ESTIMATING
MODULE 4
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law.
COMPILING RATES / PRICES
Contents:
• Pricing an estimate compared to
pricing a tender
• Direct costs
• Indirect costs
• Preliminaries and General (P&G)
• Allowance for overheads, profit
and attendance
• Checking your numbers
• Adjustment of rates
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law. 2
Pricing an estimate vs a tender
• To price an estimate you need to know the current prices
for specific trades in a specific location. These prices include
supply, delivery, installation, labour, plant, tools, profit etc.
• To price a tender you need the detail of each rate / price for
a specific location:
o Supply,
o Delivery,
o Installation,
o Labour,
o Plant,
o Tools,
o Profit, etc
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law. 3
Direct costs
• Labour
• Materials
• Plant and Equipment
• Sub contracts
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law. 4
Labour costs
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law. 5
Material costs
• Product cost (R)
• Procurement costs (Someone must order it / tender it)
• Delivery costs (Is it included in the; list price?)
• Handling costs (Offloading)
• Storage costs (Containers etc)
• Waste & Shrinkage (Plaster, layer works, etc)
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law. 6
Plant cost
• External hire costs
• Fuel costs
• Operator costs
• Operator accommodation etc
• Maintenance
• Standing time
• Availability
• Utilisation
• Efficiency
• Productivity
• Internal hire costs
• Include other projects in your planning
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law. 7
Subcontractor costs
• Miscellaneous Items
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law. 8
Indirect costs
• Preliminaries
• Performance guarantee
• Insurance
• Payment guarantees
• Scaffolding
• Batch plant
• Tower cranes
• Vehicles and large equipment
• Small tools
• Maintenance
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law. 9
Preliminaries and General
P & G’s are defined as those expenses which are incurred before
work in producing the project deliverable commences, together
with those costs that are non-specific to a particular Bill or
Activity list item. P&G cost therefore represents those costs
which cannot be reasonably allocated to any specific identified
activity on a project. In this regard the international Webster
comprehensive dictionary defines the word preliminary as
“antecedent or introductory to the main business” and defines
the word general as “pertaining to including or affecting all of
the whole; not local or particular”. The term originates from
civil engineering industry where those costs which are not
attributable to a specific bill of quantity item rate or cost were
collected under the heading “P & G expenses.”
J.A. Kruger & Associates
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law. 10
Preliminaries and General
©2018 Copyright Alusani Skills & Training Network®. All Rights Reserved.
The format, design, content and arrangement of this document constitute a trademark of Alusani Skills & Training Network®.
Unauthorised reproduction will be actionable under South African law. 11
Preliminaries and General
Len Holder
Tel: 011 447 7470
Web: www.alusani.co.za
14