, extremely important.
2.2 Flanges
Every abrasive wheel must be mounted between suitable flanges, which should be
not less than one third the diameter of the wheel. The flanges should be recessed
on the side next to the wheel, to ensure that clamping pressure is not exerted near
the hole.
Flanges for wheels with large holes should not be recessed, but the corners of the
wheel seating should be undercut, so that the corners of the wheels will not be
subjected to pressure. The inner (driving) flange should be keyed, screwed, shrunk,
or otherwise secured to the spindle, and the flange bearing surface should run true
with the spindle.
2.3 Washers
The purpose of washers is to distribute the clamping pressure evenly on the wheel,
In addition to the prevention of slipping with less clamping pressure, washers tend
to reduce wear on the flanges.
Before running the wheel make sure the guard is in proper adjustment.
If the machine is fitted with a work rest, adjust this as close as possible to the
surface of the wheel; rotate the wheel by hand to make sure it is clear all the way
round.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 136 of 207
New wheels should be run free at full operating speed for a short period before they
are used; during the trial run everyone stand clear.
2.5 Guards
2.6 Controls
Machines in which abrasive wheels are used must be provided with efficient devices
for starting and cutting off power, and the controls of such devices must be readily
and conveniently operated by the person using the machine.
Where there is a rest for supporting the workpiece, it shall at all times while the
wheel is in motion, be properly secured and adjusted so as to be as close as
practicable (3 mm) to the exposed part of the abrasive wheel.
Every rest must be of substantial construction and properly maintained.
The floor surrounding every fixed machine or area where portable tools are being
used, shall be maintained in good and even condition. So as far as practicable it will
be kept clear of loose material and prevented from becoming slippery.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 137 of 207
provided in pursuance of these Procedures, and of rests for workpieces, and if the
discovers any defected in the same, shall forthwith report such defect to the
occupier manager, or other appropriate person.
Person carrying out dry grinding operations, or truing or dressing an abrasive wheel,
must wear safety glasses and full face shields and be protected by suitable
transparent screens.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 138 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 139 of 207
The purpose of this procedure is to outline the hazards associated with airborne
dust particles and the preventive measures to be taken to reduce risk to health &
neighbouring equipment. It covers areas where the work is being carried out and
includes consideration for surrounding land areas.
2.0 DEFINITION
Dust is defined as very small particles of dirt, sand, rock or other airborne particles,
which can be inhaled into the lungs of workers.
3.0 RESPONSIBILITIES
Supervision when planning the work shall take into account the anticipated dust
levels that personnel under their control may be exposed to.
Where any concerns exist supervision shall consult with the HSE department
and arrange an analysis to take place.
Shall provide adequate and suitable respiratory protection for the work being
performed reorganising dust hazards and factors for different types of
respiratory protection.
4.0 INSTRUCTIONS
4.1 General
The phenomena of dust-induced ailment and disease only recently has been
understood. The causation factors of working in areas featuring high dust levels are
now clearly understood and the long term consequences created from working in
such high risk environments have forced companies placing greater level of care on
employees.
The physiological damage of working in environments where high levels of dust
exist can be simply explained by the damage caused to the lungs, this may result in
a host of respiratory diseases, heart disease and pulmonary ailments.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 140 of 207
4.2 Action
The action point for the NGL-4 project is to keep the airborne dust particles to a
minimum.
This includes watering of roads as often as necessary on site.
Screening grit blasting areas to contain particles from this operation.
Provide adequate respiratory protection for each different activity to include
general dust/sand storms which are common in this area.
Ensure pulmonary function test for all personnel who are required to wear any
respirator other than a simple dust mask.
Dirt should not be dumped or worked in an area where dust will settle on
equipment and machinery in neighbouring locations.
Dirt should be wet down as it is being unloaded and when being worked.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 141 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 142 of 207
This procedure describes the HSE meetings held at site between QGPC, Contractor
and Subcontractors in order to maintain good communications with each other and
promote safety.
It defines the kinds of meetings and participants.
2.0 GENERAL
The Contractor shall initiate and maintain a site HSE Committee with the primary
mandate for HSE Programme implementation quality assessment.
The HSE Committee shall include :
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 143 of 207
Primary meeting agenda is the quality assurance assessment of site HSE activities
with a special emphasis on the HSE meeting and hazard identification and analysis
activities.
The HSE meeting shall be organized to regularly monitor and report the
implantation of the specific HSE Manual and to promote the safety of persons
working at site and to ensure safety practices in order to avoid accidents, injuries
and loss of property. It will be preceded by a site “walk a round inspection” by all the
participants to the meeting.
