1 Lighting
1.1 Lighting requirements for site accommodation, mess hut, stores etc. P P
1.2 Lighting requirements for work area P
2 Power
2.1 Power requirements for site accomodation, mess huts, stores etc. P P
2.2 Power requirements for work area P
a. 110V single phase supply
3.1 Messing/Cooking P P
3.2 Toilet P P
3.3 Shower
3.4 Maintenance of above throughout contract P P
3.5 Consumables required for operation P P
4 Office Accommodation
4.1 Site Office
7 Hoisting Facilities
7.1 Static Hoist
8 Uploading/Handling Facilities
8.1 Labour to unload plant and material deliveries to site
8.2 Labour to distribute plant and material over the site area as required, including necessary plant
8.3 Mechanical uploading
8.4 If Balfour Beatty have agreed to unload etc, the sub-contractor is to provide full details of
deliveries to our site management at least 24 hours in advance
9 Water for Works
10.2 To container/skip
12 Safety Requirements
12.3 The sub-contractor is to comply with any instruction from our Health Safety Officer or his
representative on site
13 Scaffolding
NB: For scaffolding sub-contracts, a separate scaffolding schedule should be attached covering
the following points
a. Drawings
b. Testing certificate
c.Take-Over certificate
d. Compliance with all regulations
g. Full boarding
h. Period of hire
I. Take-Over dates
j. Value
k.Extra over hire
a. Provision
b. Use of
c. Responsibility for safety
14 Protection
14.1 Protection of other contract works by all and any necessary means
14.2 Protection to public and adjacent properties by all and any necessary means to the clients
satisfaction P P
Page 1 of 1