PRO BOARD TECHNOLOGY SERVICES CORP.

CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

SUBCONTRACTOR CHECKLIST
Project:
Client Name: LOCATION:
________________________________ _______________________________

Contractor:_________________________________________________________________________
Subcontractor:______________________________________________________________________
Date Start: Target Date of
__________________________________ Accomplishment:_______________________________

ARCHITECTURAL:
 HOUSE CONSTRUCTION (LIVABLE AND USABLE AREAS
 LANDSCAPING
 FENCE AND GATE
 OTHERS (PLEASE
SPECIFY):____________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________

GROUND FLOOR

TOTAL SQM
AREA(s) FINISHES AND INCLUSIONS (Measured
wall to wall)
GROUND FLOOR
 LIVING AREA
Flooring
-Use 60 x 60 cm Vitrified Tiles (Color/ Design refer to
swatch(s) given.
-Use Tile adhesive
-Use tile grout

Ceiling:
Cove layout ( see working drawings for details)
Use gypsum board ______ mm THK.
Use metal furring for framing.
Use skim coat for finishing
Use flat white paint.

Walls:
PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

@ Exterior Walls
Use 6’’ CHB plastered finish
Use skim coat
Use flat white latex paint primer
Use semi-gloss paint for finishing
Rebars: Specified @ drawings.

Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.
Use Royu brand switches and convenience outlet
(No. Will be based on drawings, BOM and BOQ
given.)
-Include panel Board.

 DINING AREA Flooring:


-Use 60 x 60 cm Vitrified Tiles (Color/ Design refer to
swatch(s) given).
-Use Tile adhesive
-Use tile grout

Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.

@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).

Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.

Electrical:
Roughing-in based on schedule and lay-out based on
PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

electrical plans,load computation and schedule


shown @ drawings.

 KITCHEN AREA FLOORING:


-Use 60 x 60 cm Vitrified Tiles/Non- Slip Tiles (Color/
Design refer to swatch(s) given.
-Use Tile adhesive
-Use tile grout

Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.

@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).

Ceiling:
Flat Ceiling
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.

Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.

Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

BOQ and Working Drawings.

Inclusions:
-1.80 li. mts. Cabinets
-Use ¾ “ Marine Plywood
- Use Laminate Finish (Color/ Design refer to
swatch(s) given).
-1.80 li. mts. Hanging Cabinets
-Use ¾ “ Marine Plywood
- Use Laminate Finish (Color/ Design refer to
swatch(s) given).
-Fixture Inclusion
1-sink (Single-Tub w/ Drain)
1-Single lever kitchen faucet (gooseneck)

 POWDER ROOM/ Flooring:


T&B Use 30 cm x 30 cm non-slip tiles (Color/ Design refer
to swatch(s) given.)
-Use Tile adhesive
-Use tile grout

Walls:
-Use 4’’ CHB wall
-Use 30 cm x 60 cm glazed tiles (Color/ Design refer
to swatch(s) given.)for Finishing
-Use tile adhesive
-Use tile Grout

Ceiling:
Flat Ceiling
-Use 3.5 mm THK HardieFlex or approved as equal
plaster board.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.

Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
Shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.

Plumbing:
PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

-Use specified sanitary pipes and fittings @ BOM,


BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.

Inclusions: (Cool or Pozzi Brand or Approved as


equal)
Fixtures:
Wall hang lavatory
Water Closet
Bidet Spray
Faucet ( Single handle basin mixer faucet) as
indicated number(s)
Telephone Shower (if included @ draings)
Appurtenances:
Soap and Tissue Holder
Fittings

Flooring:
Concrete Pavement
@ Counter top 60 cm X 60 cm tiles
 SERVICE AREA @Depressed at sink area

PLUMBING:
-Hose bibb and roughing-in
 PORCH Concrete pavement
 LANAI Concrete pavement
Flooring:
Concrete Pavement
 CARPORT
PLUMBING:
-Hose bibb and roughing-in
 MAID’S ROOM
Flooring:
- HDF Wood Laminate 194 x 1212 x 8mm
(color/design as per approved swatch of client) -Use
–Use adhesive based on installation process
required.

Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.

@Interior Walls
PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

-Use 6 mm HardieFlex or approved as equal drywall


-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).

Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.

Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.

 MASTER Flooring:
BEDROOM - HDF Wood Laminate 194 x 1212 x 8mm
(color/design as per approved swatch of client) -Use
–Use adhesive based on installation process
required.

Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.

@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).

Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

-Use flat white paint.

Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans, load computation and schedule
shown @ drawings.

 MASTER WALK IN Flooring:


CLOSET - HDF Wood Laminate 194 x 1212 x 8mm
(color/design as per approved swatch of client) -Use
–Use adhesive based on installation process
required.

Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.

@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).

Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.

Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.

INCLUSIONS:

1.2 MTS WIDTH CABINET


-Use ¾” Marine Plywood
-Use Laminate for finish ( Color /Design as approved
swatch)
PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

 MASTER T&B Flooring:


Use 30 cm x 30 cm non-slip tiles (Color/ Design refer
to swatch(s) given.)
-Use Tile adhesive
-Use tile grout
-Use waterproofing

Walls:
-Use 4’’ CHB wall
-Use 30 cm x 60 cm glazed tiles (Color/ Design refer
to swatch(s) given.)for Finishing
-Use tile adhesive
-Use tile Grout

Ceiling:
Flat Ceiling
-Use 3.5 mm THK HardieFlex or approved as equal
plaster board.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.

Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
Shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.

Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.

Inclusions: (Cool or Pozzi Brand or Approved as


equal)
Fixtures:
Pedestal type lavatory
Water Closet
Bidet Spray
Faucet ( Single handle basin mixer faucet)
Telephone Shower

Appurtenances:
PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

Soap and Tissue Holder


Fittings

Flooring:
- HDF Wood Laminate 194 x 1212 x 8mm
(color/design as per approved swatch of client) -Use
–Use adhesive based on installation process
required.

Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.

@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
 __ BEDROOM (S) Room(s).

Ceiling:
Flat Ceiling
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.

Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans, load computation and schedule
shown @ drawings.

INCLUSIONS:

0.80 MTS WIDTH CABINET


-Use ¾” Marine Plywood
-Use Laminate for finish ( Color /Design as approved
swatch)

 COMMON T&B Flooring:


PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

Use 30 cm x 30 cm non-slip tiles (Color/ Design refer


to swatch(s) given.)
-Use Tile adhesive
-Use waterproofing
-Use tile grout

Walls:
-Use 4’’ CHB wall
-Use 30 cm x 60 cm glazed tiles (Color/ Design refer
to swatch(s) given.)for Finishing
-Use tile adhesive
-Use tile Grout

Ceiling:
Flat Ceiling
-Use 3.5 mm THK HardieFlex or approved as equal
plaster board.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.

Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
Shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.

Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.

Inclusions: (Cool or Pozzi Brand or Approved as


equal)
Fixtures:
Pedestal type lavatory
Water Closet
Bidet Spray
Faucet ( Single handle basin mixer faucet)
Telephone Shower

Appurtenances:
Soap and Tissue Holder
Fittings
PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

 BALCONY FLOORING:
-Use plain concrete pavement
-Use waterproofing
RAILING
-Use 2” x 2” tubular painted.
 ROOFING -Use gauge 24 pre-painted long span roofing.
-Use reflective bubble insulation.

 WINDOWS -Use 6mm THK. Anneal glass (or shaded) in


Aluminum Frame Powder Coated
- Note: In larger span of glass 6 mm Tempered Glass
must to use.
 STAIRS -Concrete Stairs
-Use Wood Planks on stair treads.
-Use 2”X2” tubular railing or s specified to drawings.
-Use Wooden millwork on handrail top
 EXTERIOR As shown in drawings
FINISHING Note: This may include claddings, wood and tiles.
 EAVES -Use 3.5mm THK HARDIEFLEX OR APPROVED AS
EQUAL PLASTER BOARD.
-Use plain White Paint/ Wood Stain if specified.

 DOORS -As reflected to the Schedule of doors and windows.


NOTES:
PRO BOARD TECHNOLOGY SERVICES CORP.
CONSTRUCTION DEPARTMENT
Blk. 22 Lot 5 Annex A, Complex Special Economic Zone,
Carmona Cavite, Philippines 4116
www.pbts-tech.com

Construction of _____________________________________________________________________
(Project Nature)
At ________________________________________________________________________________
(Location)

SUB-CONTRACTOR AGREEMENT

THIS AGREEMENT is made ___________________between _________________________________


(Date)

____________________________________________________ (Hereafter, called “CONTRACTOR”),


(Company Name and Address- Main Contractor)

and_______________________________________________________________________________
(Company Name and Address- Sub-Contractor)

(Hereafter, called “THE SUB-CONTRACTOR”), of the mentioned part above.

In consideration of payment to be made by the Contractor to the Sub-Contractor, the Sub-Contractor


hereby covenants with the Contractor to execute, complete and maintain the Sub-Contract works in
conformity in all respects with the terms and conditions of this Agreement.

In WITNESS thereof the Contractor and the Sub-Contractor have hereunto set their respective hands
the day and the year first above written.

Authorized Signatory Authorized Signatory


On Behalf of the Sub-Contractor On Behalf of the Contractor

____________________________ ____________________________
Printed Name and Signature Printed Name and Signature

Das könnte Ihnen auch gefallen