These kind of meetings will be held in each construction site. The Contractor’s Field
HSE Coordinator co-ordinates this meeting. The Field HSE Co-ordinator, together
with all Subcontractor’s HSE Supervisors shall attend the meeting. Medical staff
should also attend.
The subjects of the meeting are as follows:
Regular weekly meetings shall be held to brief foremen on the HSE programme and
include their involvement in it. The meetings shall provide a mechanism for foremen
to make their contribution to the HSE issues.
The meeting is conducted weekly. Special meetings shall be held as required.
The Subcontractor’s HSE Supervisor shall organize the meetings. He shall prepare
an agenda and a written summary of each meeting highlighting the major
discussion items, and unresolved issues. Both of them shall be sent to the
Contractor’s Field HSE Co-ordinator for information.
The Contractor’s Field HSE Co-ordinator can attend the Foremen’s HSE Meetings.
Standing items will be:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 144 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 145 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 146 of 207
2.0 DEFINITIONS
3.0 RESPONSIBILITIES
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 147 of 207
Provide technical input into the formulation of the method statements and risk
assessments and shall review prior to its distribution.
Audit the task against the requirements specified to ensure compliance.
3.5 Subcontractors
5.0 INSTRUCTIONS
To simplify the application of this procedure it has been broken down into two
stages. The work method statements are stage one of the process, and the risk
assessments are stage two of this procedure.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 148 of 207
Part 2A - Sequence
This is a breakdown of the activities into individual tasks, giving a broad overview of
the activities which can be supplemented as required.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 149 of 207
Part 8 - Communications
The final part of this statement is an assurance that parties involved with the task
are fully aware of the steps, procedures and considerations necessary to undertake
the task.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 150 of 207
APPENDIX 1
.................................................................................................................................................
Part 2
Part 2A
Sequence of work
Activity 1...................................................................................................................................
.................................................................................................................................................
Activity 2...................................................................................................................................
.................................................................................................................................................
Activity 3...................................................................................................................................
.................................................................................................................................................
Activity 4...................................................................................................................................
.................................................................................................................................................
Activity 5...................................................................................................................................
.................................................................................................................................................
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 151 of 207
Part 3
.................................................................................................................................................
.................................................................................................................................................
.................................................................................................................................................
Part 4
Cranes......................................................................................................................................
Plant.........................................................................................................................................
Portable Equipment..................................................................................................................
Lifting Equipment......................................................................................................................
Part 5
.................................................................................................................................................
.................................................................................................................................................
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 152 of 207
Part 6
.................................................................................................................................................
.................................................................................................................................................
.................................................................................................................................................
Part 7
Prepared by:
Name:......................................................... Company:.............................................................
Signature:................................................... Date:.....................................................................
Reviewed by:
Name:......................................................... Company:.............................................................
Signature:................................................... Date:.....................................................................
Approved by
Name:......................................................... Company:.............................................................
Signature:................................................... Date:.....................................................................
Part 8
The above work method statements has been communicated and understood by all
personnel associated with the task.
Name:......................................................... Company:.............................................................
Signature:................................................... Date:.....................................................................
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 153 of 207
APPENDIX 2
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 154 of 207
APPENDIX 3
STAGE TWO RISK ASSESSMENT
RANKING:-.........................................
ACTIVITY
HAZARDS
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 155 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 156 of 207
The Hazard Analysis and Control Programme sheets are listed below:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 157 of 207
SITE PREPARATION
ACTIVITY
EARTHWORKS
HAZARDS
CONTROL MEASURES
1)..Drivers, operators and banksmen of mechanical plant and equipment will be trained, competent
and at least 18 years of age. Only authorized drivers and operators will be allowed to use plant
and equipment.
2) .Drivers and operators will have been trained not only in the correct operation of the plant and
equipment but also in the limitations of its use and the hazards which exist if it is not used
properly.
3) .Preventative maintenance programmes will be established to ensure that all plant and equipment
is systematically inspected, serviced, repaired and maintained as necessary.
4) .Prior to earthworks commencing overhead and buried electrical cables and other pipelines will be
identified and precautions taken to prevent damage to these services.
5) .Non-essential personnel will be kept well away from the area of operation and trained banksmen
will be provided where necessary.
6). Measures will be taken to prevent dust from impairing visibility by use of water spray on roads and
if practicable a one-way system for traffic.
8) .Plant items will not be parked so as to cause an obstruction to other plant or site activities, or so
close together as to cause danger to personnel in the vicinity. A stacking system will be operated
away from the area of activity if required.
