TEMPORARY RETAINING SECANT PILE WALL : CHURCHGATE STATION
Pile dia 0.8 m
Spacing Of Secant Pile 1.3 m
2 SECANT BORED PILE WALLS
Transport piling plant and equipement to site; set up, 2.1 1 Sum dismantle and remove upon completion. Movement of plant and equipment to each pile 2.2 position, including setting up rig and all other 1 Sum necessary operations Bore female pile shafts in soil (free or not of boulders) 2.3 7,099 m 800 mm specified diameter Bore female pile shafts in weathered rock of 800 mm 2.4 2,710 m specified diameter Bore female pile shafts in hard rock of 800mm 2.5 451 m specified diameter Bore male pile shafts in soil (free or not of boulders) of 2.6 7,099 m 800 mm specified diameter Bore male pile shafts in weathered rock of 800 mm 2.7 2,710 m specified diameter Bore male pile shafts in hard rock of 800 mm specified 2.8 451 m diameter Concrete or bentonite/cement mix quality M10 in 2.9 5,157 m3 female pile shafts 800 mm specified diameter
Concrete mix quality M30 in male pile shafts 800 mm
2.10 5,157 m3 specified diameter Remove excavated material including loading and 2.11 depositing (m3 of in place material, without expension 10,314 m3 coefficient)