PPE's Required: Safety Helmet, Safety Shoes, Gloves, Glasses, and Dust Mask, Blasting
PTW NO.
Hood, Ear Muffs, Coverall
Step
Ensure workers involved in sand blasting are trained Conduction of tool box meeting before
Unskilled workers
and competant to carry out the job safely. commencement of job.
2 Sand Blasting
PPE's Required: Safety Helmet, Safety Shoes, Gloves, Glasses, and Dust Mask, Blasting
PTW NO.
Hood, Ear Muffs, Coverall
Step
2 Sand Blasting
Do not leave blasting equipment un-attended with air
Injury due to mishandling supply on. Ensure that blast gun is fitted with Prohibition of unauthorized personnel to stay in
blasting equipment emergency release handle (Dead man's handle) and it affected area.
is functional.
Shicago couplings and whip guard shall be ensured. Safety valve and dead man switch should be
Pressure Explosion
Hose fittings need to be secured properly. ensured.
Presence of blastinfg supervisor shall be ensured in the Conduction of tool box meeting before
Lack of communication area. A watchman shall be present to communicate with commencement of job. Safety signs for sand
blaster in case of emergency. blasting to be installed.
Sand Blasting
PPE's Required: Safety Helmet, Safety Shoes, Gloves, Glasses, and Dust Mask, Blasting
PTW NO.
Hood, Ear Muffs, Coverall
Step
PPE's Required: Safety Helmet, Safety Shoes, Gloves, Glasses, and Dust Mask, Blasting
PTW NO.
Hood, Ear Muffs, Coverall
Step
Wear safety goggles and hand gloves recommended in Conduction of tool box meeting before
Skin and eye irritation
MSDS. commencement of job.
4 Paint work
Doc. Version: 00
W.e.f: 20-3-2012
Risk Controls
meeting before
asting to be installed.
Doc. Version: 00
W.e.f: 20-3-2012
Risk Controls
meeting before
Safety signs for sand
Doc. Version: 00
W.e.f: 20-3-2012
Risk Controls
be present at the
ool box meeting before
Continuous Monitoring of
LEL Meter. Maintain log
g. Safety signs for sand
meeting before
Safety signs for sand
meeting before
Display MSDS in working
Doc. Version: 00
W.e.f: 20-3-2012
Risk Controls
meeting before
be present at the
ool box meeting before
Continuous Monitoring of
LEL Meter. Maintain log