10)Employees working in the vicinity of earth moving operations will wear safety helmets, safety
footwear and high-visibility vests.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 158 of 207
CONTROL MEASURES
11)Drivers will not remain on a vehicle being loaded unless a suitable overhead protective canopy is
provided. Personnel should stand well clear of loading operations.
12)Personnel will be instructed to establish contact with the driver prior to walking in path of a
vehicle.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 159 of 207
GENERAL
ACTIVITY
SITE TRANSPORT
HAZARDS
A) Vehicle/Pedestrian Interface
B) Site Conditions
C) Contact with structures/overhead lines
D) Vehicle Defects
E) Falls into excavations
CONTROL MEASURES
1) Site conditions will be taken into account in the selection of plant. Drivers will be fully trained in
the erection of plant and will be aware of the limitations of their machines and in safe operating
procedures.
2) Vehicles will be maintained in a proper state, in efficient working order and in good repair. Basic
maintenance will be carried out by the driver/operator on a daily/weekly basis. Defects found will
be repaired before the vehicle is put into service. Periodic servicing of vehicles will be carried out
in accordance with the manufacturers instruction.
3) Speed limits will be established and clearly displayed for travelling on site haul roads.
4) Personnel working adjacent to haul roads will wear high visibility jackets and suitable warnings will
be displayed where people can see them in good time.
5) The possibility of vehicles coming into contact with overhead structures or power lines will be
reduced by erecting height gauges of the goal post type, constructed from non-conducting
material, distinctively marked with red and white stripes or bunting.
6) Drivers will be instructed not to leave vehicles with their engine running.
8) Safe working procedures will be planned in order to reduce the possibility of personnel being
struck by reversing vehicles. These may include (i) avoiding the need to reverse by providing a
one way system of (ii) the exclusion of pedestrians from areas where vehicles have to reverse. (iii)
The provision of banksmen. (iv) The fitting of reversing alarms to vehicles.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 160 of 207
CONTROL MEASURES
9) Vehicles will be prevented from falling into excavations by (a) clearly marking haul roads and
securely fencing off the immediate excavation area, (b) providing a banksman to guide the vehicle
and warn personnel in the excavation to keep clear, and (c) by providing a fixed stop e.g. timber
balk securely anchored, well back from the edge.
10)Vehicles will not be overloaded, and the loads will be evenly distributed, secured, and not
projecting beyond the sides or back of the vehicle. If some projection is unavoidable then the load
will be properly marked in order to ensure that the projection is clearly visible.
11)Drivers will not remain in their vehicles whilst they are being loaded with loose materials.
12)The loading and unloading of tipper lorries will be attended by a competent banksman. Tipper
lorries will not be allowed to move off until the body has been lowered.
13)Dumpers will not be allowed to travel with the body in a raised position unless inching forward to
discharge the load.
14)Connections between trailers and towing units will be securely fixed using the correct towing pin,
and the trailer parking brakes applied before disconnection from the towing vehicle
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 161 of 207
GENERAL
ACTIVITY
MATERIAL HANDLING
HAZARDS
CONTROL MEASURES
1) Whenever practicable, mechanical lifting aids e.g. cranes, fork lift trucks etc., will be used to
alleviate the requirement for manual handling.
2) Supervision will assess weight, centre of gravity etc. and determine the number of persons
required to carry out the work safely.
5) Good housekeeping measures will be enforced in order to prevent slips, trips and falls during
material handling.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 162 of 207
GENERAL
ACTIVITY
HANDLING OF STEEL
HAZARDS
A) Trapping injuries.
B) Falling material.
C) Manual handling.
D) Slips, Trips and Falls.
CONTROL MEASURES
5) Good housekeeping standards will be maintained in steel laydown areas in order to prevent slips,
trips and falls.
7) Personnel not involved in any steel handling, operation will be kept clean of the area of work.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 163 of 207
GENERAL
ACTIVITY
HANDLING OF TIMBER
HAZARDS
A) Trapping injuries.
B) Slips, Trips and Falls.
C) Hand injuries.
CONTROL MEASURES
3) Timber will be stored in designated areas away from offices and other buildings.
4) Good standards of housekeeping will be maintained in order to prevent slips, trips and falls.
5) Swarf, wood chips and sawdust will be removed in a timely manner to prevent accumulation of a
fire hazard.
