Agreements:

A. FINAL SITES FOR RLTA TRAINING

1. Bohol - will host CAR, Region 5


Resource Persons: ARD, PENRO, Mr. Canda and Ms. Len

2. Cebu/Consolacion - will cover Region 7 pilot sites

Resource Persons: Engr. Hormachuelos, Ms. Lucifina Bardoquillo, Chris Cabilugan, Engr. Marina
Bayron
3. Bayawan, Negros Oriental
- will host MIMAROPA and Region 1 (if necessary)
- Maricor Katada, Elie Mapili, PENRO Charlie
4. Agusan Del Sur
- will host Region 13. If Agusan backed out,
- Engr. Lea, LMO Mamerto Alvarez
5. Bukidnon
- will host Region 9. In case Bukidnon backed out, Region 9 can go to Cebu
- ARD Paquito Melichor, Ms. Sarah, Norberto Aparicio, Arnulfo Magadan,

NOTE: Leyte for Leyte Pilot Site – Patrick Catada, Malou Abucot, Winston Sulite
Instruction: Confirmation with Region 1 (Mam Shiela), Agusan, Bukidnon

B. REQUIREMENTS FOR IMMERSION SITES

1. Should have a good working MOPA on the site


2. Preferably with ongoing CM prep, S.A or RLTA activities
3. Participants can observe a Barangay Assembly
4. 2 days of actual conduct in interview/census

C. 6 days training (Monday to Saturday) 2 days lecture, 2 days actual interview, 2 days ????
D. CM Preparation – hiring of a technical person who knows about mapping
- Actual CM preparation
E. Scope of terms and reference of the hired personnel
- The responsibilities and scope of work of the hired encoder must be expressly
specified/explained
- 1 month is not sufficient to accomplish the encoding of data. Suggested is 2 months as per
Sir Henry
F. Third option: to digitized the cadastral map (2-3 days)
- Scanned maps will be given to LGUs as per Sec. Cimatu
G. Pilot areas must be assessed first
H. Requirements for Pilot Municipalities for RLTA
1. Availability of Cadastral Data:
- Cadastral Maps – should be outside timberlands
- List of Claimants
- Land Data
- Status of the Lots/Lot Allocation Book (CENRO)
- The pilot municipality should have initial potential of 1500 untitled lots
I. Data must be already encoded in LAMS
J. Must have existing working MOPA
K. Participants
1. Regional Office – LPDD Chief, Planning and SMD
2. PENRO – DMO III, Technical Division Chief
3. CENRO – LMO III, LMI,
4. LGU – 2 representatives for LGU partner (assessor and DPLI)

INSTRUCTIONS:

A. 5 Day Training Plan

Day 1 – Lecture on CCM, LTP, Community Mobilization (Barangay Officials), RLTA, Barangay
Assembly, Barangay Exit
Day 2 – Barangay Consultation with option to proceed to interview
Day 3 & 4 – Continuation of house-to-house interview census, presentation of RLTA output
Day 5 – Reflection, observation and strategizing

B. Resource Person
- Arrangement of travel, accommodation
- Training will be conducted on the 3rd week of May up to 1st week of June

C. Terms of Reference for Encoders/Researchers, CDA, and Enumerators – refer to LAMP Manuals
D. Transportation costs during the immersion
E. HONORARIUM for the resource person
F. Lecture Materials (PPTs) – must be standardized. c/o Mam Len and Mam Diana
G. Reporting arrangements

Agenda for tomorrow:


a. Finalizing the budget
b.
2018 2019 2020 2021

Target – 45,000 parcels 31,000 parcels

RLTA – 8 regions doing 8 RLTA – Other municipalities


municipalities
Accommodate the 8 regions
for training

8 others doing RLTA to all


municipalities

P600 Million budget for RLTA P4.5 Billion budget


Identify lots for subdivision LAMS Data Capture must be
completed

Very accurate determination


of remaining potentials