7) Push sticks will be used for the cutting of timber by circular saws.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 164 of 207
GENERAL
ACTIVITY
DIESEL ENGINES
HAZARDS
CONTROL MEASURES
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 165 of 207
GENERAL
ACTIVITY
HAZARDS
CONTROL MEASURES
1) Welders will be provided with and wear the following personal protective equipment:-
Welding gloves
Overalls
Welding goggles with correct filter
3) If (2) is not practicable, other suitable precautions will be taken to alleviate fire and explosion risk
e.g. Provision of fire blankets/fire watcher.
5) Before welding operations are carried out, the materials involved and their by-products will be
identified, the risks assessed and necessary control measures identified in order to prevent
possible respiratory disease/systemic poisoning (e.g. cadmium, stainless, galvanised, lead coated
materials).
7) Welding returns will be firmly connected to the metal on which welding is taking place. This will be
carried out by means of well constructed earthing clamps only.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 166 of 207
CONTROL MEASURES
8) In order to prevent risk of Arc Eye injury to other personnel, suitable screens will be placed around
the welders working area.
9) Damp, humid and wet conditions will be a consideration for the voltage and type of transformer
used.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 167 of 207
GENERAL
ACTIVITY
HAZARDS
CONTROL MEASURES
5) Cylinders being off-loaded from a vehicle will not be dropped to the ground and shall not be rolled.
6) Only cylinders with ‘in date’ test certificates shall be transported pressurised
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 168 of 207
GENERAL
ACTIVITY
GAS CUTTING
HAZARDS
A) Cylinder explosion.
B) Damage to eyes.
C) Fire.
D) Explosion risk - Live plant.
CONTROL MEASURES
3) Gas hoses and gauges to be maintained in a safe condition and inspected daily. Defective hoses
and gauges are to be replaced immediately.
5) Personnel carrying out gas cutting operations will wear suitable eye protection.
6) Suitable measures e.g. Provision of fire blankets/fire watchers, will be taken to prevent the risk of
fire during cutting operations.
7) Prior to gas cutting operations in Live plant areas, gas checking shall be carried out and work will
proceed in accordance with permit to work requirements.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 169 of 207
GENERAL
ACTIVITY
GRINDING
HAZARDS
CONTROL MEASURES
3) Changing of abrasive wheels to be carried out by trained and authorised personnel using proper
disc spanners.
4) Personnel carrying out grinding work will wear safety glasses and full face shield and hearing
protection.
5) Grinding operations in Live plant areas, will be carried out in accordance with the permit to work
requirements.
6) Grinding operations will be controlled in order to prevent the risk of injury to other personnel from
sparks/metal splinters.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 170 of 207
GENERAL
ACTIVITY
HAZARDS
A) Health impairment.
B) Fire/explosion.
C) Environmental impact.
CONTROL MEASURES
1) Assessments on the hazards and risks to health by potentially harmful substances will be carried
out. These assessments will detail the control measures that will be taken to reduce risks to
health.
2) Material safety data sheets and assessments of the risk and necessary control measures will be
in place prior to the work being carried out.
3) Personnel will be instructed to take appropriate precautions to protect their health from the
hazards. Training will be given in the correct use and maintenance of personal protective
equipment.
4) Hazardous substances will be stored in a safe manner. Materials will be segregated in accordance
with good practice e.g. keeping oxidizing and reducing agents apart.
5) Contingency arrangements will be in place to initiate the spillage of any hazardous substance.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 171 of 207
GENERAL
ACTIVITY
HAZARDS
A) Manual handling
B) Damage to body parts
C) Occupational health problems
CONTROL MEASURES
1) Personnel engaged in the removal of waste material will wear gloves, safety footwear and safety
helmets.
3) Heavier waste e.g. steel off-cuts, drums etc. will be removed using mechanical plant e.g. fork lift
truck, excavator etc.
5) Waste material classified as hazardous will be removed by a contractor classed as competent for
the task.
6) Hazard Analysis and Control Programme sheet n° 11 will be followed for the handling of any
hazardous waste.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 172 of 207
TEMPORARY WORKS
ACTIVITY
ERECTION OF SCAFFOLDING
HAZARDS
CONTROL MEASURES
2) Safe means of access/egress to be provided and maintained for the scaffolders carrying out the
erection work.
3) Suitable and sufficient material will be available in order for the scaffold to be erected properly.
4) Scaffolders will wear gloves, safety footwear, safety helmets and safety harnesses during scaffold
erection activities.
5) Scaffold components will be lifted using safe techniques. (Components will not be thrown up to
the scaffolder nor to the ground).
6) Unauthorised personnel will be excluded from the area where scaffold erection is being carried
out.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 173 of 207
TEMPORARY WORKS
ACTIVITY
HAZARDS
A) Collapse of scaffolding.
B) Personnel falling from scaffolding
CONTROL MEASURES
1) Detailed consideration will be given to all scaffolding to ensure that it is properly planned and
erected to meet the working requirements, designed to carry the necessary loading and
maintained in a sound condition.
3) Regular inspections of scaffolding will be undertaken and recorded in order to ensure that the
structure is maintained in a safe condition.
4) Personnel working from scaffolds will be instructed not to interfere or alter an existing scaffold.
5) Effective actions will be taken by supervision in order to ensure that scaffolding defects are
rectified immediately e.g. guard-rails replaced, toe-boards replaced etc.
6) Only authorised scaffolders will be allowed to alter the scaffolding in any way. Supervision will
liaise with scaffolders in order to ensure that the co-ordination of scaffolding maintenance.
7) Incomplete scaffolding will be clearly identified and personnel will be prohibited from using this
structure.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 174 of 207
TEMPORARY WORKS
ACTIVITY
DISMANTLING OF SCAFFOLDING
HAZARDS
CONTROL MEASURES
2) An assessment (by the supervisor in charge) of the best method of dismantling the scaffold will
take place that reduces overall risks, risk at falling material and maintenance of the stability of the
structure.
4) Working platforms will be dusted and cleared of all materials and debris before dismantling
commences.
5) All possible access to the dismantled sections of scaffolding should be barred and a warning sign
displayed.
6) Scaffold materials will be lowered carefully. The ‘bombing’ of scaffold materials will be strictly
prohibited.
7) Surplus boards and fittings will be removed from the platforms as the work progresses and at the
end of each day.
8) Tubes and fittings will be stacked at ground level unless the first lift has been designed to support
the extra loading.
9) Unauthorized personnel will be excluded from areas where the dismantling of scaffolding is taking
place.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 175 of 207
CIVIL WORKS
ACTIVITY
EXCAVATION
HAZARDS
CONTROL MEASURES
1) Cable avoidance tool to be used prior to excavating in order to determine cable routes
4) Detailed study to be undertaken if excavation work is to be carried out adjacent to existing and/or
temporary foundations/buildings. Temporary shoring or supporting of structures in order to
prevent collapse to be approved and actioned prior to commencement of excavation.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 176 of 207
CIVIL WORKS
ACTIVITY
BACKFILLING OF EXCAVATIONS
HAZARDS
A) Collapse of excavation.
B) Physical injury due to proximity of plant.
CONTROL MEASURES
1) Only Contractor approved mechanical shovels are to be used to carry out this work.
2) Plant used to backfill excavations will carry current certification and will be maintained in a safe
condition.
4) Banksmen will be used to control the backfilling operation in order to prevent plant working too
close to the excavation edge.
5) Unauthorized personnel will be excluded from areas where the backfilling of excavations is taking
place.
6) A survey of the area will be carried out to asses risks to any adjacent structures and/or utilities that
may exist. Operators will be briefed on any identified potential hazards.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 177 of 207
CIVIL WORKS
ACTIVITY
STEEL FIXING
HAZARDS
A) Falling material
B) Slips, Trips and Falls.
C) Manual Handling.
D) Cut injuries.
CONTROL MEASURES
1) Experienced and trained steel fixers will be used with adequate supervision provided.
3) Re-Bar will be lifted into the work area using certificated lifting equipment and tackle.
4) Re-Bar offcuts/wire will be removed in order to alleviate slips, trips and falls.
5) Steel fixers will use proper tools in order to assist in bar bending (type activities).
6) Tool box talks will be conducted emphasising the hazards of bar bending (pinch points) and
handling steel re-bar (sharp edges)
7) Exposed vertical bars e.g. pile CAPs that are sited in a manner that expose personnel to risk from
implement will be bent, covered or protected by some other means.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 178 of 207
CIVIL WORKS
ACTIVITY
HAZARDS
CONTROL MEASURES
1) Access for personnel to carry out work on shuttering to be planned. Safe means of access to be
provided at all times in order to prevent risk of falls from height.
3) Personnel to be provided with appropriate P.P.E during work with cement/concrete - gloves, rubber
safety footwear, R.P.E, hearing protection etc. Training to be given on hazards associated with
work with cement/concrete.
4) Hand and power tools to be properly maintained. Defective tools will not be used.
NOTE: Wash out area for concrete trucks to be identified to prevent build up of waste concrete.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 179 of 207
CIVIL WORKS
ACTIVITY
CONCRETE POURS
HAZARDS
A) Manual handling.
B) Defective plant/equipment.
C) Falling materials.
CONTROL MEASURES
1) Personnel placing concrete will wear suitable gloves/footwear and eye protection.
2) Plant and equipment used during concrete placing will be operated by trained and authorised
personnel under close supervision.
3) All plant and equipment will carry current certification and be maintained in a safe condition.
Defective plant/equipment will be removed from service and effective remedial actions taken. Only
Company approved plant/equipment will be used.
5) Unauthorized personnel will be prohibited from entering areas where concrete placing activities are
being undertaken.
6) Access across re-bar fixing will be maintained with timber boardings to provide a sale access and
place of work.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 180 of 207
CIVIL WORKS
ACTIVITY
ERECTION OF FENCING
HAZARDS
A) Fall of material.
B) Manual handling.
C) Slips, trips and falls.
CONTROL MEASURES
1) The erection of fencing will be carried out by personnel who have been briefed in the correct
method of work..
4) Posts will be lifted with mechanical assistance in order to alleviate manual handling.
5) Personnel will wear gloves, safety footwear and safety helmets during the work.
6) Training will be given on the hazards associated with work with cement/concrete.
7) Permit(s) to work will be required when working adjacent to overhead lines, underground utilities
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 181 of 207
CIVIL WORKS
ACTIVITY
FABRICATION OF GATES
HAZARDS
A) Falling materials.
B) Fire and explosion.
C) Damage to body parts.
D) Electric shock.
CONTROL MEASURES
1) Gate fabrication will be carried out by personnel who have been familiarised with the requirement
for safe working practices.
2) Personnel will wear gloves, safety footwear and welding goggles with the correct filter during this
work.
3) Welding will be carried out in dry conditions and in accordance with the requirements of the Hazard
Analysis and Control Procedure 007.
4) Gas cutting will be carried out in accordance with the requirements of the Hazard Analysis and
Control Procedure 009.
7) Oxy/Acetylene sets will be sited in an adjacent location with valve keys fitted and secured upright.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 182 of 207
CIVIL WORKS
ACTIVITY
ERECTION OF GATES
HAZARDS
A) Fall of gate.
B) Damage to body parts.
C) Manual handling.
CONTROL MEASURES
4) The lifting of gates into position will be undertaken using suitable lifting tackle and equipment.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 183 of 207
CIVIL WORKS
ACTIVITY
ROCK DRILLING
HAZARDS
CONTROL MEASURES
1) Cable avoidance tools to be used prior to rock drilling in order to determine presence of live
cables.
5) Personnel carrying out drilling work will wear safety helmets, gloves, safety footwear, eye and
hearing protection.
6) Unauthorised personnel will not be allowed in areas where rock drilling is being undertaken.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 184 of 207
CIVIL WORKS
ACTIVITY
ROCK BLASTING
HAZARDS
A) Use of explosives.
B) Noise.
CONTROL MEASURES
2) Before explosives are used a written system of work will be prepared. Personnel involved in the
blasting operation will be made aware of the safe systems of work prior to be followed.
Consideration will include: blast mats, audible alarms, site inspection and communications.
3) Sentries and visual warning signs will be posted around the area likely to be affected by the blast.
4) Effective actions will be taken to ensure that the danger area is clear of all personnel/animals
immediately before firing occurs.
5) An audible means of giving warning that a shot is about to be fired and to sound the all clear, will
be provided.
6) The police site personnel and other relevant parties will be notified of shot firing times.
7) Existing foundations/pipes in the vicinities of the rock blasting will be protected by shoring.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 185 of 207
MECHANICAL WORKS
ACTIVITY
ERECTION OF STEELWORK
HAZARDS
CONTROL MEASURES
1) Steel erection will be carried out by trained and competent personnel working under supervision.
2) Method statements detailing the proposed erection schemes will be produced. These method
statements will identify hazardous site features and other aspects likely to impair safe erection.
The proposed methods for ensuring the stability of the framework and its components during
erection and until completion will also be addressed.
3) Steelwork will be lifted into position using suitable certificated lifting tackle/equipment.
5) Personnel will wear gloves, safety footwear and safety helmets. Safety harnesses will be worn
and attached to a secure anchor point when erection work is being undertaken..
7) Good housekeeping standards will be maintained in areas where equipment erection is being
undertaken.
8) The area of the site affected by erection operations will be designated as a restricted area:-
barriers and notices will be erected to prohibit entry to non-erection personnel.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 186 of 207
MECHANICAL WORKS
ACTIVITY
HAZARDS
A) Manual handling.
B) Trapping.
C) Slips, trips and falls.
CONTROL MEASURES
1) Installation will be carried out by trained and competent personnel working under supervision.
2) Heavy fittings will be lifted using suitable certificated lifting tackle/equipment and tag lines.
3) Personnel will wear gloves, safety footwear, safety helmets and eye protection.
5) Good housekeeping standards will be maintained in areas where installation work is being
undertaken.
6) Pipelines will only be installed on structures which have been vetted as mechanically complete or
are safe to work from.
7) Rigging studies will be prepared for spoil pieces/valves etc. Being placed inside structures of
limited access.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 187 of 207
MECHANICAL WORKS
ACTIVITY
HAZARDS
A) Defective equipment.
B) Overloading of vehicles.
CONTROL MEASURES
3) Licensed and experienced operators will be used to carry out this activity.
4) The loading of equipment will be carried out in accordance with Company approval.
6) Rigging/Crane studies will be undertaken (if required) to ensure the lifting operation is carried out
in a controlled and effective manner utilising any existing lifting points provided.
7) The weight of any such load will be determined to ensure that overloading is prevented.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 188 of 207
MECHANICAL WORKS
ACTIVITY
RADIOGRAPHY
HAZARDS
A) Exposure to radiation
CONTROL MEASURES
1) Site radiography will only be carried out only by competent and experienced radiographers.
2) Site radiography will be carried out in accordance with the procedure for site radiography set out
in Company HSE Manual.
4) Emergency equipment e.g. local shielding, sand bags, tongs to be provided on site.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 189 of 207
ELECTRICAL INSTALLATION
ACTIVITY
ELECTRICAL WORK
HAZARDS
CONTROL MEASURES
1) Electrical work will be carried out by trained and competent electricians. These persons will have
the technical knowledge and experience to understand the hazards which may arise during the
work and the precautions which need to be taken.
2) Work on live conductors, or on electrical equipment which has been made dead will be carried out
only under an appropriate permit to work procedure.
3) Safe means of access will be provided for electricians required to work at height e.g. ladders,
scaffold towers etc.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 190 of 207
ELECTRICAL INSTALLATION
ACTIVITY
HAZARDS
CONTROL MEASURES
2) Vehicles to be sited with regard to site traffic and area for off loading to be barriered off.
3) Cable drums to be loaded/off-loaded using slings of an adequate safe working load. This
operation is to be carried out by experienced and competent personnel.
5) Cable drums will be located on cable jacks designed for purpose and of a suitable capacity and
base.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 191 of 207
ELECTRICAL INSTALLATION
ACTIVITY
CABLE PULLING
HAZARDS
CONTROL MEASURES
3) Personnel to be instructed in cable pulling techniques, including the requirement for ensuring good
manual handling techniques are adopted.
4) Assessment of the weight of cable to be pulled and numbers of persons required to be defined.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 192 of 207
ELECTRICAL INSTALLATION
ACTIVITY
HAZARDS
CONTROL MEASURES
4) Personnel will be trained in cable laying/cable termination techniques, including the requirements
for ensuring good manual handling techniques are adopted.
5) Cable terminations will be carried out by trained and competent personnel using suitable tools.
6) Permit to work system to be followed to ensure that glanding and termination of cables are on
electrically isolated panels.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 193 of 207
MECHANICAL PRECOMMISSIONING
ACTIVITY
PRESSURE TESTING
HAZARDS
CONTROL MEASURES
1) Pressure testing of piping will only be carried out by competent and experienced personnel.
2) The pipework under test and the surrounding area will be barriered/cordoned off and suitable
warning signs will be displayed.
3) Personnel will be instructed not to enter areas where pressure testing is being undertaken.
5) All fittings e.g. sight glasses, gauges, bursting discs, likely to fail under test pressure to be
removed.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 194 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 195 of 207
The purpose of this procedure is to ensure that all incident/accident are reported in
a logical and consistent manner, to give guidance on the preparation of Accident
Reports and to capture all information necessary to identify the causes. It is also to
prescribe and implement suitable actions to prevent re-occurrence of similar
incidents.
The procedure establishes a written method of investigation for:
Any accidents/incidents on the NGL-4 Project areas and within QGPC premises
shall conform to this procedure.
2.0 REFERENCES
3.0 DEFINITIONS
Note: all accidents are incidents, all incidents are not accidents.
For the purposes of this procedure the accidents as above defined are classified as
follows:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 196 of 207
Category III Restricted work cases, medical treatment cases (no lost time).
Damage in excess of US$ 500 (inclusive) to properties, plants, etc.,
or minor environmental impact.
Tripod accident causation method helps to determine root causes and weakness
efficiently and quickly. This method may be used as decided by the Field HSE
Coordinator at the scene of the incident.
The following list summarizes the series of steps in the analysis process and help to
build an accident investigation tree:
Review accident report and broadly classify all items of Factual evidence into
one of the five main levels.
Build accident investigation tree from classified facts highlighting any lack of
information.
Identify breached defences.
Identify unsafe acts and categorise human errors/violations.
Determine the preconditions surrounding each unsafe act.
Identify the latent failures and categories into the General Failure Types.
Identify the decision behind the General Failure Types.
Seek out missing information and repeat the process.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 197 of 207
5.0 INVESTIGATION
5.1 Purpose
Every incident should be investigated, although the level of investigation and detail
of investigation will vary and will depend on the actual or potential injury, damage or
loss.
Immediately upon notification of a fatality (Category I), the Resident Manager shall
set up an Investigation Committee with the following members:
For any another incident, the Resident Manager shall decide if the investigation will
be carried out by a specific committee. This committee shall be composed by:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 198 of 207
At the initial stage the Committee will gather and record all the facts which may be
of interest in determining causes. They should avoid reaching conclusions too early
in the investigation process, and base their results on positive factual findings.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 199 of 207
Note: Unsafe act should describe the acts or omissions which led directly to the
incident.
Unsafe conditions should describe the situation, systems, equipment or any other
attribute that should have been provided to prevent the incident.
The preconditions that led to the unsafe act or condition may include, but not limited
to, the following:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 200 of 207
The general failure types found in the incident causation chain can be listed as
follows:
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 201 of 207
The root causes listed above have been identified as the general and latent failures
attributable to organisations that lead to accidents. It should be noted that these
failures are generally the result of policy decisions and where possible these should
also be identified and form part of any actions taken to remedy the causation
factors.
A contract may be under bid to the point where insufficient allocation of resources
results, leading to the incident.
7.0 REPORTING
Based on the accidents classification, the reporting activities are summarized in the
table that follows.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 202 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 203 of 207
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 204 of 207
THE
ACCIDENT
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 205 of 207
ANNEX B
MDT.SZ.SC.4016
$ DAMAGE REPORT Rev 1
HYUNDAI Sheet 1 of 1 Date
Nov. ’96
SITE COMPANY IDENTIFICATION CONTRACT PROGRESSIVE
No. No.
Witnesses
......................................................................................................................................................................
......................................................................................................................................................................
(See sketch and photographs attached)
Causes of damage
......................................................................................................................................................................
......................................................................................................................................................................
Note : The part included within the bold lines shall be filled in by Contractor.
ANNEX C
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 206 of 207
MDT.SZ.SC.4015
$ ACCIDENT REPORT Rev 1
HYUNDAI Sheet 1 of 1 Date
Apr. ’97
SITE COMPANY CONTRACT N. PROGRESS. N.
Place of accident Date of accident Hour After w.h. Date of leave Hour
from work
Witnesses
........................................................................................................................................................................
........................................................................................................................................................................
(See attached sketch and photo)
Date Signature
Safety engineer remarks
........................................................................................................................................................................
........................................................................................................................................................................
Date Signature
Company representative remarks
........................................................................................................................................................................
........................................................................................................................................................................
Date Signature
Resident Mgr./Construction Mgr. remarks
........................................................................................................................................................................
........................................................................................................................................................................
Date Signature
RECEIVED AT HOME OFFICE REF.
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.
QATAR GENERAL PETROLEUM CORPORATION
Job N° Doc N°
NGL – 4 EPC PROJECT GTC–146/98 PR-0000-90-02003
@$ Location
QATAR
Job N°
306300
Doc N°
00-AS-E-02003
Plant Doc Class : 1 0 1 A
GENERAL Rev.
Sh 207 of 207
ANNEX D
Report No. Date of Incident
FINAL INCIDENT/ACCIDENT
INVESTIGATION REPORT
Type of Incident: Categories:
Personal Injury Property Damage 1° 2° 3° 4°
Description of Incident
Injury Report:
Surname First Name(s)
Date of Birth Company
Description of Injury/Illness
Immediate Causes:
Basic Causes:
Root Causes:
Investigation Team:
Name Signature Position Company
_______________________________
Form code: MDT.GG.QUA.0005 Sh. 01/Rev. 3.96 File code Data file: 384932034.doc
This document is the property of Joint Venture SP/HY who will safeguard its rights according to the civil and penal provisions of the law.